Loading...
HomeMy WebLinkAboutPermit Miscellaneous 1996-8-1 SPRINGFIELD ~. CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: RAY/JENNIFER KLEIN Location: 1485 MARKET ST Developement Type: C Building Size: Job No.: 960825 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 1,0 X X 0.210 Per Sq Ft 2. SANITARY SEWER Number Of PFUs (see Page 2) - CITY 1. 0 X 15 X 43.43 Per PFU = 3. TRANSPORTATION Number Of Units Trip Rate X Cost Per Trip X Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs o Per PFU + MWMC Admin Fee 18.750 X X = MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0,50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 06/24/96 Page 1 ",,* $0.00 $651. 45 $0.00 $0.00 $0.00 $0.00 $651.45 $32.57 $684.02 SPRINGFIELD Job Number: 960825 FIXTURE UNIT CALCULATION TABLE Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture Unit Equivalent Fixture Units o o o o o o o o o 1 o 1 1 1 o 2 o 2 1 2 3 6 2 6 1 3 2 o o o o o o o o o 2 o 2 2 1 o 8 o 2 2 1 6 4 15 CREDIT CALCULATION TABLE: Based on assessed value, If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o X 0.00 = 0.00 o X 0.00 = 0,00 CREDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.) SPRINGFIELD ~~ Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 960825 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 1485 MARKET ST Assessors Map #: 17032533 Tax Lot #: 10005 owner: RAY/JENNIFER KLEIN Address: 3990 DILLARD RD Phone #: 485-8024 City/State/Zip: EUGENE, OR 97405 Description Of Work: OCCY INSP/REMODEL REMODEL Value: 0.00 Const. Contractor Contractor # Expires Phone General: GEORGE HAWES 0089821 06/30/97 912-6567 2061 HARRIS, EUGENE, OR 97405 Plumbing: WILDWOOD PLUMBI 0063790 01/26/96 253-5922 Mechanical: HOME COMFORT 0084164 06/25/97 345-2838 85262 Peaceful Valley Rd Eugene OR Electrical: DIXON ELECTRIC 0066894 OS/23/97 744-0619 1130 Bailey Hill Rd #24 Eugene OR 9 --- PLUMBING No. 9 Fee Charge 90,00 Single Fixture TOTAL PERMIT 90.00 - -- MECHANICAL --- No. Fee Charge 12.00 12.00 2.00 10.00 4 Furnace/burner & vent < 1000,000 BTUs Vent Fan/Single Duct GAS PIPING Permit Issuance TOTAL PERMIT 36.00 HANDICAP ACCESS: Y -- OFFICE USE QUAD AREA: 2CNW LAND USE: 5300 Item REMODEL OF 3996 SQ F Square Feet x $/Square Feet = Value 76,000.00 TOTAL VALUE OF PROJECT 76,000.00 Plan Check Fee: 234.65 Rec #: 22105 Date: 06/19/96 Rec By: LORNE PLEGER SPRINGFIELD ~~ Job Number: 960825 Page 2 BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PLUMBING Surcharge/Admin 361.00 28.88 36.00 2,08 90.00 7.20 SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 525.16 684.02 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 1,209.18 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following u*u work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROUGH PLUMBING - Prior to cover. ROOGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. FRAMING - Prior to cover. CEILING GRID DRYWALL - Prior to taping. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. FINAL FIRE - When all Fire Department requirements have been met. been met. ROUGH GAS - after line is installed and capped if not attached to an appliance FINAL GAS - When all gas work is complete, GAS SERVICE - After line is installed and line has been connected to a minimum of one appliance. Pressure test done at this point. FINAL BUILDING - When all required inspections have been approved and the building is complete. --- ADDITIONAL COMMENTS --- Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 07/31/96 , , SPRINGFIELD Job Number: 960825 Page 3 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Signature~~~ g-j//1~ Date I f - - - VALIDATION Receipt Number: -:2 -:z."7 /2. Date Paid: ~-/'-~ Received By: /2~j~ 4/~~., t'P;7~ .,.,. . Amount Received: