Signed copy will be faxed.
bart
MCKEE Bart [BartM@subutiLcom]
Tuesday, March 31, 2009 1:51 PM
MARKARIAN Molly
1072 Main Street Development Issues
1072 Main Street development issues 3-31-09.docx
1
R . ed' 9l2, d dl
Date ecelv ' .
Planner: MEM
03/31/2009 14:01 FAX 7477348
WSC FAX
~ 002/003
. -". ....
SPRINGFIELD'UTILlTY BOARD
W..\TER SERVICE CF.l\TER 202 South 18th Straet Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.subutil.com
March 31,2009
Molly Markarian
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Molly:
SUBJECT:.
DEVELOPMENT ISSUES MEETING #ZON2009-00007 SPRINGFIELD CHURCH OF
BRETHREN 1072 Main Street
17-03-35-41 TL 4700, 4800, 4900
Listed below are our comments for the above referenced development proposal:
I. The proposed development is within the Springfield city limits and cUlTently receives water
service from the Springfield Utility Board (SUB).
2. All new water system facilities and modifications to water system facilities both inside and
adjacent to the proposed development shall be placed in street right-of.way at a location and
depth of bury that meets the standards of the SUB Water Division.
3. All water facility materials shall be to a standard that must meet SUB Water Division
- specifications.
4. All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water Division and the long-range needs of the City, These needs include, but are not limited to,
meter iocation and access, sizes of water distribution and transmissjon lines, pumping facilities,
and communication lines.
6. If additional water service is required, please ask the developer to contact the SUB Water
Division for detailed information on the materials and construction standards, detailed costs for
installing SUB water facilities, and a schedule of construction. Construction expenses may be '
reduced with good planning of required water facilities, good timing of facilities installation; and
joint trench opportunities.
7, All water meters will be placed in public right-of,way at a location identified by the developer:
Each lot or parcel must have its own water service,
S:\SITEPLAN\I072 Main Street development issues 3-31-09.docx
Date ReceiVec:i:6) 6./ J 01
Planner: MEM
03/31/2009 14:01 FAX 7477348
WSC FAX
1;1] 003/003
.... ....
8. Water service facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to c~ge. Actual charges will be those in
effect at the time water service is requested.
9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes from wells. In every instance, care shall be taken to prevent groundwater contamination.
Contractors/developers/owners shall be responsible far the safe handling and storage of .
cheinicals, petroleum products, fertilizers, and the prevention of groundwater 'and storm water
runoff contamination.
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726.2396.
10.
'Backflow prevention devices will be required for this service, Please contact Chuck Davis at
726-2396 prior to installing water service. Chuck can help in the selection of the most
economical device and location. Water service will not be provided until a backflow plan has
been submitted to SUB Water Engineering and approved for installation. .
"
II. Fire Question #4 - The fire flow requirements will be established by the Springfield Fire
Marshall's office. There is no current flow informiltion available far the existing fife hydrant.
12. Fire Question #6 - Under current SUB policy a separate water service I required far each tax lot.
An exception may be applied far inwriting from the SUB Water Division Director. The,
backflow prevention devices must be installed above ground. The backflow.prevention devices
ate required by SUB's standards to be placed within 10' of the point of connection to the public
water system. A variance may be applied for in writing from the SUB Water Quality Manager.
13. Public W orkslEngineering Question #2 " The SUB water system at this location operates at a '
normal pressure of 50-55 psi. There may be an issue of adequate pressure"to provide required fire
flows to the 301 floar without a booster pump system. This question will need to be addressed as a
part of the onsite fife sprinkler system design.
PLEASE NOTE:
. SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.
Sincerely,
(] a...& L v'V\ c- Va 0
Bart E. McKee, P,E.
Senior Civil Engineer - Water Division
BEM:mt
cc: Carl Kern, ShelterCare, 1790 W 11th St Eugene OR 9702
Anne DeLaney, Bergsund DeLaney Architecture &. Planning 1369 Olive Street Eugene OR
97401 '
S:\SlTEPLAN\10n Main Street development issues 3-31-G9.docx