HomeMy WebLinkAboutPermit Field Test & Inspection Report 1996-4-15
BRAUN'M
I NTE'RTEC
. April,15, 1996
Ms, Karen Romero
Selco Credit Union
P.O. Box 7487
Eugene, Oregon 97401"
.'
. Dear Ms, Romero:
Re: Selco Credit Union
(2~.flN6rt6, 19th " Springfield, Oregon
~s- l~D
Braun Intertec Northwest
,2285 Nugget Way
Eugene, Oregon 97403
541.746-9649 Fax: 746-7163
. Engineers cnd Scientists Serving
the Built and Natura! Environments
Project EBXX"96-0083
Report E-56651
Subject: Results offield density tests performed by our'representative on April 11, 1996, at the
above referenced project. .
Report: Field Density Tests - Nuclear Densimeter - all tests performed at finished grade of
base rock under driveway pavemeni areas,
I near south end 'of drive through
I near middle of drive through
.1 near north end of drive through
I between island and A TM
13rd' exit,lane
135.7
140,6
133.7
136.0
131.5
...... peteent . .'
.Moisture......
7,3
6.2
3.4
5.7
10.6
Note: 1vfois~ure!Density ReIa~i9n~hip o'f 129..4lbs./cu.ft. at-9'.O%'~.c?i~t~re'was piovidciLby. rl!e
cHen,t. (Eugene Sand.& Gravel 3/4"-0). .'
Sincerely,
/l?A_ /?/~~
Michael L. Meyer, Managpf -Phe6..)
Eugene Branch.'. ' .
c: . . \ City .of Springfield
McKenzie. Commercial ,
"
,
,'_ r',..
c:lwp51Irepart.lfdtslseJ56651.sel
ft'",.
'''', .
l" ~ ,_' '-".
': ~.I '.. : I
.,-.,.....,..
.-
t. .'_
BRA U N I N T E R T E C NOR T H W EST
Inspecting Engineers--Chemists
2285 NUGGET WAY
EUGENE, OR 97403
Phone: (503) 746-9649
FAX: 746-7163
CONCRETE COMPRESSION TESTS
TESTED FOR:Selco Credit Union
CAST BY: our rep. R. Aliperti.
PROJECT:Selco Credit Union- #96022
ADDRESS:201I-Nort:h 19th'
"~spr irigfTe:l<f,'-Or'egon
TYPE OF SPECIMEN:6 x 12
2000 psi, 3500 MAX SIZED AGGREGATE 3/4"
ADDITIVES:
SOURCE:Eugene Sand & Gravel
PRODUCT CODE:Mix 184
CONDITION OF STORAGE:ASTM
PROJECT NO.:EBXX960083
REPORT NO:12-036-5854
P.O. NO:
('PERMIT-NO :~5~ 18:6..9_.)
, DATE MADE: 03/27/96
DATE REC'D:03/28/96
SACK MIX5.50
SLUMP:2 3/4"
TICKET NO: 85661W
LOAD NO: 1
LOCATION OF
AIR TEMP: 44 TIME: 8:15 am CU. YARDS: 9.0
CONC TEMP: 60 WEATHER: cloudy % AIR:
POUR:Grade beams, pier pads, and columns for ATM drive thru services
and building footings. (Load 1 placed in building footings)
Test Weight Load - lbs.
Date Mark Pounds per sq. in.
04/03/96 28.3 3430
04/24/96 28.3 4510
04/24/96 28.2 4420
4465
Age
Tested
7 day
28 day
28 day
Averaqe
cyl only
Note: Advised Bill with McKenzie Commercial of on-site test results.
cc: city of Springfield
McKenzie Commercial
Eugene Sand & Gravel
THIS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR
CLIENT AND IS INTENDED FOR THE USE OF OUR CLIENT ONLY. NO
OTHER PERSON OR ENTITY MAY UTILIZE THIS REPORT OR ANY PORTION
THEREOF WITHOUT OUR WRITTEN AUTHORIZATION.
BRAUN'M
INTERTEC
March 14, 1996
Ms. Karen Romero
Selco Credit Union
P.O. Box 7487
Eugene, Oregon 9740 I
Dear Ms. Romero:
Re: Selco Credit Union
2011 North 19th
SpringtieJd, Oregon
q5-l ?:lQD
Braun Intei'tec Northwest
2285 Nugget Way
Eugene, Oregon 97403
541.746-9649 Fax: 746-7163
Engineers 'and Scientists Serving
the Built and Nafural Environments
Project EBXX-96-0083
Report E:56514
March 13, 1996
Sitework
R. Aliperti
Clear
Report
':;
Met on-site with representatives of McKenzie Commercial and Eugene Sand & Gravel to
ohserve proof-roll of the south half of the asphalt pavement area and driveway approach.
,The proof-roll was conducted with a loaded double-axle dump truck weighing
approximately 45,000 pounds. 'A yielding area was observed under the wheel loads near
the middle of the west side of the pavement area. The area measured approximately 10 feet
east/v.lest by. 31)prc);dmatel'y 30 feet north!south. Informed hy the.9wner's representative
that the area will be over-excavated six inches in depth ancl replaced with iniported granular
material. No detlection was visible under the wheel loads for the remainder of south half
of the asphalt pavement area and driveway approach indicating a stable base is presently
availahle. Owner's representative was asked to. notify o.ur oftice when additional services
are needed.
.>incerely,
!>> 1. j}! -V.j.>>U U/tLt3 )
Michael L. Meyer, Manager
Eugene Branch
c: City of Springfield
McKenzie Commercial
c:\wp51 \r~ports\soi Is\;;.:! 565] 4.sd
BRAUN'M
.,
INTERTEC
Braun Intertec NOr1hwest
2285 Nugget Way
Eugene, Oregon 97403
'541.746.964<1 Fax: 746,7163
Engineers and Scientists 5e";'ln-g
/he Built and Natural Environments
March 14, 1996'
Project EBXX-96-0083 .
Report E-56513
Ms. Karen J<omero
Selco Credit Union
P.O. Box 7487
Eugene, Oregon 97401
Dear Ms. Romero:
Re: Selco Credit Union
'20I( Norlhi9th ' .
Springfiel~; 9regon
B.P. No. 95-1860
"
I
I
I,
,
March Ii, 1996
Sitework
R. Aliperti
Partly Cloudy
Report
. Met on-site with representatives with McKenzie COIn)nercial 'and Eugene Sand & Gravel to
observe proofroll on exp.osed subgrade for building pad and parking/drive)"ay pavement.
I areas at approximate' elevations of 458.5' and 460.0'; respectively. Tl)e proof-roB was
I conducted with a loaded.double-axle dump truck weighing approximately 45,000 pounds.
Yielding 'areas were observed under the wheel. loads on the north half of asphalt pavement
. area, the middle of the concrete pavement area, and the south half of the bUlldmg.pad. The
approximate locations of the yielding areas were marked on the ground with spray paint.
The architect was contacted and informed .01' the proofi.oll ohservations. The architect
directed the contractor to (lVer-excavate the yielding areas within the pavement sections six
inches in depth and replace with imported granular material. The architect did not direct
I any remedial action to be performed on the building pad subgrade. The south!half of the
.. asphalt pavement area and driveway approach were not ready for proof-roll at the time of
lour site visit. Contractor's representative was advised to notify our office when additional
site visits are.needed.
...incerely;.
/h. I. ./JJ 0/ ##72ft)
Michael L. .Meyer; Manager '
Eugene Branch
c: . City of Springfield
McKenzie Commercial
c:\wp51\reporls\soils\scl56513.sel -