Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-3-3 .,/\.\jifl> ./"'.J!.l 0 / / ~4r~ " /,;:;/'"'1:_ . Page 1 of 1 ~< ,~ U~ ."'~ / Report of Inspection Services ~""u,,~&ConstructionServicSs Welding/High-Strength Bolting ~..... ; ~yrt! .1.'II~lti;"I~.'~~'IIII\I.1111J1 Client: Mr. Jim Thomas Wildish Building Co. PO Box 7428 Eugene, Oregon 97401 Project: LCAFRC- BLM r-Warehouse Addition '- 3110 Pierce Parkway_' Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.: Inspection of: Fabricator or Erector: Contractor: Welding Farwest Steel Wildish Building Co. Shop: Ii1l Weather: BPNo.: 03-03-09 2097030 E-22494 K. Green 8003776 ICC Field: 0 Inside Pending Perfqrmed ,continuous visual inspection during multi-pass flare groove weld. Inspected fit-up and monitored amps, volts and travel speed during in-progress welding by two (2) certified welders using' E71T-1 electrode FCAW process. Work was completed on eleven (11) embeds per sketch submitted by Tony Dean (Wild ish) dated 02-25-09 for, th<:, BLM warehouse addition. Completed welds were checked for size, length, profile and location. Dave Church (Farwest Steel) was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked Is in conformance with shop drawings dated 02-25-09 and applicable AWS D1.1 code, except if noted above. Reviewed By: (h.;:.~ Michael L. ~ey' T echn/cal Manager ~ c: Barrantine Bates Lee- (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) Wildish- Tony Dean (em ail) City of Springfield MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed"and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed withoutFEI Testing & Inspection, lnc.'s 'NI'"itten authorization. . 750 NW Comell Avenue. Corvallis, Oregon 97330, phone (541)7574698' fax (541) 757-2991 29540 BAirportRoad' Eugene, Oregon 97402. phone (541) 684-J849 . fax (541) 684-3851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4M6 ~f;l ~G\~72\5 Page 1 of 1 l1mU.1!Ii..rl'It.':.<:1111Ii'tw!I Geotechnical & Construction Servires Field Density Test Results - ASTM D 2922 Client: Mr. Jim Thomas Wildish Building Co. PO Box 7428 Eugene, Oregon 97401 Project: 'lCAFRC- BlM Warehouse Addition 311 0 F'i~rc!3 Parkway Springfiela; Oregon 'Revised Report 03-04-09 Date: 02-23-09 Project No.: '2097030 Report No.: . E-22430 B.P. No.: 'Pending MOISTURE/DENSITY DATA: ASTM D698 - Maximum Dry Density of 144.6 pcf, at 7.7% moisture furnished by client for 1 1/2"-0 crushed gravel (Wild ish Sand and Gravel). . . A . Test APp~~Ximate location Approx. D:::tY-- Percent Dry Density I ( Percent j Compaction Nr' B~~;25 E~~'~:n MO~Tre ~~n I com:a~)t/iO Req~~~ment 3 Ca-3footing FG 149.7 5.8 141.4 98.0 92.0 ~__ _ Bc-2footing FG 146.2 6.2 137.7 ~;__92.0 Tests performed at finished grade of 1 1/2" base rock under slab area and footings" V Reviewed By: A.i.~~ Michael L~ Me~ Technical Manager . c: Barrantine Bates lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) Wildish- Tony Dean (email) City of Springfield MLM:sc This report andlor enclosed lest data is the confide'nllal property of tile client t(l whom it is addressed and pertains to the specific process and/or material evaluated. As such, infom13tion contained herein shall not be reproduced in part offuB andlor any part thereof be disclosed without FE! Testing & Inspection, Ine.'s written authorization. 750 NW 0JmeII Avcrrue' Cavallis, Oregoo 97330, phooe(541) 757-4698 . fux(541) 757-2"1)1 29540 B AitpmRrnd' B.Jgme, Oregoo 97402 . j:/1ooe(541)684-3849.!Ex (541)684-3851 63050 COIporatePlace, Suite 2 . Bend, Oregon 97701' phone (541) 3824844. tax (541)3824846 SfEI 0.1- "2-/>-' Page 1 of 1 11a.'lltlrt;"lf.'~~lllll\'.ln. <Xv",,"; ,nical & Construction Servire; Daily Field Report . Client: . Mr: Jim Thomas Wildish Building Co. PO Box 7428 Eugene, Oregon 97401 Project: LCAFRC- BLM Warehouse Addition r-. .--- ' ..c____, . ~ 3110 Pierce Parkway' -SpringfieliJ, Oregon - Date: Project No.: Report No.: Inspector: 10 No.: 03-03-09 . 2097030 E-22490 D. Delatte 1080867-88 ICC Inspection of: Reinforced Concrete Contractor: Wildish Building Co. Weather: Overcast BP No.: Pending Continuous Inspection: 0 Periodic Inspection: 0 Performed inspection on the reinforcing steel for pad footings G4, G3, G2, F4, E4, D4, C4, A4, A3, A2 and elevator pit slab. Reinforcing steel was checked for grade, size, lap, placement and clearance. Anchor bolts for columns. were checked for size, embedment and were placed in templates. Note: contractor stated he had verbal approval not to run the three (3) #5 bars at the bottom of continuous footing thru pad footing. . .--- Observed the placement of 38 .yards of Knife River 4000 psi concrete (3000 psi required) (mix 40-1 K) for areas noted above. Concrete was placed by pump and mechanically consolidated. Cast one'(1) set of four (4) 4" x 8" concrete test cylinders. The on-site test results from load 3 are as follows: slump- 5 1/4"; air temperature- 55F; concrete temperature- 65F; air content- 4.3%.' Tony Dean (Wildish) was notified of our on-site test results and was asked to notify our office when additional serVices are needed. To the best of our knowledge, the work inspected was in accordance with plans dated 02-12-09, RS2 print dated 02-25-09 and applicable workmanship provisions of the I.B.C., except if noted above. . Reviewed By: jl7. tj~ Michael L. Me"r Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers- (e-mail) Oregon Military Dept. -:- (e-mail) Wildish- Tony Dean (email) .City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NW ComeIIAvenue' CoIvaIlis, Oregon 97330, phone (541) 757-4698, lax (541) 757-2991 29540 BAirportRoad' Eugene, Oregon 97402, phone (541 )684J849. lax (541) 684-3851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 - phone (541)382-4844' lax (541) 382-4846 U~:'1.. -'''Zjt, ; ~5 ; ,.8. .,. " ,~ 1--------._';::-' '~.-....: ~......~ ~ftl Page 1 of 1 11~'m[tI;.I~.'~~'IIII~.IIl. Gcv~ 111ia31 & Cor1struction Services Report of Inspection Services Welding/High-Strength Boltin~ Client: Mr. Jim Thomas Wildish Building Co. PO Box 7428 Eugene, Oregon 97401 Project: LCAFRC- BLM Warehouse Addition ~3-11 o'Pierc~RarkwaY~ S'pringfield, Oregon Date: Project No.: Report No.: Inspector: ID No.: .03-01-09 2097030 E-22493 K. Green 8003776 ICC Field: 0 Inside Pending Inspection of: Fabricator or Erector: Contractor: Welding Farwest Steel Wildish Building Co. Shop: Itl Weather: BPNo.: Performed visual inspection of two (2) fabricated structurai steel embe~s per sketch (page #3) submitted by Tony Dean (Wi/dish) dated 02-25-09. Completed welds were checked for size, length, profile and location. Dave Church (Farwest Steel) was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked is in conformance with shop drawings dated 02-25-09 and applicable AWS D1.1 code, except if noted above. Reviewed By: ;h. ';(.~ Michael L. ~eyer;- Technical Manager c: Barrantine Bates Lee ~ (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) Wildish- Tony Dean (email) City of Springfield MLM:sc RECEIVED MAR 0 6 1009 This report and/or enclosed test data is the'confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall notbe reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 t#V ComeU Avenue. Corvallis, Oregon 97330, phone (541) 757-4698 . fax (541) 757-2991 29540 B Airport Road . Eugene, Oregon 97402. phone (541) 684-3849 . fax (541)684-3851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4644 . fax (541) 382-4646