FIELD DENSiTY REp-ORT
SOIL AND ~Oll:..-AGGREGA TE
Client: Ms. Laurelta Davies
Address: Jerry's rlome ImProvement
P.O. 80x261,1
Eugene, Oregon 97402
Project No.: 722-80276-39 . --
Project: Jerry's-McKenzie Fiel<t linptovments
Project 2525 Qlympic Street' .
Location: Springfieid';ioregon -...
Equipment: Troxier: ,3430 ,- SN: 30016
Date Performed:
P.O. No.:
B.P. No.:
Technician:
Laboratory Soil / Aggregate Daia .
Moistur~ D~HlsilyF~elationshir o~ 135Ibs./c_u.fl., at 8% moisture was supplied by suppfierfor Egge'Saf]d an.d GraveI3/4"-a'mo?ified.
1 040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 -15,\ t)746-7163 fax
January 30, 2009
Z4175LD
Dale Russell
Test No.
Approximate Test Location
Slab on grade for outside storage
Approximate Test
Elm'.:
Field Density Tests: N,u.clear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 688 OS 2939)
,-
B.5 at 9.25
FRG
2 B.5 'at 9.75 FRG
3 1025819.25 FRG
4 1025 at1 0.75 FRG
5 IF at 925 FRG
6 IFal975 I FRG
Tests performed at finished grade of base rock(frg) at listed locations abovR
Tests were reported 10 Jason Pickell willl Chambers Construction.
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stoiarczyk
Metzler Engineering - Scoll Metzler
,!,,:,
Probe Wet Density Dry Density
Depth LBS/CU.FT. LBS/GU.FT.
8" 143.1 133.7
8" 145.6 136.3
8" 139.7 1330
8" 144.1 135.0
8" 139.7 130.7
)l" 138.5 129.6
... ..,."
.
Percent Percent Required Comments
Moisture Compaction Compaction
7.0 99.0 . -950/0---"
6.8 100.9 95iyo~
5.1 98.5 , <95%
6.7 100.0 9'5%'
6.8 96.8 .95%
6.8 96.0 95%
Pr6fessio/1al Service IndustNes, Inc.
C~:;(XQ~~'~\
Raymond V. Alipl;t;\)
Project Manager
THIS REPORT JS PROVIDED FOR THE INFORldATlON OF TI-IE CLlENTONL Y. mE REPRODUCTION OF nus REPORT BiANY METi-IOD AND rrs TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT-IN FULL IS PROHIBITED
WITHour rilE WRITTEN
. ~." .:.t' _ ,'-'':: -~',' ;". ' PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
~
l"'~;lInformation
,.,~. .ToBuild on
Engineering . Consulting. Testlng
DAiLY FIELD' REPORT
Date Performed:
Client:
January 13, 2009
Ms. Lauretta Davies
Jerry's Home Improvement
PO. Box 2611
Eugene, Oregon 97402
Report Number:
722-90008-2
Project Name:
Jerrl"s-Warehouse Renovations
2525 Olympic Street
Springfield, ci~ego~
Project Location:
P.O. No.:
Type of Inspection:
Z4175LD
Epoxy
BP#,COM2008-01595:
Weather: '. - . -~. 'InSide
Field Observations and Comments .
Performed continuous inspection during the installation of five (5) 5/8" and two (2) 3/4" diameter all thread epoxied
anchor bolts in the following locations: Existing east CMU wall on line 9 between C and D at door header. Prior to
installation the predrilled holes were cleaned using a nylon brush and compressed air. Verified minimum embedment
depth of 5 inches for the 5/8" and 6 3/4" for the 3/4". The above listed epoxy anchors were installed using Hilti Hit HY
150. Contractor stated the nuts would be tightened after epoxy has cured. To the best of our knowledge, the work
inspected was in accordance with the building department approved design drawings detail C/S2, specifications and
applicable workmanship provisions of the International Building Code.
Inspector: Steve Wilder
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
i);:~rrlft"'~
David F. Smith
Branch Manager
c: City of Springfield .
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORII1A nON OF THE CLIENT ONL Y. THE REF;RODUCTION OF THIS REPORT, !3Y ANY METHOD. AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
prof~SSional Service Industries, Inc.. 1040A Shell:y..St.. Springfield, OR 97477. Phone 541/746-9649. Fax ?41n46-7163