February 24, 1997
Project No. EBXX-96-0424
Report E-58646
Mr. Bob Kostrba
P,O, Box 107
Springfield, Oregon 97477
Re: CIGM Expansion
1425 South B Street
Springfield, Oregon
C.:\ ~'~ 'm41 P.O. No. Hi26
~f'. q~- DI12
February 20, 1997
Dale Webber A WS# 93050801
Performed visual inspection on the completed weld repairs in the expansion area on the
south side of the existing building, All column to beam welds, and the plate to beam
welds at center column on north side have been repaired (ref: our report no, E58221,
dated 12113/96), To the best of the inspector's knowledge the work checked is in
conformance with submitted design drawings and applicable A WS DI.I (static) code with
the following exception: certitic~tion papers for Lynn Anderson do not list 4G (overhead
welding) as a ql!aiified position (see 3hove referenced report), Also, re-inspected bolted
heam to existing wall connection at center of north side, New plate and six (6) long grade
8 bolts have been installed, Bolts and nuts appear to be in a 'snug-tight' condition,
Contractor was asked to notify our oftice when additional services are needed,
Sincerely,
1?;,~~~
Willamette Valley Operations Manager
!~v~~~
Eugene Brancb
c: City of Springtield .
c: \wpSl '.rcports\wclds\cig58646.cig
.\ - "
<-~
BRAUN'M
INTERTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541,746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Buill and Natural Environments
December 13, 1996
Project No, EBXX-96-0424
Report E-58221
Mr. Bob Kostrba
P.O. Box 107
Springfield, Oregon 97477
Re: CIGM Expansion
.14~5South.R.Street .
. Springfield, Oregon
.,..B.P....96-lW(i:f P.O. No. 1026
t.i~z.
December II, 1996
'DaleiWebber 'I'\WS#93050801 /"David Smith
',.
.CIGM:;..,. '
".;J, ; ....
.' .. f.... .",.,.
"
,".,:-: (', ':;-'-,1" :',:.,
Performed visual inspection on the completed weldments in the expansion area on the
south side of the existing building for conformance to design drawings, U ,B,C. and
applicable AWS DI.I (static) code, Advised that Lynn Armstrong was the welder on the
job. It appears that E7018 SMA W was used on all weldments, According to submitted
documentation, Lynn Armstrong was certified in the 3G position in .1990 by Northwest
I Testing. There was no documentation received that welder was engaged in the given
process needed to perform vertical and overhead fillets, Contractor was advised welder
was not certified in accordance with A WS D 1. I code,
All column to beam welds and plate to beam weld at center column on north side were
marked for repair due to overlap, undercut andlor poor workmanship, All column to base I
plate welds are acceptable.
Performed inspection on the bolted beam to existing wall connection at center of north
side of n(lw addition. Six (6) 3/4" grade.8 bolts are in-place in over-size slotted hOles" II
Washers were used under the bolt head and n'ut and appear to be concaved on beam flange
side:'- Bolt.diimeter and msher thickness -do' not app'earto - conform to AISC manmil. or". .
U,B,C,- recommendations for~us~ with oversize slotted holes.. Recommend,owner contact _
.".:,../"... .' '," - . '..' ". ,.,.
structural'engmeer for review and acceptance of as-bUilt connectIons. -: '_I!
,-, "",{".)": \.' :
:\
,
Sincerely,
fYI.L ;n~-eJu
Michael L. Meyer, PridCipal,l.'q).
Willamette Valley Operations Manager
c: City of Springfield
c:\wp51\reports\welds\cig58221.cig
CIGM
Project EBXX-96-0424
Report E-S8221
December 13, 1996
Page 2
/2, IOLLn~.~\
Ray,mond V-:-A1i~erfi, Supervisor ~
Eugene Branch