HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-2-13
SFEI
Geotechnical & Construdion ServiOOs
C9mpressive Strength of Concrete
. (ASTM C 39)
'1:"'II~lrt;<!II~\Il':il~'IIII~.ln,*
CLIENT
PROJECT
Hayden Bridge Water
,
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
02-13-09
2087168
6176
EWEB
500E. 4th Ave.
EUgene, Ore9on
B.P. NO.. 2008-00225
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
01-16-09 CAST BY
4000 psi
4000 psi SACKS
40-SE7 CEMENT
AEA; Super; Eclipse; Hot water
2 TICKET NO.
62" F YARDAGE
38" F WEATHER
Wall number 20.
A. Fenstermacher
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAGE
3354009
10.0 OF
Fog
28.0
~ !
LOAD 2 SAMPLED
From 2nd lift. .
"
TEST AGE AREA WEIGHT TOTAL COM PRESSIVE
DATE (DAYS) (IN.') (LBS\ LOAD (LBS) STRENGTH (PSI)
01-23-09 7 12.62 8.4 47000 3720
I 02-13-09 28 12.62 8.42 63390 5020
r' 02-13-09 28 12.82 8.40 62525 4950
-"Hoid
AVERAGE
STRENGTH
(PSI)
TIME OF
TEST
8:15AM
7:10AM
7:15AM
4985
01-17_09.
.4" x8"
Knife River
3/4"
3.8%
61/4"
9:30 AM
ASTM C31
TYPE OF
FRACTURE-
5
3
5
**1 - End Cones
2 - Cone/Split
3 - Columnar
4 - Diagonal
5'- Side (top and bottom) . 6 - Side (top or bottom)
'I
REMARKS: Jake Stuck'y was.advised of on-site test results.
R~Y~
Michael L. Meyer
Technical Manager
,
,.
c:
EWEB~ Mike Stickling (email)
. EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Buildin9 Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in'part or full a-nd/or any part
thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorization.
750 t-NV ComeIIAvenue' CorvaI~, Cregan 97330' phone (541) 757-4698, fax (541) 757-2991
29540 B Airport Road . Eugere, Cregan 97402 . phone (541) 684J849 . fax (541) 684-3851
63050 Corporate Place, Su~e 2 . Bend, Oregon 97701 . phone'(541) 382-4644 . fax (541) 382-4646
RECEIVi:.\.
FEB 1 8 ?nn~
~fEl
Page 1 of 1
11;"'IIH~;'I~.':I:'.IIIJ~_
Ce..b...',nicaI & Construction Services
Daily Field Report
Client: EWEB Project: Hayden Bridge W~ter Filtration Date: 02-12-09
500E. 4th Ave. Plant Expansion Project No.: 2087168
Eugene, Oregon Springfield, Oregon Report No.: E-22375
Inspector: A. Fenstermacher
ID No.: 5258882-49
ICC
Inspection of: Reinforced Concrete Weather: Partly Sunny Continuous Inspection: 0
Contractor: Wildish Building Co. BP No.: 2008-00225 Periodic Inspection: ~
. Performed inspection on the reinforcing steel for elevated slabs as follows: above wall
numbers 20 and 36 and raw water channel lid above wall 26. Reinforcing steel was
checked for grade; size, laps, quantities, locations, ties, 'clearance and supports.
Observe'd the placement of 20 yards of Knife River 4000 psi concrete (mix 40-SE7) into
areas noted above. Concrete was placed by pump and mechanically consolidated.
Load 1 was tested for air content- 6.1%. Cast one (1) set of four (4) 4" x 8"
compressive strength cylinders. Notified Jake Stucky (Wildish) of on-site results.
Concrete temperature- 65F; air temperature- 47F; slump- 7"; air content- 4.4%.
Mr. Stucky was asked to notify our office when additionCjI services are needed.
To the best of our knowledge, the work inspected was ,in accordance with plans dated
02/?008 and applicable workmanship provisions of the I.B.C., except if noted above.
ReViewedpJ;U/!-
. k--
Michael L. Meyer
Technicai Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (em ail)
Wildish Building CO.-Kevin Fitzjarrell (email)
Wildish Building CO.- Jake Stucky (email)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of. the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shal,~ no~ be reproduced in part or full ~nd/or any part
thereof be disclosed without" FEI Testing & Inspection, Inc.'s written authorization.
7fIJ NW Cornell Avenue' CoivaIUs, Oregon 97330, pha1e (541) 7574698, fax (541)757-2991
29540 B Airport Road . Eugene, Oregon 97402 . phone (541)'684-3849 . fax (541) 684-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4644 . fax (541) 362-4646
._.0'> '" _.~ . ~__....._,.........._
~fE'
11~'II~lrt:.lf..'~;'lIm.I~L" .
CLIENT
EWEB
500E. 4th Ave.
EUgene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE'
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 1 SAMPLED
Geotechnical & Construction ServiceS
Compressive Strength of Concrete
(ASTM C 39) .
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
02-11-09
2087168
6177
B.P.NO.
2008-00225
01-14-09 CAST BY A. Fenstennacher DATE RECEIVED 01-15-09
4000 psi SPECIMEN SIZE 4" x 8"
4000 psi SACKS SUPPLIER Knife River
40-SE7 CEMENT MAX SIZE AGG. 3/4"
Super; Eclipse; AEA AIR CONTENT 5.3%
1 TICKET NO. 3160789 SLUMP 7"
59" F YARDAGE 9.0 OF 18.0 TIME 1:00 PM
420 F WEATHER Fog SPECIMEN STORAGE ASTM C31
Elevated slabs above East side of wall number 30 and above wall 24; east and west side walls above
wall number 25. .
Set 3
From slabs.
AVERAGE
TEST AGE AREA WEIGHT TOTAL COM PRESSIVE STRENGTH TIME OF TYPE OF
DATE (DAYS) (IN.') (LBS) LOAD (LBS) STRENGTH (PSI) (PSIl TEST FRACTURE"
I 01-21-09 7 12.50 8.2 51600 4130 10:50At-A 4
I 02-11-09 28 12.56 8.3 76145 6060 8:00 AM 2
I 02-11-09 .28 12.56 8.3 75170 5980 6020 8:05At-A 2
I Hold
** 1 - End Cones 2 - Cone/Split 3 -Columnar 4 - Diagonal 5 -Side (top and bottom) 6 - Side (top or bottom)
REMARKS: Jake Stucky (Wildish) and Mike Stickling (EWEB) was advised of on-site test results.
Reviewed By:
/JJ,'-1.~
Michael L. ~e~#
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullou9h (email)
OBEC- Pete Slocum (email)
Wildish Buildin9 Co.- Kevin Fitzjarrell (email)
Wildish Buildin9 Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such. information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization.
750 N-N ComeII Avenue' Corvallis, Oegon 97330' phone (541) 757-4698' fax (541) 757-2991
29540 B AiIporl Road . Eugene, Oegon 97402 . phone (541)ffi<1.;l849 . fax (541) 684-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701' phone (541) 382-4644 . fax (541) 382-4646
A".....'
~'9rt
'1~'lltlrt;thl", ~a'IlIH.I~L"
CLIENT
EWEB
500E. 4th Ave.
Eugene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 3 SAMPLED
TEST
DATE
01-21-09
02-11-09
02-11-09
Hold
AGE
(DAYSL
7
28
28
Geotechnical & Construdion Services .
. Compressive Strength of Concrete
(ASTM C 39)
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
02-11-09
2087188
6175
B.P.NO.
2008-00225
. CAST BY
A. Fenstermacher'
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAGE
01-15-09
4" x 8"
Knife River
3/4"
7.3%
6"
10:30 AM
ASTM C31
01-14-09
3000 psi
3000 psi . SACKS
30-1K CEMENT
AEA; Hot water; Fibers
3 TICKET NO.
640 F YARDAGE
390 F. WEATHER
Coagulant building slab on grade.
S"t 1
From thickened edge near northwest corner.
3160782
10.0 OF
Fog
88.0
AREA
(IN')
12.50
12.56
12.56
AVERAGE
WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF
(LBS) LOAD (LBS) STRENGTH (PSI) (PSI) TEST FRACTURE-
8.0 34500 2760 10:40 AM 5
8.1 46780 3720 8:20 AM 4
8.1 48240 3840 3780 8:25 AM 5
**1 _ End Cones 2 - Cone/Split
3'- Columnar
4 - Di.agonal
5 - ~ide (top and bottom)
6 - Side (top or bottom)
. REMARKS: Jake Stucky (Wildish) and Mike Stickling (EWEB) was advised of on,site test results.
Reviewed By:
;1J . '-/. I/vu; ------
Michaell. Me.."t:
Technical Manager
c:
EWEB- Mike Stickling (email)
EWES- Wally McCullough (email)
OSEC- Pete Slocum (email) .
Wildish Building Co.- Kevin Fitzjarrell (email)
Wild ish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
RECEIVED
FEB18 2009
This report and/or enclosed test data is the confidential properly,of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FE! Testing & Inspection, Inc.'s ~itten authorization.
750 r-w eaneIJ Avenue' CorvaI\iS, Oregon 97330' phone (541) 757-4698' fax(541) 757-2991
29540BAirpatRoad' EUQe18,0reg0n97402' phone (541) 684-3849 .fax(541)684-J851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone ,(541) 382-4644 . fax (541) 382-4646
SEEl
rl~'IINCI;.I~~'~~'I(Ii~'lln" Geotedmical & Construction Servit:eS
CLIENT
EWEB
500E. 4th Ave.
Eugene. Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 8 SAMPLED
Compressive Strength of Concrete
(ASTM C 39)
PROJECT
Hayden Bridge. Water
Filtration Plant Expansion
Springfield, Oregon
B.P. NO.
2008-00225
01-14-09 CAST BY
3000 psi
3000 psi' SACKS
30-1K CEMENT
AEA; Hot water: Fibers
8 TICKET NO.
62" F YARDAGE
43" F WEATHER
Coagulant building slab on grade.
Set 2
Near northwest comer of slab.
A. Fenstermacher'
3160787
10.00 OF '88.0
Fog
TEST AGE AREA WEIGHT' TOTAL COMPRESSIVE
DATE (DAYSL (IN.') (LBS) LOAD (LBS) STRENGTH (PSI)
I 01-21-09 7 12.50 8.1 33600 2690
I 02-11-09 28 12.56 8.2 55135 4390
I 02-11-09 28 12.56 8.2 53925 4290
I Hold
DATE
PROJECT NO.
REPORT NO.
02-11-09
2087168
6176
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAG.E
01-15-09
4" x8"
Knife River
3/4"
6.1%
6"
12:15 PM
ASTM C31
AVERAGE
STRENGTH
(Psn
TIME OF TYPE OF
TEST FRACTURE~ 1
10:45 AM 5
8:10AM 5 I
8:15AM 5 1
4340
**1 _ End Cones. 2 - Cone/Split
3 - Columnar
4 - Diagonal
5 _ Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Jake Stucky (Wlldish) and Mike Stickling (EWEB) was advised of on-site test results.
~eviewed By:
/h."i,~
Michael L. ~e.,jl .
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wild ish Building Co.- Kevin Fitzjarrell (emall)
Wildish Buildin9 Co.- Jake Stucky (emall)
City of Springfield .
Knife River'
This report and/or enclosed test data is the confidential property of the ciient to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection; lnc.'s written authorization.
,
MLM:sc
750 !\NIl Camell Avenoo' Cotvallis, Oregon 97330, pha1e(541) 757-4698' fax(541) 757-2991
29540 BAirpatRoad' Eugene, Oregon 97402, pha1e (541)68<h'3849' fax (541) 6B4-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4644 . fax (541) 382-4646
~fE'
11~'II~ltI;.I~lio'iI;al[II~i1I~ltll
Geotechnical & Construction Services
Compressive Strength of Concrete
(ASTM C 39)
CLIENT' EWEB
500E. 41h Ave.
EUgene, Oregon
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
02-11-09
2087168
6194
B.P.NO.
2008-00225
DATE CAST 02-04-09 CAST BY A. Fenstermache( DATE RECEIVED 02-05-09
STRENGTH REQUIRED 4000 psi SPECIMEN SIZE 4"x8"
STRENGTH PLACED 4000 psi SACKS SUPPLIER Knife River
PRODUCT CODE 40-SE7 CEMENT MAX SIZE AGG. 3/4"
ADDITIVES Super; Eclipse; Hot water; AEA AIR CONTENT 4.6%
LOAD NO. 1 TICKET NO. 335119 SLUMP 7"
CONCRETE TEMP 630 F YARDAGE 10.0 OF 1~.0 TIME 9:30 AM
AIR TEMP 37" F WEATHER Clear SPECIMEN STORAGE ASTM C31
r
POUR LOCATION Raw water channel lids above wall numbers 24 and 2;').
TEST
DATE
02-11-09
03-04-09
03-04-09
Hold
AGE
(DAYS'
7
28
28
AREA
{IN."
12.56
WEIGHT
(LBS!
8.3
TOTAL
LOAD (LBS)
50990
COMPRESSIVE:
. STRENGTH (PSI\
4060
AVERAGE
STRENGTH
. (PSI\
TIME OF
TEST
8:40 AM
TYPE OF
'FRACTURE-
3
"*1 - End Cones
2 - Cone/Split
3 - Columnar
4 - Diagonal
. 5 -;rSide (top and bottom)
6 - Side (top or bottom)
REMARKS: Jake Stucky (Wildish) was advised of on-site test results.
Reviewed By:
A ,'-j.{}c-u,
Michael L. MeyJ
Technical Manager
---
c:
EWEB- Mike Sticklin9 (email)
EWEB- Wally McCullou9h (email)
OSEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (em ail)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the client to ,whom it is addressed and pertainsto the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
750 NW ComeIIAvenue' CavaIIis, Qe;jon 97330, phone (s41) 757-4698 . fax (541) 757-2991
29540B Airport Road . Eugene, Qe;jon 97402 . phone (541) 684-3849 . fax (541 )684-J851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541 ) 382-4644' fax (541) 382-4646
. i
~F~t
lJPro'ml~;4mlt.':'n.'nlJ~.m.
CLIENT
EWEB
500E. 4th Ave.
EUgene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 2 SAMPLED
TEST
DATE
02-09-09
03-02-09
03-02-09
Hold
AGE
(DAYS)
7
28
28
.*1 - End Cones
Geotechnical & Construction Services
C<;1mpressive Strength of Concrete
(ASTM C 39)
PROJECT
Hayden Bridge W~ter
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
02-09-09
2087168
6187
B.P. NO.
2008-00225
02-02~09 CAST BY A. Fenstermacher DATE RECEIVED 02-03-09
3000 psi SPECIMEN SIZE 4" x 8"
3000 psi SACKS SUPPLIER Knife River
30-1K CEMENT MAX SIZE AGG. 3/4"
AEA; Fibers: Hot water AIR CONTENT 5.3%
2 TICKET NO. 3352725 SLUMP 6 1/2"
58" F YARDAGE 10.0 OF 30.0 TIME 9:30 AM
410 F WEATHER Clear . SPECIMEN STORAGE ASTM C31
Alum tank pedestals and elevated walkway support ,!,.alls at southwest corner of coagulant building.
From'1't1if): in southeast pedestal.
AREA
(IN.')
12.50
I
'WEIGHT
I (LBS)
I 8.2
TOTAL
LOAD (LBSl
30900
COMPRESSIVE
STRENGTH (PSI)
2470
AVERAGE
STRENGTH
(PSI)
TIME OF
TEST
9:15AM
TYPE OF
FRACTURE~
5
2 - Cone/Split
3 - Columnar
4 - Diagonal
5 ~ Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Jake Stucky (Wildish) was advised of on-site test results.
Reviewed By:
t1~!~r
Technical Manager
c:
EWEB, Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Buildin9 Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As suCh, information contained herein shall, not be reproduced in part or full,and/or any part
, thereof be disclosed without FE] Testing & Inspection, Inf.'s written authorization.
750 t-NV Camell Avenue' CoIvaIUs, 0reg:Jn 97330, phone (541) 757-4698 . fax (541) 757"2991
29540 B Airpat Road . Eugere, 0reg:Jn 97402 . phone (541) 684-J849 . fax (541) 684J851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541 ) 362-4644 . fax (541) 382-4646
("
d=>-
,~
. ~
. J'-..
.?
~~
~
~FEl
11.'11~1r1:.I~~':i;.t[fl~.9
CLIENT
EWEB
500E. 4th Ave.
Eugene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
Geotechnical & Construction Services
Compressive Strength of Concrete
(ASTM C 39)
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
02-06-09
2087168
6164
B.P. NO.
2008-00225
c:=
~
'-y 'c~
5'$\ ~
~ J'-
01-09-0g CAST BY
4000 psi
4000 psi SACKS
2440K1UOKS CEMENT
Super; Eclipse; Hot water
1 TICKET NO:
63" F YARDAGE
41" F WEATHER
Elevated walkway above wall #23.
J. Keller
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAGE
~
S
01-10-09
4" x8"
Knife River
3/4"
6.0%
8"
10:10AM
ASTM C31
3160681
6.0 OF
Overcast
AVERAGE
TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF
DATE (DAYS) (IN.') (LBSl LOAD (LBS) STRENGTH (PSI) (PSI) TEST FRACTURE-
01-16-09 7 12.50 7.9 32800 2620 !, 1:20 PM 5
02-06-09 28 12.56 8.0 40900 3260 10:10AM 3
02-20-09 42
Hold
*"1 - End Cones
2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Mike Stickling (EWEB) was advised of on-site test results.
Reviewed By:
/h. t(. iAuJ
Michaell. MeyelJ
Technical Manager
c:
EWEB- Mike Sticklin9 (email)
EWEB- Wally McCuliough (email)
OBEC- Pete Slocum (email)
Wildlsh Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the client to Whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall"notbe reproduced in part or full and/or any part
thereof be disclosed without FEI T~sting & Inspection, 106:'5 written authorization.
750 NW ComeIIAvenue. Corvams, 0reg0197330' phone (541 ) 757-4698, fax (541) 757-2991
29540 BAirportRoad . Eugene, 0reg01 97402' phone (541 )f384-J849' fax (541 )684-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541 ) 382-4644 . fax (541) 382-4646
Sf;)
11a.'II~lfl;.I~t.'~:.IIIIIIIII~l.
CLIENT
EWEB
500E. 4th Ave.
EUgene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 3 SAMPLED
TEST
DATE
01-16-09
02-06'-09.
02-06-09
Hold
AGE
(DAYS)
7
28
28
**.1 - End Cones
Covl,,"': " ,icaI & Constn..K:fun Services
PROJECT
. B.P.NO.
01-09-09 CAST BY
,
4000 psi
4000 psi SACKS
2440K1VOZF CEMENT
Adva; Eclipse: Fiber; Hot w~ter
3 TICKET NO.
65" F YARDAGE
34" F WEATHER'
Slab #18.
Near center
AREA
(IN.'l
12.50
12.56
12.56
WEIGHT
(LBSl
8.3
8.3
8.3
TOTAL
LOAD (LBSl
44200
62600
61100
Compressive Strength of Concrete
. (ASTM C 39) .
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
~!
DATE
PROJECT NO.
REPORT NO.
02-06-09
2087168
6163
2 - Cone/Split
3 - Columnar
2008-00225
J. Keller
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAGE
3160677
7.00 OF
Overcast
.,
COMPRESSIVE
STRENGTH (PSIl
3540'
4980
4860
AVERAGE
STRENGTH
(PSIl
TIM E OF
TEST
1:35 PM
10:00 AM
10:05 AM
4920
01-10-09
4.' x8"
Knife River
3W
4.9%
7 1/2"
9:30 AM
ASTM C31
TYPE OF
FRACTURE"
5
5
5
4 -Diagonal
5., Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Mike Stickling (EWEB) was advised of on-site test results.
Reviewed By:
rfJJ. ':J( J7w --
Michael L. Mevt:!
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Buildin9 Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (emaii)
City. of Springfield
Knife Riv~r
MLM:sc
R~C'
1::"
f"E8 I t/!:,
. ././ (,.
. <V~
This report and/or enclosed test data is the confidential property of. the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein.shall:not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, In~.'s written authorization.
750 NoN CcxnaIAvenue' Cavallis, Oegon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 B Airport Road . Eugene, Oegon 97402, phone (541 ).684-3849' fax (541) 684-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4644 . fax (541) 382-4846
~fEl
11;"'I~lrt;41I~"'~;"'III~i!lI~I.
CLIENT
EWEB
500E. 4th Ave.
EUgene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
" POUR LOCATION
LOAD 2 SAMPLED
Osv~ ,,1iCaI & Construc:OOn Services
Compressive Strength of Concrete
(ASTM C 39)
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Ore90n
DATE
PROJECT NO.
REPORT NO.
12-29-08
2087168
6129
B.P. NO.. . 2008-00225
CAST BY
A. Fenstermacher
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAGE
12-02-08
4" x8"
Knife River
3/4"
3.5%
7 3/4"
11:15AM
ASTM C31
12-01,08 .
4000 psi
4000 psi
40-SE7 (with fibers)
Super, Eclipse, Fiber
2 TICKET NO. 3160461
66" F YARDAGE 10.00 OF
57" F WEATHER Over.cast
1'" and ~" lift in wall #'s 22 and 27.
Set 1
From 2" lift.
SACKS
CEMENT
,20.00
AVERAGE
TEST' AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF
DATE (DAYS) (IN.'! (LBS) LOAD (LBS! STRENGTH (PSIl (PSn TEST FRACTURE-
12-08-08 7 12,50 8.4 60100 4810 3:10 PM 6 I
12-29-08 28 12.56 8.5 80400 6400 8:20 AM 5 1
12-29-08 28 12.56 8.5 78100 6220 6310 8:25 AM 6 I
Hold I
**1 - End Cones 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom)
REMARKS: Jake Stucky (Wildish) was advised of on-site test results.
Reviewed By:
fh. '7./h..-
Michael L. Met
Technical Manager
---------
c:
EWEB- Mike Stickling (email)
EWES- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Sprin9field
Knife River
MLM:sc
~
~~
c? ~
~.~
[f>
This report and/or enclosed test data is the confidential property of the client to ...mom it is addressed and pertains to the specific
process-and/or material evaluated. As such, information contained herein shall'not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, In:~.'s written authorization.
750NW CanelIAvenue' cnvaJlis, Oregon 97330' phone (541) 7574698 . fax (541) 757-2991
29540 B Airpat Road . Eugene, Oregon 97402 . phone (541)684-3849 . fax (541) 684J851
63050 Corporate Place, Suite 2 . Bend. Oregon 97701 . phone (541) 382-4644 . fax (541) 382-4646
~f~J
..... ,...,.' icaI & Constru"""- Servi
'1~'II~lri;"h\"'~{'ltlh'.m.. VCvLV\.A d 1 VUUlI ces
CLIENT
PROJECT
EWEB
500E. 4th Ave.
EUgene, Oregon
RP. NO.
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
CAST BY
SACKS
CEMENT
LOAD 2 SAMPLED
Cf;>mpressive Strength of Concrete
(ASTM C 39)
Hayden Bridge "/ater
Filtration Plant Exbansion
Springfield. Oregon
2008:00225
A. Fenstermacher
,
,55.0
REMARKS: Jake Stucky (Wildish) was advised of on-site test results.
Reviewed By:
!2~e~'f!r
Technical Manager
c'
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
DATE
PROJECT NO.
REPORT NO.
12-29-08
2087168
6130
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAGE
12-02-08
4" x8"
Knife River
3/4"
4.9%
8"
12:45 PM
ASTM C31
This report and/or enclosed test data is the confidential property of the client to \\'horn it is addressed and pertains to the specific
. process and/or material evaluated. As such, information contained herein shall net be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, In:~.'swritten authorization.
12-01-08
4000 psi
4000 psi
. 40-SE7
Super, Eclipse
2 TICKET NO. 3160466
66' F YARDAGE 10.00 OF
56" F WEATHER Overcast
. Top half of walls 22 and 27, and all of wall 26.
Set2
From 4th lift in wall 22.
"
750 NW Cornell Avenue' CorvaIiis, Oregon 97330, phone (541) 757-4698 . fax(541) 757-2991
29540 B Airport Road . Eugene, Oregon 97402 . phone (541)684-3849 . fax (541) 684;J851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4644 . fax (541) 382-4646
.,
~..!:,
~yr~
.1a.'II~IC'l:...,~..':l;"IIII~\.I~I"
CLIENT
'EWEB
500E. 4th Ave.
EUgene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 1 SAMPLED
TEST
DATE
12-18-08
01-08-09
01-08-09
Hold
AGE
(DAYS)
7
28
28
**1 - End Cones
Geotechnical & ConstrUclion Services
Compressive Strength of Concrete
(ASTM C 39)
PROJECT
. I
Hayden Bridge Water
t
Filtration Plant Expansion
Sprin9field, Oregon
12-18-08
2087168
6145
DATE
PROJECT NO.
REPORT NO.
, B.P. NO.
2008-00225
CAST BY
A. Fenstermacher
DATE RECEIVED
SPECIMEN SIZE
SUPPLIER
MAX SIZE AGG.
AIR CONTENT
SLUMP
TIME
SPECIMEN STORAGE
12-11-08
4000 psi
4000 psi .
40-SE7
Super; Eclipse
1 TICKET NO. 3160554
61" F YARDAGE 7.5 OF
50' F WEATHER Fog
Ramp footings, north and south (up to sump).
SACKS
. CEMENT
22.0
From south footing near west end.
AREA
(IN.')
12.56
WEIGHT
(LBS)
6.4
TOTAL
LOAD (LBS)
54900
COMPRESSIV"
STRENGTH (PSI)
4370
AVERAGE
STRENGTH
(PSI)
TIME OF
TEST
7:40 AM
I
I
12-12-08
4" x8"
Knife River
3/4"
4.5%
5"
11:20AM
ASTM C31
TYPE OF
FRACTURE-
4
2 - Cone/Split
4 - Diagonal
5": Side (top and bottom)
6 - Side (top or bottom)
3 - Columnar
REMARKS: Jake Stucky (Wildish) was advised of on-site test results.
Reviewed By:
CL~{!:P-
Technical Manager
c:
EWES- Mike Stickling (email)
EWES- Wally McCullough (email)
OBEC-. Pete Slocum (email)
Wlidish Building Co.- Kevin Fitzjarrell (email)
Wild ish Buildin9 Co,- Jake Stucky (em ail)
City of Springfield
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the client to y.'hom iUs addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorizatior:t.
750 NN Canel Avenue' CoIvaJlis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540BAirportRoad' Eugene, Oregon 97402 . phone (541) 684J849 'fax(541)684.J851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701' phone (541) 382-4644 . fax (541)3824846