Loading...
HomeMy WebLinkAboutPermit Building 1991-11-12 -..f COMM ERCIALlI N DUSTRIA. PERMIT APPLICATION ~ . JOB NUMBER ~//')f3 INSPECTION LINE: 726.3769 OFFICE: 726.3759 225 Fifth Street, Springfield, Oregon 974~t'J"1 LOCATION OF PROPO~ED WORK: -P;9..Cf /J)/7JeOJ/fi t<lJ ASSESSORS MAP: /'702. '2. Q..(;9C> (I?IJAJ L W /L-SolV J l1-u ( c;)o~~ TAX LOl' /7 (J7- ? /) ()/) ,/10/3: r> OWNER: E tV n5 <; O() /:' Lf% 5'fJ/"?JtA PHONE: ti9Cf ' 2- 'i#J /I ziT J?z-' { ADDRESS' CITY' STATE: -.t2PJ ZIP: t?7 )ltJ/ DESCRIPTION OFWORK: _/farJe r3fL/UJ)1V1, - / JJl/} T .<U15Snr17,:f/U J-!OUs,r NEW ~ REMODEL ADDITION DEMOLl~H OTHER VALUE>fC,,<;;jIJIJO ARCHITECT: NAME Er.u l. L3 ( <;;P,-1YI1 ADDRESS fl<:; Pf-,r,/JU f I ) PHONE CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR' /' ~I ~;Yl'7~-:;.r GENERAL:~~l'R"'" ~L"'o<:'~/.o A:~', _, B'- -. .-==-~.~~. -:?'2772 /.2,,1/--!'2. tt::r?- 7-:Lllit":> " # r , r EXPIRES PHONE PLUMBING' MECHANICA' . ELECTRICA' . PLUMBING MECHANICAL NO. FEE CHARGE Nn 000 rI-lAQf,!C ft. Furnacel burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Single Fixture Relocated Bldg. (new' tlx. addU) Water Service Sanitary Sewer It. Storm Sewer It. Backflow Device Permit Issuance $10.00 I .1 I I TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: QUAD AREA LAND USF' . OF UNITS' CONSTR. TYpo. FLOOD PLAIN: . OF BLDGS' ZONIN'" OCCY GROUP' LIGHTING POWER BUDGET: . OF STORIES: HEAT SOURCO' WATER HEATER' SQ. FT. SQ. FTG MAIN /0/.6'_ '5?y $/SQ. FT. VALUE X c k?~-~ . SQ. FTG ACCESS X SQ. FTG OTHER X TOTAL VALUE OF PROJECT~ 5cJtJ.o PLAN CHECK FEf 2/ 3 ~ .RCPP 36'.sg..D DATE '1//2/'7/ BY ~p~ I BUILDING PERMIT 15% State SurcharQe I MECHANICAL 15% State Surcharae I PAVING 3:z:!!>. -0 /G-.YC:::> I PLUMBING I DEMOLITION 5% State Surcharge FENCE VALUE $. SIDEWALK FT. SUBTOTAL PERMITS SYSTEMS DEVELOPMENT IY-f- -:?.y<v Y" &> CURBCUT FT. TOTAL PERMIT FEES I EXCLUDING ELECTRICAl . REQUIRED INSPECTIONS . It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. X ~IGH PLUMBING, .!..lO!]T<lICA1;::& MECHANICAL: No work Is 10 be covered until these inspections have been made and approved. PAVING: Afler gravel Is in place but prior to placing asphalt or concrete. )f. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner! Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS x STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) x CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. FRAMING: To be made afler the roof, all framing, fire' blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing, electrlcai, gas, sanitary sewer, storm sewer, water and drat nage II nes. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum board interior wall covering is applied. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: UB.c. Standards 43.B. x SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering is. applied or before gypsum board joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.c. STDS. 25.10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) x MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. .In addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: Afler forms are erected but prior to placing concrete. )t SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested afler the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL PLUMBING x FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY ././/e-<?~'" ~---::? DATE/:;I-//-<9/ ~ /P" -".~ /-~ , By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that alt required inspections are requested at the proper time, that project address Is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all ~:::t::~inK~~ IA~~ Date l~jj9/ VALIDATION: AMOUNT RECEIVED: RECEIPT ': '50L_YC> '?292... DATE PAID' RECEIVED BY' /2-,1'/,<::; /" 4--'~~ .