Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 1996-3-25 Ii RAU NSM, I NTE RTEC Braun InterteC N~r1hwest 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 fax: 746-7163 Engineers and Scientists Serving the Bui!' and Natural Environments March 25, 1996 Project EBXX-96-OO80 Report E-56555 Mr. Doug Lee . Lee Construction , P.O.'Box 10367 Eugene, Oregon 97440 Re: Oregon Metro Credit Union 2355 Olympic Street . Springfield, Oregon B:P. No. 95-1545. Project Information Epoxy Anchored Bolts March 22, 1996 M. Meyer #487 Report. Witnessed the installation of fourteen (14) epoxy anchored bolts in the column footings at the north, south and west entrances and at the southeast building corner. The' 10" x 3/4" all thread bolts were embedded a minimum of 5" in pre-drilled 7/8" holes and were installed . with Epcon System Ceramic 6 formula epoxy. . All holes were cleaned with a plastic brush and compressed air prior to i.nstalling bolts in accordance with manufacturer's directions and in accordance with the approved plans and specifications. Contractor stated bolts will be tightened after adhesive .has set. Contractor asked to notify our office when additional JII : 'I services are needed.' n Sincerely, . m.L.m-o/A~~) Michael L. Meyer, Manager . . Eugene Branch . c: City of Springfield c:\'Wp51 \reporta\weld\1ee56555.or~ BRAUNS. INTERTEC Braun Intertec Northwest 2285 Nugget Way Eugene, Oregon 97403 541.746-9649 fax: 746-7163 Engineers and Scientists Serving the Bu;!t and Natural Environments March 14; 1996 . Project EBXX-96-00S0 Report E-56504 Mr. Doug Lee Lee Construction P.O. Box 10367 Eugene, Oregon 97440 Re: Oregon Metro Credit Union i355 Olympic Street Springfield, Oregon B.P. No. 95-1545 Project Information. Epoxy Anchor Bolts March 12, 1996 S. Wilder #4S0 -I I Report Witnessed the installation of the epoxy anchor bolts for the interior and drive through column base plates. The 10" x 3/4" all thread holts were embedded a minimum of 5" in , pre-drilled 7/S" holes and were installed with Epcon System Ceramic 6 formula epoxy. All holes were cleaned with a plastic brush and compressed air prior to installing bolts in accordance with manufacturer's directions and in accord.a..nce with the approved plans an:J specitications. Contractor stated bolts will be tightened after adhesive has set. Contractor ,I asked to notify our oftice when additional services a.re n_e.':'.ded. _ Sincerely, j)/. /. IJ/.ttj,a Michael L. Meyer, Manager ~j Eugene Branch c: City of Springtield c :\wp51 \rcports\wdd\lo.'lc56504 .ore