Loading...
HomeMy WebLinkAboutPermit Electrical 1994-11-10 The,loHoY/lng project a9 submitted h09 the 10110\ zOning, and does not require specific land usa approval. 225 FIFTH STREET SPRINGFIELD, OREGON 97477 INSPEctION REQUEST: 726-mll 1\ -\ D -c,'( OFFICE: 726-3759 IJ Authorlrad Signature ~ Zoni:tg e.,u . 1. ~ ~~~~N ) , LEGAL DBSCRlI:I,ION ' \ \ 01_?~T..J CfJ \(Y) ~OB PlSClQZIIOH .' n f\ \ 0' {\.I,.) 1\"1) \ tUA.YJI Permits are non-transfel~e and expire if work is not started ~)ihin 180 days of issuance or if work is suspended for 180 days. ! 2. CONTRACTOR INSTALLATION ONLY B. Electrical contractor~~A cfd2:-#/C. Address ,,2 7$'.?.. /'~~e:z-/' City. &"'VPe/ Phone gf?5-.?2?? / -' Supervisor Licen,se Number .,25 -;ld-5 /tJ-7 :3 J 7J<:s- L / t)--9.3 Expi'ra don Da te Constr Contr. Number Expi'ration Date Signature of Sup~s~n~ Electrician , ~~--~ ~rs Name ~\r ~ _\~ _ 'Q.~ D. Addreft_~'\ TrwYY't\~ City~vttL{rt]hOne ' OVNER INSTALLATION The, installation is being made on property I own which is not intended for sale, lease or rent. Owners Signature: DATE: RECEIrI ,: RECEIVED BY: I/LP'_~ / J, ~ "lc,-' ~/..:,~/ '47- :.r....;:..... ELECTRICAL PERHIT APPLICATION ~J 'City Job Number A. "ONPI RTR VRR SCHEDULE BELOV New Residential-Single or '~' Hulti-Family per dwelling unit. ' " Service Included: , . Items Cost , m 1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Hanuf'd Home or Hodular Dwelling Service or Feeder $ 85.00 $ 15.00 $ 40.00 Services or Feeders Installation, Alterations or Relocation: 200 amps'or less 201 amps to 400 amps 401 amps to 600 amps 601 amps to 1000 amps 'Over 1000 amps/volts Reconnect Only $ 50.00 $ 60.00 $100.00 $130.00 $300.00 '$ 40.00 C. Temporary Services or'Feeders Installation, Alteration or Relocation 200 amps or less 201 amps to. 400 amps Over 401 to 600 amps Over 600 amps or 1000 $ 40.00 $ 55.00 $ 80.00 volts see "B" above Branch Circuits New, Alteration or Extension Per Panel One Circuit ~ $ 35.00 Each Additional Circuit or with Service or Feeder Permit 7 Al!!J, $ 2.00 ~ ._..!5 .,~. /Y.~ E. Hiscellaneous (Service/feeder not included) -Each installation Pump or irrigation $ 40.00 Sign/Outline Lighting $ 40,00 Limited Energy/Res $ 20.00 Limited Energy/Comm $ 36.00 5. SUBTOTAL OF ABOVE q",?_ - 5% State Surcharge J'!~ ~. ys - TOTAL 1'~ I. ':-"''? 5' <- '7'"<- . COMMERCIAL/INDUSTRIAL PERMIT APPLICATION ~ 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK' ,~ ;..... '.~ ASSESSORS MAP' \1'\{)L-?_c;=)L~' . JOB NUMBER q#/?!)/ INSPECTION LINE: 726-3769 OFFICE: 726-3759 ,~r''-1 /93c; /:J;:?,b,;>-~.-. ,47) ~ TAX LOT: ~ OWNER:~Jl4A-.> ~P~7'-<:' ADDREr'~ ^C;~ f\, \1lf'(\0fO.' ~ ) CITY: ~LX 1 ~ STATE: DESCRIPTION OF WORK: "f ~ 'i7' '_\" ~I I , NEW REMODEL ADDITION DEMOLISH NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME GENERAl' \I\;L:..,;:(....n\.j ~:r_. \.. PLUMBING' MECHANICAL' ~ ELECTRIC"" Q-e,-v, ~ ~ v- JJ~ rr~<;,..t.~<>. EU:;'c!>>JI~ 9?S0S" , PLUMBING I I Nn I I I I I I I NO, FEE CHARGE Single Fixture Relocated Bldg, (new fix, addU) Waler Service It, Sanitary Sewer It, It. Storm Sewer Backflow Device TOTAL PERMIT PHON~' (V AQI\pD r:g~'T -~ ~I - 11 ZIP: OTHER ~~s VALUE: :5) e<9-C:> PHONE CONST, CONTRACTOR' 'D~o EXPIRES 10- 9'S'" PHONE b.'fS/-~411 '~t"':>~,~c 'R'f'?'72S) MECHANICAL ."" ("~o.Dr.:1: Furnace/burner & vent <100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart Irom AC or htg, Mechanical exhaust haod and duct WJ#c: ;?'E'C;?:7~~ ~ - Permit Issuance I I I I I I I I I I I $10,00 I /~.-I TOTAL PERMIT ~//Y, ~ QUAD AREA}.0 f\)l.l.. ) - OFFI;; U;':7\ LAND US.' Pi. J...f ..AJ . OF BLDGF' . OF UNITe,_ OCCY GROUP: rr-t/ / CONSTR. TYp., HEAT SOURC.' . OF STORIEF' SQ, FT, $/SQ, FT, SQ, FTG MAIN SQ, FTG ACCESF SQ, FTG OTHER l1~d#Z?EC X X "3.., ~.j6 HANDICAP ACCESS: FLOOD PLAI(jy' ") , \ ZONING' LIGHTING POWER BUDGET: WATER HEATER' VALUE TOTAL VALUE OF ,PROJECT ~ '),-?-oj;)n ,<H'J PLAN CHECK FEf 3?-.S,; RepT' /C; 7. 'f..,t'.) DATE----1-I/:y1f BY p~ I BUILDING PERMIT 15% State :.~- I Surcharge 7" :3 I MECHA~: I 15% Stal'e -{f: I Surcharoe ;:.;) I PAVING I I PLUMBING 5'~.50 -;.:: -> ~ I 'S":2... /&>'....6 #"7,- . 7>'- . if 5'" 5% Slate Surcharoe I FENCE VAIIlE= $ I SID-EWALK I CURBCUT FT, FT, . DEMOLITION I SUBTOTAL PERMITS- I SYSTEMS DEVELOPMENT $C>. ?'S #4. TOTAL PERMIT FEES I EXCLUDING ELECTRICAl , 8 c::>; 75' . ;, REQUIRED INSPECTIONS . It is tha responsibility of the permit holder to saa that all Inspections are made at the proper lime, To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing, POST & BEAM: To be made prIor to Installation of floor Insulation, decking or floor sheathing, FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. x ROUGH.. .....,.,........:.. ELECTRICAL & MECHANICAL: No work is to be covered until thesa inspections have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, STRUCTURAL CONCRETE: In excess of 2500 P.S,1. (306 a,1) STRUCTURAL WELDS: Performed on the job, (2722 f) HIGH STRENGTH BOLTING: During all bolt Instailatlon and tlghtanlng operations, (306 a,6) SPRAYED ON FIREPROOFING: U,B.G, Standards 43.8, SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnlshad to the City's Building Division before beams are placed, (2501 UB,C, STDS, 25.10,11), STRUCTURAL MASONRY: (306 a,7) *In addition to the Inspec- tions specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code, FINAL PLUMBING ------------------------------------------------------- )( FINAL ELECTRICAL y FINAL MECHANICAL y FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing Inspection. /< FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, Chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all Insulation and requIred vapor barriers are In place but before any lath or gypsum board Interior wall coverIng Is applied, FIRE & SEPARATION WALL: Located and constructed according to plans. x LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished, SIDEWALK & DRIVEWAY: . Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project conditions such as landscaping, parking lot striping, etc, must be completed before requesting this Inspection, FINAL BUILDING: Requested aftar the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premIses can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises, y /2 {/~ PLANS REVIEWED BY By signature, I state and agree. that I have carefully examined the completed application and do hereby certify that all Information . hereIn is true and correct, and I further certify that any and all work performed shalt be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work descrlbad herein, and that NO OCCUPANCY will be made of any structure without permIssIon of the Building Safety DIvisIon. I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. t further.agree to ensure that all required Inspections are requested at the proper tIme, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during con~tr~lon. Slgnaturo.!tJ~e:7:f!.- - Date /1-/V-51 1/-;/'0. "T </ /7 ~~-;_-~ #(l/ v RECEIPT N' AMOUNT RECEIVED: /"?-::r L"/ /'7'~2C;;;- VALIDATION: -~ ~~ DATE 7' /~/d-"5J Y DATE PAID: RECEIVED BY: