REPORT OF ULTRASONIC INSPECTION
TESTED FOR: Jack Foster
Springfield Forest Products
1651 South "F" Street
Springfield, Oregon 97477
PROJECT:
Fire Damage - Repair
Springfield, Oregon
DATE:
February 13, 1997
OUR REPORT NO,: 722-70078-4
.
o
o
u
0 .
" " u
~
, " " ,
u 0 ? , ~ C,
:s .
E I ;: ;; 0
~ ~
,
I .
g I ~
l'1l '::' J
.~ ~! ~ ~ ;
.--....- --
I Ultrasonic UM
I Serial No, Sonic Mark1
I Location
I Sprinqfield, Oreqon
DeCIDeIS" i
I
o I
.~ ~ I
." 0 I
'0';:'
.5 ~ i:'
o
12285E
Client Oraer No.
: Lao No,
! Length
! 8"
TeS! Melnaa Slanoara AWS D1.1~96/QClIT
AccePtance Standara Sect 8
! Thickness
! 1/2"
DiscontinUity
Weld Identification
Qj ~
g
::! Ql S
5u s:::
III g =
~ .~ 2 g,
:::::...... o.E
I 0
, .Q
;;
o _
< 0
0-
- u
- .
~-
Dislance
~
< .
g~
= ~
~
C5~
From
X
From
y
a I D
c
d
~
~ ~
9> 0
~ .=:!.
!Truss Splice #7
Web
'x
1 i
. 70 : A 1-21
I
1
i 58
I
I
I
I
I
I
I
I I I I I I I
WELD LOCATION AND IDENTIFICATION SKETCH
Couplant
Cellulose
I Calibration BloCkS
PI'L.218
i Frequency
,? ?C;
I Surface COnditions
j'ls welded
c3-'
I TectlniClan: Kp 11 v Hi 11
I Technician:
REMARKS:
(Indicate X-V Markings)
Level TT Interpreter: 1(~ 11 Y f-l'i 11
Level
Level T r-1
X.Y MARKERS
.Use Leg I. II. or 1/1
I I
..Gain In 03 InAnenuallon In 081
a-D-c""o D-a-c-O
Respectlully 5uDmlltea.
InforntPIttmr'TlJeBftilelYJftes Inc.
PSI A.SQO.16 (1l Professional Services Industries, Inc.. 545 Conger Street. Eugene, OR 97402.541/484-9212. Fax 541/344-2735
/'
i2/24/!Jli
15:45
'854.1 484 6759
EYEllGHEE,~ E~G.
l~Oll:!
\u5\ F '5t.
,
,
EVERGREEN ENGINEERING INC.
.. ,.'.' ......
,.. "...,,,..1
P.O. Box 21530 . Eugene, Oregon 97402~0409
(541) 484,4771. FAX (541) 484.6759
,
,
December 24, 1996
Project #767,0
Mr, Lome Pleger
City of Springfield
Building Safety Division
225 N, 5th St,
Springfield, Or 97477
RE: Springfield Forest Products Fire Restoration Project, Job #961170 B
J.
.,
Mr, Pleger,
To comply ,vith the Special Inspection and Testing as required iri the permit application, we have
made the following arrangements:
I, Professional Service Industries, Inc.
A purchase order was issued to PSI for:
Determination of the strength of the bolts used in the roof repair.
Welding inspections using non destructive testing,
Concrete strengths detennination for the concrete slab the new scrubber will sit on,
At this time, the determination of the strength of the bolts used in the roof repair has been
completed,
About one-half of the welding inspection has been completed,
The concrete slab for the scrubber has been poured and the cylinders have been submitted
to PSI for strength detennination,
We are expecting their completed report in about two weeks and we will forward a copy
to you ASAP,
2, Evergreen Engineering, Inc.(EEI)
EEl will:
Oversee the driving ofthe piles for the scrubber slab.
Inspect th~ weldment plates to the anchors. Evaluation of the welds and the
adherence to drawing # 1 OOCO I.
12124/96
15:45
'/3'541 484 6759
E\'EHGREE~ E~G.
i4I 00:3
Mr, Lome Pleger
City of Springfield
December 24, 1999
Page Two
Project #767,0
The pile driving and the weldrnent plate evaluation was done, Please see the enclosed
Inspection Report,
The weldrnent plates were inspected and the welding and the adherence to drawing
#100COl were adequate,
Lome, we hope this is what you need. If you need anything else please give me a call.
We wish you the best Holiday season.
Sincerely,
QJ;~
Dale Hohbach
1:!/24/96 1:1:46
'5'54 J 484 6759
EVEHGHEEN E~G.
Springfield Forest Products
Inspection Report
Pile Hammer Informatiorr
Manutacturer: Delmag
Model: D15
Type: Diesel
Rated Energy: 27,100 foot-pounds
Striking Weight: 3300lbs
Total Weight: 4080lbs,
Stroke: 8'-2"
Operating Speed: 60 strokes/rninute
Insoection
Date: 12/2-3/96
Contractor: Jay F. Oldham & Son Inc,
Engineer: L. Ralph Lonbeck, P.E.
Inspector: L. Ralph Lonbeck, P ,E.
Pile Number and Location (see sketch)
Pile Dimensions/Size fYV 8 x 35)
Ion
91o- [liD
I u S I F S/-.
@Utl4
Project #767.0
12/96
l2/24/fHi 15:47
'0'541 484 5759
EVERGREEN E1\G.
i4J UU;}
.
Springfield Forest Products
Inspection Report
Page Two
Project #767.0
Cut-off Ground Pene- Drive Final ,Deviation
Pile Length Length Elev. tration Time Blows & Comments
No. (Ft,) (Ft) (F!) (F!) (Min ) PerFt. Plumb
1 307 22,67' 95'-6" 1867' 15-20 25-30 N/A -,
2 30' 22,75' 95'-6" 18,75' 15-20 25-30 N/A
3 30' 32.0' 95'-6" 28' 15-20 25-30 N/A Splice to make cut-
off
4 30' 23.0' 95'-6" 19' 15-20 25-30 N/A
5 30' 32,0' 95'-6"1 28' 15-20 25-30 NfA Splice to make cut-
off
6 30' 24.67' 95'-6" I 20.67' 15-20 25-30 N/A
7 30' 21,42' 95'-6" 1742' 15-20 25-30 N/A
8 30' 22,92' 95'-6" 18.92' 15-20 25-30 N/A
9 35' 23,08' 95'-6" 1908' 15-20 32 1/12 Test Batter
East/West
10 30' 26,0' 95'-6" 22,0' 15-20 25_30 N/A
11 35' 25,5' 95'-6" 21.5' 15-20 25-30 1/12 Batter WestlEast
12 30' 23.67' 95'-6" ]9,67' 15-20 25-30 N/A
13 30' 23 .17' 95'-6" 19]7' 15-20 25-30 N/A
I ]4 30' 24.25' 95'-6" 20,25' ] 5-20 25-30 N/A
.~ 15 30' 23,08' 95'-6" 1908' 15-20 25-30 N/A
]6 35' 28,08' 95'-6" 2408' 15-20 33 N/A ! Test
I ]7 35' 23,25' 95'-6" 19.25' ] 5-20 24 N/A Test
I 18 30' 2442' 95'-6" 20.42' 15-20 25-30 N/A
\ 19 30' 25,92' 95'-6" 21.92' 15-20 25-30 N/A
20 30' 24.92' 95'-6" 20.92' ]5-20 25-30 N/A
Min, Bearing Capacity = 26 tons@ pile #17,
Avg, Bearing Capacity = 28,5 tons,
Splice welds at piles 3 and 5 were inspected per specification Section 02365. Welds were
acceptable,
20f2 12/96
I
~N
&
I,
j
~t-
<.0
~
~
~
~
"
~
'"
0"
"-
'"
."
'"
."
...,
."
on
~
0'
."
,n
'"
'"
'-
."
~,
'-
~,
.
,
I,
'I
,
I
I
,
6 SPACES Ii 6'-6':39'-0"
)<
I J'..J' I
, I,
I l1'P Y
I, " 9' I
~I 'I i
, i I ~ i I I I !
I , " " , , , ' I
~-- - - - 8'=--- - - -Eil -- - -- e:E - -J - - - - ~I' - -- i ~- -11- .-€i=--- - -f1us=-
J I I I I !
l.l') I I I (I I I I I I
~ __ _tSC&~J - _ - - -1- - - -- - J- - --- f - - -. --~ _l J._ - ~;- - - L - ~: - -_.- -1---
i ! ! ~ ~!! cq- ! €,". i
i ! !! ! I! ! ! ! i
~------'-g-----@--------~'- cH----- ci:-fts~"1--ct= --1---Gf---'
I I i I I I I I I I
f
3 SPACES /I 6'-6.= /9'-6'
.
'0
,0
"'
PILE PLAiV
1/('="-0'
l"~.lE",I~ ",,~I
..~. Geotechnical
. - Construction
Consulting. Engineering. Testing
~lr tllO
Pittsburgh Testing Laboratory Division
REPORT OF INSPECTION SERVICES
TESTED FOR:
JACK FOSTER
SPRINGFIELD FOREST PRODUCTS
1651 SOUTH "F" STREET
SPRINGFIELD, OR 97477
PROJECT:
FIRE DAMAGE - REPAIR
SPRINGFIELD, OREGON
DATE:
December 20, 1996
OUR REPORT NO.: 722-70078-9
REMARKS:
PSI REPRESENTATIVE BRYAN SCHRINER WAS PRESENT AT YOUR ABOVE MENTIONED
PROJECT TO PERFORM ULTRASONIC INSPECTION ONLY, SEE REPORT # 8 FOR
LOCATIONS AND RESULTS,
RESPECTFULLY SUBMITTED,
PROFESSIONAL SERVICE INDUSTRIES, INC,
R.EPORTS MAY NOT BE REPRODUCED, EXCEPT IN FUll, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC.
Information To Build On
PSI A.)OO.lN F'
Professional Services Industries, Inc.. 545 Conger Street- Eugene, OR 97402.541/464-9212. Fax 541/344-2735
/'
./
l I Environmental
,DS: Geotechn~cal
.- ConstructIon
Consulting. Engineering. Testing
EW:qLD- \ I,D
Pittsburgh Testing Laboratory Division
REPORT OF ULTRASONIC INSPECTION
TESTED FOR: Jack Foster
Springfield Forest Products
1651. South "F" Street
Springfield, Oregon 97477
PROJECT:
'Fire Damage - Repair
Springfield, Oregon
DATE:
December 20, 1996
; Lao No.
I
OUR REPORT NO,: 722-70078-8
Client Order No.
I Lengm
I
1 ThiCkness
I
,
TeSl Memoc Standard
Acceptance Standaro
OecibeIS..
Weld Identilicauon
o
n
?
u
"
o
:i
0;
~
~ ~ ~ Q
8 i -5 "0 It;
'" i g ~ u
Ri. 0\ U
.... i c: E .::
a o! C
I W
9 I ~
- '.
~eil~Gi
'0 :> : ~ :>
-= ~ ' a: ~
; <:.l
U U
. ~ ! ~
~ -s,; 0
! ;: ~ : ..::
~
.
~
i Truss
I Truss
, Truss
, Truss
i Truss
, Truss
, Truss
Splice #7 1
Splice #7 2
Splice #7 3
End Plate
End Plate 10
End Plate 11
End Plate 12
70 ;
70 :
70 :A-Rl-258
i I
70 ,A-R1-:2
I 70 :A-Rl-2
70 ~A-R1-;j
,
I
I
I
I
I
I
I
I
I I I I I I I
WELD LOCATION AND IDENTIFICATION SKETCH
.X
X
I
i52 '4
I
'52 I
'52
1~2
'X 1 1
iX
X
'X I
ITechnic,an:J:jryan :::iChrloer
i Tecnnician:
(Incicate X-Y Markings)
Level II Interpreter: Bryan Schriner
Level
REMARKS:
'[ Ultrasonic Unl1
Senal No.
i Location
c
.2
;;
? -
= 0
0-
- u
<~
i
I
- [
.~ 0\ j
." = I
0'=
.:: ~
From From
X y
Oisconllnuny
Distance
::; ::.>
~5
~ ~
g;:::
~
. n
"3 S
r ~
~
.
d i
I
I
1+2 !3"
I I
I
I
I
I
I
12.7
I
I
11/4" i
Couplant
Cellulose
I Calibration Blocks
ffif' Ol q4 ~q
'[ Frequency
, 2.25
I Sur1ace Conditions
Flat
I
j
,
I
I
I
I
I
I
I
I
I
I
.8'---
, -,
Level I I
X.'f MARKERS
'Use Lee; I. II. or III
I I
"Gam in 08 1 "Attenuallon ,n dB I
a-b-c.o I o-a-c=C
Respec:tullv submltlea.
1,F; PrOlei,'onal,;;e'lif.e'r'PR'es. Inc.
1lyormatZOn 10 DUUU Un
PSt A.500.16 PI Professional Services Industries, Inc. . 545 Conger Street. Eugene, OR 97402' 541/484-9212' Fax 541/344-2735
l I Environmental
DS: Geotechn~cal
.- ConstructIon
Consulting' Engineering' Testing
QLD-I.\iD
Pittsburgh Testing Laboratory Division
DAIL Y FIELD REPORT
TESTED FOR:
JACK FOSTER
SPRINGFIELD FOREST PRODUCTSc
1651 ,SOUTH UF" STREET
SPRINGFIELD, OR 97477
PROJECT:
FIRE DAMAGE - REPAIR
SPRINGFIELD, OREGON
DATE:
December 18, 1996
OUR REPORT NO.: 722-70078-7
WEATHER:
TEMPERATURE RANGE:
TO:
INSPECTOR:
DON THORNTON
TYPE OF INSPECTION BEING PERFORMED
SOILS
---1L CONCRETE
FOUNDATIONS
BATCH PLANT
CONTROLLED FILL (COMPACTION)
PLACEMENT (JOB SITE)
X CYLINDER PICK UP
ASPHALT
OTHER
BATCH PLANT
PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
PSI REPRESENTATIVE DON THORNTON WAS ON SITE THIS DATE FOR THE PURPOSE
OF PICKING UP CONCRETE TEST CYLINDERS CAST 12/17/96 FOR COMPRESSIVE STRENGTH
TESTING.
Respectfully submitted,
Professional Service Industries, Inc.
REPORTS MAY NOT BE REPROQUCED, EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC.
PS1A.300.2(llF
Information To Build On
Professional Services Industries, Inc.. 545 Conger Street. Eugene, OR 97402.541/484-9212. Fax 541/344-2735
l I Environmental
DB: Geotechn~cal
. - ConstructIon
Consulting. Engineering. Testing
C\L~ - \ \10
Pittsburgh Testing Laboratory Division
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
JACK FOSTER
SPRINGFIELD FOREST PRODUCTS
1651 SOUTH llF" STREET
SPRINGFIELD, OR 97477
DATE:
December 17, 1996
OUR REPORT NO,: 722-70078-6
PROJECT:
FIRE DAMAGE - REPAIR
SPRINGFIELD, OREGON
FIELD DATA:
LOCATION OF PLACEMENT SOUTH SIDE OF MILL, FOUNDATION
75' WEST OF OIL HOUSE
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, 'F
CONCRETE TEMPERATURE, 'F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
December 17, 1996
11:20 am
3 1/2
4.0
43
57
December 18, 1996
PSI\DON THORNTON
MORSE BROS,
SUPPLIER
DELIVERY TICKET NOITRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
MORSE BROS.
650681
80140-1/ 4000 psi
NO.IE:..A?..fLICA6LEASIM_Slf;NMBOS,U.NLESS.OTHERWISEJNClJCAIED~SlUME;..C143,90a:AIR.C.ONI.Et'H.~Cn'-'-9jb.:..IEMP.ERALURE~Cl 064:eij(~Jl
COMPRESSION TEST RESULTS
ASTM C39-94
SPECIMEN TEST TOTAL CYLINDER CYLINDER I CaMPRESSIVE I
LABORATORY IDENTIFICA liON AGE DATE OF lOAD DIAMETER AREA STRENGTH
NUMBER OR SET NO (DAYS) TEST (LBS.) (I~.) (SO. IN.) (PSI) TYPE OF BREAK
5049 7 12/24/96 100000 6,00 28,27 3540 Cone
5050 7 12/24/96 100500 6,00 28,27 3560 Cone
5051 28 01/14/97 123500 6,00 28.27 4370 Cone
5052 28 01/14/97 119500 6.00 28,27 4230 Cone
SPECIFICATIONS
28
REMARKS:
Cylinders picked up byPSI
1;. representative.
~ Cylinders made by PSI representative.
Cylinders made by Architecl's or
Contractor's representative
4000
x
Tast results comply with applicable
specifications
Cylinders delivered to PSJlaboratory.
Test results do nO,t comply with
appllcablespeclflcalions,
, TECHNICIAN,
KEN ANDRIEU
Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT,
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT 'NRITTEN PERMISSION BY ?ROfOESSIONAL SERVICE INDUSTRIES. INC.
PSI A-200.4 (4)F
Professional Services Industries. Jnc.. 545 Conger Street. Eugene, OR 97402.541/484-9212. Fax 541/344-2735
Information To Build On
TESTED FOR:
DATE:
FIELD DATA:
SET NO,
1
'I
l
LOCATION:
1
l"~.lEnviron", ~;,f..c,'
..~. Geotechnical
. - Construction
Consulting. Engineering. Testing
M ~ G\U' \ \'l 0
Pittsburgh Testing Laboratory Division
REPORT OF FIELD INSPECTION OF CONCRETE
JACK FOSTER
SPRINGFIELD FOREST PRODUCTS
1651 SOUTH "F" STREET
SPRINGFIELD, OR 97477
PROJECT:
FIRE DAMAGE - REPAIR
SPRINGFIELD, OREGON
December 17, 1996
OUR REPORT NO.: 722-70078-5
Concrete was a 4000 psi mix delivered by MORSE BROS.
mix number 80140-1.
I Na. OF I CONCRETE 1
SPECIMENS SUPPLIER TIME'TRUCK TIME TRUCK
MADE TICKET NUMBER DISPATCHED UNLOADED
I 4 I 650681 10:47 am I 11:27 am
I I -
-I I
I I
I I
I I
SOUTH SIDE OF MILL, FOUNDATION
75' WEST OF OIL HOUSE
YARDS OF
CONCRETE
I TEMPERATURE, OF
AIR I
SLUMP, IN CONTENT, % AIR CONCRETE
31/2 4.0143 57
I
------ - - --,..-'----1-- .'-' ,- - -
I
I
I
10,0
NOTE: APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31-91; SLUMP: C143-90a;AIR CONTENT: C231-91b; TEMPERATURE: C1064-86{93)
REMARKS: Observed the placement of 39,0 cubic yards of concrete,
TECHNICIAN: DON THORNTON
Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESUL T5 APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL. WITHOUT VVRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC
PSIA-200-1(2)F
Information To Build On
Professional Services Industries, Inc.' 545 Conger Street. Eugene. OR 97402' 541/484-9212' Fax 541/344-2735
l I Environmental
as: Geotechn~cal
. - ConstructIon
Consulting. Engineering. Testing
~9'. 9LD-1 no
Pittsburgh Testing Laboratory Division
REPORT OF ULTRASONIC INSPECTION
TESTED FOR: Jack Foster
Springfield Forest Products
,1651 South "F" Street
Springfield, Oregon 97477
PROJECT: Fire Damage - Repair
Springfiel, Oregon
DATE: December 3, 1996
OUR REPORT NO.: 722-70078-3
i Client Order No.
I
I
! Test Methoa Standard AWS D1.1
I Acceptance Standard AWS Dl.l
: Lao No.
I Length
16"-811'
1 ThiCKness
'I' Ultrasonic Unit
, Seria' No. Nortec 131 sin 10568
! 3/8"
'I LOCation
, Jobsite
DeClDels'. i
DiSCOni,nUllY
DISlance
i 0
- i
~ S I
~ ~ I "
'< I co
From From
X y
.I
I
I
!
I
I
I
I
I I
I CouPlant
Cellulose
I Calibration Blocks
/ T'TW ",In 711
\ 'I Frequency
, 2.25 MH2
I Surlace Conditions
l..nm
I
I
I
I
I
I
I I I I I I I I
WELD LOCATION AND IDENTIFICATION SKETCH
.--, ,
I
.
\
r"
1\
\
"..I
) -
'\
(Indicate X-Y Markings)
Level II Interpreter; John Reitan
l
r-..
/,
J
"
o
o
!TeChniClan; JOhn Heltan
I Technician:
Level I I
X-Y MARKERS
.Use Leg I, II. or III
I I
"Galn in c3 1"Anenuallon In aB I
a-o-c~c D-a-c.O
Level
REMARKS:
Respec:tully submmed,
Inforrififttlft1am'BiiifrJ"(j,ts Jne.
PSI A.5OQ.16 (11 Professional Services Industries, Inc.. 545 Conger Street. Eugene, OR 97402.541/484-9212. Fax 541/344-2735
l I Environmental
.DS: Geotechn~cal
. - ConstructIon
Consulting. Engineering. Testing
~Lr l \10
Pittsburgh Testing Laboratory Division
REPORT OF INSPECTION SERVICES
TESTED FOR:
JACK FOSTER
SPRINGFIELD FOREST PRODUCTS
1651_S0U_TH ."F" STREET,
SPRINGFIE~D, O~ 97477
PROJECT:
FIRE DAMAGE - REPAIR
SPRINGFIELD, OREGON
DATE:
December 02, 1996
OUR REPORT NO.: 722-70078-2
REMARKS:
PSI REPRESENTATIVE JOHN REITAN WAS PRESENT AT THE PROJECT SITE TO TEST
BOLTING PROCEDURES, EQUIPMENT, AND BOLTS. THREE OF EACH 3/4" AND 1"
DIAMETER BOLTS WERE CHECKED ON A SKIDMORE MODEL MS SiN III 95 WITH A TONE
SHEAR WRENCH MODEL S-110 E2 SiN 114323 FOR THE 1" AND SiN 642002 FOR THE
3/4" BOLTS.
ALL BOLTS ACHIEVED THE MINIMUM TORQUE REQUIRED FOR EACH SIZE,
RESPECTFULLY SUBMITTED,
PROFESSIONAL SERVICE INDUSTRIES, INC.
REPORTS MAY NOT BE REPROQUCED, EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC.
PSIA.300.1NF
Information To Build On
Professional Services Industries, Inc.. 545 Conger Street. Eugene, OR 97402.541/484-9212. Fax 541/344-2735
L"~.l Environme.ntal .
..~. Geotechnical
. - Construction
Consulting . Engin~er;ng . Testing
Cil D--U1D
Pittsburgh Testing Laboratory Division
REPORT OF INSPECTION SERVICES
TESTED FOR: JACK FOSTER
SPRJNGFIELD Fq?EST PRODUCTS
1.:1:6.5:1: SOUTH "F" STREET
SPRINGFIELD, OR 97477
PROJECT:
FIRE DAMAGE - REPAIR
SPRINGFIELD, OREGON
DATE:
December 02, :1:996
OUR REPORT NO.: 722-70078-:1:
REMARKS:
PSI REPRESENTATIVE TROY HULL WAS ON SITE THIS DATE TO MEET WITH DICK
LARSON OF EVERGREEN ENGINEERING, ALBERT ALBUSH OF SPECIALTY CONTRACTORS,
AND BOB. BARNHART OF CITY OF SPRINGFIELD, DISCUSSED SPECIAL INSPECTION
REQUIREMENTS FOR HIGH STRENGTH BOLTING AND WELDING. BOB BARNHART STATED
THAT CITY REQUIRES ULTRASONIC TESTING ON ALL FULL-PENETRATION WELDING.
THE FOLLOWING SCOPE WAS DEFINED:
:1:, PSI ANTICIPATES 2 TRIPS TO THE SITE TO PEFORM ULTRASONIC TESTING ON
:1:00% OF FULL-PENETRATION WELDS.
2. PSI ANTICIPATES :1: TRIP TO PERFORM VISUAL INSPECITON ON :1:00% OF FILLET
WELDS,
3, PSI ANTICIPATES :1: TRIP TO THE SITE TO CHECK THE LEJUNE BOLTS FOR
REQUIRED TENSION WITH A SKIDMORE TENSIONING INDICATOR DEVICE AND TO
VISUALLY INSPECT :1:00% OF HIGH STRENGTH BOLTS INSTALLED.
PSI OBSERVED THAT SOME TO THE FULL-PENETRATION WELDS PERFORMED TO DATE ARE
NOT IN ACCORDANCE WITH DRAWINGS PROVIDED, PSI REP~ESENTATIVE REQUESTED
THAT SPECIALTY FAE OBTAIN PAPERWORK FROM THE ENGINEER OF RECORD ACCEPTING
PLAN CHANGES.
PSI REPRESENTATIVE ALSO REQUESTED THAT SPECIALTY PREPARE A SUBMITTAL OF
WELDER QUALIFICATIONS AND WELD PROCEDURERS,
RESPECTFULLY SUBMITTED,
PROFESSIONAL SERVICE INDUSTRIES, INC.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION 8Y PROFESSIONAL SERVICE INDUSTRIES, INC.
Information To Build On
PSIA.300.1NF
Professional Services Industries, Inc.' 545 Conger Street. Eugene, OR 97402' 541/484-9212' Fax 541/344-2735