Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-3-17 ~P"~ ~rtl U~'lmft;4IlIl..':I~'lItJ~Bld CLIENT EWEB 500E. 4th Ave, Eugene, Oregon DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMp. AIR TEMP POUR LOCATION LOAD 3 SAMPLED TEST DATE 03-17-09 . 04-07-09 04-07-09 Hold AGE (DAYS) 7 28 28 **1 - End Cones Geotechnical & Construclion, Services Compressive Strength of Concrete (ASTM C 39) . PROJECT Hayden Bridge Water Filtration Plant Expansion ,~pringfield, Oregon \-\~ cte.n €,' ' 2008-00225 ~ 03-17-09 2087168 6262 DATE PROJECT NO, REPORT NO, 3q~'1 B,P,NO, 03-10-09 CAST BY A, Fenstermacher DATE RECEIVED 03-11-09 4000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 40-SE7 CEMENT MAX SIZE AGG, 3/4" Super; Eclipse; AEA;: Hot water AIR CONTENT 5,6% 3 TICKET NO, 3354206 SLUMP 7" 60",F YARDAGE 9,0 OF 54,0 TIME 9:20AM , 36" F WEATHER Overcast SPECIMEN STORAGE ASTM C31 Coagulant building'topping slab; raw water channel west wall south of wall.#24; south stop log gate North riser box; curb:build-up north riser box, From thickened edge, east side, center. AREA (IN,') 12,56 WEIGHT (LBSl 8,17 TOTAL LOAD (LBSl 45730 . COMPRESSIVE STRENGTH (PSn 3640 AVERAGE STRENGTH (psn TYPE OF FRACTURE** 5 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: Jake Stucky (Wildish) was advised of on-site test results, Reviewed By: /h, '-/IA;- Michael L, Meyer Technical Manager c: EWEB-Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield Knife River ' MLM:sc This report and/or enclosed'test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclose'd without FEI Testing & Inspection, tile. 's written authorization. 7fJJ rwv ComeII A;mue' Cm-alIis, ~ 97330, phone (541)757-4698' fax (541 )757-2991 29540 B,Ajrport Road ' Eugene, ~ 97402 ' phone (541) 684J849 ,fax (541) 684-J851 63050 Corporate Place, Su~e 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 ~.....~ ~rtl Page 1 of 1 Geoted1nical & Cor1s1Juc!ion SEirvires Daily Field Report . 1I:"lIflrl;.IO:I~~.lltl~.I~t" Client: Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon 511~n ~dCn bn~ Date: Project No,: Report No,: Inspector: 10 No,: EWEB 500E, 4th Ave, Eugene, Oregon 03-1 3-09 2087168 E-22564 D, Delatte 1080867-88 ICC Inspection of: Epoxy Anchors Contractor: Wildish Building Co, ,Weather: ,Clear .BP No,: 2008-00225 Continuous Inspection: 0 . Periodic Inspection: &'I Observed the placement of ninety-eight (98) 5/8" x 7". stainless steel epoxy all thread anchors as foliows: fourteen (14) each seven (7) locations for stop log gates at the west end of contact basin #3, Prior to 'installation, the predrilled holes were cleaned with a brush and compressed air, Verified minimum embed depth of 3", Anchors were secured with Epcon A7 epc)xy adhesive (ICC-ESR 2351/ expiration date 12-08~10 and 05-10-10), Contractor stated nuts will be tightened after epoxy has cured, Jake Stucky (Wild ish) was asked to notify our office when additional services are needed, To the best of our knowledge, the work Inspected was in accordance with EWEB memo dated 01-23-09 and applicable' workmanship provisions of the I.B,C" except if noted above, Reviewed By: !Ja~~-(!:;r- Technical Manager c: EWEB. Mike Stickling (em ail) EWEB- Wally McCullough (em ail) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) , City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains tathe specific process and/or material evaluated. As such, information contained herein, shall not be reproduced in part or full and/or any part thereof be disclos~d without FEI Testing & Inspection, Inc.'s written authorization. ' 700 WI ComeIIAvenue' CorvaI~,Oregon 97330' phone (541) 757-4698' fax (541) 757-2991 29540 B Airport Road 'Eugene, Oregon 97402 'rfune(541)684-3849 'fax(541)684-3851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846 (?)~. . ..,.......1 ~ . ... . - Page 1 of 1 11~'llfLCI;lIl~.'1:i1;"lllli_ Geoted1nical.& ConstrucOOn Servires Daily Field Report Client: EWEB 500E. 4th Ave, Eugene, Oregon Project: Hayden Bridge Water Filtration Date: Plant Expansion Project No,: Springfield, Oregon Report No.: ~q 51 \-b.46.en e,nclff- Inspector: , ID No,: 03-13-09 2087168 E"22562 D, Delatte 1080867-88 ICC Inspection of: Reinforced Concrete Contractor: Wildish Building Co, Weather: Clear BP No,: 2008_00225, Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on reinforcing steel for two (2) 36" pipe collar walls and.one (1) 30" collar wall at penetrations into gallery; two (2) 40" collar walls at penetration into water channel settlement area and top haif of threshold grade beam at overhead door, 'in coagulant building, Reinforcing steel was checked for grade, size, lap, placement , and clearance, Reinforcing steel was secured with tie wire, Observed the placement of 20 yards of Knife River 4000 psi concrete (mix 40-SE7) in areas noted above, Concrete was placed by pump and was mechanically consolidated, Cast one (1) set of four (4)"4" x 8" concrete test cylinders, The on-site test results from load 1 are as follows: slump- 6"; air temperature- 58F; concrete temperature- '72F; air content- 4,1 %, ' Jake Stucky (Wildish) was asked to notify our ,office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with plans dated . 02/2008, revisions on sheet S431 dated 03-09-09 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: /h,~,~ Michael L. Meyer Technical Man~ger c: EWEB- Mike Stickling (email) EWEB-Wally McCullough (em ail) OBEC- Pete Slocum (em ail) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield MLM'sc This report'and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 r-N>J ComeIIAvenue' Cavallis; CXegon 97330' phooe(541) 757-4698, fax (541) 757-2991 29540 BAiipalRoad ' Eugene; Q-egon 97402, phme(541)684J849' fax (541)684-J851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 (~FE) Geotechnical & Construction SeIvires Compressive Strength of Concrete (ASTM C 39) 11~'II~ICl;<liII~'''':I;'IIIII'_ CLIENT EWEB 500E. 41h Ave, , Eugene, Oregon PROJECT Hayden Bridge Water DATE Filtration Plant Expansion PROJECT NO, 2:,C15-lngf~d, or~ ~v1~E:IORT NO, B,P, NO, , 2008-002~ " "'() 03-12-09 2087168 6211 DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP POUR LOCATION 02-12-09 CAST BY A, Fenstermacher DATE RECEIVED 4000 psi SPECIMEN SIZE 4000 psi SACKS SUPPLIER , 40-SE7 CEMENT MAX SIZE AGG, Super; Eclipse; Hot water AIR CONTENT 2 TICKET NO, 3354147 SLUMP 650 F YARDAGE 10,0 OF 20,0 TIME 4r F WEATHER Partly Sunny SPECIMEN STORAGE Elevated slab as follows: above wall # 20 and 30; raw water channel lid above wall #26, LOAD 2 SAMPLED Above wall #30, 02-13-09 4" x 8" Knife River 3/4" 4.4% 7" 11:20AM ASTM C31 AVERAGE TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYS) (IN.'! (LBS\ LOAD (LBSI STRENGTH (PSIl (PSI! TEST FRACTURE- 02-19-09 7 12,56 8,36 56335 4490 8:10AM 2 , ,03-12-09 28 12,56 8,38 70340 5600 1:30 PM 3 03-12-09 28 12,56 8,39 70330 5600 5600 1:35 PM 5 Hold u 1 _ End Cones 2 - Cone/Split 3 - Columnar 4.,.... Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: Jake Stucky (Wildish) was advised of on-site test results, Reviewed By: /h ,X'.f}1AJ Michael L MeyefJ 'Technical Manager ,-/ c: EWEB- Mike Stickling (email) EWEB-Wally McCullough (email) OBEC- Pete Slocum (email) 'Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield Knife River I?€ ' ,C€/VI20 114/( , 1,7 Jp , ' ,', ~ This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the-specific ' process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof-be disclosed without FEI Testing & Inspection, Inc.'s written authorization. MLM:sdd 7ffJ Nt/V CanelI Avenue' CoNaIlis, Oregon 9733O ' phone (541) 757-4698 ,fax (541) 757-2991 29540 B Airport Road ' Eugene, Oregon 97402 ' phone (541)684-d849 ,fax (541 )ll84J851 63050 COlporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846 &fEJ Page 1 of 1 11:"IIHrf:.rr~'~:"II'H.IH. Gootechnical & Construction SeMres Daily Field Report Client: EWEB 500E, 41h Ave, Eugene, Oregon Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon ~9S1 ~den e:.,,,a.~{, Date: Project No,: Report No,: Inspector: IDNo,: 03-11-09 2087168 E-22541 A. Fenstermacher 5258882-49 ICC Inspection of: Epoxy Anchorsl Reinforcing Steel Contractor: Wild ish Building Co, Weather: Fog BPNo,: 2008-00225 Continuous Inspection: 0 Periodic Inspection: 0 Performed conti'nuous 'inspection during the instaliation of fifty-two (52) 5/8" x 8" vertical and, horizontal stainless steel, all thread anchors for stop log gates at north and south walis of settled water channel. Prior to instaliation, the predrilied holes were cleaned with compressed air and a brush, Verified minimum embedment of 5", Anchors were secured with Epcon A7 (ICC_ES ESR- 2351/expiration date 05-10'10), Contractor stated that nuts would be tightened after epoxy has cured, Also, performed preliminary inspection on the reinforcing steel for 30" and, 36" pipe coliars in clear' weli under filter N3 and settled water channel, respectively, Reinforcing steel was checked for size, laps, grade, quantities, locations, ties, clearance and supports, A final inspection will be performed prior to concrete placement. ,Note: received revised drawing dated 03-09-09 regarding rebar noted in FEI report number E22522 dated 03-09-09, . Jake Stucky (Wildish) was asked to notify our office when additional services are needed, To the best' of our knowledge, the work inspected was in accordance with plans dated 02/2008, revised drawing D31267-S431 dated 03-09-09 and applicable workmanship provisions of the LB,C" except if noted above, Reviewed By: jJJ, ~ ~ Michael L Meyer Technical Manager c: EWEB- Mike Stickling (em ail) EWEB- Waliy McCuliough (em ail) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarreli (em ail) Wildish Building CO,- Jake Stucky (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7m rwv CanelIAvenue' CootaI~, Oegoo 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BAirpa1 Road' Eugene, Oegoo 97402, phone (541 )684-J849 '.fax(541 )684-J851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541 ) 382-4844 ' fax (541) 382-4846 ~Ftj Page 1 of 1 11~'IINrt;.lf..'~Ull'J\!IiIHCI Gou~ ,,1ica1 & Construction Services Daily Field Report Client: EWEB 500E, 4th Ave, Eugene, Oregon Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon . ~C\'S1 \-\CA>.\c\ev1 ~~ Date: Project No,: Report No,; Inspector: 10 No.: 03-10-09 2087168 E-22556 A. Fenstermacher 5258882-49 ICC Inspection of: Reinforced Concrete Contractor: Wildish Building Weather: Overcast BP No.: 2008"00225 Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for coagulant buiiding toppin9 slab, Raw water channel west wall south of wall #24, 'south stop log gate north riser box, curb build-up north riser box: A p(eliminary inspection was performed on 03-09-09 (ref FEI report no, E22522), Observed the placement of 54 cu/yds, of Knife River 4000-psi concrete (mix #40-SE7) into areas noted above, Concrete was placed by pump and was mechanically . consolidated, Load 1 was tested for air coptent during initial discharge, Test result was 7,0%, Load was mixed for several minutes and retested, Test result was 5,0% and load was placed, Mike Stickling (EWEB) was advised, Cast one (1) set of four (4) 4" x 8" compressive strength cylinders from load 3, The results are as follows: Load 3 - slump: 7"; concrete temperature: 60" F; air temperature: 36" F; air content: 5,6%, Jake Stucky (Wildish Building Co,) was advised of on-site test results and asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: 11.~~ Michael L. Mey; , Technical Manager C:, EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Siocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield R.tC At4..p (i V ~/J' <,J 1t't',9 MLM:ld This report and/or enclosed test data is the confidential property of the client to'whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be,reproduced in part or full and/or any part thereof;be disclosed without FEI Testing.& Inspection, loc.'s written authorization. 700 r-m Cornell Avenue 'CorvaIDs, Oregon 97330' phcne (541) 757-4698' fax (541) 757-2991 29540 B Airport Read . Eugene, Oregon 97402 ' phcne (541) 684,'l849 ,fax (541) 68<h3851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 ~.....~ ~y.rtl Page 1 of 1 112r.'llNrt;"ln,'nallll~liIh'la G:..,l~ ,,1ica1 & Construdion Servioes Daily Field Report . Client: EWEB 500E, 4th Ave, Eugene, Oregon 'Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon ~~51 ~cl.e.n-e,~ Date: Project No,: Report No,: Inspector: 10 No,: 03-09-09 2087168 E-22522 A. Fenstermacher 5258882-49 ICC Inspection of: Reinforcing Steel Contractor: Wildish Building Weather: Showers BP No,: 2008-00225 Continuous Inspection: 0 Periodic Inspection: 0 P!lrformed preliminary inspeciion on ,the reinforcing steel for'coagulant buildin9 topping slab with curb, 'raw water channel west wall section south of wall #24, south step log ,gate north riser box, curb build-up at north riser box, coagulant building threshold at overhead door, north and center 42" pipe collar wall in gallery, Reinforcing steel was checked for size, grade, laps, quantities, locations, ties, clearance and supports, ,A final inspection will be performed prior to concrete placement. Note: Collar wall details show #6 vertical bars. As built, #5 vertical bars are installed, Verbal approval has been obtained from Engineer of Record to bundle, an additional #5 bar at three (3) locations, Written approval is pending, Jake Stuckey (Wildish Building Co,) was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008, RFI #58 dated 12-12.08 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: A, '/,.I~---- Michael L M~ . Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield MLM:ld This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing ~.Inspection, Inc.'s written authorization. 7'3JNN ComeIIAvenue' Corvanis, Oregon 97330, phone (541) 757-4698, fax(541) 757-2991 29540 BAirpatRoad' Eugene, Oregon 97402, phone (541)684-J849 'fax(541 )684-3851 63050 CorPorate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 ~ftJ Page 1 of 1 Geotechnical & Construction Servires Daily Field Report 11a.'IJfICl;.J~~'~:"I(II/.I~I. Client: F'roject: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon ~S1 ~cl.tn ~~ Date: Project No,: Report No,: Inspector: 10 No.: EWEB 500E, 4th Ave, Eugene, Oregon 03-06-09 2087168 E-22523 D, Delatte 1080867-88 ICC Inspection of: Epoxy Anchors Contractor: Wildish Building Co, Weather: Overcast BP No,: 200~-00225 Continuous Inspection: D Periodic Inspection: 0 Observed the installation of six (6) 3/4" x 13" stainless steel all-thread anchors into slab for' new stair base connection in the southwest corner of contact basin #3 (new), Prior to installation, the predrilled holes were cleaned with a brush and compressed air, Verified the minimum embed de'pth of 10", Anchors were secured with Epcon A-7 epoxy adhesive (ICC- ESR 2351) with an expiration date of 11-07-09, Mike Stickling (EWEB) was notified of on-site observations, To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: ;1. ';1',1'4 Michael L. Me7er Technical Manager < c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (em ail) Wildish Building CO,- Jake Stucky (email) City of Springfield MLM:ld " .' This report and/or enclosed test data is the confidential property of the client to whom'it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andler any part thereof be disclosed without FEI Testing & Inspection, Inc.'s wr~tten authorization. 7ffJ NN CaneD Ava-oo' Cavallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 B Airport Road 'Eugene, Oregon 97402, phone (541)684-J849 'fax(541)684-J851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846