HomeMy WebLinkAboutPermit Field Test & Inspection Report 1995-3-8
"
I.
.
BRAUNS.
INTERTEC
March OS, 1995
Mr. Dave Hoffman
Chambers Construction Co.
2295 Coburg Road Ste. 100
Eugene, Oregon 97401
Braun Intertec Northwest
2285 Nugget Way
Eugene, Oregon 97403
503-746.9649 Fax: 746-7163
Engineers and Scienfists Serving
the Built and Natural Environmenfs
Project EBXX-94-o355
Report E-54685
Re: Cascade Fabrication
950 International Way
Springfield, Oregon
P.O. No. 10520-723 -B.P. No. 941620
Sincerely,
m-d\~C}5
Michael L. Meyer, Manager
Eugene Branch
Project Information
II
I
Weldments
MBSI
Report
Performed visual inspection on the folIowing completed
field welded connections: girt to wall; Furlin to wall,
ledger to wall; revised misaligned corner plates (file #h94-
110), revision alIowing welding of beam clip angles (detail
HSW3/sheet 94-060797-02 by Butlet Manufacturing
Company); rebar weldments from. C to D on line 1 and
from line 1 to 2 on jine D and E. Welds were checked
for size, length, profile, and location and are acceptable as j
per the above mentioned criteria from manufacturer (see
attached), approved prints and applicableA WS codes.
c: City of Springfield
Morris Redden Affolter & West Architects
c :\wpSl \reports\weld\cha54685 .cas
BRAUNS.
INTERTEC
Braun I"tertec Northwest
2285 Nugget Way
Eugene, Oregon 97403
503-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Bvilt and Natural Environments
March 01, 1995
Project EBXX-94-0355
Report E-54644
Mr. Dave Hoffman
Chambers Construction Co.
2295 Coburg Road Ste. 100
Eugene, Oregon 97401
Re: Cascade Fabrication
950 Intermitional Way
Springfield, Oregon .
P.O. No. 10520-723 - B.P. No. 941620
Project Information
High Strength BoltslWeldments.
MBSI
Report
Performed inspection on the 3/4" A325 high strength bolts
in the beam to beam and beam to column connections.
The bolts were checked with a calibrated torque wrench,
in accordance with the AISC manual, and are satisfactorily I
tightened to meet minimum suggested torque values.
(Note: hardened washers were not installed). .
I
In addition, contractor requested visual inspection on the
completed field weldments. The welds were not slagged
or cleaned. The contractor was asked to notify our office
when welds are ready for inspection.
S incerel y,
\f\~~~~
Michael L. Meyer, Manager
Eugene Branch
c: City of Springfield
Morris Redden Affolter & West Architects
c:\wpS 1 \rep-orla\weld\cha54644 .CftS
FE8-27-1995
10:25 FROM :BUTLER VISALJA -
.
TO
.... ..... ..' . .::';>r~tT:r{'\~}i~~f;
~150~6e7~~S.1. . ~ :p: 0.1:,.'. ,"'~::..;\:'.~;~~~f,~~~~
. og' . ."\Lo" .' '~.Y '0' :.. ".".": .h..'....~.:..'\:..:.,
.., -~' . . . .,.... ..~"."
f\~1J' ';b~L~~":;~';)::'~
. ,:-rU .; U UJU '. '~" - .' . . . .:
. '. ".. .'
.. . .
"L ...
.,' ,
..'
<:SUTLIE~
But/er Manufacturing Company
7440 Doe A venue
Post Office Box 2590
Vi.alia, CaUfornia 93279.2590
Pho".1209J 652-2247
"
.
MR. nAVE HOP'FMAN
CHAMBERS CaNST. co.
2295 COBURG RD.
EUGENE. OREGON 97402
RE:' CASCADE FABRICATION UNIT #2
SPRINOFiELD. OREGON
40'XI20'X17' LRSS
TO WHOM IT MAY CONCERN: .
FEBRUARY ~7, 1~'5
.~
I:
;.
~
,
,,l .
.,
. PLEASE ACCEPT TH!S AS CERTIFICATION FROM BUnER THAT IT IS ACCEPTABLE TO
WELD CLIP ANGLES TO BEAMS ON DETAIL HSW3 OF SHEET 94.060797.02.:. nus WELD
SHOULD BE A MINIMUM 3/16" Fll..LET WELD AROUND INSIDE FACE AND TOP AN::lBOnOM
OF EACH ANGLE IN ORDER TO REPLACE THE BOLT STRENGTIi INDICATED. IF QUESTIONS
REMAIN PLEASE CALliME AT (209)651-5347. . - "
.
,..7!?~
'. .~~~~~=~t;:');"~i;;if~
.. '
. ':.' .
. - "(.;
~', : . . ". ': ':.
, -,.
'.,'
",:
').',
",':'
!
..'
~., " ;
. ,.,'
.-. <>c .
"....5';::;'...
. .' .
. .
. .
,
0,
.0
'.
.,.. ,.:.;.,:
,'",::
~ .
.' ,
,
~'... '
TOTAL P.01. .
BRAUNSM
I NTE RTEC
February 14, 1995
Mr. Dave Hoffman
Chambers Construction Co.
2295 Coburg Road Ste 100
Eugene, Oregon 97401
q L{ ~ \ lo 2 \;.aun Intertec Nerthwest
2285 Nugget Way
Eugene, Oregon 97403
503.746.9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
Project EBXX-94-0355
Report 12-015-4557
Cl60 \r\tc.c~~
Re: Cascade Fabrication - 950 International Way
6x6x21 Flexural Beams cast on January 16, 1995
Dear Mr. Hoffman:
I~~!P;!GN............IJ
IM~~!~...~gG
CONCRETE POUR INFORMATION
ASTM l
58474
410
630
9:30 am
9.0
4.5
500 flexure
..:-;.;.;.;.;.;.;.;.;.;.;.:.;.:,:,-.;.;.;.;.:".;.;.,.;.::,-:,:.,.;.;.;.;.,.,.;.,.....;.;.:.;.:-:-:-:
...,.....-..-.........,.......-.,...........,....-,---..
....................-.-.;.:-,.:-.-.-.,'.,.,;..,.,'.,.-,....................,......._.,_..-,-.-.
STORAGE......
...... ,._-.-........ .......-.......
.........................".....
3/4"
N/A
...-.........,......-...-,-.:..,.......'...'...'.:.:.:...,',.,'...-,....-.....-......-.-...
............-...-.-.,.-.....................,..--.-----
:':.:,:,:.:.:.,.:.:.;.:..:,:.,.,...,:,:"""""".:,::,.:,:,:,:,:.",.,.;".:.:.:.;.:,:.:.:.:.:.:.
"TIC KET'N' 0..................
.. .. ......----.-...
:},' '. ':'-' '. . .j' _: }??~\;}}':',
.....'....,....-..--.-----..--.-.,.....-..,.....................,.,..
Hot Water
--.--..-..- ,..,-- ,...-------------------
............-.-.-...-.---,_..--..-............,.........
:'.:'.:':;:'::.:;":':':::':":":""'::"':'::":::"':;::'::':;:::.::':.::.':;:::':'::::::::::::::':::
"'C' O' 'NC'TEMP'" ..............
:\ ':', -, '. ::.,:::::: '.)/J,~:::\::',:
..., '--. ..'........."....
..,,--.............. .........."
Eugene Sand & Gravel
4"
PtCloudy
Tilt-up panel numbers 1,3,6-9, 15,20,21,23,24,31, 33-36
(Load 13 placed in panel #8). II
COMPRESSION TESTS
..~I;jij'^x;;i
;;..I;.; ...................;!L6AD...........
beam 7700
beam 8400
beam 9900
l
,
;.lpA.I~.......................
Ij'~i~u}I.
.'..,...,."....,.,..,.......,.
1-23-95
2-13-95
2-13-95
illlll }\
7 day
28 day . I
I
28 da~
600
690
830
760
c: City of Springfield
Morris Redden Affolter & West AlA
Eugene Sand & Gravel
TIllS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT AND IS INTENDED FOR THE USE OF
OUR CLIENT ONLY. NO OTHER PERSON OR ENTITY MAY UTILIZE TIllS REPORT OR ANY PORTION THEREOF WITHOUT
OUR WRrITEN AUTHORIZATION.
BRAUNSM
I NTE RTEC
February 14, 1995
Mr. Dave Hoffinan
Chambers Construction Co.
2295 Coburg Road Ste 100
Eugene, Oreg?n 97401
q4 -IIJ>ZO
Braun Intertec: Northwest
2285 Nugget Way
Eugene,Oregon,'97403
503-746-9649 Fax: 746-7163
Engineers and S~ientists Serving
the Built and Natural Environments
Project EBXX-94-Q355
Report'12-015-4558
~5D \~ ~
Re: Cascade FabriClition - 950 International Way
6x6x21 Flexural Beams cast on January 16, 1995
Dear Mr. Hoffinan:
.\L6CA'rIQNOFJ>(){jR<
CONCRETE POUR INFORMATION
500 flexure
7:30 am
9.0
3.5
ASTMl
58457
3/4"
NIA
400
Hot Water
Eugene Sand & Gravel
640
3 1/2"
Showers
Tilt-up panel numbers 1,3,6-9, 15,20,21,23,24,31, 33-36.
COMPRESSION TESTS
L_2H5 beam 6500 540 7 day
I 2-13-95 beam 8000 670 28 day
I 2-13-95_ 8700 730 700
beam 28 day
c: City of Springfield
Morris Redden Affolter & West AlA
Eugene Sand & Gravel
TillS REPORT [S SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT AND IS INTENDED FOR THE USE OF
OUR CLIENT ONLY. NO OTHER PERSON OR ENTITY MAY UTILIZE TillS REPORT OR ANY PORTION THEREOF WITHOUT
OUR WRlTIEN AUTHORIZATION.
~H - H.v'2.D
BRAUNS'
I NTE RTEC
Braun, I"tertec Northwest
2285 Nugget Way
Eugene, Oregon 97403
503-746-9649 fax: 746-7163
Engineers and Scienfists Serving
the Built and Nah,Jral Environments
January 26, 1995
Project EBXX-94-0355
Report 12-015-4564 .
Mr. Dave Hoffman
Chambers Construction Co.
2295 Coburg Road Ste 100
Eugene, Oregon 97401
f1fJD \~ W~
Re: Cascade Fabrication - 950 International Way
6x6x21 Flexural Beams cast on January 19, 1995
Dear Mr. Hoffman:
CONCRETE POUR INFORMATION
500 flexure ASTM I'
3/4" 58642 I
6.0 420
Hot Water 710
Eugene Sand & Gravel 7:15 am
51/4" 9.5
Fog 3.5
Tilt-up wall panels numbers 9,10,11,12,15,16,17,18,27, & 30
(load 2 placed in panel number 15)
COMPRESSION TESTS
I 01-26-95 beam 5400 450 7day
I 02-16-95 beam 28 day I
II 02-16-95 ' beam 28 day J
c: City of Spnngfleld
Morris Redden Affolter & West AlA
Eugene Sand & Gravel
THIS REPORT IS SUBMITTED AS THE CONFIDENTIAL PROPERTY OF OUR CLIENT AND IS INTENDED FOR THE USE OF
OUR CLIENT ONLY. NO OTHER PERSON OR ENTITY MA Y UTILIZE THIS REPORT OR ANY PORTION THEREOF WITHOUT
OUR WRITTEN AUTHORIZATION.