Loading...
HomeMy WebLinkAboutComments PWE 9/11/2008 , - TENTATIV'SiTE PLAN REVIEW APPLICATION PRE-SUBMITTAL CHECKLIST Engineer: Eric Walter Case#: PRE2oo8-ooo65 PUBLIC WORKS ENGINEERING o Site Assessment of Existing Conditions. Complete ~ Incomplete See PW Note(s) Prepared by an Oregon licensed Landscape Architect or Engineer Vicinity Map The name, location, and dimensions of all existing site features including buildings, curb cuts, trees and impervious surface areas, clearly indicating what is remaining and what is being removed.. For existing structures to remain, also indicate present use, size, setbacks from property lines, and distance between buildings The name, location, dimensions, direction of flow and top of bank of all watercourses and required riparian setback that are shown on the Water Quality Limited . Watercourse Map on file in the Development Services Department The.loo-year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development Services Department Physical features including, but not limited to trees 5" in diameter or greater when measured 4Y2 feet above the ground, significant clusters .of trees and shrubs, riparian areas, wetlands, and rock outcroppings Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted concurrently if the Soils Survey indicates the. proposed development area has unstable soils and/or a high water table ~ ~ ~ IiiW liilllli jjj0P 3:'-.<1, .H~ ~. ~ 8?1 .~ ~ ~ jjj I"Q'I k;8;J I1j;f1 t!2fS1 ~ ~ Revised 10/25/07 Date Received' q) II / 0 S Plannep~~ I fY6 3 0.. Improvement and ...ublic Utilities Plan must be.:in compliance with.the regulations of SDC Sections 5.17-100, 4.1-100, 4.2-100, and 4.3-100 and must include the following information: Complete Incomplete See PW Note(s) i:8\l jjj ~ i:8\l 1 i:8\l fiiI I!!!J ~ jjj o Grading and Paving Plan Complete Incomplete See PW Note(s) i:8\l jjj ~. i:8\l 2 i:8\l G'(I ~ i:8\l III ~ ~ i:8\l rw;T .~ ~ .~ Prepared. by an Oregon licensed Civil Engineer Location and width of all existing and proposed easements Location of existing and required power poles, transformers, neighborhood mailbox units, and similar public facilities Location and size of existing and proposed utilities on and adjacent to the site, including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points Prepared by an. Oregon licensed Civil Engineer Planting plan prepared by an Oregon licensed Landscape Architect where plants are proposed as part of the storm water management system Roof drainage patterns ana discharge locations Pervious and impervious area drainage patterns The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural , drainageways to be retained Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land 'with a slope over 10 percent, the contour lines may'be at 5 foot intervals) Amount of proposed cut and fill o . Stormwater Management System Study - provide four (4) copies of the study with. the completed Storm water Scoping Sheet attached. The plan, calculations, and documentation must'be consistent with the Engineering Design Standards and Procedures Manual. . Complete .Incomplete See PW Note(s) k&I ijjl ~ Revised 10/25/07 Scoping Sheet and attached Stormwater Management System Study Date ReceivEtrt' 0..1 \ \ I ('J e Planner: U) -r t.0 ~ J IriJ 3 ,. . . PW Notes: 1. Specify all existing easements on pr~perty. plans should inclyde.,<t minimum 7' PUE fronting 39th Street. Al-;,o, .s~-',oJ'Y- .ePS~ ~~ ),-t-. s~ ' 2. Submit bioswale detail showing conformance with the City adopted .Portland Stormwater Management Manual Chapter 2.9. Bioswale design shall include a seed mix specified meeting an approved bioswale design (Pg. 2-65 to 2-69). Additional comments not related to the completeness of the application: . ?\C'-V\.) ~~lL a.. " L~o..IL":~" "Z~' UO\j~ ~ 1..J,/;'e..- J r;j\d: - 7 -0~ 1 .4Ifll'~Z;'),J~ ,~~ ~L II {,z ;AAJ()~f1 (j\Ato ,~V' ,v--t<:. fntl~1' . Revised 10/25/07 . Date Received' q 1 \ ( I OB . Planner: CD . PlD ~ ~93