HomeMy WebLinkAboutPermit Plumbing 1998-8-26
.
CO M M ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
~
.
JOB NUMBER
f! I()(, 'f
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK' 700, r,
ASSESSORS MAP'
I'h<-<v I~ /(' / '
/76 ";'2-~/ .,
TAX LOT:
Ou 700
OWNER' VIII...l<-
ADDRESS: 2.oof .......~_<o
CITY- J 14....' -r ke IJ
:1.. '" j)"",,)/
,
/...
PHON~'
nJ
STATF'
6-Pt.
NEW
REMODEL
ADDITION
DEMOLISH
OTHER
~ZIP', ,'7'OJ
~'
"
, ,
ALUE:
,
"
DESCRIPTION OF WORK'
ARCHITECT'
NAME
Q"....!. N...(.tj
ADDRESS
PHONE
CONTRACTOR'S NAME
ADDRESS
CONST,
CONTRACTOR'
EXPIRES
PHONE
GENERA' '
PLUMBING' /{./o - .(., k-
11'7 a.-v' - /ok;,
~711(2
t8r-I7J/
MECHANICA"
ELECTRlr" '
I PLUMBING MECHANICAL I
I NO, FEE CHARGE ..n ~"" ('1-I6D('::I: I
I 'Furnace/burner& vent I
Single Fixture < 100,000 BTUs
I Relocated Bld9, Furnacel burner & vent I
(new fix, addul > 100.000 BTUs
I Water Service Floor furnace and vent I
It.
I ,/ Sanitary Sewer 2.<;"~ Suspended wall or floor I
J(; ,It. mounted unit heater
I Storm Sewer I Appliance Vent I
It. separate
I I Stationary evap. I
Backflow Device cooler
I I Vent Fan/Single I
duct
I' I Vent System apart I
from Ac or htg,
I I Mechanical exhaust I
hood and duct
I I I
I I Permit Issuance $10,00 I
I TOTAL PERMIT 2-) TOTAL PERMIT I
- OFFICE USE - HANDICAP ACCESS:
QUA'D~~1 r""""'Q,,,,,nn law reQuires youy~ NO U~"' FLOOD PLAIN:
.. - d t - d by the Oregon Ut,lify
. oFUll~rules a op e 1_ - are set f'oDl\1UNIT~' ZONING'
.t!otification Genter. ,"U"" 'u W R 952-8~- L\'OTICE'
OC'rX8~~52-Qn1_nn1nthrouahOA TR. TYP~,I~. L1GHTING'POWER BUDGET:
....""""'''!lu may obtain copies of the rules THIS PERMIT SHALL EXPIRE IF THE WORK
. O/Vtll"'''<I~ , lI'te-telephoiltlfAT SOURCF WATER 1:lE.A1:ER:
,..,,\linn the ceme.. \"~'::.:;,) I ~e::"~" ^' ITl-lnI'lm:n 11~lnFR THIS PERMIT I::; NU I '
numberforthe.ureQR'F.J:32_2344). $fSQ,.<<:r.MMENCEO OR IS ABAwatmEO FOR
Center IS 1-S'0'0-;J; \,U
SQ, FTG MAIN X ( .;tJY 180 DW.pE-RIC!:',
SQ, FTG ACCESS
SQ, FTG OTHER
X
X
TOTAL VALUE OF ,PROJECT
PLAN CHECK FEF RC PP DAT"
I BUILDING PERMIT ' PLUMBING
15% Slate 5% State
Surcharge SurcharQe
I MECHANICAL FENCE
VALUE L
15% State SIDEWALK
Surcharoe FT,
I PAVING, CURBCUT
FT,
BY
, DEMOLITION
SUBTOTAL
PERM ITS
SYSTEMS
, DEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDING ELECTRIC"' ,
7-7 ~
\
.
REQUIRED INSPECTIONS
.
It Is the responsibility of the permit holder to see that all Inspections are ~ade at .the prope~ time. To request 'an 'inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will b~ ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after?:OO ~.m. will be made
the following work day,
SITE INSPECTION:, To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be' covered until these
inspections have been made
and approved.
PAVING: After gravel Is In'
place but prior to placing
as phalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior 'to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing I,nspectlon,
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, 'chimneys
and vents are complete and
the rough electrical, plumbing
and mechanl,cal are approved.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during.
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
STRUCTURAL CONCRETE: In
excess of 2500 PS,I. (306 a,1)
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
plplng,'accessories and other
an .. equipment items are
n place but before any
concret Is placed.
STRUCTURAL WELDS:
Performed on the job, (2722 f)
(
UNO GROUND: Plumbing,
ele rlcal, gas, sanitary sewer,
st m sewer,water and
ralnage lines. To be made
prior to coverl ng or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor.
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied..
HIGH STRENGTH BOLTING:
Ourlng all bolt Installation and
tightening operations, (306
a,6)
SPRAYED ON
FIREPROOFING: U,BC,
Standards 43.8,
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor insulation, decking ,or
floor sheathing.
FIRE & SEPARATION WALL:
Located. and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
insulation, decking or floor
sheathing,
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished,
GLU.LAM BEAMS: Inspection
Certificate by an approved.
agency, furnished to the City's
Building Olvlslon before
beams are placed, (2501 U,BC,
STDS, 25-10,11),
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
/' decking or floor sheathing.
STRUCTURAL MASONRY: (306
a,7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415,
SIDEWALK.& DRIVEWAY:
Aequlred for all concrete
paving within street right'of
way, to be made after all
excavating complete ~nd form
work and sub-base material In
place.
ROOF SHEATHING AND
NAILING: Pilor to Installing
any roof coverl ng.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete. .
"In addition to the inspec.
ilons specified, the Building
Official may make or require.
other inspections of any
construction work to ensure
c9mpl1ance with the Building,
City or Development Code.
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days In advanc.e
of the date you wish inspection, All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection,
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
, Certificate of Occupancy has been Issued by the Building Division
and posted on the pr.emi~es.
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWEO BY'
OAT"
By signature,l state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO PCCUPANCY
will ,be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance with OAS 701.055 will be used on this project.
I further agree to ensure that ,all required Inspections are requested at the proper time, that project address Is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
::::t:~~lnv7d ~,' , ' Dato ~/;?~ /?S
VALIDATION:
AMOUNT RECEIVED' '2- 7
IY3/7-/I_
V'U
DATE PAID J/ 'Lt.l r::;;_
RECEIVED BY: ~fi{,J,
RECEIPT .'