HomeMy WebLinkAboutPermit Field Test & Inspection Report 1996-3-23
L)lr DI cC> .
BRA ~ N I N T,E R T E C NOR T H W.E S T
Inspecting':; Engineers--Chemists
2285 NUGGET WAY.
EUGENE, OR 97403
Phone: (503) 746-9649
'FAX: 746-7163
CONCRETE" COMPRESSION. TESTS
TESTED FOR :'John Hyland Construction'
CAST BY:our rep. D. Smith.
PROJECT:,Spring.fJe.1d utility Board
\ ADDRESSf],'q,i)CMain street.
. -_. "'~-SpringfIel-d~' Oregon
TYPE OF.SPECIMEN:6 x 12
psi, 3000. MAX SIZED AGGREGATE 3/4"
ADDITIVES.: AEA
SOURCE:Morse Bros.,Inc.
PRODUCT CODE~080030-~
CONDITION OF STORAGE:ASTM
PROJECT.NO.:EBXX960097
REPORT NO:12-036-5841
P'.O. NO:9384 :!
PERMIT NO:
DATE MADE:03/22/96
DATEREC'D:03/23/96
SACK MIX . .
SLUMP: 5"!'
'J
TICKET NO: 513914 AIR TEMP: 47
LOAD NO: 1 CONC'TEMP: 61
LOCATION OF POUR:Stem walls and
.' TIME: 2: 20
'WEATHER: rain
pier footings.
pm
CU. YARDS: 6.5
% AIR:'
,-
Test
Date
Mark
Weight.
Pounds
Load - lbs.
per sq. in.
Averaqe
Age
Tested
03/29/96
04/19/96
65/17/96
27.8
1880
"
7 day
28 day
56 day
27.9
2760
"
cyl only
Note:' Advised superintendent of on-site test results.
CC:' . John Hyland Const.-Dave" Van Houten
Morris, Redden, Afholter, west Arch
.city of,Springfield
Morse Bros.., Inc.
THIS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR
CLIENT AND IS INTENDED FOR THE USE OF.OUR CLIENT ONLY. NO
OTHER PERSON OR ENTITY MAY UTILIZE THIS REPORT OR ANY PORTION
THEREOF WITHOUT OUR WRITTEN AUTHORI ZATION .' ,
C1\Q:- 0 l eO
BRA U N I N T B R T E C NOR T H W EST
Inspecting 'Engineers--Chemists
2285 NUGGET WAY
EUGENE, OR 97403
Phone: (503) 746~9649
FAX: 746-7163
CONCRETE ,COMPRESSION TESTS
TESTED FOR:John Hyland Construction,
CAST BY:our rep. D. smith
PROJECT:Springfield utility Board
( ADDRESS: 100 r Main'St:f'eet'.
~'- ~--Spr ingf ield-,- Oregon
TYPE OF SPECIMEN:6 x 12
psi, 3000 MAX SIZED AGGREGATE 3/4"
ADDITIVES:AEA
SOURCE:Morse Bros. ,Inc.
PRODUCT CODE:080030-5
CONDITION OF STORAGE:'ASTM
PROJECT NO.:EBXX960097
REPORT NO:12-036-5841
P.O. NO:9384,
PERMIT NO:
DATE MADE:03/22/96
DATE REC'D:03!23/96
SACK MIX
SLUMP,: 5"
TICKET NO: 513914 AIR TEMP: 47
LOAD NO: 1 CONC TEMP: 61
LOCATION OF POUR:Stem walls and
'TIME: 2: 20 pm
WEATHER: rain
pier footings.
CU. YARDS: 6.5
% AIR:
Test Weight Load - lbs. Age
Date Mark Pounds per sq. in. Averaqe Tested
03/29/96 27.8 1880 7 day
04/19/96 27.9 2760 28 day
05/17/96 27.9 3360. 56 day.
cyl only
Note: Advised superintendent of on-site test results.
cc: John Hyland Const.-Dave Van Houten
Morris, Redden, Afholter, West Arch
City of Springfield
Morse Bros. ,Inc.
THIS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR
CLIENT AND IS INTENDED FOR THE USE OF OUR CLIENT ONLY. NO
OTHER.PERSON OR ENTITY MAY UTILIZE THIS REPORT OR ANY PORTION
THEREOF WITHOUT OUR WRITTEN AUTHORIZATION.
"
qle - am
BRAUN IN T.E R T E C NORTHWEST
Inspecting Engineers--Chemists
2285 NUGGET WAY
EUGENE, OR 97403
Phone~ (503) 746-9649
FAX: 746-7163
CONCRETE COMPRESSION TESTS
TESTED FOR:John Hyland Construction,
CAST BY:our rep. D. smith .
PROJECT: springfi_~M. !l~JHty Board
ADDRESS :'-1001 Ma'in Street
spr lng-Hele} ,-or-egon
TYPE OF SPECIMEN: 6 x 12
psi, 3000 MAX SIZED AGGREGATE
ADDITIVES:AEA
SOURCE:Morse Bros.,Inc.
PRODUCT CODE:'080030-S
CONDITION OF STORAGE:ASTM
PROJECT NO.:EBXX960097
REPORT NO:12-036-5834
P.O. NO:9384
PERMIT NO:
DATE MADE:03/21/96
DATE REC'D:03/22/96
SACK MIX
SLUMP: 5"
TICKET NO: 513846 AIR TEMP: 59 ,TIME: 11:25 am CU. YARDS: 9.5
LOAD NO: 1 CONC TEMP: 63 WEATHER: clear % AIR:
LOCATION OF POUR:Continubus footing office addition.
Test Weight Load - Ibs. Age
Date Mark. Pounds per sq. in. Averaqe Tested
03/28/96 28.5 1880 7 day
04/18/96 28.5 2550 28 day
05/16/96 56 day
cyl only
. No'te: ADvised superintendent of on-site test results.
cc: John Hyland Const.-Dave Van Houten
Morris,Reden,Afholter,West Archit.
city of Springfield
Morse Bros. ,Inc.
i
THIS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR
CLIENT AND IS INTENDED FOR THE USE OF OUR CLIENT ONLY. NO
OTHER PERSON OR ENTITY MAY UTILIZE THIS REPORT OR ANY PORTION
THEREOF WITHOUT OUR WRITTEN AUTHORIZATION.
qlJ>- OlCO
I
BRA U N I NT E R T E C NOR T H WEST
Inspecting Engineers--Chemists
2285 NUGGET WAY
EUGENE, OR 97403
Phone: (503) 746-9649
,FAX: 746-7163
CONCRETE COMPRESSION TESTS
TESTED FOR:John Hyland Construction
CAST BY:our rep. D. Smith
PROJECT:Springfield utility Board
, ADDRESS':ibo-1~MaIn - street
-' -Springfierd, Oregon
TYPE OF SPECIMEN:6 x 12
psi, 3000 MAX SIZED AGGREGATE
ADDITIVES :AEA .
SOURCE:Morse Bros.,Inc.
PRODUCT CODE:080030-S
CONDITION OF STORAGE:ASTM
PROJECT NO.:E~XX960097
REPORT NO:12-036-5834
P.O. NO:9384
PERMIT NO:
DATE MADE:03/?1/96
DATE REC'D:03/22/96
SACK MIX ..
SLUMP: 5"
TICKET NO: 513846 AIR TEMP: 59 TIME: 11:25 am CU. YARDS: 9.5
LOAD NO: 1 CONC TEMP: 63 WEATHER: clear % AIR:
LOCATION OF POUR:Continuous footing office addition.
Test Weight Load - lbs. Age
Date Mark Pounds per Sq. in. Averaqe Tested
03/28/96 28.5 1880 7 day
04/18/96 28.5 2550 28 day
05/16/96 28.5 3180 56 day
cyl only
Note: ADvised superintendent of on-site test results.
cc: John Hyland Const.~Dave Van Houten
Morris,Reden,Afholter,west Archit.
City of Springfield
Morse Bros.,Inc.
THIS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR
CLIENT AND IS INTENDED FOR THE USE OF OUR CLIENT ONLY. NO
OTHER PERSON OR ENTITY MAY UTILIZE THIS REPORT OR ANY PORTION
THEREOF WITHOUT OUR WRITTEN AUTHORIZATION.