HomeMy WebLinkAboutPermit Field Test & Inspection Report 1997-10-21
BRAUN'M
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541,746-9649 Fax: 746-7163
Engineers ond Scientists Serving
the Built ond Natural Environments
October 16, 1997
oCt 21 '\991
Project EBXX-97-0400
Report E-6052I
Mr. Paul Hellerstedt
Northwest Steel Fabricators
P.O. Box 2590
Eugene, Oregon 97402
Dear Mr. Hellerstedt:
Re: Overhead Crane Addition
.1051 'North~2Sth Btreet
" -., .
Springfield, Oregon
B.P. No. 97-0352
D, Webber CWI-AWS#93050801; ICBO# 1033346-85
, ,',d.:'f:l
Performed visual inspection on overhead crane addition at Northwest Steel Fabrication.
Detailed shop drawings were used for inspection, dated May 02, 1997, As per detail 4/S3
column - truss "A", rigid connection, details 5/S3, 7/S3, 8/S3 and 9/S3 were all completed.
Checked <ill rigid connection between grid lines A and p, To the best of our knowledge,
lthC work .checked is in conform aace with design drawings arid applicable A iNs D 1.1. code.
Note: No special inspection was performed during fabrication and welding in-progress on
the complete penetration- groove weldments on column to truss connection as per 5/S3 and
5/S4 in all locations. In addition, ultrasonic testing was not performed on groove
weldments listed above. '
""-
Sincerel y,
in.L.lIJi+c~J .. .
Michael 'L:Mey'er,"Pfiiicipaf" . , .
Will~metl~.'y~iIey..Operations .Manager
.. ..
./.. v;4-ta--{/C-)
._ _. ...__."" . ._.__C.~..~ . ... w- ~
"
I
.. ,
:Raymond V. Aliperti, Supervisor .
Eugene.Branch-...;',... ~...-
, . ,',_ ',. ;.:,.J: ....,;'." :: -, i\ - .,'
.,'
. c:. ',Cit;:ofSpringtieldJ:
I ' . 1
f:\groups\pub-data\wp,doc\reports\weJds\nor60521.ove