Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 1995-11-21 BRAUNSM I NTE RTEC Brciun Intertec Northwest, 2285 Nugget Way Eugene, Oregon 97403 503-746-9649 Fax: 746-7163 Engineers and Scientists Serving fhe Built and Natural Environments November 21, 1.995 Project EBXX-95-03S5 Report E-561S5 Mr. John Crist Becker Company 2345 N Ross Portland, Oregon 97227 Dear Mr. Crist; Re: Chevron Station #12592 Remodel 1111.Mohawk . Springfield, Oregon P.O. No. 42961 ,RP, No. 951309 Project Information Weldments I IIInsp~ii~110f:><> .. November 15, 1995 W. Matthews - AWS #93110574 Western Pneumatics Report Performed continuous special inspection on two (2) pipe sP.lice, weldments for the drivewaY~' canopy remodel. The existing 14" (.250) wall thickness x 10" diameter pipe was extended 6'-0 3/S" using new ASTM A-500. GRB 3/S" (375) wall thickness x 10" diameter pipe. The specifications .(type and grade) of the new added material was verifiable by contractor supplied certifications. An A WS pre-qualified joint (B-U2A) configuration was used and appear to conform to allowable as 'fit up tolerances specified with in the code. Welding was performed with the SMAW process using E70lS electrodes. The joint fit-up and each succeeding pass was cleaned and inspected with no rejectable discontinuities being observed or noted at any hold point throughout the welding process. The completed weldments -appear to the best of the inspector's knowlt:dge to conform to the approved prints, UBC and AWS Dl.1-94. J Sincerely /IJ.?f ~ tj>>tJ MichaeLL.. Meyer, Manager Eugene Branch c: City of Springfield c:\wp51 \reports\weld\bec56185.che