HomeMy WebLinkAboutPacket, Pre PLANNER 12/2/2008
~.,
. .
,
!
.
i I'
.. I
PRE-SUBMITTAL
DISTRIBUTION LIST:
Date Distributed:
/5...~d-- D2
/ Dave Puent - Building
../ Gilbert GordonlMelissa Fechtel- Fire
V. Jon Driscoll- Traffic
v Matt Stouder- Public Works/Engineering
Dennis Ernst/Chris Moorhead, Surveying
Planner" cJ;tr>>L . . .
I ,
PRE.SUBMITTAL REC'D .
DEe.. 220p8
City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
541-725-3753 Phone
541-726-3689 Fax
.
SF!AlNGI'1IEtD',
f' .....,.,;>.."..
Pre-Submittal Meeting
Case Number Assigned: PRE2008-000n
Date Submitted: 12/2/2008
Proiect Name: BRING RECYCLING
Project Description: Pre-Submittal for Site Plan Modification Major to remove old MH, replace setic.
system and 'increase stormwater system and paving for BRING Recycling
, Application Type: Site Plan Modification Mjr
Job Address: 4446 FRANKLIN BLVD 2
Assessor's & Tax Lot #: 1703344401500
DISCLAIMER: Applications will not be exempt from Development Code or procedural amendments thalmay occur
between the time oftbe Pre-Submittal Meeting and Submittal of the Application for Development Review. Please contact our
office at 541-726-3753 with any questions or concerns.
A Planner will be assigned the following business day and will contact you to confirm the meeting date and time.
PRE.SUBMITTAL REC'O
DEe 2 2008
PilmJobPrint.rpt
12/2/2008
2:48:48PM
.
.
Pre-Submittal ~eeting
Development SerVices Department
Room 615/616
PRE-SUBMITTAL MEETING DATE: Tuesday, December 9,2008
1. PRE-SUBMITTAL MTG #PRE2008-00072 (SITE MOD MJR) BRING'
Assessor's Map: 17-03-34-44 TL 1500 RECYCLING
,Address: 4446 Franklin Blvd
Existing Use: Bring Recycling Center
Applicant submitted plans to modify original site plan2001-07-0143, Phase 2 by
demolition and renovations to existing buildings; relocation and replacement of on-site
septic system; landscaping and electrical plan. .
Meeting DatefTime: Tuesday, December 9, 2008 10:00 -11:00 a.m.
Planner: Steve Hopkins
2. PRE-SUBMITTAL MTG #PRE2008-00071 (SITE MOD MJR) WlLDISH CO
Assessor's Map: 17-02-30-00 TL 1000 ARMED FORCES RESERVE CENTER
Address: 2022 3.lst Street
Existing Use: Armed Forces Reserve Center
Applicant submitted plans to modify original site plan DRC2004-00005/DRC2007-00026
with an addition of a 12,300 sq ft two story building for offices,restrooms, storage and
conference room.
Meeting DatefTime: Tuesday, December 9, 2008 11:00 - noon
Planner: Andy Limbird
PRE-SUBMITTAL REC'O
DEe "H008
:City (;)f Spri'ngfield
Development Services Department
225 Fifth Street '
Springfield, OR 97477
Site Plan Review
.
PRE.SUBMITTAL REC'O
DEe 2 2008
U:~,.~I ~
~~
Site Plan Review Pre-Submittal:
Site Plan Review Submittal: [j
. - . -...-
ADDlicant Name: j,^,,\~, OP<N\~ Phone: '1+f..t'- ?01.'t>
lcompan~: 13~\NUl \Zevyc.~\N~ IFax: 12U - <'teA4-
IAddress: +4-"\-& ~NK.\'IN ~\..Vp. I
1"..;1",...... ..""..s:>"&,I!E....:W<<".:qTP~:'-_.:::n~~.'" .-.....~'"c,,"'~ """"'"">!\'i:':''''::''':''',;''','C'''::;::.l;"",,,,,,~:,,,,,"-''',,,,,.';...,,..,~__~.'' "";,,,,,::,,,~..,!;[~~~;.,:..>'I'-":::'!#..~.,-- "''''.'''':'''.."li''\'.,:It>~'ll'>1i!.>''''-...::",'!::);ilb:::'1';''''::;'; ,,>',." ,:""""''':......~'''''''',=~N_~~~,':''''-,T,~~~' I
Applicant's Rep.: ~~ !Z.\f'f'e- ! JOI-IN \..AWu::;.oS Phone: (1)81- to 10
Icompany: -r~~ AIZG\-\I11CC1S Ix fLANNf::.lZ..S Fax: ue1-0(PlCS
!Address:, I 'bl ~T e,~APWAY, 0tAl-n:. ZOO (~~e..l OIZ-} Cl1401
p.,::,,......"", .. ',"" "<0 ~"",:'. ,~,........' ""'T,"',"_'\"l:~'"'' ,..",,,-""'. '''<''''-''''''''.''''''c~:'''''-''''''''',-a''''':::i",'I' ,--,<0" ,'. -c' ,"."" --...g-".>l ",,,..,=,,,,,,. ',<"".,,,,_.,,, ""'"."'..e-"',,,~'-'_,..;.-."'"'.H.',,rt ::""'!'1)!,~"~,,",""::';"'" ..""_,'..,,e ,.x"y".',......,~~..."......'3""~,.. . "_ "". "'....."'-"'''_''''''''.~,,;
\ Property Owner: E)~lN~ lZE:GYC,L.ING Phone: 7# - Qo2.?:J
Icompany: ~t(\N~ ~E:O(CL.\NGt Fax: t')1.tI - q~q4-
IAddress: 444-(( fAANK.UN !SoI.A.LhVA~P / bl-0\-.lWCI?t> I o~ Q14-o? I
".c....,' >~.".n.->.,- '."''';'I'''''.~-'' '--,.$".~.,~,""'>~"""""';."'."'''5L_'_';;'''''I1~..i-'",:",--~,','M''''.''..'i-"'-"'';~''_ ""-'1',.,'''-"0 ._. """,... '"''',..,'',':f;~,,-,-..,;;m.''*''',-,'I[>',,,,,,:,~;,,,,~,'''''''''''.,'_0'''''"m_,";;,~>I'i''''C::'''';'''''-_, -"'~"",J,J! .......',..,...L~~._...'"'''' -":;,,,,,>,,,,,,,"'~.,~'_,,,v";il""_'(1
IASSESSOR'S MAP NO: 1100-0444 ITAX LOT NO(S): 1500, I(POD I 1.400
I Property Address: 4441n FrLANKL.lN ~OI..l.l.CVA1UJ I
ISize of Property: 1-. e>q Acres ~ Square Feet 0 I
I Proposed Name of Project: PLANE:T IMPIZoV~NI CcN~ - f\\'t>-s€o 1(. I
I' ,""'__<', '...."'..- "'>'..,;"."", ~"'~. ';><1"', :<"'.._".'j"'~,""'; "''''_.'''''~"",,"','I:'.r,' "'. ~,<<< ""''''''''''''', "_',"'~\ilil;'''' ~...:';~"" ,..,....".. "_",,-c,,,,,,.,,,,,,,.,,",,,,,,,,,, .._"..:'...."",,'""..,'h.H;:::::::',."h'A.;:,..'- -"~".....->..:-"'....,--<:'n..''"'''''''...:''.~~'''"...,..''t..''''''... '>' >l .' ."'~<;.'c".".;"'.6"'''',;o.'"'',..-;,,,.:,~_;.;...,''"....... ~ .
I Description of If you are filling in this form by hand, please attach your proposal description to this application. -
ProDosal: . S~ N A\Z~T 1\JE:. . _ ','
I " / I7lAlI-V"'<lJI
Existing Use: '6~C.()N\)-HANO tteT1><.\L... 5AU/P&f:;. 6e.N-rvz...
INew Impervious Surface Coverage (Including Bldg. Gross Floor Area): '2.1.., lcel
Si natures: Please si nand rint our name and date in the a riate box on the next
I
sf I
. - . -... ~
Associated Applications: I).QC ZGl}:;" ~ (5\'].J20 (' I::~,~)
Signs:
Pre-Sub Case No.: R-('2cD~- ~:r2. Date: 1Z./Z/6~ Reviewed by: -bvr-..
Case No.:
I !.III) q!!
Application Fee: $ 0l1O
ITOTAL FEES: $ 3'i-1o e.o
Date:
ITechnical Fee: $
Reviewed by:
\postaqe Fee: $
I
I
PROJECT NUMBER: .p
.s - Gfjo 1<';-
Revised 1/1/08 Molly Markarian
V'(\QQ..-Y-~( 1.... - I' c..->., \ 1.. I c{ I u~:.
o IC.0D~m
1 of 10
(
)
Owner Signatures
. This application form is used for both the required pre"submittal meeting and subsequent
complete application submittal. Owner signatures are required at both stages in the application
process. An application without the Owner's original signature will not be accepted.
Pre-Submittal
The undersigned acknowledges that the information in this application is correct'and accurate for !?cheduling of the
Pre- Submittal Meeting. .
Owner:
Date:
1rJ.[;2/ ot
).fIN I~L
Print
, Submittal
I represent this application to be complete for submittal to the City. Consistent with the completeness check
performed on this application at the Pre-Submittal Meet"ing, I affirm the information identified by the City as
necessary for processing the application is provided herein or the information will not be provided if not otherwise
contained within the submittal, and the City may begin processing the application with the information as submitted.
This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a complete
application. .
Owner:
Date:
Signature
Print
PRE.SUBMITTAL REC'O
DEe 2 2008
Revised 1/1/08 Molly Markaria~
2 of 10
( )
(
)
CITY OF SPRINGFIELD.
VICINITY MAP
PRE2008-00072
4446 Franklin Blvd
SITE
Map 17-03-34-44
Tax Lot 1500,
1600,2400
North
...
PRE-SUBMITTAL REC'O
DEe 22008
PHASE2 (____
~ PHASE 1
, (COMPLETE)
.,'-'-'-'-'-'-'l
a@=
'..!!:.!.!...-
r-----
,
J
r
I !!!!L..Wl!:.!.
, ,
,
,
I r"
(~~= ~
.\.~~
.~:.
1t
I
PQlN::ftl.----- I
~
_~m
aoo.'O'l!l
-=
PRE.SUBMITTAL REC'O
DEe 2 2008
.1
Ii
I
IJ
i
I
i
i
~ PAHSE 2
~j 1" 60'-0"
~m_
r-~
-~
/
~.
SITE PLAN
.........-.---tNl~....,...,
. I'UM3<lJHETO
""",!:lLJ(;.5
PLANET IMPROVEMENT CENTER
6RING RECYLClNG BLDG. 3
4446 OLD FRANKLIN BL YD.
GLENWOOD, OREGON
TBG
ARCH ITECTS
PLANNERS IINC
PROJECT #
.200334
DRAWN
BR
DATE
12/02/08
132 East Broadway
$uite200
Eugene, Oregon 97401
(541) 687-1010
Fax (541) 687-0625
CHECKED
Il
12/2/08
"
I PiN~~~ t
~ ~~DREGON,It
'1>-.. ~<Y
-{fop ~
SHEET
A-1 .OSR
Jrilwlng Ililme; L:\I-'KUJILWjj4 t:lnngII"AU\AI.,.IIVl:\;:'lle Ii~Vltlw\llIlJ(Il y~tlll::it( MO(lI~calIrnl\LWjJq::;1'" illUO ::;t\.UI"I\j
Saved on: Nov25, 2DOB@9:22om
@ Copyright 2008 by BG Architects & Planners / Inc
G
.December 2,2008
Development Services Department
City of Springfield
225 Fifth Street .
Springfield, Oregon 97477
RE:
BRING Recycling - Planet Improvement Center (200334/1.3)
Type II Site Review Mod!fication Application
Project Address:
4446 Franklin Boulevard/McVay Highway
Glenwood, Oregon
Assessor's Map and Tax lot: 17-03-34-44; Tax lots 1500, 1600 and 2400
Applicant:
BRING Recycling
4446 Franklin Boulevard
Eugene; Oregon 97403
Voice (541) 746-3023 . Fax (541) 726-9894
AUn: Julie Daniel
Applicant's
Representative:
TBG Architects & Planners/lnc
132 East Broadway, Suite 200
Eugene, Oregon 97401
Voice (541) 687-10.10 . Fax (541) 687-0625
brippe@tbg-arch.com
AUn: Ben Rippe
TBG
,/ ,/ ~
.0 _ >"" ~
\?~:r
ARCH !TECTS &
PLANNERS/INC
132 East Broadway
Suite 200
Eugene, Oregon 97401
541-687-1010
541-687-0625 Fax
PRE-SUBMITTAL REC'O
DEe 2 2008
LAND USE REQUEST
BRING Recycling (the applicant) is seeking the approval of a Type II Site Plan
Modification to the original approved Site Plan Development Agreement dated
December 20, 2002 (City File #2001-07-0143). In 2005 a Type II Site Plan
Modification to the original Site Review was approved (Development Agreement
dated July 15, 2005), which outlined two phases of development. This application is
to be reviewed under the Site Plan Review Modifications SDC Section 5.17-145.
This proposal is a modification request limited to portions of Phase 2 of the approved
. Final Site Plan dated December 19, 2002, and Final Site Plan Modification dated
March 31, 2005. The specific modifications proposed to Phase 2 include the
following: '
1. The demolition of approximately 683 square feet and renovation of a portion of
existing Building 4; 'plus a 3,375 square foot covered trash enclosure;
2. ,The demolition of Building 6;
3. The addition of permeable pavers, the increase of impervious surface area and
the associated additional stormwater facility;
J
John E. lawless, AlA
Principal
James F. Alberson Ill, AlA
Principal
Darrell L. Smith. NCARS, FAIA
Principal
City of Springfield
December 2, 2008
Page 2 of 8
"
4. The relocation and replacement of the on-site septic system; .
5. The detailing of the landscape plan; and
6. The detailing of the electrical plan.
PRE-SUBMITTAL REC'O
DEe' 2 2008
SITE AND SURROUNDING CHARACTERISTICS
The total site area includes Tax Lots. 1500, 1600 and 2400 for a total of 2.89 acres,
which will be referred to as one site throughout the document. The subject site is
zoried Community Commercial (CC) with an Urban Fringe .overlay (UF-1 0). The site
is essentially' flat with the Southern Pacific Railroad tracks elevated some 25 feet
above grade to the south.
The FEMA Flood Insurance Rate Map (#41 039Cl142 F) identifies the site as being in
Zone X (areas of 500-year flooding). FEMA Maps label this as "other flood areas" and
not a "special flood hazard area" so there are no flood hazard issues.
The area directly surrounding the project site is developed with a mix of residential
and commercial' uses. The subject site is located on the west side of Franklin
Boulevard (McVay Highway), immediately north of the Southern Pacific Railroad
tracks and trestle bridge crossing the Willamette River. Adjacent uses to the north are
commercial (Cash King Liquidators and Six States Distribution, both fronting McVay
Highway) and industrial (Valley Tool & Die, fronting Brooklyn Street). To the east are
commercial uses (Eye Beam Light Rental and storage warehouses across McVay
High~ay); to the west are residential uses.
Access to the site is via an existing driveway on Franklin Boulevard. Franklin
Boulevard is a Major Arterial, under ODOT jurisdiction. The access drive was
approved and constructed under ODOT Permit #52782, in accordance with all
applicable regulations.
,Th~re are no inventoried wetlands or historic resources on the subject site. Existing
vegetation consists of the Phase 1 landscaping, including landscape ratios and
numbers of trees consistent with the original approved Site Plan Review and 2005
Site Plan Review Modification.
APPROVED SITE PLAN REVIEW AND 2005 SITE PLAN REVIEW MODIFICATION
GENERAL OVERVIEW
The adopted original Site Plan Review and 2005 Site Plan Modification outline two
phases including 7 existing buildings, 3 proposed buildings, a covered trash area and
associated site infrastructure. (Reference the proposed Site Plan Review Modification
Site Plan, Sheet A 1 .O-SR dated 12/02/08 and the approved 2005 Site Plan Review
Modification documents for the Phase 1 and Phase 2 project areas).
'"
City .of Springfield
December 2, 2008
Page 3 .of 8
PRE;SUBMITIAL REC'O
DEe 2 2008
Phase 1
The completed Phase 1 includes the remadel .of existing, Buildings 1, Building 3 and
the nartheast partion .of Building 4 as well as the new canstruction of Building 7 and
, Building 8 with assaciated parking, stormwater retention and bioswale facilities, and
site infrastructure. Although included in Phase 1, Building '2 will be constructed
when needed in the future. Building 1 is a 2,939 square faat waad-framed .office
building fronting McVay Highway. Building 3 is the primary retail and sales building
tataling abaut 2,293 square feet. Building 3 includes an existing waad-framed
building and a Phase 1 steel building addition. Building 4 serves the function of a
receiving and inventarywarehause including the emplayee break raam. It is a waad
frame structure tataling abaut 5,544 ,square feet. Building.7 is a covered drop-off
steel frame canopy far unlaading danated items totaling abaut 3,546 square feet.
Building 8 isalsa an .open-sided steel frame building far cave red starage tataling
about 9,438 square feet.
cA
Phase 2
The adapted farthcoming Phase 2 includes the remodel .of existing Building 5 and the
sauthwest partian .of Building 4, as well as the new constructian .of Building 10 and a
cave red trash enclosure with assaciated employee parking, starmwater retentian and
'biaswale facilities, and site infrastructure. BUilding 5 is a 2,422 square feet storage,
building lacated at the southwest corner .of the site. Building 6 is an existing .old
mabile hame scheduled far demalitian. Building 10 is an open-sided, prefabricated
steel building similar ta existing Building 8. Building 10 is primarily designated ta
provide weather cover far the starage' .of salvaged materials, with the possibility far a
partian of the building ta serve as greenhause starage far plants.
TYPE II SITE REVIEW MODIFICATION APPROVAL CRITERIA AND SUPPORTIVE
FINDINGS
As stated under SDC 5.17-145(0): "The criteria of approval for a Site Plan
Madification appliCatian shall be in compliance ,^,ith the applicable standard and/ar
criteria .of approval specified in Sectian 5.17-125," Criteria .of approval for a Site Plan
Modification are listed in. bold italics and . relevant, , previously approved,
development conditions are listed in italics far reference.
A. The zoning is consistent with the Metro Plan diagram, and/or the applicable
Refinement Plan diagram, Plan District map, and Conceptual Development
Plan.
There are no proposed changes to the zoning .or uses; therefore, the praposed
Site Plan Review Madification remains cansistent with the .original approved Site
Plan Review and 2005 Site Plan Review Modificatian, and relevant develapment
code standards.
City of Springfield
December 2, 2008
Page 4 of 8
"
B. Capacity requirements of public and private facilities, including but not limited
to, water and,electricity; sanitary sewer and stormwater management facilities;
and streets and traffic safety controls shall not be exceeded and the public
improvements shall be available to serve the site at the time of developme(lt,
unless otherwise provided for by this Code and.other applicable regulations.
The Public Works director or a utilitY provider shall determine capacity issues.
With the exception of minor on-site routing changes to the water,sanitary sewer,
stormwater management and electrical facilities, there are no proposed changes
to the public or private facilities. Therefore, the proposed Site Plan Review
Modification remains consistent with the original approved Site Plan Review and
2005 Site Plan Review Modification and relevant development code standards.
Previous Condition - Water
As stated in the Conditions of the original Site Review Development
Agreement dated July 15, 2005, "Show on the Final Site Plan the locations of
the required fire hydrants' and note how fire flow compliance will be
accomplished. "
Conforming Response: An existing 8" fire line and a 1-1/2" domestic water
supply stub out for a Phase 2 future connection under the asphalt just past the
boundary between Phases 1 and 2, immediately north of Building 4. Phase 2
lines will connect to the existing lines in order to extend the supply of
domestic water to Building 4. , A second fire hydrant is proposed for Phase 2
to be located at the northwest corner of the covered trash enclosure, subject
to the review and .approval of the Fire Marshal. Reference attached Sheet
C4.0 - SANITARY SEWER, WATER, FIRE & GAS PLAN dated December 2,
2008 for details.
Previous Condition - Sanitarv Sewer
As stated in the Conditions of the original Site. Review Development
Agreement dated July 15, '2005, "Show on the Final Site Plan the existing and
proposed drain fields or redundant drain field system sites; and connection of
the commercial/industrial dumpsters to the drain field and describe the type of
pretreatment proposed."
Conforming Response: Although the City of Springfield anticipates extending
the public sanitary sewer trunk line down McVay Highway or Brooklyn
Avenue in the future, there are currently no public sanitary sewer facilities
available to serve the development site. Due to the uncertainty regarding
when this public facility may be available to serve the subject site, BRING
manages all sanitary sewer waste on-site with an approved septic tank and
drain field system.
PRE-SUBMITIAL REC'O
DEe 2 2008
q
City of Springfield
December 2, 2008
Page 5 of 8
PRE-SIIRMITTAL RECID
DEe 2 Z008
BRING hired Royal Flush Septic who conducted an on-site inspection of the'
system on.August 11, 2008 and found that the current drain field has failed.
Several of the lines have collapsed and/or are plugged. Therefore, t~e
applicant and Royal Flush Septic, working in coordination with the county
, sanitarian, have determined that a new drain field and septic tank are needed
to serve the entire site. The existing Building 6 is proposed to be demolished
to provide adequate area for the new septic tank and drain field plus reserve
area rather than be used aS,a caretaker's residence as approved in the original
Site Plan Review. The new septic system has been designed to serve the
entire site with' capacity to last 15-20 years. The county sanitarian has
determined and approved that there is sufficient capacity for the proposed
on-site sewer and wastewater treatment (septic system construction permit to
follow as a deferred attachment). Reference attached Sheet C4.0 - SANITARY
SEWER, WATER, FIRE & GAS PLAN dated December 2, 2008 for details.
.,~
Previous Condition - Electrical'
As stated in the Conditions of. the, original Site Review Development
Agreement dated July 15, 2005, "Show on the Final Site.P/an the relocation of
power poles. Submit written correspondence from the SUB Electrical Division
that their issues have been addressed." .
Conforming'Resoonse: . This proposal removes several existing power poles
and modifies the configuration of power lines to Buildings 5, 10 and the
adjacent residence across the west property line. Electricity is currently
provided to the rear of the site via overhead power lines running along and
parallel to the southern property line and the railroad tracks. Power to
Buildings 5 and 6 and the adjacent residence is fed from the overhead line
along the south to a utility pole in center of the storage yard. From this pole,
overhead lines connect to each building, The proposed modification
relocates this utility pole and the existing transformers to the northeast corner
of Building 5. Power continues to be' routed to this pole in its relocated
location directly from the last pole in the series of utility poles along the
southern property line. From there, electricity will serve the existing adjacent.
r,esidence via underground conduit to the existing pole at the west. property
line, then overhead to the residence. Power to B'uildings 5 and 10 is proviged
from the existing meter at Building' 3 via underground conduit. . Existing
conduit was stubbed out underground for future Phase 2 connection.
Reference Sheet E1 - SITE PLAN POWER (DEMOLITION) and ,Sheet E2 - SITE.
PLAN POWER (NEW WORK) both dated December 2, 2008 for
demonstrated continued compliance with SDC 4.3-125 and SDC 4.3-135.
Stormwater .
This proposal slightly modifies the location, configuration and size of the
bioswale and infiltration basin to accommodate the proposed increase of
impervious surface area in' Phase 2 (increased from 10,706 square feet to
City of Springfield
December 2, 2008
Page 6 of 8
"
.
12,850 square feet) from the original approved Site Plan Review and 2005
Site Plan Review Modification. Aside from the minor changes to the location,
configuration and size, the stormwater facility remains consistent with the
original approved Site Plan Review and 2005 Site Plan Review Modification.
Additionally, pervious pavers have been added alon'g the entire west edge of
the property and other locations as shown on the drawings for a total of
13,255 square feet. Reference attached Sheet C3.0 - STORM DRAIN PLAN
dated December 2, 2008 and Storm Drain Study from Balzhiser & Hubbard
Engineers, both dated December 2, 2008 for demonstrated continued
compliance with SDC 4.3-110.
Traffic
The applicant only proposes an expansion of the covered trash ericlosure
(approximately 2,080 square feet of roof area). This addition does not affect
the original traffic analysis completed by the City of Springfield. Therefore,
the proposed Site Plan Review Modification remains consistent with the
original approved Site Plan Review and 2005 Site Plan Review Modification
and relevant development code standards.
C. The proposed development shall comply with all applicable public and private
design and construction standards contained in this Code and other
applicable regulations.
The proposed demolition of about 683 square feet and renovation of Building 4
(maintaining the original approved use), the demolition of 'Building 6, and the
expansion of the covered trash enclosure (addition of 2,080 square feet) remain
compliant with SDC standards and other applicable regulations, and consistent
with the, original approved Site Plan Review and 2005 Site Plan Review
Modification. The increase in roof area of the trash enclosure is not considered
an increase in impervious surface, since the area it extends over was previously
shown as asphaltic concrete paving or roof area.
This modification application provides more detailed landscape plans consistent
with SDC 4.4-105, the original approved Site Plan Review and 2005 Site Plan
Review Modification. (Reference attached Sheet L 1 " PLANTING PLAN dated
December 2, 2008.)
D. Parking areas and ingress-egress points have been designed to: facilitate
vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide
conn'ectivity within the deve/op11,1ent area and to adjacent residential areas,
transit stops, neighborhood activity centers, and commercial, industrial and
public areas; minimize driveways on arterial and collector streets as specified
in this Code or other applicable regulations and comply with the ODOT
access management standards for State highways: PRE-SUBMITTAL REC'O
DEe 2 2008
.^
.
City of Springfield
, December 2, 2008
Page 7 of 8
PRF-~"BMlrrAL REel)
DEe 2 Z008
There are no proposed changes to the parking areas' or ingress-egress points;
therefore, the, proposed Site Plan Review Modification remains consistent with
the original approved Site Plan Review and 2005 Site Plan Review Modification
and relevant development code standards.
With the exception of the expanded circulation area within the Phase 2 storage
yard that will better accommodate emergency vehicles, there are no proposed
changes to the on-site vehicular Circulation. Consistent with the original approved
Site Plan Review and 2005 Site Plan Review Modification, there is no public
access to this area of the site a'nd on-site bicycle and pedestrian circulation was
met in Phase 1. .
E. Physical features, including, but not limited to: steep slopes with unstable soil
or geologic conditions; areas with susceptibility of flooding; significant
clusters of trees and shrubs; watercourses shown on the WQLW Map and their
associated riparian areas; wetlands; rock outcroppings; open spaces; and
areas of historic and/or archaeological significance, as may be specified in
Section 3.3-900 or ORS 97.740-760, 358.905-955 and 390.235-240, shall be
protected as specified in this Code or in State or Federal law.
One existing tree (48" dbh maple) is proposed to be removed at the west property
line. Per SDC 5.19-110, a Tree Felling Permit is required with the felling of more
than's trees per calendar year, thus a Tree Felling Permit is not required. .
There are no proposed changes that impact the physical features of the site,
therefore, the proposed Site Plan Review Modification remains consistent with
the original approved Site Plan Review and 2005 Site Plan Review Modification.,
CONClUSION
The proposed Phase 2 modifications to BRING Recycling's Planet Improvement
Center meet or exceed all applicable Site Review criteria. The proposed Building 4
alteration, the demolition of Building 6, the expansion of the covered trash enclosure,
the increase of impervious surface area and associated enlargement of the stormwater
facility, the relocation and replacement of the on-site septic system, and the detailing
of the landscape and electrical. plans are consistent with the conditions of the original
approved Site, Plan Review and 2005 Site Plan Review Modification. The applicant
continues to consciously incorporate design elements to enhance the
commercial/industrial building aesthetics in the surrounding area and to provide a
functional, convenient, educational and safe re-use warehouse use to the community.
1 There is no change in use or change to the number of the existing customer parking spaces, with the
exception that 3 spaces were required to be removed at the access drive as a condition of GOOT. There are
39 existing spaces and Phase 2 will add 10 spaces for a total of 49 parking spaces. The number of spaces to
be added in Phase 2 is unchanged from previous applications.
City of Springfield
December 2, 2008
Page 8 of 8
,
~
We appreciate your thoughtful consideration of the project and encourage you to
approve the requested application for a Type II Site Plan Review' Modification as
proposed.
Sincerely,
~~Q
Ben Rippe
,
BR/nl
cc: Julie Daniel, BRING Recycling
Monica Anderson and Don Davey, Ba/zhiser & Hubbard Engineers
Carol Schirmer, Schirmer + Associates,LLC
Z:\PR0J\200334 Bring\Corresp\Agency\5pringfleld\Site Plan Review Modification 2008\200334-SR Modification Application-200B.doc
,
PRE-SUBMITTAL REC'O
DEe 2 2008
December 2, 2008
TBG
~,L/ /
"-, "
--,A/"/
;),,/V
Development Services Department
City of Springfield
225 Fifth Street
Springfield, Oregon 97477
ARCHITEOS &
PLANNERS/INC
RE: BRING Recycling - Planet Improvement Center (200334/1 :3) .
, Type II Site Review Modification Application
132 East Broadway
Suite 200
Eugene, Oregon 97401
541-687-1010
541-687-0625 Fax
Project Address: 4446 Franklin Boulevard/McVay Highway
G1enwood, Oregon. ..
Assessor's Map and Tax lot: 17-03~34-44; Tax Lots 1500, 1600 and 2400.
Applicant:
BRING Recycling
4446 Franklin Boulevard
Eugene, Oregon 97403
Voice (541) 746-3023 . Fax (541) 726-9894
Attn: Julie Daniel
Applicant's
Representative:
. TBG Architects & Planners/lnc
132 East Broadway, Suite 200
Eugene, Oregon 97401
Voice (541) 687-1010 . Fax (541) 687~0625
brippe@tbg"arch.com
Attn: Ben Rippe
On behalf of BRING Recycling, enclosed is a package with an application for a'Type
2 Modification to the approved Site Plan Development Agreement dated December
20,2002 (City File #2001-07-0143). Consistent with the Site Plan' Reyiew Submittal
Requirements, the following is provided for review by the City Staff and the Planning
Director: '
Type 2 Site.Plan Review Modification Application Form - 1 Copy
Attachments - 1 Copy Each:
Narrative
Copy of the Deed
Copy of a Preliminary Title Report
.Site Plan reduced to 8Y, x 11
Right-of-Way Approach Construction Permit
Storm Drain Study, (3 Copies)
PRE.SUBMITIAl REC'O
DEe 2 2008
John E. lawless, AlA
Principal
James F. Alberson III, AlA
Principal .
Darrell L. Smith, NCARS, FAIA
Principal
City of Springfield
December 2, 2008
Page 2 of 2
Plan Sets dated December 2,2008 " 7 Copies Each:
T1-SR - TiTlE SHEET
A 1.0-SR " SITE PLAN
Al.l-SR -FLOOR PLANS
Al.2-SR - EXTERIOR ELEVATIONS
. L 1 - PLANTING PLAN
Cl.0 - EXISTING CONDITIONS
C2.0 - GRADING PLAN
C3.0 -STORM DRAIN PLAN
C4.0 - SANITARY SEWER, WATER, FIRE & GAS PLAN
C5.0 - PAVING PLAN
C6.0 - CIVIL DETAILS, LEGEND AND GENERAL NOTES
El " SITE PLAN - POWER (EXIST. AND DEMO)
E2 - SITE PLAN - POWER (NEW WORK)
E3 - SITE PLAN - LIGHTING (NEW WORK)
The Site Plan Review Submittal Requirements Checklist requires three (3) copies of a
Traffic Impact Study. We do not feel that this requirement should apply to our
specific application because our proposal is a modification request limited to portions
of Phase 2 development that does not affect traffic. Reference the attached Narrative.
for the conforming response to traffic criteria of approval for a Site Plan Modification.
If you have any questions, please do ,not hesitat~ to call me at your convenience.
Thank you for your time and consideration of this proposal.
Sincerely,
:Df~~
PRE-SUBMITTAL REC'O
DEe 2 2008
Ben Rippe.
BR/nl
cc: Julie Daniel, BRING Recycling
Monica Anderson and Don Davey, Balzhiser & Hubbard Engineers
Carol Schirmer, Sc;hirmer + Associates, LLC
Z:\PROJ\200334 Bring\Corresp\Agency\Springfield\Site Plan Review Modification 2008\200334-SR Modification COVER Letter-200B.doc
1
Theodore R KnIongoski, Governor
Department of Transportation
ODOT DiJitrict 05
644 'A' Street
Springfield, OR 97477
(541) 744-8080
Fax: (541) 726-2509
Lynn.S.Stuckratb@odot.state.or.us
File Code: PMT 4-21
July 18, ,2006
JULIE DANIEL
BRING RECYCLING
PO BOX 885
Eugene, OR 97440 '
Subject:
Transmittal of Permit to Construct a State Highway Approach
Highway Number 225, (McVay),'
at Mile Point .15
Application Number 5411
OOOT has received your evidence of insurance al')d required bond or cash deposit and
can now issue a Permit to Construct a State Highway Approach.
The Construction Permit(s) is attached. This Construction Permit includes the
Construction Drawing(s) and all necessary tenns and conditions.
You have until the date specified on the Construction Permit(s), June 09,2007, to
complete installation of the approach(es). '.
As set forth in OAR 734-051-0185, your contractor must advise OOOT (please contact
the Oistrict 05 Office at (541) 744-8080) at least 48 hours in advance of '
commencing construction. Construction of the approach must conform to the terms
of the Construction Permit and exhibits attached to the Construction Permit. I have
attached a copy of OAR 734-051-0215, which addresses applicant liability and control
during construction of approaches. .
You must notify the District 05 Office when construction of the approach is
completed. OOOT will inspect the completed approach and advise you in writing
whether or not the approach has been constructed in a satisfactory manner. If the
approach was constructed in a satisfactory manner, a Permit to Operate, Maintain and
Use an Approach can be issued.
If the approach was not Constructed in a satisfactory manner, OOOT will provide in a
written notice a list of all specific deficiencies that must be satisfactorily corrected before
a Permit to Operate, Maintain and Use an Approach can be issued.
NOTE: An approach can be legally usedONL Y after a Permit to Operate,
Maintain, and Use an Approach has been issued.
PRE-SUBMITTAL REC'O
DEe 2 2008
Transmittal of Final Permit to Cons11uct a Slate Highway Approach
Highway Number 225, (McVay), at Mile Point.15'
Application Number 5411.
Tuesday. July 18, 2006
Page 2
If you have any questions regarding the construction of your approach(es), please
contact me at (541) 744-8080. I welcome the opportunity to assist you.
Sincerely,
~~(\.~
Lynn Stuckrath, Permit Specialist
ODOT District 05, Maintenance Office
Attachments (Construction Permit and OAR 734-051-0215, Liability and Control)
PRE.SUBMITTAI REC'D
"DEe 2 2008
PERMIT NO: 52782
Appllcatlonld: 6411
Highway Number: 226
Applicant Infonnation
I N~J'ULlE DANIEL
1 c'BRING RECYCLING
Malflng'Addt.ss:
PO BOX 885
Eugene, OR 97440
1 "'''i5411746-3023 15411726-9694
I,MjULIED@BRINGRECYCLlNG.ORG
,Insurance Information
I Comprilny:
KPD INSURANCE. INC. '
1 ";~O'::13616 A$:;~OOO.ooo
I PoHcy ~In: Po!Jey Ern!:
07/17/2006 0711712007
Performance Bond Infonnation
ICNiA"Y;
J O"dNO:
.'.
Amount
$
Property Owner Infonnatlon
Name:
JULIE DANIEL
Compsny: .
BRING RECYCLING
Mailing Add",ss:
PO BOX 886
Eugene, OR 87440 usa
Phone: FAX'
!641) 746-3023 (6411728-8884
.Mall: _ .
JULJED@BRINGRECYCLlNG.ORG
I Appliesnt sign~Me
I Locat Agency Approvel (If required)
CHAMPS - d_rpt-P8rmlt_8pprch_coo
PERMIT TO CONSTRUCT A
STATE HIGHWAY APPROACH
Mllepoint: 0,15 Reeson for Rsquest:
Property Infonnation
1
.1
Addrtlss:
I
1
I
NlItNorest7: I,'
I
4448 FRANKLIN BLVD
EUGENE OR 87403
County:
Lane
Highway:
McVay
Mllepoint:
0.15
,Landmarkl:
Rout.,:
, ORE225
t:ngineertngSt8tlon:
101+65
Side or HWy:
R
175'-0" NORTH OF 19TH STREET
Tax Lot Infonnation
TowiIship Range ,Section
17S 3 34
17S 3 34
17S 334
Tax Lot
1500
1600
2400
PRE.SUBMITTAl REC'O
DEe 2 2008
.'
, Oregon Department o( TiiifAr18t10n
Completion Date: 06/09/2007 Jr
Improvement
Plan View
"
w
"'= '
---- '/~
---- ~
---
-.--"- - ~
.;peciflcatlon
- 'Wlclth(VVI:
24.001t
WIng VVidlh (X):
7,001t
PllVing Lmt (P1l:
.00f!
'SUr\'{DS):
16.001t
1 cN';;~e O':ollln .LOOIt
1 Sub Base Crae: ' Thickness:
37.5mm - 0 Aqnreaate Base 11112".0' 6.001n
I a..s~ Cra.: Thickness:
19mm - 0 Aaareaate Base (314" - OJ 6.001n
I LsidCD~tv Class 'C' Asohalt Concrete' "':.~oj~
1 Wear Crn Thiokness:
Std D~tv Class 'C' Aaohalt Concrete 2.001n
'Anglll(AI:
90
'Curb-Sdwlk{K):
6.00ft
PiWlngLml(p;;!):
.001t
, Instructions' . .
Issuing of permits under thsse rsgulatlons Is not e finding of compl/snce with the slstewlde plsnnlng goals cr Ihe acknowledged
comprehensive plan for the area. Permits are Issued subject to the approval of city I county or other governmental agencies having
authority to regulate Isnd use by means or zoning andlor buildIng regulations. It shall be the appllcsnt's responsibility to obtsln sny
such approvals IncludIng, where applicable, local.govemment determinations of compliance with statewlde'plannlng goals. All
mate~als and workmanship shall bsln accordance with current Oregon Standard Specifications for Highway Construction.
The Permit Islssusd sub)sct to ths provtslons or Oregon Admlnlstratlvs Rules 734-051-0045 through 734-051-0355, which are by .
reference made a part of this per.mlt; and which are In, effect at any partlcufar tfme in the duration of the permIt
This permit Is not valid until signed by a duly authorized I
reoresentatlve ofthe Oreflon D!lpartment of Transportation.
I~/p-~
AuthOriz"ODO~S~~
~~/
Date
Date
Page 1 of 1
Printed: 01/181200612:01:47 PM
Application Id: 8411 Highway Number: 225
MllePolnt 0.15
PROVISIONS
Oregon Department of Transportal/on
1r
PERMIT FOR ENCROACHMENT, CONSTRUCTION
ON OR USE OF STATE HIGHWAY
PERMIT NO: 52782
Applicant: JULIE DANIEL Company: BRING RECYCLING
140,301 Construction Plans are approved in general only. The District Manager or representative may require field changes. When revisions are made in
the field, as-constructed drawings must be submitted to the District. '
150.101 The permit and all specifications, details, typical drawings and standard drawings attached to the permit shall take precedence over all plans,
drawings end specifications produced by the Architect or Engineer representing the Applicant or Contractor, .
150.103 The following ODOT documents or subsequent revisions there to, where applicable and not otherwise superseded by the permit language herein,
shall be incorporated for use in this permit: Oregon Standard Specifications For Construction (ODOT,2002), Oregon Highway Design Manual
(2003), and relevant Standard Drawings, ODOT shall have authority over the acceptance of all materials and workmanship performed under this
permtt as stated in 00150.00 of the Oregon Standard Specifications For Construction (ODOT,2002).
150.201 Within 48 hours before beginning permit work and again after completing permtt work, the Applicant (or agent) shall notify the District permitting
representative.
150.403 Applicant is responsible for maintaining existing structures, including fences, unless otherwise directed by the District Manager or his representative
150.411 Applicant (or agent) shall have on the Job site, at all times, a copy of the permitand all attachments, The permit shell be readily available for
inspection. '
150.501 The permitted work, is located within the Oregon Utility Notification Center (OUNC) area. The OUNC Is a utilities notification system to notify owners
of utilities about excavation work performed in the vicinity of their facilities. The utilities notification system telephone number is 1-800-332-2344.
150.702 Do not park on state right-of-way unless permitted by the District Manager. Comply with ORS 810.230, 810.160.
150.703 Remove all dirt and debris from the highway at the end of each work shift or more frequently if a hazard to the traveling public exists or as directed
by the District Manager.
170.303 Applicant shall be responsible and liable for (1) investigating presence/absence of any legally protected or regulated environmental resource(s) in
the action area; (2) determining any and all restrictions or requirements that relate to the proposed actions, and complying with such, including bur
not limited to those relating to hazardous mat.rial(s), water quality constraints, wetlands, archeological or historic resources(s) state and federal
threatened or endangered species, etc; (3) complying with all federal, state, and local laws, and obtaining all required and necessary permits and
approvals.' .
If the applicanttmpacts' a legally protected/regulated resource, applicant/permittee shall be responsible for all costs associated with such impact,
including, but not limited to all costs of mitigation and rehabilitation, and shall indemnify, and hold harmless ODOT for such impacts and be
responsible and liable to ODOT for any costs or claims that ODOT may hava.
330.411 Native material found to be unsatisfactory for compaction shall be disposed off of the project and Department controlled property. The site shall be
shaped to drain, contoured, trimmed and seeded with native grasses in a manner satisfactory to the District Manager.
330.421 Only earth or rock shall be used as fill material. The site shall be shaped to maintain existing drainage, contoured, trimmed and seeded with naJive
grasses in a manner satisfactory to the District Manager.' -.
400.001 Permission is required for any person(.) seeking to change drainage patterns which increase peak fiow rates or pollutant loads to ODOT RIW. The
Impacts created by the development must be mitigated to maintain the water quality and peak surface runoff at the existing level. All of the
proposed Improvements shall comply with the Clean Water Act, Oregon Drainage Law, NPDES regulations, Total Maximum Daily Load (TMDL)
limitation guidelines, and the Endangered Species Act. Erosion control measures shall be taken to prevent Impacts to highway right-of-way,
during and after construction.
- PRE-SlIRMllTAl REC'O
n F C_2-2DOR
Reason.for Request: ,Improvement
CHAMPS. d_rpt_prov_woasb
Page 1 of2
Printed: 07/18/2006 "12:02:03 F'M
'.'
PERMIT NO: 52782
PERMIT FOR ENCROACHMENT, CONSTRUCTION
ON OR USE OF STATE HIGHWAY
Oregon pepartment of Transportation
1r
Application Id: 6411 Highway Number: 226'
MII.Polnt 0.16
PROVISIONS
Reason for Request: Improvement'
Applicant: JULIE DANIEL Company: BRINO RECYCLINO
445.412 Any area of cut or damaged concrete shall be restored In accordance 'brawing RD300 and "Typical Section-Pipe Section Under Sidewall<" See
~00445.410. ' .
00445.41 Installation In Paved'Areas: _ '
(a) General - Install pipes, within paved areas that are to be.preserved, by open,excavation, tunneling, jacking, or boring methods as allowed by
ODOT Permit. Regardless of the method used, do not disturb the adjoining pavement more than necessary.
(b) Open excavation Method - Where open excavation method is used, cut, remove, and restore the pavement as follows:
(1) Pavement Cuts - Saw cut the pavement along each edge of the area to be 'removed when no pavement overlay will occur or when the surface is
carrying traffic. All other pavements may be saw or wheel cut. Limit the area being cut, to the least width and extent practical for Installetion. Cuts
shall be clean, vertical, and made true to lines designated within a tolerance of 25 mm. Depths of the cuts shall be sufficient to permit the removal of
pavement between or alongside them without damage to pavement or structures to be-Iefllnplace. Remove and dispose of pavement lying within
the limits of the cuts and from any adjoining areas damaged by the cutting and removal operations according to Section 00310. '
(2) Replacement Surfacing: _ '
a. Aggregate Base. After pipe has been Installed and tha trench backfilled to 'proper elevation, 'according to Section 00405, for pipes 1800 mm and
less in diameter and Section 00510 for pipes over 1800 mm in diameter, place and oompact aggregate base or foundation material to a thickness of
450 mm or the thickness of the removed e"ggregate base, whichever is greater. .
b. Pavement - Unless otherwise epproved, the kind of replacement pavement to be construoted shall correspond with the same kind removed from
the area, Replace highway shoulders, driveways, curbs, gutters, walks, dikes, walls and other similar asphalt or portland cement concrete
structures with construction at least equal in all respects to that of the structures or parts of structures removed, ,similar and matching that of
adjoining, undisturbed structures. Perform replacement work as follows:-
- Trim all loose fragments from abutting edges of old pavement.
- 'Apply asphalt tack coat to edges of existing asphalt concrete.
- Thoroughly molstan edges of old portlend cement concrete with water.
- Place, shape, compact, and finish the asphalt or portland cement concrete to established grade end cross. section eccording to Sections 00745
(Light Duty) and 00440, es approprlste.
- Respective thickness' of.new pavement shall equal removed pavement thickness or the following, whichever is greater:
Material Minimum Compacted Thickness, mm
Traveled-Wey Area Other Arees
Asphelt Concrete 130 100
Portlend Cement Concrete 200 200
1040.002 Areas from the back of sidewalk to the property line may be used for landscaping by obtaining a separate ODOT Miscellaneous permits from this
office. Any other uses such as parking or storage requires a land rental or lease agreement by the department. No curbs, signs, posts or other
structures shall be placed on the right of way without written authorization from the District Manager or representative.
1.000 Special Provisions
2.000 If tax lot 1600 and/or 2400 become different owners, an easement will be required to cross over properties.
3.000 Parking spaces near approach could effect safety of traffic entering the site from the McVay Highway. Applicant shall remove three of the spaces
closest to the approach (o~ the Northeest corner of the parking lot, or right side as a vehicle enters the site), nearest the approach.
-0
:;0
!T1
.
c::; :~
fTi Ei
r: '"
::::..
t-:o j;!
,...., r-
<=>
<=> ;;:0
ex> ~
d
CHAMPS. d_rptyrOV_W08sb
Page 2 of2
Printed: 07/1812006 12:02:03 PM
PERMIT TO CONSTRUCT A
STATE HIGHWAY APPROACH
MllePolnl: 0.15 Reaaon for Request:
,"':-J
Application Id: 5411 '
Highway Number: 225
Permit No: 52782
Issue Date: 07/18/2006
Applicant Information
I ""jULlE DANIEL
I CoiR{NG RECYCLING
MllUng AddreQ:
PO BOX 885
Eugene, OR 97440
PhoM: FAX:
J5411746-3023 15411726-9894
eM.II:
JULIED/lJlBRINGRECYCLlNG.ORG
Completion Date: 06/09/2007
Property Information
, I :'i:RANKUN BLVD
EUGENE OR 87403 '
I~~
Highway: Route:
McVav ORE225
MII.Polnt Englnnnng 5mllon: tilQt: 01' t1WY: Nalll-Cflar,:
0.15 101+65 R ' N
U1ndlNll'lCl:
175'..0" NORTH OF 19TH STREET
Tax Lot Information
ToWoship RlInp _OIl Tax Lot
178 ,3 34 1500
178 3 34 1600
178 3 34 '2400
'. This placard should be posted and visible from the highway at all times
during construction.
For inspection, call (541) 744-8080
~~d..rPl..PemtIL.pp!'Ch...,PltlC
PRE-SUBMITTAL REe'D
DEe '2 2008
Prtnt8d: 07/1812008 12:01:52 PM
.'