Loading...
HomeMy WebLinkAboutPermit Building 1998-12-2 ,. Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 980807 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 2280 MARCOLA RD Assessors Map #: 17032513 Tax Lot #: 01800 ~, ~" .. Owner: SPFLD FAMILY CLINIC Address: 1457 G STREET Phone #: 747-8576 City/State/Zip: SPRINGFIELD, OREGON 97477 Description Of Work: MEDICAL CLINIC NEW Value: Name Address Phone Architect: KENNETH NAGAO Canst. Contractor Contractor # Expires Phone General: MElLI CONSTRUCT 0063771 02/12/99 485-1417 10 VAN BUREN EUGENE OR 974020000 PI urOOing: TWIN RIVERS PLU 0017695 03/11/99 688-1444 PO BOX 40397 EUGENE OR 974040000 Mechanical: COMFORT FLOW 0000460 06/27/99 726-0100 1951 DON ST #D SPRINGFIELD OR 97477 Electrical: NEW WAY ELECTRI 0051088 06/29/99 686-2365 PO BOX 21503 EUGENE OR 974020409 0.00 --- PLUMBING --- NO. 57 Fee Charge 570.00 25.00 40.00 160.00 40.00 20.00 Single Fixture Sanitary Sewer 20 Water Service 106 Storm Sewer 916 106' FIRE LINE 2 BACKFLOW DEVICES ft. ft. ft. TOTAL PERMIT 855.00 --- MECHANICAL --- No. Fee Charge 102.00 4.50 48.00 10.00 16 Furnace/burner & vent < 1000,000 BTUs Mechanical exhaust hood and duct Vent Fan/Single Duct Permit Issuance TOTAL PERMIT 164.50 HANDICAP ACCESS: Y # OF BLDGS: 1 - - OFFICE USE QUAD AREA: 2CNW LAND USE: 5300 Item Square Feet x $/Square Feet Value Job Number: 980807 Page 2 Sq. Ftg Main 12533 1,200,000.00 TOTAL VALUE OF PROJECT 1,200,000.00 Plan Check Fee: 1,927.90 Rec #: 30620 Date: 07/01/98 Rec By: AL WARD BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PAVING VALUE 100,000.00 PLUMBING Surcharge/Admin ELECTRICAL CITY SDC FEES ~RC~I14??/':<-;/-~;rC?/~2/:77 PLAN REVIEW ADJUST 2,383.00 190.64 164.50 12,37 433.00 855.00 68.40 797.04 ~QO,ooo.oQ..) -378.95 SUBTOTAL PERMITS 14,525.00 TOTAL PERMIT FEES -ElKe-:''i'lH::. ~RICA!. 14.525.00 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any .following lI*ll work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code, FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. UNDERFLOOR PLUMBING - Prior to insulation or decking. ROUGH MECHANICAL - Prior to cover. ROUGH GAS - after line is installed and capped if not attached to an appliance WATER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench, STORM SEWER LINE - Prior to filling trench. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. GAS SERVICE - After line is installed and line has been connected to a minimum of one appliance. Pressure test done at this point. ROUGH ELECTRICAL - Prior to cover. ELECTRICAL SERVICE - Must be approved to obtain permanent power. Job Number: 980807 Page 3 FRAMING - Prior to cover. INSUL-V.B./SUB: TO BE CALLED FOR AT .SAME TIME AS SUB FRAMING INSPECT MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER DRYWALL - Prior to taping. FIREWALL - Located and constructed according to plans. ROUGH GRADING - After gravel is in place but prior to placing concrete FINAL PAVING - After paving is complete, FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. FINAL FIRE - When all Fire Department requirements have been met. been met. FINAL SITE PLAN - After all requirements have been met for Minimum Development Standards or from the Development Agreement. FINAL BUILDING - When all required inspections have been approved and the building is complete. --- ADDITIONAL COMMENTS --- DRC #98-06-123, PLANNER IS KITTI GALE DTC #98-06-123, KITTI GALE, PLANNER Plans Reviewed By: TOM MARX Building Site Reviewed By: LISA HOPPER Date: 08/12/98 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall 98 done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. ~ K ~/~fb-- Signature /2-Z../fg' Date -- - VALIDATION Receipt Number: '32:Z ~2 Date Paid: /'2 ~'2-95i? U"""~. - 2!> Amount Received: / ~~~. Received By: .~~. 11/20/98 RSu~ REAL PROP ACCOUNT SUMMARY , ACCT: 1517646 1998 A;ESSMENT YEAR COUN. LANE INDEX: F MAP EQ 17032513~800 ACCT X YRA X ACCT STAT: SEG,SADJ,PAYOR,POST ~~~P DESCR: 17 03 25 13-01800 NAME ADDR: L~uAL: PARCEL 2 PART PLAT 94-P0491 PROP ADDR: YRIA PROP CLASS 1.72 LAND IMPS TIMBER GROSS: EXMPTS: NET: L > YRLA 96 200 STAT CLASS ACRES CYCLE SAV 324,110 324,110 324,110 # LAST ACTIVITY 4 ZONE REAL MARKET 324,110 324,110 324,110 SPFLD FAM PRACTICE CL LLC 1457 G ST SPRINGFIELD OR RES NEIGH 405S0 COM NEIGH 10-22-98 CONTROL GROUP 152 LEVY CODE 19-00 TAX CERTIFIED: (RMV) 1998 YEAR TAX: TAX DUE 1998 YEAR: TAX DUE PRIOR YEARS: INTEREST AS OF 11-20-98 TOTAL BALANCE DUE: OLDEST DELINQUENT YEAR 13:45:47 97477 1900 4,280.90 4,280.90 2,853.94 2,853.94 1998 11,'-' -~. . ::f. " ~. I . . . I . I . . . . ~ ~ , I I I . JjJmJ~ tJ j;"..., + W' ! f?~~f/<iL. FUTlJRR TRAFFIC VOLUMES The existing traffic volumes were factored by a three percent per year growth rate to project the background (No Build) traffic volumes in 1999. Trip Generation Trip generation values for the pipeline project were developed from trip rates given in the Trio Generatioo manual, Sixth Edition, published by the Institute of Transportation Engineers (ITE), Trip rates were determined for each of the different land use zones. For the 67.5 acres of campus industrial, an industrial park (ITE Land Use 130) was assumed to occupy the site, Site acreage was used as the independent variable for the trip rates, The 42 acres of medium density residential was assumed to be developed at 20 units per acre (the maximum density allowed by City of Springfield code). This results in a maximum of 840 units on the site. For trip generation purposes, each of the units was assumed to be an apartment (ITE Land Use 220), The 6,9 acres of community commercial zoning was assumed to be developed by an office park (ITE Land Use: 750), Site acreage was used as the independent variable for the trip rates. As discussed previously, only 25 percent of the pipeline project is assumed to be completed in 1999. The trip generation values in this report retlectthis. A summary of the projected trip generation for the pipeline project is included in the Appendices. 1999 'No Build' traffic volumes with the pipeline project are shown on Figure 3, Trip generation values for the proposed medical office building (ITE Land Use: 720) were developed based on trip rates in the Trin Generatiol} manual, Sixth Edition. Based on this data' the proposed 12,533 square foot medical office building will generate 46 trips during the PM peak hour and 453 trips on an average weekday. ""\ t f\ N ~ v::> I Pn ! A D 7 , if o fir c:J trl )' :) nljlJ. ' ~ ..0. _._...__... ...-..--.----- \--- .... ---.- Branch Engineering - Page 4