.DAILY FIELD .REPORT
Date Performed: February 23, 2009 Report Number: 722-80276-56
Clien:: Ms. Lauretta Davies Project Name: Jerrl"s-McKenzie Field
Jerry's Home Improvement Improvements
PO Box 2611 Project Location: 2525 Olympic Street
Eugene, Oregon 97402
Sprinrfield, Oregon
P.O. No.: Z4175LD Permit No.: C-8- 'SOl 6
Contractor: Chambers Construction Weather: Light Rain
Type of Inspection: Masonry
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: cmu pilasters and fence columns on the south'
and east sides of the building from 6' to 10'. Reinforcing steel was checked for grade, size, lap, placement and
clearances where applicable. Reinforcing steel was placed in accordance with approved design drawings and
specifications. All cells were relatively clean and mortar projections are within the limits of the International Building
Code. Performed continuous inspection during placement of grout in the locations listed above. Grout was placed by
pump and mechanically consolidated. All cells were grouted solid. Contractor was asked to notify our office when
additional services are needed. To the best of our knowledge, the work inspected above was in accordance with the
building department approved design, drawings, specifications and applicable workmanship provisions of the
International Building Codes.
TVDe of ~
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total YardaQe Placed
Inspector: Steve Wilder, ICC #0876915-88
CCB# 176269
Gm.ut
Knife River
247KG3ROOO
10"
51'
57'
11:00AM
2,500
7 yds
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
pR;rV,a~ndustries. Inc.
Raymond Aliperti
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL y, THf REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Profession,al Service Industries, Inc. -1040A Shell:y .81. . Springfield, OR 97477. Phone 541n46.9649. Fax 541n46.7163
l.ii,~.J lrifonnation
1,~~.lToBuild On
II!!n{IIneerfng ~ c---." . n-tIng
Client:
Address:
Ms. La~rella Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
I
,
Placement Data:
Footings east side of, new structure
Location Sampled At:'
Tllree nortll most footings
Date Cast: 01/26/09 Date Rec'd: 01/27/09
Ticket No.: 1~~~3~~~5200 Weather:
3352600 Clear/Cold
Desi~n Stren~th (psi): reQuired
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0303 2/11/2009 7
09-0304 2/23/2009 28 1
09-0305 2/23/2.009 28
09-0306 H. H
SPRINGFIELD OFFICE
COMPRESSION REPORT 1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
Project No.: 722-80276-40 Date: ._, Feb"!~dt 2009 CCB#176269
P . N J . M K . F' Id I t B.P. No.. e&-l':>', S
rOJ. ame: erry s- c enzle Ie _ ~~rnen s'P.O:No.: . -
Location: 2525 Olympic Street, Springfield) Cast By: Chris McDonald
Oregon
Material: Concrete
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Conlent: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pcl): ASTM Cl38
Time Cast: 12:10 PM
Additives:
Results Reported To:
Field Test Data
81/2"
3/4"
1.0%
34"
49"
4x8
Curing Conditions:
1 day F .C. remainder ASTM
ILoad:
Yardage
1
10
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
3,000 olaced 3.000
Jason with Chambers
Lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type I Capping Method
Dimensions Max. Load (Ibs.) Test Time
(days) (Inches) (5.1.) (Ibs.) (psi)
C61l-0J C12J1-0J
---
6 4.00 12.57 8.6 37,040 2,950 2 12:47 PM X
-- ------- --
27 4.00 12.57 8.6 59,120 4,700 4 10:05 AM X
27 4.00 12.57 8.6 57,880 4,600 2 10:09 AM X
H
u 1 - Co"ne (boOth ends) '2 - ConeNertical Cracks (one end) 3. Columnar 4. Diagonal WinO cracking at ends
Remarks: Set #1 .
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Melzler Engineering - Scott Metzler
5 - Side frac~ures (at top of bottom) 6 - Top -rractures (same as #5"6llt erid of cy'lirllle"ri's'!}ofrlted)
Ref(s~::uIIY Submitted,
PI ij:;IJal S (vices Industries, Inc.
Sieve Wilder
Laboratory Manager
THIS REPORT IS PROVIDED FOR THE INFOR^,IA nON OF THE CUENTONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. /S PROHIBITED
H'/THOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l...~ _lInformation
,.,~. .To Build On
Engineering' Consulting' . Testing
.DAILY _FIELD.REPORT
Date Periormed: February 19, 2009 Report Number: 722-80276-54
Client: Ms. Lauretta Davies Projec, I~ame: Jerrl"s.McKenzie Field
Jerrj"s Home Improvement Improvements
P.O. Box 2611 Project Location: 2525 Olympic Street
Eugene, Ore90n 97402
Springfield. Oregon
P.O. No.: Z4175LD Permit No.: k,~" l ~5
Contractor: Chambers Construction Weather: ar Iy Cloudy
Type of Inspection: Masonry
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: cmu fence columns between lines 9 and 10
from line A to G from F.F to G. CMU wainscoat south and east sides at building from F.2 to top of wall. Pilasters south
and east sides of building from F.F to 6'. Reinforcing steel was checked for grade, size, lap, placement and clearances
where applicable. Reinforcing steel was secured using tie wire. Reinforcing steel was placed in accordance witt'
approved design drawings and specifications. All cells were relatively clean and mortar projections are within the limits
of the International Building Code. Performed continuous inspection during placement of grout in the locations listed
above. Grout was placed by pump and mechanically consolidated. All cells were grouted solid. Contractor was asked
to notify our office when additional services are needed. To the best of our knowledge, the work inspected above was in
accordance with the building department approved design, drawings, specifications and applicable workmanship
provisions of the International Building Codes.
)vDe Df Materi.iil
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
. Total YardaQe Placed
Inspector: Steve Wilder, ICC #0876915-88
CCB# 176269
Grout.
Knife River
247KG3ROOO
10"
50.
58.
11:30AM
2,500
13
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
k;)S(IOlf:ce Industries, Inc.
Raymond Aliperti
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL v. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
ProfessitnlWS.~~.\"rrlt%irr1ef~Frft~11 0'.\'6)" ~!Te~fWSi~~ ~~liri&r.efJ,"I1fFil9~;O/ f~~6~~S5WjJUl.~~Zg ~~~;'tilr, ~~~~O~"'''O
/
L...~ _ZInformation
,.,~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
February 18, 2009
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Report Number:
722-80276-53
Jerry's-McKenzie Field
Improvements
2525 Olympic Street
Springfield, Oregon
----- ~
L 8"-15l1 s
Client:
Project Name:
Project Location:
P.O. No.:
Type of Inspection:
Z4175LD
High Strength Bolts
Weather:
Overcast
Field Observations and Comments
Arrived on site as requested to perform high strength bolt inspection. Verified "snug-tight condition" for 5/8, 3/4, and 7/8
A325 high strength bolts for tube struts to columns. Verified minimum tension requirements for the fully pre-tensioned
primary frame connections for 8/5", 3/4", and 7/8" A325 high strength bolts using contractors torque wrench (serial
#1102100119) and previously determined torque values of 190 ft Ibs for 5/8" A325 bolts, 340 ft Ibs for 3/4" A325 bolts,
500 ft Ibs for 7/8x2'/. A325 bolts and 515 ft Ibs for 7/8x3" A325 bolts. Checked (2) bolts per connection or 10% of bolts
In connection. All bolts checked this date will meet and/or exceed minimum tension requirements with exception to the
following: there is a gap between faying surface on the northwest interior column to beam connection. The
southwest interior column to beam connection, the southeast interior column to beam connection and the
exterior southwest column to beam connection.
Inspector: Chris McDonald ICC# 5298238.51
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~y~~
Project Manager
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTiON OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PRqFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. . 104QA Shelley 51. . Springfield, OR 97477. Phone 541046-9649. Fax 541n46-7163
/
l"~;lInformation
,.,~. .To Build On
Engineering . Consultlng . Testing
DAilY fiELD REPORT
Date Performed:
February 17, 2009
Report Number:
722-80276-52
Client:
[VIS, Laurett2 Davies
Jerry's Home Improvemem
PO Box 2611
Eugene, Oregon 97402
Projec, Name:
Jerr)"s-lVtcKenzie Fielc
improvements
Project Location:
:252'5 Olympic StreeL."
~_gt~~~regon
Rain
P.O. No.:
Contractor:
Type of Inspection:
Z4175LD
Chambers Construction
Masonry
Permit No.:
Weather:
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: pilasters line 1 from A to J and line A from 1 to
9. Top out of cmu block except final coarse. Reinforcing steel was checked for grade, size, lap, placement and
clearances where applicable. Reinforcing steel was placed in accordance with approved design drawings and
specifications. All cells were relatively clean and mortar projections are within the limits of the International Building
Code. Performed continuous inspection during placement of grout in the locations listed above. Grout was placed by
pump and mechanically consolidated. Additional Comments: RFI to follow for engineering approval for dropping top
horizontal rebar down (1) one coarse due to clearance issued with structural steel member located at top of pilasters.
Last block will be placed and slugged with mortar. Contractor was asked to notify our office when additional services are
needed. To the best of our knowledge, the work inspected above was in accordance with the building department
approved design, drawings, specifications and applicable workmanship provisions of the International Building Codes.
Tvoe of I\IIiImri.aJ Grout
Supplier Knife River
Mix # 247KG3ROOO
Slump 8"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardage Placed
Inspector: David F Smith, Ice #0877340.84
CeB# 176269
46'
10:00 AM
2,500
5.0
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
prf!es:i~7' S~ice Industries, Inc.
IVWil La f .
Raymond Aliperti .
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE eLlENTONL Y. THE R:cPRODUCTlON OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
Professicfrl\ft'8.l\IlcWrrldBSlHi.!~fi{(fT,'~6'Ml... !If\oililVTs\Hi ~plijjQi!.fd'P6'ff~9.\'r7"."PR6n~'5'4'ifl41f.91f~ Vfli~'if41!74i;~ff/;~BITED
--
l'" ~';'I Information
~~~~ lToBuild On
I/!nglnoerlng ~ ~ . n..tIng
Client:
Address:
Ms. La~retta Davies
Jerry's Home Improvement
p.o. Box 2611
Eugene, Oregon 97402
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (54'1)746.7163 fax
February n, 2IJ09 CCB#176269
Ce-169.S
Project No.: 722-80276.22 Qa!~:
. N . M K . F' Id I t" B.P. No.:
Pro). ame: Jerry s- ~ enzle .Ie .~provmen s'P.6. No.:
Location: 2525 Olympic Street, Springfield,.J Cast By:
Oregon
Pla~ement Data: Material: Concrete
Monolilhic Concrele Slab on Grade 9ridline E to J from 1 to 9
location Sampled At:
H at 1.5
Date Cast: 1J1112/09 Date Rec'd: 01/13/09
Ticket No.: IM;~5NOO~~:2200 Weather:
3'160693 Clear
Design Strength (psi): required
Cylinder No. Test Date Age (days) Field Cure
(days)
09.0065 1/19/2009 7
1J9-0066 219/2009 28
09.0067 2/912909 28
09-0068 31912909 56
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Teme iFl:
-----
Yardage Specimen Size:
Load: 3
Total: 10
Supplier:
Knife River
Pete Furlong
Field Test Data
51/4"
1 1/2"
5.5%
38
68
6 x 12
Unit Weight (pet): ASTM Cf38
Time Cast: 4:30 AM Curing Conditions:
I>.ddilives: AEA, Hot Water
Results Reoorted To: Contractor
ASTM
Compressive Strength Data ASTM C39
5,000 placed 5.000
Lab Cure Diameter or Cross Sect. Area Cylinder WT. Camp. Strength Fracture Type Capping Method
Dimensions Max. Load (Ibs.) Test Time
(days) (s.l.) (Ibs.) (psi)
(inches) C611-03 C1231-03
6 5.96 27.20 27.2 99,035 3,550 2 1:00 PM X
27 5.97 28.01 27.4 124,175 4,430 3 3:50 PM X
.. .
27 5.97 28.01 27.3 126,065 4,500 4 3:56 PM X
55
.. 1 - Cone (bolh enclsj 2 - ConeNertical Cracks (one end) 3 - Columnar 4 - Diagonal w no cracking al ends 5 _ Side fracures (at lop of be [10m)
Remarks: SET #1
c: City of Springfield
Chambers Construction - David Bakke
Robert~on Sherwood Architects. Scott Stolarczyk
.Metzler Engineering - Scott Metzler
6 - Top fr .Jctures (same as #5 tlut end 0 cylinder IS IlOin-led)-.
~~r{er~:~uIIY Submitted,
,p~A:n~::;r:: Industries, fnc.
Steve Wilder
Laboratory Manager
THIS REPORT is PROViDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THiRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
n'I7HOUT HiE WRITTEN
PERMISSiON OF PROFESSIONAL SERVICE INDUSTRIES.
II' ';;~'''i-."6:fl Information
fJ,~~. .To Build On
/l!!nfI1ne " . ." ~ c-.uHInfI . 11MrUng
Client:
Address:
Ms. la~retta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746.9649 - (54'1)746-7163 fax
February 13, 20U9 CCB#176269
CO:- \54..5
Project No.: 722-80276-23 . p."te: _
. N J . M K . F' Id It'. B.P. No.:
ProJ. ame: e~ry s- c enzle. Ie.. mprovmen S 'p .0. -No.:
Location: 2~?5 Olympic Street, Springfield, Cast By:
Oregon -,
Pete Furlong
Yardage
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): "ASTM C1p64
Max Temp (F):
.Min TemD CFl:
Specimen Size:
Field Test Data
5"
11/2"
5.0%
38
66
Placement Data: Material: Concrete
Monolilhic Concrete ?Iab on Grade gridline E to J from 1 to 9
Location Sampled At:
F at2
Date Cast: 01112/09 Date Rec'd: 01113/09
Tic~et No.: IMiX No.:' Weather:
3352286 2450002200 Clear
[)esign~trength (pSi): required
Cylinder No. Test ~ate Age (days) Field Cure
(days)
09-0069 1/19ti009 7
09.0070 219/2009 28
09-0071 2/912009 28
n9-0072 3/912009 56
6 x 12
load:
10
10
Unit Weight (pet): ASTM C138
Time Cast: 5: 1 0 AM Curing Conditions:
___ __n___
Additives: AEA, Hot Water
Results Reported To: Contractor
Total:
----.
Supplier:
Knife River
ASTM
Compressive Strength Data ASTM C39
5,000 olaced 5,000
Lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type Ganpillg Method
Dimensions Max. Load (Ibs.) Test Time
(days) (inches) (5.1.) (Ibs.) (psi)
C617.0J C12J1-OJ
6 5.95 27.82 27.7 105,885 3,810 3 1:04 PM X
27 5.99 28.21 27.9 132,235 4,690 3 4:00 PM X
27 5.99 28.21 27.9 131,170 4,650 2 4:07 PM X
55
"1 - Cone (bolh ends) 2 .'ConeNerHcal Cracks (one end) 3 - Columnar 4 - Diagonal w no cracking at ends
Remarks: SET #2
c: City of Springfield
Chambers Construction - David Bakke
Rohertson Sherwood Architects - Scott Stolarczyk
Metzler. Engineering - Scott Metzler
5 - Side frac ures (at top of bottom) 6 - Top fractures (same .as #sh.ul end 0_ cylirl-[ler is DC)inted)
~~;/s~~fUIlY Submitted,
Pl40~Jhs Industries, Inc.
Steve Wilder
Laboratory Manager
~
THIS REPORT IS PROVIDED FOR THE mFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
IVITllour 1HE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l riIIl :1;1;1 Information
I:!:.~. .70 Build On
,
IE!n(Jlneerlng i eon.uHIng . n..tIng
SPRINGFIELD OFFICE
COMPRESSION REPORT
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
PO Box 2611
Eugene, Oregon 97402
Project No.: 722-80276-42
Proj. Name: Jerry's-McKenzie Field hnprovments
Location: 2525.01;~PiC Str~et; Spririgfi;;!d,
.-.- -'_I
Oregon
Date:
Bj'.-No.:
P.O: No'.:
.Cast By:
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
.February 13, 2nnu CCB#176269
C.~-\SSS
Pete Furlong
Field Test Data
Placement Data: Material: .Concrete
Slab D 10 G belween 9 and 10 on out side storage area
Clear
Yardage
Load: 1
Total: 10
Supplier:
Knife River
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
A.ir Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp !Fl.:___
Specimen Size:
Unit Weight (pef): ASTM C138
Time Cast: 5:15 AM Curing Conditions:
A.dditives: AEA. Hot Water
Results Reported To: Contractor
6"
1 1/2"
5.0%
340
620
Location Sampled At::
D.5 at 9.5
6 x 12
Date Cast:
Ticket No.:
3354098
02104/09
I ~i:5~:~2200
Date Rec'd: 02/05/09
Weather:
ASTM
6
27
27
H
H 1 - Cone (both ends) '2 - ConeNerlical Cracks (one end) 3 - Columnar 4 - Diagonal wino cracking at ends 5 ~ Side frac ures (at top of bottom)
Remarks:
Design Strength (psi): req u ired
.'
Cylinder No. Test Date Age (days) Field Cure
(days)
09.0383 2/11/2009 7
09.0384 3/4/2009 28
09.0385 3/4/2909 28
,
09.0386 H H
Compressive Strength Data ASTM C39
5,000 placed 5,000
Lab Cure
(days)
Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type C"pping Method
Dimensions Max. Load (Ibs.) Test Time
(inches) (sj.) (Ibs.) (psi)
C617.03 C1231-OJ
.-..-
5.94 27.73 28.3 120,995 4,360 3 1:00 PM X
c:
Cily of Springfield
Chambers Construction - David Bakke
Robert~on Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
6 ~ Top fractures (same as #5 but e-nd of cylimfel is IJointed)
~1fJ ectfully Su~r;~:~'
)~I;OI1~ ,~ndllSllies, IIIC.
Steve Wilder
Laboratory Manager
THIS REPORT IS PROVIDED FOR T/1E INFORMA nON OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS
PROHIBITED n'll/ II)Ur THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l>>.$ili:f};;::;:~n
/Hnglneerlng ~"~-11IH:rUng
Client:
Address:
Ms. la~retta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
SPRINGFIELD OFFICE
COMPRESSION REPORT 1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
Project No.: 722-80276-26 Date: F~bruary_13, 2009 CCB#176269
P . N J . M K . F' Id I t !B:P~No.:Ce-l595
rOJ. ame: erry s- c enzle_ le_ ~p~~vmen Slp:O: No:,' -' .
Location: 252t'j QlYI1)Qi~Street, springfield) Cast By: Pele Furlong
. Oregon
Placement Data: Materiai: 'Concrete
Monolithic Concrete :"Iab on Gracie griclline E to J from 1 to 9
!
Location Sampled At:'
.F at 8.5
Date Cast: 01/12/09 Date Rec'd: 01/13/09
Ticket No.: /MiX No.: Weather:
3352301 245000'2200 Clear
Design Strength (psi): reQuired
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0081 1/1912009 7
ILoad:
Yardage
39
10
Field Test Data
6"
11/2"
4.5%
36
63
'Slump (in.): ASTM C143
"Max. Aggr. Size:
Air Content: ASTM C231
.Air Temperature (F):
'Material Temp. (F): ASTM CIOM
Max Temp (F):
,Min TemD (F):
Specimen Size:
Unit Weight (pef): A$TM C138
Time Cast: 8: 15 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
6 x 12
ASTM
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5000 placed 5.000
Lab Cure
(days)
Diameter or
Dimensions
(inches)
Cross Sect. Area Cylinder WT.
(5.1.) (Ibs.)
C1231"03
6
5.95
27.82
Compo Strength Fracture Type
Max. Load (Ibs.) (psi)
Test Time
C<lpfling Method
09.0082 I 2/9/2909 28 27 5.94 27.73
09.0083 I 2/9/2009 28 27 5.94 27.73
09.0084 I H H H
~ 1 ~'c'cirie'(tjo}th ends) "2 - tori~Nertical '6acks '(one end)" 3 -"Columnar 4 - Diagonal w/no"'cracking at ends
Remarks: SET #5
c City of Springfield
Cl1ambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
rvI.eizler: Engineering - Scott Metzler
C611.03
27.9 112,290
27.9 143,500
27.9 144,305
4,040
5,170
5,200
3
2
3
1:19PM
4:15 PM
4:19 PM
x
x
x
5 - Side fractures (at top of bottom)
--,." \. .-.. --."....\,...
6 - Top fractures (same as #5 but end 0 cylinder is pointed)
Respectfully Submitted,
P7fsSi~aJ~es Indusirles. Inc.
S ~lf:vvilder
laboratory Manager
THIS REPORT IS PROVIDE,? FOR THE INFORM4T10N OF THE CLIENT ONL Y. T~IE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. 1$
PROf-llBITED WlnlOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l~~/fl.i;f;;::;:~~n
1/E!nfI.,,, , ," ,;rIf1 ~ ~ . 1MUng
Client:
Address:
Ms. Lauretta Davies
Jerry's 00me Improvement
P.O. Box 2611
Eugene, Oregon 97402
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
February_13,2009 CCB#176269
eB:'-\~~? . .'
Project No.: 722.80276-24 Date:
P . N J . M K . F' Id I 't -B.P'. No::
rOJ. ame: erry s- c enzle Ie mprovmens_p:O~No.:'
Location: 25.i5 OTy,;'-pic ~!re~i:. ~~priI'gft;;jd,; Cast By:
Oregon .
"Placement Data: ;'-- Wlaterial: Concrete
Monolithic Concrete ?Iab on Grade grid line E 10 J from 1 to 9
Location Sampled At:.
H at6
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTMC1064
Max Temp (F):
Min Tern? (F~:
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 6:00 AM Curing Conditions:
A-ddiUv;~: AEA, -HoCWater--
Results Reported To: Contractor
'-l:d':
21
10
Date Cast:
Ticket No.:
3352291
01/12/0g
l~i:5~~~2200
Clear
Date Rec'd: 01/13/09
Weather:
Design Stren!Jth (psi):
required
Cylinder No.
I
Test Date
Age {days}
Field Cure
(days)
Lab Cure
(days)
Yardage
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 olaced 5,000
Diameter or
Dimensions
(inches)
Cross Sect. Area Cylinder WT.
(s.L) (Ibs.!
Camp. Strength Fracture Type
Max_ Load (Ibs.) (psi)
C1231.03
09.0073 I 1/19/2009 7 6
09.0074 I 219/2009 28 27
09.0075 I 219/2009 28 27
09-00761, .. H, H H
~; 1 - Cone (both ends) 2 - ConeNertical Cracks (one end) 3 - C-olumnar 4 ~ Diagonal w. no cracking at ends 5 ~ Side fractures (at top of bottom)
Remarks: SET #3
c City of Springfield
Chambers Construction - David Bakke
Robert~on Sherwood Architects - Scott Stoiarczyk
Metzler Engineering - Scott Metzler
Pete Furlong
Field Test Data
51/2"
1 1/2"
5.0%
36
63
. (; x 12
ASTM
c.
TeslTime
Capping Method
C617-03
5.95 27.82 28.0 114,910 4,130 3 1:09 PM
6.00 28.27 28.0 143,550 5,080 3 4:06 PM
---.- --
5.94 27.73 28.0 144,700 5,280 2 4:11 PM
x
X
X
6 ~ Top fractures (sanle as "#5'butend 0 cyfinde-r--fs parr-lied)
Re{}!~ctfUIlY Submitted,
P, 71 sSiona'J~ Indusllies, Inc.
s{4v i~r
Laboratory Manager
THIS REPORT IS PROVIDE~ FOR THE INFORA,1A TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS
PROHIBITED WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
!
l~~ll;;;;::z:~n
1i!!nS~" . . ,:ng ~ ~ . l1ttrtIng
Client:
Address:
Ms. La~retta Davies
,Jerry's Home Improvement
P.O. Box 2611
ELlgen~, Oregon 97402
i
SPRINGFIELD OFFICE
COMPRESSION REPORT 1040 - A Shelley Street
Springfield, Oregon 97477
(541)746.9649 - (541)746-7163 fax
Project No.: 722-80276-25 \" .Date:_~--:-IC~b~I@_'Y. 1~2009 CCB#176269
Proj. Name: J,my's-McKenzie F~el~ Improvments' ~:~...~~:~CB__A.~51? j
Location: :2525ci~mpi~Str'e~t, Springfield) Cast By: Pete Furlong
_. -- - ---~. - -----. -----..J
Oregon
Field Test Data
Placement Data: Material: "Concrete
Monolithic Concrete ~Iab on Grade grid line E to J from 1 to 9
Location Sampled At::
G at6
Date Cast: 01/12/09 Date Rec'd: 01/13/09
-
Ticket No.: !MiX No.:' Weather:
3352295 2450002200 Clear
Design Strength (psi): reauired
Cylinder No. . Test Date Age (days) Field Cure
(days)
09.0077 111 9/2009 7
09.0078 2/9/2009 28
09.0079 2/9/2?09 28
09-0080 H H
5"
ILoad:
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
'Max Temp (F):
Min Temp IF):
Specimen Size:
Unit Weight (pef): ASTM C138
Time Cast: 7:15 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
ASTM
11/2"
5.0%
35
66
Yardage
6 X 12
29
10
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 Dlaced 5,000
Lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type GClpping Method
Dimensions Max. Load (Ibs.) Test Time
(days) (inches) (s.i.) (Ibs.) (psi)
C617-03 C1231-03
6 5.94 27.73 28.4 112,630 4,060 3 1:14 PM X
27 5.94 27.73 28.4 143,520 5,180 2 4:24 PM X
27 5.94 27.73 28.4 149,440 5,390 2 4:29 PM X
H
*~ 1 - Cone (both ends) '2 - Coneiverlical Cracks'(one end) - 3 - Columnar 4 - Diagonal w no cracki-ng at ends
Remarks: SET #4
C' City of Springfieid
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
5 - Side frac ures (at lop of bottom) 6 - Top fractures (same as #5 i;ut-end 0 cyll~r is floillted)
Re~~~:fUIlY SL~f~~:ted,
PI; ~O~J!C:S Industlies, Inc.
St,;Jve Wilder
Laboratory Manager
THIS REPORT IS PIWVIDED FOR THE INFORft.1ATlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARry BY ANY MEANS EXCEPT IN FULL IS
PROHIBITED WITI-iOUT TIlE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
SPRINGFIELD OFFICE
COMPRESSION REPORT 1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
Project No.: 722-80276-30 Date:. February 13, 20m) CC8#176269
Proj. Name:. Jerr:'."~Mc~enZie Fie!dl~OVrnen~:~~:~~~+~I()':::r~~ -.
Location< 2525 Olympic <i.tr~~~l..~pJ:iOg~,"_> Cast By: Pete Furlong
'Oregon
.Slump (in.): ASTM G143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pef): ASTM C138
Time Cast: 7:00 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Conlractor
1R.~!lJ;f};:::l:~n
I'I!ngIneedng ~ c-uHIng . JHtIng
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
PO Box 2611
Eugene, Oregon 97402
Placement Data: Material: Concrete
Monolithic Concrete Slab on Grade gridline A to E from 1 to 9
location Sampled At:;
D at8
Yardage
Load:
30
10
Date Cast:
Ticket No.:
3160772
01/14/09
IM;:5NOO~~2200
Date Rec'd: 01/15/09
Weather:
Total:
Supplier:
Knife River
Foq
.
Field Test Data
6"
11/2"
5.0%
34
61
6 x 12
ASTM
Compressive Strength Data ASTM C39
Design Strength (psi): re9uired 5000 olaced 5.000
, ...
Field Cure Lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type Capping Method
Cylinder No. Test ~ate Age (days) Dimensions Max. Load (Ibs.) leslTime
(days) (days) (inches) (s.i.) (Ibs.) (psi)
C617-0J C1231-03
09-0153 1/21/2009 7 6 5.99 28.21 28.0 118,915 4,215 '1:45 PM X
09-0154 2/1112009 28 27 5.95 27.82 28.0 151,545 5,450 3 1:27 PM X
09-0155 2/1112009 28 27 5.95 27.82 28.0 150,300 5,400 3 1:33 PM X
09-0156 H H H
~*- f.' Cone (both entis) ::2 - ConeNerllcal Cracks (one end) 3 - Cafumnar 4 - Diagonal w no cracking at ends
Remarks: SET #4
c: Cily of Springfield
Chambers Construction - David Bakke
Robert~on Sherwood Architects - Scott Stolarczyk
Metzler Engineering ~ Scott Metzler
5 - Side fracures (a"t top of bottom)
.-- ... ,-.- -- -- ..--......
6 - Top fractures (same as #5 but end of cylinder is pointed)
R~ectfU"y S bmitled,
Pr :SSiOfu!; rvices Industries, Inc.
."^--
S eve Wilder
Laboratory Manager
THIS REPORT IS PROVIDED FOR THE 1i':FORMA nON OF THE CLIENT QNL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FUll.. IS
PROHIBITED w"I7uour mE WRlrTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
-GAi~-~GJ~95
- . -'" -~ , -' "-,. ;-
l ~~~;lInformation
iI'!'-~. .To Build On
~ ~ ~-1'lNotIng
COMPRESSION REPORT
Client:
Address:
Ms. Lauretta Davies
Jerry's tiome Improvement
PO Bqx 2611
Eugene, Ore9on 97402
Project No.: 722-80276-31 Date:
P . N J 'M K . F' Id I t B.P. No.:
ro). arne: erry s- c enzle Ie rnprovrnen s P.O. No.:
Location: 2525 Olympic Street, Springfield, Cast By:
Oregon .
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
'Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temo IFl:
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 7:55 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
Placement Data: . 'Ma"teriaf:-ConcretE~
Monolithic Concrele ~Iab on Grade gridline A to E from 1 to 9
location Samplel! At:'
Bat 8
Yardage
Load:
39
10
Date Cast:
Ticket No.:
3160778
01/14/09
IM;:5NO~d2200
Pale Rec'd: 01/15109
Weather:
Total:
Supplier:
Knife River
Fo~
SPRINGFIELD OFFICE
1040. A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (54'1)746-7163 foX
February 13, 2U09 CCB#176269
Pete Furlong
Field Test Data
6"
11/2"
4.5%
34
62
6 x 12
ASTM
Compressive Strength Data ASTM C39
Design Strength (psi): required 5,000 placed 5,000
Field Cure Lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type Capping Method
Cylinder No. Test qate Age (days) Dimensions Max. Load (Ibs.) Test Time
(days) (days) (inches) (s.L) (Ibs.) (psi)
C617-03 C1231-0J
1/21/2009 -----
09.0157 7 6 6.00 28.27 28.0 126,010 4,460 2 1:50 PM X
2/11/2009 ---
.09.0158 28 27 5.98 28.10 28.1 150,225 5,350 3 1:38 PM X
09.0159 2/11/2009 28 27 5.98 28.20 28.1 156,790 5,580 3 1:43 PM X
09.0160 H H H
*i 1 - Cone (bo'thends) '2 - ConelVerlical Cracks (one end) 3 - Columnar 4 - Diagonal wIno cracking at ends 5 - Side fractures (at top of bottom)
Remarks: SET #5
c: City of Springfield
Chambers Construction - David Bakke
Rober190n Sherwood Architects -'Scott Stolarczyk
Metzler Engineering - Scott Metzler
6 - Top fractures (same as tis but end ()f cylifllieris 'pail lied)
Re~f'ctfuIlY S Ibmitted,
Pr t,ss;ona/l,rv;ces Indus/ries, Inc.
/ I t;,j"\
SI (vf,;(/i~der .
Laboratory Manager
THIS REPORT IS PRO\'IDEp FOR THE INFORAlA nON OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REI?ORT..By'ANy'METHOD, ANO./TS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS
PROHIBITED WITHOUT mE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l~sili;fl;::z:1;~n
li!nglne.m.tg ~ ConsuItInrI . 'nNrUng
Client:
Address:
Ms. La~retta Davies
Jerry's Home Improvement
PO. B~x 2611
,
Eugene, Oregon 97402
I
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746.7163 fa.
Date: . february.13,2009 CCB#176269
B.P. No.:~::c.a-_15S15
P:O. No.: L .
Cast By: Pete Furlong
Project No.: 722-80276-29
Proj, Name: Jerry:s-McKenzieField Improvmentc
Location: 2525 Olympic Street, Springfield,
Oregon
Placement Data: Material: Concrete
.Monolithic Concrete Slab on Grade gridline A to E from 1 to 9
Location Sam pled At:'
Cat 5
Dale Cast; nt/14/09 Date Rec'd: 01/15/09
Ticket No.: IM;;5NO~d2200 Weather:
3160766 FOQ
-
Desi~m Strength (psi): reQuired
"-- - - ,
Cylinder No. Test qate Age (days) ~ield Cure
(days)
,
09-0149 1/21/~009 7
,
09-0150 2//1/2009 28
09.0151 2/t 112'009 28
09-0152 H H
Yardage
load:
20
10.75
'Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
'Material Temp. (F): ASTM CIOG4
Max Temp (F):
,Min Temp (F':
Specimen Size:
Unit Weight (pef): ASTM C138
Time Cast: 5:45 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
Compressive Strength Data ASTM C39
5,000 placed 5.000
Lab Cure
(days)
6
27
27
H
Total:
Supplier:
Knife River
Diameter or
Dimensions
(inches)
Cross Sect. Area Cylinder WT.
(s.l.) (Ibs.)
Max. Load (Ibs.) comp(p:~;ength Fracture Type
C1231-03
5.99
5.95
5.95
28.21
27.82
27.82
28.4 119,040
28.3 146,125
28.3 144,410
'';-1- Cone (both ends) '2 -'CcineNertb3! C-rack"s'(6ne end) 3 - Columnar 4 - Diagonal w no cracking at ends
Remarks: SET #3
c: City of Springfield
Chambers Construction - David Bakke
Robert~on Sherwood Architects - Scali Stolarczyk
Metzler Engineering - Scott Metzler
5 - Side frac ures '(at top of bottom)
Field Test Data
61/2"
1 1/2"
5.5%
35
63
6 x 12
ASTM
Test Time
Cilpping Method
C617-03
4,220
5,250
2
3
1 :40 PM
1:19 PM
x
X
5,190 3 1:23PM I X
.-.. . .. m' 1,...
6 ~ Top fracfures-(sanle as tt5 bul end 01 cylinder IS [Jointed)
R~~ctfUIIY ftr;:itted,
~/J sSionJ~ces Industries, Inc.
Se ~er
Laboratory Manager
THIS REPORT IS PROViDED FOR THE INFORM,JJ, nON OF THE CLIENTONL Y THE REPROQUCnON OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
IrITNOUl' TIlE WRlTTt:N
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES,
l \' -~;1 Infonnation
1::!!.~/fI .To Build On
. /i!nfllneartng ~ ~ . n..tIns
Client:
Address:
Ms. La~retta Davies
Jerry's Home Improvement
I
PO. Box 2611
Eugene" Oregon 97402
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
Date: . F-:.brua'):, 13,.2009 CCB#176269
B.P. N<>.~Qg::15~5
P.O. No.:
Cast By: Pele Furlong
Project No.: 722-80276-28
Proj. Name: Jerry's.McKenzie Field Improvments
- "-- ~
Location: 2525 Olympic Street, Springfield,
Oregon
Placement Data: , Ma"terlal:- Concrete
Monolithic Concrele Slab on Grade gridline A to E from 1 to 9
I
I
I
I
Location Sampled At:'
I
B al2
Date Cast: 01/14/09 Date Rec'd: 01/15/09
Ticket No.: IM;:5NOO~62200 Weather: ", ..,,".
3160761 FOQ
De'sign Strength (psi): required
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0145 1/21/2009 7
09-0146 2/11/2009 28
09-0147 2/11/2009 28
09.0148 H' H
Slump (in.): ASTM CI43
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM Cl064
Max Temp (F):
Min Temo (Fl:
Specimen Size:
Unit Weight (per): ASTM C138
Time Cast: 4:50 AM Curing Conditions:
Additives:----p.E:A:Hot Water
Results Reported To: Contractor
IlO~~'
Field Test Data
51/2"
1 1/2"
4,9%
36
67
6 x 12
ASTM
Compressive Strength Data ASTM C39
5,000 olaced 5,000
7
Lab Cure Diameter or Cross Sect Are" Cylinder Wi. Camp. Strength Fracture Type Capping Method
Dimensions Max. Load (Ibs.) Test Time
(days) (inches) (s.i.) (Ibs.) (psi)
C617-03 C1231-03
6 6.00 28.27 28.5 117,825 4,170 2 1:30 PM X
27 5.95 27.82 28.5 145,410 5,230 3 '1: 13 PM X
27 5.95 27.82 28.5 147,365 5,300 3 :18 PM X
6 - Top fractures (same as #5 but end 0 cylinZler is pointed)
R"!feCtfUI'~IJ~~mitted'
Pi r: sSion~/~Vices Industries, Illc.
I 1
Steve Wilder
Laboratory Manager
THIS REPORT IS PROVIDE? FOR THE INFORMA nON OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
Yardage
10
10.75
Total:
Supplier:
Knife River
H
4 - Diagonal wino cracking at ends
5 - Side fractures (at top of bollom)
,
~-i 1~-Cone (both enc{s}2 - ConeNertical Cracks (one end) ~3 _ Columnar
Remarks: SET #'i
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler En9ineering - Scott Metzler
, "'~;lInfonnation
1.I"<ii7. .To Build Ori
Engineering . Consulting. Jesting
DAILYF-IELDREPORT.
Date Performed: February 13, 2009 Report Number: 722-80276-51
Client: Ms. Lauretta Davies ProjeGt Name: Jerrr's~lVIcKenzie Field
Jerry's Home Improvement Improvements
PO Box 2611 Project Location: 2525 Olympic Street
EUgene. Oregon 97402 .. '
Springfield, Oregon
P.O. No.: Z4175LD Permit No.: C8- 1SC\5
Contractor: Chambers Construction Weather: Clear
Type of Inspection: Masonry
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: cmu pilasters on the north and west sides at'
building from 10' to 14'. Reinforcing steel was checked for grade, size, lap, placement and clearances where applicable.
Reinforcing steel was placed in accordance with approved design drawings and specifications. All cells were relatively
clean and mortar projections are within the limits of the International Building Code. Performed continuous inspection
during placement of grout in the locations listed above. Grout was placed by pump and mechanically consolidated. All
cells were grouted solid. Contractor was asked to notify our office when additional services are needed. To the best at
our knowledge, the work inspected above was in accordance with the building department approved design, drawings,
specifications and applicable workmanship provisions of the International Building Codes.
Tvo" of Ma~
Supplier
Mix #
Slump
Air Content
Ambient Temperature
Material Temperature
.Time Placed
Design Strength (psi)
Number of Samples
Total YardaQe Placed
inspector: Steve Wilder, Ice #0876915.88
eCB# 176269
Grout.
Knife River
247KG3ROOO
101/2"
45'
55'
2:00 PM
2,500
5
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
~Ofesslivaa~rvice Industries, Inc.
~d AliPl~ .
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTiON OF THIS REPORT, BY ANY METHOD: AND ITS TRANSMITTAL TO A THIRD
PARTY. BY ANY MEANS. EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSiONAL SERVICE INDUS"[RIES, I? PROHIBITED.
Professional Service Industries, Inc. -1Q4QA ShelleySt.. Springfield, OR 97477. Phone 54fn46-9649 - Fax 541n46.7163
/
l"~;lIriformation
,,~. .To Build On
Engineering. Consulting . 7l!stlng
.DAILVEIELDREP.ORI
Date Performed, February 11, 2009 Report Number: 722-80276-48
Client: IVIs. Lauretta Davies Project Name: Jerrr's-McKenzie Fieid
Jerry's Home Improvement Improvements
P.O. Box 2611 Project Location: 2525 Olympic Street:
Eugene, Oregon 97402
Springiield, Oregon
P.O. No.: Z4175LD Permit No.: eg- IS9.5
Contractor, Chambers Construction Weather: Overcast
Type of Inspection: Masonry
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: cmu pilasters on the north and west sides 01
the building from 6 to 10'. Reinforcing steel was checked for grade, size, lap, placement and ciearances where
applicable. Reinforcing steel was placed in accordance with approved design drawings and specifications. All cells
were relatively clean and mortar projections are within the limits of the International Buiiding Code. Performed
continuous inspection during placement of grout in the iocations listed above. Grout was placed by pump and
mechanically consolidated. All cells were grouted solid. Contractor was asked to notify our office when additional
services are needed. To the best oi our knowledge, the work inspected above was in accordance with the building
department approved design, drawings, specifications and applicable workmanship provisions of the International
Building Codes.
Tvoe of Materi.a\
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total YardaQe Placed
Inspector: Steve Wilder, Ice #0876915-88
CeB# 176269
Grout
Knife River
247KG3ROOO
10"
460
550
8:30 AM
2,500
5
If you have any questions re9arding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
t~~o.n~ce Industries, Inc.
Raymond Aliperti .
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT DNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, 1$ PROHIBITED.
Professional Service Industries, Inc.. 1040A Shelley St.. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
/
l"'~;1 Information
,.,~. .To Build On
Engineering 0 Consulting o Testing
DAILY FIELD REPORT
Date Performed:
February 9, 2009
Report Number:
722-80276-47
Client:
Ms. Lauretta Davies
Jerry's Home Improvement
P.O Box 2611
Eugene, Oregon 97402
Project"Name:
Jerq,ls-M:::J'~enzi€:" Field
Improvements
2525'Olympic Street
Springfield, Oregon
fI'6-ISl\5
O'vercast
Project Location:
P.O. No.:
Contractor:
Type of Inspection:
Z4175LD
Chambers Construction
Masonry
Permit No.:
Weather:
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: cmu wainscoat walls and pilasters on the north.
and west sides of the building. Wainscoat walls from floor slab to 3' 4", pilasters from floor slab to 6'. Reinforcing steel
was checked for grade, size, lap, placement and clearances where applicable. Reinforcing steel was secured using tie
wire. Reinforcing steel was placed in accordance with approved design drawings and specifications. All cells were
relatively clean and mortar projections are within the limits of the International Building Code. Performed continuous
inspection during placement of grout in the locations listed above. Grout was placed by pump and mechanically
consolidated. All cells were grouted solid. Cast one (1) set offive (5) solid test prisms. Contractor was asked to notify
our office when additional services are needed. To the best of our knowledge, the work inspected above was in
accordance with the building department approved design, drawings, specifications and applicable workmanship
provisions of the International Building Codes.
Tvn<, nf Material
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardaqe Placed
Inspector: Steve Wilder, ICC #0876915-88
CCB# 176269
Grout
Knife River
247KG3ROOO
10"
45'
57'
1:30 PM
F'M = 1 ,500
5
191/2
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
nrofessional Service Industries, Inc.
Kt~jv. ~
Raymond Aliperti
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
,
THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT GNL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
ProfessiOlil/l?BeMalIllI1l1i1~lI",s,>1w.' '11filOA SH~.VSf!"'Siffllitifrer1f,~97'M.fj5Ii\\W~'5~o/fMf.~61i9' 1/j!':W~fh 46t'f{6~S'TED
/ .
l"~;lInformation
,.,~. .To Build On
Engineering . Consulting . Testing
DAILY FIELD .REPORT
Date Performed: February 5, 2009 Report Number: 722-80276-46
Client: IVis. LaurettCi Davies Projeci. Name: Jerrl"s-McKenzit Field
jerry's Home Improvement Improvements
P.O. Box 2611 Project Location: 2525 Olympic Sireet
Eugene. Oregon 97402
Springfield, Oregon
P.O. No.: Z4175LD Permit No.: C~'\qf\S
Contractor: Chambers Construction Weather: Clear
Type of Inspection: Reinforced Concrete
Field Observations and Comments
Performed visual inspection during the placement of concrete for slab A to D between 9 and 10. Concrete was placed
by pump and hand consolidated. Cast one (1) set of four (4) (6x12) concrete test cylinders. To the best of our
knowledge, the work inspected above was in accordance with the buiiding department approved design drawings,
specifications, and applicable workmanship provisions of the International Building Code. Contractor was asked to notify
our office when additional services are needed.
hn., of Malerial
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardage Placed
Inspector: Pete Furlong, ICC #00083536
CCB# 176269
Set #1
Knife River
2450V02200
51/2"
5.0%
38'
69'
5:15AM
5000
4
118
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
r:S0n~'ndustries, Inc.
Raymond Aliperti
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
. PARTY, B'( ANY MtANS. exec/-'! IN I-ULL. WllHUUl 1M!: VVf"(IIICIV r-C"t\'j..,.J'V'" ur rnv'-,-",,,,'v""~ ....i-',.,"''- ",""'uw",,:S. ,3 r'\3, ,,::;-;~::.
ProfeSSional Service Industries, Inc. -1Q4QA Shelley St.. Springfield, OR 97477. Phone 541n46-9649 - Fax 5411746-7163
--
l"~;lInformation
",..,. .To Build On
Engineering . Consulting. Testing
DAILY FJELD REPORT
Date Performed: February 4, 2009 Report Number: 722-80276-45
Client: Ms. Lauretta Davies Project Name: Jerrr's~McKenzie Fieid
Jerry's Home Improvement Improvements
P.O. Box 2611 Project Location: 2525 Olympic Street
Eugene. Oregon 97402
Springfield. Oregon
P.O. No.: Z4175LD Permit No.: C~-\Sq5
Contractor: Chambers Construction Weather: Clear
Type of Inspection: Reinforced Concrete
Field Observations and Comments
Performed visual inspection during the placement of concrete for slab D to C between 9 and 10 on outside storage area.
Concrete was placed by pump and hand consolidated. Cast one (1) set of four (4) (6x12) concrete test cylinders. To
the best of our knowledge, the work inspected above was in accordance with the building department approved design
drawings, specifications, and applicable workmanship provisions of the International Building Code. Contractor was
asked to notify our office when additional services are needed.
Tvn.. of Materi.aJ
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total YardaQe Placed
Inspector: Pete Furlong, ICC #00083536
CCB# 176269
Set #1
Knife River
2450V02200
6"
5.0%
34"
62"
5:15AM
5000
4
120
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
D 9'V rf&\
~~nd Aliperti
Project Manager
cc: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS RE.DORT IS PROVIDED FOR THE INFORMATION OF THE C!..IENT ONL Y. TNE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
,,,,..., f, 0 f MIV' W''''''''''''', ,-",-,,-,, ,,, I L"...., ."" ,..::.v;- ',-, .[ ~.1.r-;-:: . ?:'\f: 55'S': 0'" ""'CC,"'":SS'';;:'" L !;:.c'l'''cr "'Ot'S""';;!'!>) 'S' C"""L"~'.,..e,",
Professional Service Industries, Inc.. 1040A Shelley SI.. Springfield, OR 97477. Phone 5411746-9649. Fax 5411746-7163
--
l~ttt:!!>;lInformation
",..,. .To Build On
Engineering . Consultlng . Testing
DAILY ~iE:LD RE:POKT
Date Performed:
February 3, 2009
Report Number:
722-80276-44
Client:
IVls. LaurettE. Davies
Jerr\"s Home Improvement
P.O. 8m: 2611
Eugene, Oregon 97402
Projecc Name:
Jerry's-M:::Ken~je Field
Improvements
,-.--- -"', .
\.. 2525 Olympic Srreei
Springfield, Oregon
Project Location:
P.O. No.:
Type of Structure:
Type of Inspection:
Z4175LD
Prrmit No.:'
Weather:
,-"'€::8;J$~ - .
. J. ~ ,,;"
- Clear
Reinforcin9 Steel
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: slab on grade for outside storage area.'
Reinforcing steel was checked for grade, size, lap, placement and clearances where applicable. Reinforcing steel
was secured using tie wire and supported on concrete dobie blocks. Reinforcing steel was placed in accordance with
approved design drawings and specifications. Additional Comments: pour is scheduled for Wednesday 2/4/09,
To the best of our knowledge, the work inspected above was in accordance with the building department approved
design drawings, specifications and applicable workmanship provisions of the International Building Code.
Contractor was advised of allan-site results and asked to notify our office when additional services are needed.
Inspector: Raymond Aliperti
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~Vl~
Raymond Aliperti
Project Manager
cc: .City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORM/; TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040A Shelley St.. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
--
IP$ilfonf;;:z~n
iE!nfllneering ~ c-.uHIng . JltsfIng
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
PO. Box 2611
Eugene, Oregon 97402
Project No.: 722-80276-27
Proj. Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfiel2"
Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 13, 2009 CCB#176269
CB-1SQS
COMPRESSION REPORT
Pete Furlong
Slump (in.): ASTM Ct43
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Terno iF):
----
Specimen Size:
Unit Weight (pel): ASTM C138
Time Cast: 4:10AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
Field Test Data
6"
11/2"
4.5%
38
69
Placement Data: Material: Concrete
Monolilhic Concrele Slab on Gracie griclline A to E from 1 to 9
Yardage
Load: 1
Total: 10
Supplier:
Knife River
6 x 12
ASTM
Compressive Strength Data ASTM C39
5,000 Dlaced 5.000
Lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type I C<lpping Method
Dimensions Max. Load (Ibs.) Test Time
(days) (Inches) (s.l.) (Ibs.) (psi)
C617-03 I C1231.03
-- ..-- ---
6 5.99 28.15 28.2 116,430 4,130 2 1:25 PM X
27 5.94 27.73 28.5 144,530 5,210 3 1:()5 PM X
27 5.95 27.82 28.5 143,720 5,170 3 I:IJ9 PM X
H
L
H 1- Cone (both ends) '2 - ConeNertical Cracks'(one end) 3. Columnar 4 _ Diagonal w no cracking at ends
Remarks: SET #1:
c: Cily of Springfield
Chambers Construction - David Bakke
Robert~on Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scolt Metzler
5 - Side frac ures (at top of bottom) 6 - Top fractures (same as tf5 ilUt end 01 cyfinderYi; poiilted)
Re11.1ictfUIlY Sl~~l~~~~'
pr'r Siona/J~ndllSfrieS' Inc.
1/ 0
Stbve Wilder
Laboratory Manager