Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 1996-4-15 BRAUN'M I NTE'RTEC . April,15, 1996 Ms, Karen Romero Selco Credit Union P.O. Box 7487 Eugene, Oregon 97401" .' . Dear Ms, Romero: Re: Selco Credit Union (2~.flN6rt6, 19th " Springfield, Oregon ~s- l~D Braun Intertec Northwest ,2285 Nugget Way Eugene, Oregon 97403 541.746-9649 Fax: 746-7163 . Engineers cnd Scientists Serving the Built and Natura! Environments Project EBXX"96-0083 Report E-56651 Subject: Results offield density tests performed by our'representative on April 11, 1996, at the above referenced project. . Report: Field Density Tests - Nuclear Densimeter - all tests performed at finished grade of base rock under driveway pavemeni areas, I near south end 'of drive through I near middle of drive through .1 near north end of drive through I between island and A TM 13rd' exit,lane 135.7 140,6 133.7 136.0 131.5 ...... peteent . .' .Moisture...... 7,3 6.2 3.4 5.7 10.6 Note: 1vfois~ure!Density ReIa~i9n~hip o'f 129..4lbs./cu.ft. at-9'.O%'~.c?i~t~re'was piovidciLby. rl!e cHen,t. (Eugene Sand.& Gravel 3/4"-0). .' Sincerely, /l?A_ /?/~~ Michael L. Meyer, Managpf -Phe6..) Eugene Branch.'. ' . c: . . \ City .of Springfield McKenzie. Commercial , " , ,'_ r',.. c:lwp51Irepart.lfdtslseJ56651.sel ft'",. '''', . l" ~ ,_' '-". ': ~.I '.. : I .,-.,.....,.. .- t. .'_ BRA U N I N T E R T E C NOR T H W EST Inspecting Engineers--Chemists 2285 NUGGET WAY EUGENE, OR 97403 Phone: (503) 746-9649 FAX: 746-7163 CONCRETE COMPRESSION TESTS TESTED FOR:Selco Credit Union CAST BY: our rep. R. Aliperti. PROJECT:Selco Credit Union- #96022 ADDRESS:201I-Nort:h 19th' "~spr irigfTe:l<f,'-Or'egon TYPE OF SPECIMEN:6 x 12 2000 psi, 3500 MAX SIZED AGGREGATE 3/4" ADDITIVES: SOURCE:Eugene Sand & Gravel PRODUCT CODE:Mix 184 CONDITION OF STORAGE:ASTM PROJECT NO.:EBXX960083 REPORT NO:12-036-5854 P.O. NO: ('PERMIT-NO :~5~ 18:6..9_.) , DATE MADE: 03/27/96 DATE REC'D:03/28/96 SACK MIX5.50 SLUMP:2 3/4" TICKET NO: 85661W LOAD NO: 1 LOCATION OF AIR TEMP: 44 TIME: 8:15 am CU. YARDS: 9.0 CONC TEMP: 60 WEATHER: cloudy % AIR: POUR:Grade beams, pier pads, and columns for ATM drive thru services and building footings. (Load 1 placed in building footings) Test Weight Load - lbs. Date Mark Pounds per sq. in. 04/03/96 28.3 3430 04/24/96 28.3 4510 04/24/96 28.2 4420 4465 Age Tested 7 day 28 day 28 day Averaqe cyl only Note: Advised Bill with McKenzie Commercial of on-site test results. cc: city of Springfield McKenzie Commercial Eugene Sand & Gravel THIS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT AND IS INTENDED FOR THE USE OF OUR CLIENT ONLY. NO OTHER PERSON OR ENTITY MAY UTILIZE THIS REPORT OR ANY PORTION THEREOF WITHOUT OUR WRITTEN AUTHORIZATION. BRAUN'M INTERTEC March 14, 1996 Ms. Karen Romero Selco Credit Union P.O. Box 7487 Eugene, Oregon 9740 I Dear Ms. Romero: Re: Selco Credit Union 2011 North 19th SpringtieJd, Oregon q5-l ?:lQD Braun Intei'tec Northwest 2285 Nugget Way Eugene, Oregon 97403 541.746-9649 Fax: 746-7163 Engineers 'and Scientists Serving the Built and Nafural Environments Project EBXX-96-0083 Report E:56514 March 13, 1996 Sitework R. Aliperti Clear Report ':; Met on-site with representatives of McKenzie Commercial and Eugene Sand & Gravel to ohserve proof-roll of the south half of the asphalt pavement area and driveway approach. ,The proof-roll was conducted with a loaded double-axle dump truck weighing approximately 45,000 pounds. 'A yielding area was observed under the wheel loads near the middle of the west side of the pavement area. The area measured approximately 10 feet east/v.lest by. 31)prc);dmatel'y 30 feet north!south. Informed hy the.9wner's representative that the area will be over-excavated six inches in depth ancl replaced with iniported granular material. No detlection was visible under the wheel loads for the remainder of south half of the asphalt pavement area and driveway approach indicating a stable base is presently availahle. Owner's representative was asked to. notify o.ur oftice when additional services are needed. .>incerely, !>> 1. j}! -V.j.>>U U/tLt3 ) Michael L. Meyer, Manager Eugene Branch c: City of Springfield McKenzie Commercial c:\wp51 \r~ports\soi Is\;;.:! 565] 4.sd BRAUN'M ., INTERTEC Braun Intertec NOr1hwest 2285 Nugget Way Eugene, Oregon 97403 '541.746.964<1 Fax: 746,7163 Engineers and Scientists 5e";'ln-g /he Built and Natural Environments March 14, 1996' Project EBXX-96-0083 . Report E-56513 Ms. Karen J<omero Selco Credit Union P.O. Box 7487 Eugene, Oregon 97401 Dear Ms. Romero: Re: Selco Credit Union '20I( Norlhi9th ' . Springfiel~; 9regon B.P. No. 95-1860 " I I I, , March Ii, 1996 Sitework R. Aliperti Partly Cloudy Report . Met on-site with representatives with McKenzie COIn)nercial 'and Eugene Sand & Gravel to observe proofroll on exp.osed subgrade for building pad and parking/drive)"ay pavement. I areas at approximate' elevations of 458.5' and 460.0'; respectively. Tl)e proof-roB was I conducted with a loaded.double-axle dump truck weighing approximately 45,000 pounds. Yielding 'areas were observed under the wheel. loads on the north half of asphalt pavement . area, the middle of the concrete pavement area, and the south half of the bUlldmg.pad. The approximate locations of the yielding areas were marked on the ground with spray paint. The architect was contacted and informed .01' the proofi.oll ohservations. The architect directed the contractor to (lVer-excavate the yielding areas within the pavement sections six inches in depth and replace with imported granular material. The architect did not direct I any remedial action to be performed on the building pad subgrade. The south!half of the .. asphalt pavement area and driveway approach were not ready for proof-roll at the time of lour site visit. Contractor's representative was advised to notify our office when additional site visits are.needed. ...incerely;. /h. I. ./JJ 0/ ##72ft) Michael L. .Meyer; Manager ' Eugene Branch c: . City of Springfield McKenzie Commercial c:\wp51\reporls\soils\scl56513.sel -