Loading...
HomeMy WebLinkAboutNotes, Work PLANNER 1/20/2009 , I , .! iCity of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 SPRINGFIELD ~- LAND DIVISION PLAT PRE-SUBMITTAL CHECKLIST Subdivision Project Name: Eureka Subdivision Project Proposal: Subdivide one parcel into five individual lots Case Number: PRE20,09-00002 Project Address: 5560 High Banks Road Assessors Map and Tax Lot Number(s): 17-02-28 TL 303 Zoning: Low Density Residential (LDR) Overlay District(s): N/A Applicable Refinement Plan: N/a Refinement Plan Designation: N/A Metro Plan Designation: Low Density Residential (LDR) Tentative Decision Date: January 20,2009 Pre-Submittal Meeting Date: January 20, 2009 Application Submittal Deadline: July 20, 2009 Associated Applications:' SUB2008-00022 ~Wj~I~I~1t~i,l!~lljEI!I:~LoE~EYO'~~~s~i[~~~A~~Ili1dI~. I POSITION ' REVIEW OF " NAME PHONE I I Project Planners Land Use Planning Lissa Davis 726-3632 I I Engineer Transportation I Jon Driscoll 726-3679 I I Engineer Utilities I Eric Walter 736-1034 I I Engineer Sanitary & Storm Sewer I Eric Walter I I Deputy Fire Marshal Fire and Life Safety I Gilbert Gordon 726-2293 I I Community Services Manager Building I Dave Puent 726-3668 I ~lml\::ANVI:!SiDEY'El!Ge1itEN!1:;#RE'lIEW:.fs1iC" . J~,~~;R_~~=",,,,.,,,,d,,,,,,",",,,,,,,,,,,,/0'/'.,,,,,,,,,,,,.w,,,,,,illL"",,,-.wit,,,%_",y;~.,~", Appiicantiowner Bill Dwyer Eureka Development 5558 Thurston Road , Springfield OR 97478 ". '"'~ (0 , ""r",,,,,,,.X/i, "'/F'"''''TY''' k__~ Jt@v0c..~2~; "'....,"'.. ,',. Engineer Tom Poage Poage Engineering & Survey 990 Obie Street Eugene OR 97402 Date f<eceivecl" ! I dD 10') Planner.zD b".Q.e)VtO/L. 2/13/2009 1 of 5 The items. needed to make the application complete for review are incorporated below. NOTE: . Conditions of Approval - taken from Notice of Decision dated: 6/26/2008 . Applicant Response - taken from: Written statement for Final Subdivision Plat Application. , Condition #1: Prior to plat approval, the applicant shall plant six trees of at least 2 inches in caliPer along the High Banks frontage oflols I and 5. The street trees shall'be selected from the Ust of Acceptable Street TreesIor planter strips with overhead power lines as specified in the EDSPM. Specifically, street trees shall be planted at least five feet behind the curbside sidewalk but not more than ten feet behind the sidewalk as specified in EDSPM 6.02.2. All tree nursery tags identifying the type of street tree shall remain on the street trees until plat approval. Applicant Response: Four street trees have be~r planted along the frontage of High Banks Road, two on Lot S and two on Lot I per a discussion with Greg of the City of Springfield and the applicant. The new street trees were planted approximately six feet behind the sidewalk. The trees are Norvvegian Maple which were selected from the List of Applicable Street Trees and are at least two inches in caliper. Finding: Correspondence from Greg Ferschweiler on November 13, 2008 indicates his concurrence that due to the driveway, 'utilities and storm system, only four street trees are required. . Finding: The applicant has verified the Norway Maple subspecies "Glob'e" was used. This selection is on the list of Applicable Street Trees for planter strips with overhead power lines. Conclusion, This condition has been met. Conditi~n #2: Prior to plat approval, Lots I through 4 shall be serviced with private sanitary sewer laterals from the 12-inch sanitary sewer main in the PUE along the High Banks frontage of the subject property as dePicted on the Tentative Plan. NOTE: Plumbing permits are required to install these private sanitary sewer laterals. Applicant Response: The applicant applied for and obtained a building permit to connect four new sanitary sewer laterals to the existing 12" sanitary sewer which falls within the existing public utility easement along the frontage of the aforementioned property. These new sanitary sewer connections were constructed under building permit number COM2008-1329 to serve lots I through 4 oftheproposed Eureka subdivision. The existing structure on lot S is served by an existing sanitary sewer lateral which connects at the east side of lot S to the same 12" sanitary sewer main mentioned above. The newly constructed sanitary sewer im'provements' are adequate to meet the requirements of SDC 4.3-1 OS.^- . Finding: The Public Works Department has determined that the public sanitary sewer system has adequate capacity to accept the anticipated flow from the proposed development. Finding: Building Permit number COM2008-1329 was finaled on January23, 2009. Conclusion: This condition has been met and complies with SDC 4.3-1 OS.^- Condition #3: Prior to plat approval, the applicant shall update the utility plan set for the proposed land division to reflect an approved stormwater management system for roof run-off for Lots I through 4. In addition, future development on Lots 1-4 shall direct the rooftop run-aff to an approved discharge location on-site, such as a rain garden or flow-through planter. Applicant Response: The applicant has constructed a conveyance swale adjacent to the porous pavement driveway, The conveyance swale is sloped in a manner to direct any surface drainage or roof run-off to the rain garden constructed ~n the south portion of lot I adjacent to High Banks Road. Roof top run-off from future buildings constructed under separate permits will. be hard piped to the newly constructed conveyance swale and travel overland to the rain garden. The rain garden was sized per the method shown on City standard drawings 4-19 and 4-22. The utility plan has been revised to reflect this condition. II I Date Received: 7A) rA Planner: Lb t)Qc.1S,{6I\ PRE 2009-00002 2 of 5 Finding: Stormwater run-off from the new driveway will be managed by a conveyance swale to a rain garden in the PUE along the frontage of Lot I with overflow conveyed to the public stormwater system in the right-of-way south of the subject property. Conclusion: This condition has been met and complies with SDC 4.3-110. Condition #4: Prior to plat approval, the applicant shall install the rain garden as proposed on the Tentative Plan. Applicant Response: The app'licant has constructed the rain garden shown on the Tentative Plan and seeded it with tufted grass. Finding: The Public Works Department is satisfied with the choice of vegetation. Conclusion: This condition has been met and complies with SDC 4.3-1 1'0. Condition #5: Prior to plat approval, the proposed rain gardens shall be fully vegetated with all plant species established to ensure a fully functioning water quality system, Alternatively, the applicant shall provide and maintain additional interim erosion control 1 water quality measures acceptable to the Public Works Department that will suffice until such time as the rain gardens become, fully established. Applicant Response: The applicant has planted the rain garden with several species of plants. perennials, and tufted grass from the list of suggested plants shown on the City of Springfield standard detail 4-22. Furthermore, the applicant has installed a landscape catch basin one inch below the back of the side~lk to serve as an overflow during a large storm event. The catch basin currently has silt fabric over the grate to prevent silt from entering die storm system until the rain garden is fully established. . Finding: The Public Works Department is satisfied with the method of interim erosion control! water quality measures Condition #6: Prior to plat approval, the applicant shall update the utility plan set for the proposed land division to show the proposed catch basin outside of the PUE Alternatively, the applicant may obtain approval from the affected utilities for the placement of the private catch basin within the PUE Applicant Response: The applicant has, obtained permission from all affected utilities and the city prior to placing the new landscape catch basin in the PUE along High Banks Road. Finding: The applicant indicated that they have obtained concurrence letters from all affected utilities; however Public Works Engineering has only received and has on file only one utility concurrence from SUB Electric. Once Public Works Engineering receives the remaining concurrence letters, the plat application can be approved. Condition #7: Prior to plat approval, the applicant shall coordinate the provision of power service to the subdivision with SUB and the City. '/n addition, prior to plat approval, the applicant shall update the utility plan on file for this development to show the actual proposed location for all utility service lines to the site. Finally, prior to plat approval, the applicant shall provide, at a minimum, power service to Lots I through 4, and 'all utility lines to serve the site shall be underground, including service lines to the existing dwelling unit Applicant Response: The location of the underground wire utilities for lots I - 4 were installed per the utility plan and the existing utilities to the dwelling unit on lot S were relocated underground. ' Finding: This condition has been met. Condition #8: Prior to plat approval, the applicant shall coordinate the provision of water service to the subdivision with SUB and the City. In addition, prior to plat approval, the applicant shall update the utility plan on file for this development to show the actual proposed location for water lines to the site. Finally, prior to plat approval, Lots I through 4 shall be served with private water laterals and water meters located as per SUB Water standards. NOTE: Plumbing permits are required to install these private water laterals, Date Received~ t17f Ins Planner: Lh DQ.CA ~ PRE 2009-00002 3 of 5 . Applicant Response: The water taps and meter base boxes were installed by SUB per plan. The service laterals were installed by the applicant to serve lots I - 4 per the utility plan set. Actual water meters will be installed by SUB as new dwelling units are built under a separate permit. Finding: This condition has been met. Condition #9: Prior to plat approval. the applicant shal(install a sight-obscuring vegetative screen or wood fence along the west proPerty line. Such a vegetative screen orwood fence shall conform to the development standards outlined in SDC 4.4-110 and 4.4-115. Applicant Response: The applicant has installed a six foot site obscuring wood fence along the west property per the specifications outlined on SDC 4.4-110 and 4.4-115. Finding: The fence has been constructed; this condition has b<<:en met. Condition #1 0: All fences installed in association with this development shall comply with the development standards ofSDC 4.4-1 10 and 4.4-1 15. Applicant Response: Existing conditions as well as the newly constructed 6 foot fence are adequate to meet the requirements of 4.4-1 00. Finding: This condition has been met, Condition # II: Prior to occupancy of any new dwelling units on Lots I through 4, vehicle parking shall be provided in accordance with SDC 4.6-125. Applicant Response: Parking will be provided for new dwelling units under a separate building permits obtained for the construction of any new dwelling unit. Finding: This condition will be met at time of construction of any new dwelling unit. Condition #12: Future development on Lots I through 4 shall abide by the base solar development standards as per SDC 3.2- 225. Applicant Response: The application meets SDC S.12-125.D. Finding: This condition will be met at time of construction, of any new dwelling unit. Condition #13: Prior to plat approval, the applicant shall remove the existing western curb cut to the subject property. as well as restoring the curb and sidewalk along that portion 'of the property's High Banks frontage. Applicant Response: As required by this condition the existing curb cut on the western side of the property has been removed and replaced with standard curb, gutter and sidewalk as well as a new 26-foot wide driveway apron per city standard drawing 3-19 for the newly constructed 20-foot wise porous pavement driveway. Finding: This condition has been met. / Condition # 14: Prior to plat approval, the applicant shall install a driveway to serve Lots I through 4. This driveway shall provide 20 feet of clear width and thirteen feet, six inches of clear height The driveway shall be paved with pervious pavement 18 feet wide (rom the edge af pavement of High Banks Road to the pan of Lot 3 as dePicted on the Tentative Plan. The driveway shall be designed and installed to support an 80,000 lb. load and shall have "No Parldng-Fire Lane" signage in iampliance with the standards of SFC 503.3 and 0 I 03.6. Prior to construction, the applicant shall submit a public and private utility plan showing all utilities and easements. Date Receivect: I \ W oC1 Planner. L{) ~c)~ PRE 2009-00002 4 of 5 . Applicant Response: The applicant has depicted a 26 wide by 147.52 foot long easement on the Final Plat in the center of the property to c~>ver the newly constructed 20-foot wide,driveway and all utilities to serve lots I through 4. A "Fire Lane - No Parking" sign has been placed within the Joint Use, Access, Utility and Maintenance Easement. Finding: This condition .has been met. Condition #15: Prior to plat approval, ,the . applicant shall record and document on the Plat a 26-faat wide irrevocable joint use, access, utility, and maintenance easement to benefit LOls I through 4. Applicant Response: The applicant has depicted a 26 wide by 147.52 foot long Irrevocable Joint Use, Access, Utility and Maintenance Easement on the Final Plat in the center of the property to cover the newly constructed 20-foot wide driveway and all those utilities required in this land use application to serve lots I through 4. Finding: This condition has been met, Condition #16: Vision clearance areas shall be maintained at each access to a public street as per SDC 4.2-130. Applicant Response: As conditioned above, the application meets the requireme~ts of SDC 4.2-,130. Finding: Th~ Plat does not indicate that vision clearance areas shall be maintained at each access. This must be indicated as a note on the Plat. WHAT NEEDS TO BE DONE NEXT: SDC 5.12-140.A states that for subdivisions, the applicant shall submit the mylars and application fee within 180 days of the pre-submitql meetings. If, however, the applicant has not submitted the plat application within these time frames, the tentative plan approval.becomes null and void and re-submittal. is required. Please refer to the plat application packet available at the Development Services Department, as well as 5,12-135 through 5.12-150 for more detailed information on the platting process. Please note that the plat, as well as the installation of public and private improvemenls, must conform to the approved tentative plan or as conditioned herein. In addition, please note that no individual parcels may be transferred and no building permils will be issued until the plat has been recorded at Lane County and the applicant has submitted five (5) recorded, rolled paper copies of the plat and three (3) copies of the required documents to the Development Services Department ADDITIONAL INFORMATION: The application, all documents, and supporting evidence are available for free inspection (copies are available for a fee) at the Development Services Department. . APPEAL: This decision is considered a Director's Type II decision and as such; may be appealed to the Planning Commission. SDC 5.3-115 states that only the property owner, applicant, if different, and those persons who submitted written comments within the 14-day comment period have standing to appeal this decision, QUESTIONS: For questions regarding this application and decision, please contact Lissa Davis, Planner 2 at (541) 726-3632 or by email at Idavisl1i)ci.sDrin.meld.or.us. Date Received' Planner. lb \ hz>lo~ ~~~ PRE 2009-00002 5 of 5