Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-3-19 Mr, Jim Thomas Wildish B'uilding Co, PO Box 7428 Eugene, Oregon 97401 ~""'I ...7ft 11~'IINfI;"1~~'1l;1I111~IIIHIi CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 3 SAMPLED TEST DATE 03-19-09 04-09-09 04-09-09 Hold AGE (DAYSl 7. 28 28 **1 - End Cones GcvW " ,m & ConstrucOOn SeIvices Compressive Strength ,of Concrete (ASTM C 39) . PROJECT LCAFRC-BLM Warehouse Addition 3110 Pierce Parkway S~ringfieJd, Oregon COM2009-00215 DATE' PROJECT NO, REPORT NO, 03-19-09 2097030 6267 B,P,NO: 03-12-09 CAST BY D, Delatte DATE RECEIVED 03-13.09 3000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 40-1 K CEMENT MAX SIZE AGG, 3/4" Hot water; AEA AIR CONTENT 6,0% 3 TICKET NO, 3354221 SLUMP 4 1/2" 68" F YARDAGE 10,75 OF 196,0 TIME 8:10 AM 36" F WEATHER Clear SPECIMEN STORAGE ASTM C31 Slab on grade with thickened areas within lines A to G, from 1 to 4 and sma!1 column near A 1, Set 1 Near 3B,2 AREA (IN,') 12,56 WEIGHT (LBSl 8,27 TOTAL LOAD (LBSl 53780 COMPRESStVE STRENGTH (PSIl 4280 AVERAGE STRENGTH (PSIl TIME OF TEST 5:30 PM TYPE OF FRACTURE" 5 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top 0' bottom) REMARKS: Tony Dean (Wildish) was advised of on-site test results, Reviewed By: ;J;, -;f~---- Michael L.vMe{),- Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers- (e-mail) Oregon Military Dep!. - (e-mail) Wild ish- Tony Dean (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information Contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written. authorization. 750 WI C6meiJAvenue' Corvallis, Qegon 97330, phcne (541) 757-4698, fax (541) 757-2991 29540 B Airport Road ' Eugene, Qegon 97402 ' phone (541) 684--3849 ,fax (541) 684-;3851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382,4844 , fax (541) 382-4846 Me. Jim Thomas Wildish Building Co, PO Box 7428 Eugene, Oregon 97401 {+)FEI II~lrWf'l,"'I"':E:IIIJlr.m. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 11 SAMPLED TEST DATE 03" 19-09 04-09-09 04-09-09 Hold AGE (DAYS) 7 28 28 **1 - End Cones GoukG: dlical & Coostrudion Servires Compressive Strength of Concrete (ASTM C 39) . PROJECT LCAFRC-BLM Warehouse Addition 3110 Pierce Parkway Springfieid, Oregon COM2009-00215 DATE PROJECT NO, REPORT NO, 03-19-09 2097030 6268 B,P,NO" 03-12'09 CAST BY 0, Delatte DATE RECEIVED 03-13-09 3000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 40-1K CEMENT MAX SIZE AGG, 3/4" ,Hot water; AEA AIR CONTENT 5.4% 11 TICKET NO" 3354229 SLUMP 5" 67' F YARDAGE 10,75 OF 196,0 TIME 9:50 AM 40' F WEATHER Clear SPECIMEN STORAGE ASTM C31 Slab on grade with thickened areas within lines A to G, from 1 to 4 and small column near A1, Set 2 Near 0-2 AREA (IN.'! 12,56 WEtGHT (LBS) 8,24 COMPRESSIVE STRENGTH (PSI) 3910 AVERAGE STRENGTH (PSI) TIME OF TEST 5:35PM TYPE OF FRACTURE~ 6 TOTAL LOAD (LBSl 49170 2. - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: Tony Dean (Wildish) was advised of on-site test results,. Reviewed By: /1, Y-~ Michael L. Mt/er .' Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) Wildish- Tony Dean (email) City of Springfield MLM:sc This.report and/or enclosed test data is. the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof-be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7ffJ NN ComeII Avenue' CoMlilis, ()egJn 97330, phone (541) 757-4698' fax (541) 757-2991 29540 BAirport Road, Eugene, ()egJn 97402, ptme(541)684-J849' fax (541) 684-3851 63050 CorporatePlace, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 ~. ....~ ~tt~ Page 1 of 1 : Gcu;~ " .;...,.) & Construclion SeIvices Daily Field Report. 'J~'IlNW;41lt~':tUIIII~.lalfl Client: . Project: , LCAFRC-BLM Warehouse Addition 3110 Pierce Parkway Springfield, Oregon Date: Project No,: Report No,: ' Inspector: IDNo,: Mr. Jim Thomas Wildish Building Co, PO Box 7428 Eugene, Oregon 97401 03-19-09 2097030 E-22587 D, Delatte 1080867-88 ICC Inspection of: Epoxy Anchors Contractor: Wildish Building Co, Weather: Overcast BP.No,: COM2009-00215 Continuous Inspection: 0 Periodic Inspection: 0 Observed the installation '~f seventy-two' (72) 3/4" x 10 1/2" and four (4) 1" x 10 1/2" epoxy all thread anchors with four (4) anchors per location as follows: 3/4" anchors- at lines 3,3B, 4A, 3,3A, lA,,1.2EA, 1C, 2C, 3C, 3,7C,1, C4, B4, X1E, X1F, X1G, 1,1G, . 1,9G,,2E, 3E; 1" anchors" 3D and 2D, Prior to installation, the predrilled holes were cleaned with. a brush and compressed air. Verified minimum embed 'depth of 8", Anchors were secured with Hilti RE-500 (expiration date 12/2009), Tony Dean (Wildish) was advised of our on-site observations and was asked to notify our office when additional services are needed, To the best of our knowledge; the work inspected was in accordance with plans dated 02:12-09 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: 'tfJ;,~.~ Michael L Meyer Technical Manager c: Barranline Bales Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. --: (e-mail) Wildish- Tony Dean (email) City of Springfield MLM:sc This report andfor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall notbe reproduced in part Of full and/or any part thereof be disclosed without FEI Testing & Inspection, Inco's mi.tten authorization. 7fJJ WI CanelIAvenue' CavaDis, Qegln 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BAiI]lOl1Road' Eugene, Qegln97402' phone (541) 684-3849 '1ax(541)684-J851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382--4846 ~....... ~yr-!:1 11:.'mlrt;"I~~':;;lllllt_ I, Geotechnical & ConstrucOCJn Servires Daily Field Report Client: Project: LCAFRC- BLM Warehouse'Addition 3110 Pierce Parkway Springfield, Oregon Date: Project No,: Report No,: Inspector: 10 No,: Mr, Jim Thomas Wildish Building Co, PO Box 7428 Eugene, Oregon 97401 Page 1 of 1 03-12-09 2097030 E-22545 D, Delatte 1080867-88 ICC Inspection of: Reinforced Concrete Contractor: Wildish Building Co, Weather: Clear 'BP No,: COM2009-00215 Continuous Inspection: 0 Periodic Inspection: It'! Performed final inspection,on reinforcing steel for, slab on ,9rade with thickened areas within liries A to G, from 1'to 4 and,small column near A1.. Preliminary reinforcing steel, inspection was performed on 03-11-09 (FEI rep?rt number E-22538), Observed the placement of 196 yards of Knife River 4000 psi concrete (3000 psi required) (mix 40-1 K) for areas noted above, Concrete was placed' by pump and mechanically consolidated, Cast two (2) sets of four (4) 4" x 8" Goncrete test cylinders, The on'site test results areas follows: ' ' I Set 1- Load 3 I Concrete temperature- 68F I Air temperature- 36F I Slump- 41/2" I Air content- 6,0% Set 2- Load 11 Concrete temperature- 67F Air temperature- 40F Slump- 5" Air content- 5,4% Also, observed the installation of ten (10) #5 dowels, three (3) horizontal on each side of new north elevator pit wall with four (4) vertical dowels into elevator pit slab and six (6) #4 horizontal hook dowels into slab for new south elevator pit wall. Prior to installation, ihe predrilledholes were cleaned with a brush and compressed air. Verified embed depth'of 41/2", Dowels were secured with Hilti Hy 150 max epoxy adhesive (ICC- ESR 1967/ expiration date 04/2009), The north and south walls were originally cast in the wrong location, Needs EOR approval for as-built condition, To the best of our knowledge, the work inspected was in accordance with plans dated 02-12-09 with note #1 clouded area and applicable workmanship provisions of 'the I.B,C" except if noted above, Reviewed By: fJJ ,~/4.- Michael L Meyef Technical Manager I I 1 1 I c: Barrantine Bates Lee - (e-mail) Oregon MilitaryDepL - (e-mail) kpff Consulting Engineers - (e-mail) Wildish- Tony Dean (email), City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the cHent to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall natbe reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc,'s written authorization. 7ffJ tom CaneD Avenue' CoovaIlis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 . 29540 B Airport Road ' E(Jgene, 0egJn 97402 ' phone (541)684J849 , fax (541) 684-J851 . 63050 Corporate Place, Suite 2 ' Bend,: Oregon 97701 'phone (541) 382-4844 ' fax (541 ) 382-4846 SfEl Gcv:c..; " ,Ca/ & Construction Servires 11~'llllet;<iI~~'~~'IIII~_ Client: Project: lCAFRC- BlM Warehouse Addition 3110 Pierce Parkway Springfield, Oregon, ,6.Er'?~~ Mr, Jim Thomas Wildish Building Co, PO Box 7428 Eugene, Oregon 97401 , Inspection of:, Reinforcing Steel/Epoxy Anchors Contractor: Wildish Building Co, Weather: Clear BP No,: . Pending Page 1 of 1 Daily Field Report Date: Project No,: Report No,: Inspector: 10 No,: 03-11-09 2097030 E-22538 D, Delatte 1080867-88 ICC Continuous Inspection: 0 Periodic Inspection: 0 Performed inspection on reinforcing steel. for slab-on-grade with thickened areas within lines A to G from 1 to 4 and small column near A 1, Reinforcing steel was checked for grade, size, lap, placement and clearance, Reinforcing steel was secured with tie wire and supported on concrete dobie blocks, Also observed the placement of four (4) 1" x 39" all-thread anchors instailed into footing for column near E4, The anchors that were instailed during concrete placement were instailed at the wrong location, Prior to instailation the predrilled holes were cleaned with a brush and compressed,air. 'Verified minimum embed depth of 24", The anchors were secured with Hilt; RE:500 epoxy adhesive (ICC ESR 1682) with an expiration date of July 2009, , To the best of our knowledge, the work inspected was in accordance with plans dated 02-12-09 with Note #1 clouded area, e-mail from Engineer of Record about anchor bolts being epoxied dated 03-09-09 and applicable workmanship provisions of the LB,C" except if noted above, Reviewed By: /h ' ~,;Jtv;________ Michael L Me{er , Technical Manager c: Barrantine Bates lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) Wildish- Tony Dean (email) City of Springfield MlM:ld This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disClosed without FEI Testing & Insp~ctjon, Inc.'s written authorization. 7fJJ rwv Cornell Avenue', COIvaI~, Oregon 97330, phme(541) 757-4698 'fax(541) 757-2991 29540 BAirportRoad 'Eugene, Oregon 97402, pha1e (541)684J849 , fax (541 )684.J851 63050 Corporate Place, SUite,2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846