TYPE II TENTATIVE LAND DIVISION,
PRE-SUBMITTAL CHECKLIST
Project Name: Vern Benson Subdivision ("5 Doves Estates")
'-
Project Proposal: 5 Lot Residential Subdivision
Case Number: PRE2008-00076
Project Address: 5642 A Street
Assessors Map an" Tax Lot Number(s): Map 17-02-33-41, TL.1704
Zonin~: Low Density Residential (LDR)
Overlay District(s):
Applicable Refinement Plan:
Refinement Plan Designation:
Metro Plan Designation: Low Density Residential (LDR)
Pre-Submittal Meeting Date: January 9, 2009
Application Submittal Deadline: July 8, 2009
Associated Applications: None
1Iem-&Yl$FJseRIN(;lilEePlQI;VEI.!$RM'EljlifIiREVIEWiinEAJMJlilIIiII!iIIII~'~
r POSITION .1 REVIEW OF I NAME PHONE l
1 Proiect Planner 1 Land Use Planning . Andv Limbird 726-3784 I
I Transportation Planninq Enqineer 1 Transportation 1 Jon Driscoll 726-3679 1
I Public Works Civil Engineer 1 Utilities 1 Clayton McEachern 736-1036 I
I Public WorksCivil Engineer 1 Sanitary & Storm Sewer Clayton McEachern 736-1036 1
1 Deputy Fire Marshal 1 Fire and Life Safety Gilbert Gordon 726-2293 I
1 Community Services Manager 1 Buildinq Dave Puent 726-3668 I
rAJRRl!IGAJljlif"'''J5vJ;vEI.!{)eMEt.liTi.RE~EWiitEAJM~""o ....0".. W
Applicant Engineer
Vern Benson . Todd Powell
940 Hwy 99 North HBA Design Group
Eugene, OR 97402 150 7th Street .
Springfield, OR 97477
.....
Revised 9/24/07
Oat€! Received:-A/,1Oo]'
Planner: AL
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
PLANNING
o Application Fee discuss the applicable fees
o One additional copy of the Land Division Plan reduced to 81h"x 11"
Complete
~.'
~
. Incomplete See Planning
Note(s)
~,
8 y," x 11" Copy of Land Division Plan
o Copy of the deed and a preliminary title report issued within the past 60'days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property owner is required.
Complete
See Planning
Note(s)
1
Incomplete
~
I.22i]
IIJ
o Tentative Land Division Plan
Complete Incomplete
See Planning
Note(s)
See Comments
.~ IIJ
~
~ IIJ
, See Comments
See Comments
~
I<:a:;J
~
~
~
I<:a:;J
~
l2::SJ
~
See Comments
1/8/09
Deed and Preliminary Title Report
Prepared by an Oregon Licensed Land
Surveyor in accordance with ORS 92
All existing and proposed easements
Dimensions and size of each parcel and the
approximate dimensions of each building site
indicating the top and toe of cut and fill
slopes to scale
Location, widths and names of all existing
and prqposed streets, alleys, dedications or
other right-of-ways within or adjacent to the
proposed land division
Location of existing and required traffic
control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units
and similar public facilities
Location and width of all existing and
proposed sidewalks, sidewalk ramps,
pedestrian access ways and bike trails
Location, size and type of plantings and
street trees in any required planter strip
Oat€! Received:-41 p2tit"f
Planner: AL
2
!il
~
2
Location and size of existing and proposed
utilities on and adjacent to the site including
sanitary sewer mains, stormwater
management systems, water mains, power,'
gas, telephone, and cable TV. Indicate the
proposed connection points.
o Phased Development Plan required if redivision is proposed. The plan must include
the boundaries and sequencing of each proposed redivision. Any redivision must
progress in a sequence promoting street connectivity between the various phases of the
development and accommodating other required public improvements.
Complete
Incomplete See Planning
Note(s)
~ Phased Development Plan
,
IW
Planning Notes:
1. Please provide a copy of the Improvement Agreements recorded against the property
(documents #93-35034 and #93-80724) with the application submittal.
2. Show and describe how each proposed lot is to be served with underground
electrical, cable television and telephone lines.
\
Additional comments no~ related to the completeness of the application:
o Please ensure the tentative subdivision plan is reproduced at the same 24"x36" size and
is bound with the plan set.
o If utility connections are proposed at the existing power pole at the northwest edge of
the site, additional utility easements may be required. Any required utility easements
shall be depicted on the tentative subdivision plan, All utilities will have to be installed to
the building envelope area prior to final plat.
o A new or updated Improvement Agreement may be required for the A Street frontage.
o Provide a draft copy of the Joint Access, Maintenance and Utility Easement for Lots 2-5
with the subdivision submittal. Additionally, details on maintenance of the bioswale shall
be included in the easement document.
'0 The existing house and garage are proposed to be removed; therefore, please remove
the building footprint line work from the tentative subdivision plan. Actual structure will
have to be removed prior to final plat.
o The existing chain link fence along the south property line (A Street frontage) appears to
exceed the maximum 4-foot height limit for a residential front yard, The fence will have
to be removed or reduced in height to meet the requirements of SDC 4.4-115.
o On the tentative plan, indicate any existing trees that are proposed to be removed.
o Clarify text note for "Proposed Cluster Mailbox Unit" shown on Lot 2, Sheet C2.0 (error?).
o At least two existing street trees may have to be removed or replaced to accommodate
the proposed joint access driveway. An additional street tree will be required for Lot 1.
o The joint access driveway serving Lots 2-5 must be paved prior to final plat.
o All existing and proposed utilities to serve the development area must be placed
underground., '
o Show or describe the distance from the southeast corner of the property to the nearest
fire hydrant near 57th & A Street. '
o The develop'er will have to demonstrate compliance with the Solar Access provisions of
SDC 3.2-225 during Building Permit review.
1/8/09
Oat€! Received:~/;.wf ,
Planner: AL
3
LAND DIVISION TENTATIVE PLAN APPLICATION
PRE-SUBMITTAL CHECKLIST
Engineer: Clayton McEachern Case#: pre2008-00076
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete
Incomplete See PW
Note( s)
~
f,'5?I
~
~
lil
I0i%1
1.2sfJ
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing site
features including buildings, curb cuts, trees, and
impervious surface areas, clearly indicating what is
remaining and what is being removed. For existing
structures to remain, also indicate present use and
required setbacks from proposed property lines
The name, location, dimensions, direction of flow and
top of bank'of all watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
, The 100-year floodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map Revision
The Time of Travel Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Development Services Department
Physical features including, but not limited to trees 5"
in diameter or greater when measured 4 V2 feet above
the ground,' significant clusters oftrees and shrubs,
riparian areas, wetlands and rock outcroppings
Soil types and water table information as mapped and
specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must be
submitted concurrently if the Soils Survey indicates
the proposed development area has unstable soils
and/or a hi~h water table
~
~.
lil
~
~
lil"
','~'
. ..~.. .
~
I0i%1
~
~
lil
Revised 10/25/07
Date Received: /;/),109
Planner: AL
o Land Division Tentative Plan
Complete Incomplete See PW
Note(s)
~
I0i%1
~
10i%1,"".,.",., ,
J.Jlifd
~
1
Prepared by an Oregon licensed Land Surveyor in
accordance with ORS 92
Location and width. of all existing and proposed
easements on and abutting the property
Boundaries of the entire area owned by the property
owner, of which the proposed land division is a part,
as well as dimensions and size of each parcel. and the
approximate dimensions of each building site
indicating the top and toe of cut and fill slopes to
scale
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
public facilities .
Location and size of existing and proposed utilities on
and adjacent to the site including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV.
Indicate the proposed connection points .
~
!il
~
3
10i%1,
~
~
1
o Stormwater Management Plan
Complete Incomplete See PW
Note(s)
~
!il
!il
~
2
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
part of the stormwatermanagement system
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size and location of stormwater management
systems components, including but not limited to:
drain lines, catch basins, dry wells and/or detention
ponds; stormwater quality measures; and natural
drainageways to be retained
~
~
~
Ii)
~
!il
Existing and proposed spot elevations and contours
lines drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Amount of proposed cut and fill
~
f,'5?I,:
t.=l
o Stormwater Management System Study - provide four (4) copies of the study' with
the completed Stormwater Scoping Sheet attached. The plan, calculations, and
Oat€! Received' 1/'1/ :upf
, (
Revised 10/25/07 Planner: AL
. .
documentation must be consistent with the Engineering Design Standards and
Procedures Manual.
Complete Incomplete See PW
Note(s)
~
~
Scoping Sheet and attached Stormwater Management
System Study
PW Notes:
1. The note for the mailbox locations appears to be misplaced. No locations shown for
power distributions for each parcel. No other dry utilities labeled or hookup
locations shown.
2. A specific planting plan for the bioswale needs to be prepared listing plants per the
City of Portland Stormwater Management Manual
3. Land division map needs bearings on all property lines
Additional comments not related to the completeness of the application:
'0 This parcel currently has a development agreement for curb, gutter, sidewalk,
sanitary sewer, storm sewer, street lighting, and streets trees. As the opposite
side of North A street has 2/3 improvements in place, this development appears
to fall under this agreement and as such these improvements should be
undertaken has part of this development. This will require a Public Improvement
Permit for the full width improvement along the frontage of this lot.
Revised 10/2S/07
. Oat€! Received:-tflJoo7
Planner: AL
LAND DIVISIONTENlTATIVE PLAN APPLICATION
,PRE-SUBMITTAL CHECKLIST,
Transportation Engineer/Planner: Jon Driscoll Case#: PRE2008-00076
Applicant: 5 Doves EstatesnVern Benson
TRANSPORTATION
f
o Right-of-Way Approach Permit application must be provided where the property has
frontage on a Lane County or an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete See Transportation
Note(s)
~
Copy of ROW Approach Permit Application
~
o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in
accordance with SDc 4.2-105 A,4., Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system.' In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
'address, if needed, City, Metro Plan and state land use and transportation policies and
objectives.
Complete Incomplete
See Transportation
Note(s)
~ IIJ
Traffic Impact Study
o Land Division Tentative Plan
Complete Incomplete See Trpnsportation
Note(s)
I!jI
~
Revised 10/25/07
DatEi"iri~J;i~ed: ~/~/,/alf
Planner: AL
Location of existing and proposed street
lighting, including type, height, and area
of illumination
Location of existing and proposed transit'
facilities '
Location and dimensions of existing and
proposed driveways
, Location and width of all existing and
proposed sidewalks, sidewalk ramps,
pedestrian access ways, and bike trails
Location, widths, conditions, and names of
all existing and proposed streets, alleys,
dedications, access easements or other'
right-of-ways within or adjacent to the
proposed land division, Proposed streets
should also include approximate radius of
curves and grades and relationship to any
~ !il
~ ~
!il ~ 1
.
fS1,
l3!!!l
'~ 2,3
","
-..... JS}::f>..'
~
~
Ii;i;1
~
projected streets as shown on the Metro
Plan, TransPlan, Conceptual Development
~Ian, or Conceptual Local Street Map
Location of existing and required traffic
control devices
Transportation Notes:
1. The sidewalk along the frontage is required and needs to be shown, (See #
2. Full street improvements (36' paved) with sidewalk, curb and gutter will need to be
added in keeping with SDC 4.2-105 (GYG-):(?>)
3. Show the dimensons for the street ROW along G St and for its existing paving.
4.
Additional comments not related to the completeness of the application:
o Proposed driveways will need to meet Code requirements (e.g" and wings be contained within
the extended property/easement lines,)
o The access easment needs to be labeled irrevocable.
'Revised 10/25/07
, Oate Recelved:~I2.0 oq
Planner: AL
.. . ~ 'r:"_.~.:\j~4' , <. t ..
.;q . .,/
~
~
fii1
~
projected streets as shown on the Metro
Plan, TransPlan, Conceptual Development
Plan, or Conceptual Local Street Map
Location of existing and required traffic
control devices
Transportation Notes:
1. The sidewalk along the frontage is required and needs to be shown, (See #
2. Full street improvements (36' paved) with sidewalk, curb and gutter will need to be
addea in keeping with SDc 4.2-105 (G)(?)6:>)
3. Show the dimensons for the street ROW along G St and for its existing paving.
4.
Additional comments not related to the completeness of the application:
o Proposed driveways will need to meet Code requirements (e,g" and wings be contained within
the extended property/easement lines,)
o The access easment needs to be iabeled irrevocable,
Revised 10/25/07
Oate 1!16ceived:-4/.z.,of
Planner: AL ,
TENTATIVE LAND DIVISION APPLICATION
'PRE-SUBMITTAL CHECK~IST
Deputy Fire Marshal: Gilbert Gordon'
, Case #: PRE2008-00076
FIRE
. ,
o Tentative Land Division Plan .
Complete Incomplete See Fire
Note( s)
~
~""
$!A"
_At.
Locatio'n, widths 'and names of all existing and
proposed streets, alleys, dedications or other right-of-
,!,ays within or adjacent to the proposed I~lnd division
Location of existing and required fire hydrants
~!il
Fire Notes:
1.
Additional comments not related to the complete'Jess of the application:
o Fire apparatus access roads shall be a minimum of 20 feet in clear width (2007
Springfield Fire Code 503.2.1) and capable of supporting an 80,000 lb. imposed'
load (SFC 503.2.3 and SFC Appendix D102.1). The cross section of the driveway
shown on Plan Sheet C2.0 is less than 20 feet with a further restriction of 18 feet
due to the extcuded curb.
, .')Nu
?~L'j -Fire-Lv..:' ~/JY74J"-
....e,J;:.-eJ
Revised 9/24/07
Date Received: Ih~;,
Planner: AL ' J '/"
ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR
PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable Not
Applicable
~
IiiliI
~
, Proposed deed restrictions and a draft of,any Homeowner's
Association Agreement
Additional plans and documentation for submittal of a clus~er
Subdivision proposal as specified in SDC 3.2-230
Riparian Area Protection Report For properties located within 150
feet of the top of bank of any' Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
tributaries of WQLW '
A Geotechnical Report prepared by an engineer must be
submitted concurrently if there are unstable soils and/or a high
water table present
Where the development area is within an overlay district'
applicable, address the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC 5.19-100
A wetland delineation approved by the Oregon Division of State
Lands must be submitted concurrently where there is a wetland
on the property
Any required federal or state permit must be submitted
'concurrently or evidence the permit application has been
submitted for review
Where any grading, filling or excavating is proposed with the
development, a Land and Drainage Alteration permit must be
submitted prior to development
Where applicable, any Discretionary Use or Variance as specified
in SDC 5.9-100 and 5.21-100
IIJ
~
N/i1
~
IiiliI
l!eJ
Ii]
~
~
~
~
~
f,'5?I
~
!il'~.
''''',;'
iE'^).
~
~
I0i%1
l.=.J
!il
~
J
,
Oattl Received:.f
Planner: AL
4
1/8/09
"
THIS APPLICATION IS:
o COMPLETE FOR PROCESSING
~ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
tL4 ' a/
/'l/.h?&9
'Date
This is not a decision on your application. Springfield Development Code Section 5.4-
105 and Oregon Revised Statutes 227.178 require the City take final action on a limited land
use decision within 120 days after the application is deemed complete. The 120-day
processing period for this application begins when all the missing information is submitted or
when you request that the City proceed without the information. You must indicate by either
signing this form or by submitting a written response to the City within seven days of the
date of this form asserting your intentions regarding the provision of the missing information.
If you indicate herein or in your written response that the missing information will be
submitted, then you have 180 days from the date the application was submitted for Pre-
Submittal Review to provide the City with the missing information. If you refuse to submit
the missing information, then upon receipt of the full application packet and processing fee,
the City will deem the application complete for purposes of starting the 120-day clock and
begin processing the application. No new information may be submitted after the start of
the 120-day period unless accompanied by a request for an extension of the 120"day
processing time. Upon receipt of a request for extension, the City may extend the 120-day
period for a reasonable period of time. The City may also require additional fees if the new
information is submitted after the Notification to Surrounding Property Owners is sent out
and a second notification is required or if the new information substantially affects the
application proposal and additional review is required. '
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the ISO-day timeline,. '
~//~.
Ownerf Applicant's Sigw.fture -
J '. . .
Oat€! Received: / /" / )#P'1
Planner: AL ~
1/8/09
5