Loading...
HomeMy WebLinkAboutCorrespondence APPLICANT 3/4/2008 , ~ , ~~;=;;'::i':~i;'~i~~t';~~"~'~"i...i:~~~~:':~';;",,::";,~, ,. ill( ARC HITECTU Rg1! Iir.. L _.~. -;: .., (541) 7724372 - P,O, Box 446Q . MEDFORD, OR 97501 . FAX: (541) 773-6523 . WWW,OR-ARCHITECTURE,COM March 4, 2008 Molly Markarian, Planner City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 ~~ ..,anner:MF.M<1:13J~ RE: Rosboro Lumber Minor Site Plan Modification DRc2007-00080 Dear Molly: This letter will address the Conditions of Approval for the above referenced planning and building action, Condition I: Update Final Site Plan Equivalent Map. Attached is the Final Site Plan Equivalent Map updated to reflect the changes proposed through the Minor Site Plan Modification, conditiqr,i 2: Propose and receive approval from Public Works for pretreatment upgrade on affycted stormwater system, Rosboro Lumber personnel have met with the City Public Works staff to propose a location to receive pretreatment. Location was approved and work is underway, Work will be complete within 60 days, Condition 3: Rosboro to install a minimum of21 bicycle spaces, 16 of which shall be covered, The Final Site Plan Equivalent Map has been updated to show the location, type and number of bicycle parking spaces, Installation work is ongoing and will be complete within 90 days. Condition 4: Rosboro to install' wellhead protection signage in conformance with SUB standards. Rosboro is currently working with Amy chinitz to locate the signs, Work .. will be complete within 60 days, I believe this addresses the outstanding conditions of appn;JVaL Sincerely, ~ ~ Mark McKechnie, AlA RosboroLumber