HomeMy WebLinkAboutPermit Miscellaneous 1996-8-1
SPRINGFIELD
~.
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: RAY/JENNIFER KLEIN
Location: 1485 MARKET ST
Developement Type: C Building Size:
Job No.: 960825
Lot Size:
1. STORM DRAINAGE
Impervious Sq Ft 1,0 X
X
0.210
Per Sq Ft
2. SANITARY SEWER
Number Of PFUs
(see Page 2)
- CITY
1. 0 X 15
X
43.43
Per PFU =
3. TRANSPORTATION
Number Of Units
Trip Rate
X
Cost Per Trip
X
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
o
Per PFU + MWMC Admin Fee
18.750
X
X
=
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0,50
TOTAL SDC
Reviewed By: TROY MCALLISTER
Date: 06/24/96
Page 1
",,*
$0.00
$651. 45
$0.00
$0.00
$0.00
$0.00
$651.45
$32.57
$684.02
SPRINGFIELD
Job Number: 960825
FIXTURE UNIT CALCULATION TABLE
Page 2
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS
Number of
New Fixture
Unit
Equivalent
Fixture
Units
o
o
o
o
o
o
o
o
o
1
o
1
1
1
o
2
o
2
1
2
3
6
2
6
1
3
2
o
o
o
o
o
o
o
o
o
2
o
2
2
1
o
8
o
2
2
1
6
4
15
CREDIT CALCULATION TABLE: Based on assessed value, If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
o
X
0.00 =
0.00
o
X
0.00 =
0,00
CREDIT TOTAL =
$0.00
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)
SPRINGFIELD
~~
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 960825
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 1485 MARKET ST
Assessors Map #: 17032533
Tax Lot #: 10005
owner: RAY/JENNIFER KLEIN
Address: 3990 DILLARD RD
Phone #: 485-8024
City/State/Zip: EUGENE, OR 97405
Description Of Work: OCCY INSP/REMODEL
REMODEL
Value:
0.00
Const.
Contractor Contractor # Expires Phone
General: GEORGE HAWES 0089821 06/30/97 912-6567
2061 HARRIS, EUGENE, OR 97405
Plumbing: WILDWOOD PLUMBI 0063790 01/26/96 253-5922
Mechanical: HOME COMFORT 0084164 06/25/97 345-2838
85262 Peaceful Valley Rd Eugene OR
Electrical: DIXON ELECTRIC 0066894 OS/23/97 744-0619
1130 Bailey Hill Rd #24 Eugene OR 9
--- PLUMBING
No.
9
Fee
Charge
90,00
Single Fixture
TOTAL PERMIT
90.00
- -- MECHANICAL ---
No.
Fee
Charge
12.00
12.00
2.00
10.00
4
Furnace/burner & vent < 1000,000 BTUs
Vent Fan/Single Duct
GAS PIPING
Permit Issuance
TOTAL PERMIT
36.00
HANDICAP ACCESS: Y
-- OFFICE USE
QUAD AREA: 2CNW
LAND USE: 5300
Item
REMODEL OF 3996 SQ F
Square Feet
x
$/Square Feet
= Value
76,000.00
TOTAL VALUE OF PROJECT
76,000.00
Plan Check Fee:
234.65 Rec #: 22105 Date: 06/19/96 Rec By: LORNE PLEGER
SPRINGFIELD
~~
Job Number: 960825
Page 2
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PLUMBING
Surcharge/Admin
361.00
28.88
36.00
2,08
90.00
7.20
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
525.16
684.02
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
1,209.18
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following u*u work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
ROUGH PLUMBING - Prior to cover.
ROOGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
FRAMING - Prior to cover.
CEILING GRID
DRYWALL - Prior to taping.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL FIRE - When all Fire Department requirements have been met.
been met.
ROUGH GAS - after line is installed and capped if not attached to an
appliance
FINAL GAS - When all gas work is complete,
GAS SERVICE - After line is installed and line has been connected to a
minimum of one appliance. Pressure test done at this point.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
--- ADDITIONAL COMMENTS ---
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 07/31/96
,
,
SPRINGFIELD
Job Number: 960825
Page 3
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety, I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
Signature~~~
g-j//1~
Date I f
- - - VALIDATION
Receipt Number: -:2 -:z."7 /2.
Date Paid: ~-/'-~
Received By:
/2~j~
4/~~.,
t'P;7~
.,.,. .
Amount Received: