Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 1999-3-23 J ~/ ~.. j;-~' J, ~ / BRAUN INTERTEC PSI has acquired the Oregon assets of Braun Intertec. Inc. March 23, 1999 Mr. Gabe Godwin CSl Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cine mark U.S.A. - Movies 17 , 2900 Gaj~wayBlvd. ~ . . - - - . .. ," _SpringfiCld, .Oregon B,P. No. 98-0538 I P.O. No. 506 01/22/99 6 x 12 9" A Division O!l"'tt:!>;lInformation . ,.,..,. .ToBuildOn Engineering. Consulting. Jbstlng Project EBXX-98-0 181 Report 12-019.-0246 ~~ 26 1999 CONCRETE INFORMATION 1/2" Morse Bros" .Inc. '.' .ASTM 430 1:20 p.m. -::"-'" I I I I I Pumic &~Superplasticizer I I I I I I, 01/23/99 3000 30 LW 390757 560 10.0 Rain R. Crawford Composite scating'slab, auditorium 8. SamPle taken in auditorium 8. Contractor was advised of on-site test results. 01/29/99 02/19/99 02/19/99 I 03/19/99 l ;, ,. '! CIty- of Spnngfleld . L:A~"Fuess Partners. -.~_ Morse.Bros,.Inc. ~i.___ COJ\-!rKlC"SION TEST RESULTS ~J~~~l 22.7 2120 7 day 22.9 2740 28 day 22.8 2850 2795 28 day 22.8 I 3330 ~6 daYh Kip pamcl, Architect -CineinirltU.S.A. This repon is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion thereof without our written authorization. f: \groups \ pu b--d.ata \ wpdoc \cy I inders \cs i0246 . cm Professional Service Industries, Inc. .lD40A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541n46-7163 " I:' '. BRAUNSM I NTE RTEC Braun Intertec Corporation 1040-'\ Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746.7163 Engineers and Scientists Serving the Built and Natrjral Environments March 2, 1999 Project EBXX-98-018! Report 12-019-0275 Mr. Gabe Godwin CS! Construction 7515 NE Ambassador PI. Portiand, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. Springfi~ld, Oregon B.P:l",o. 98-ti533 I P;O: No. 506 . ..~. .~ . CONCRETE INFORMATION ....,.....,.............".:',..:"..:',.... ...................................'......'...-. --".".""."".,. .,," DATE RECEIVED. 02/01/99 ' 01/30/99 6 x 12 3000 1/2" 8" 30-LW Morse Bros., Inc. 390944 ASTM Pumic &superpIasticizer . 460 61' 6:15 a.h1. 10.0 1 Overcast' R. Crawford LU1Vtl'J<ESSJON TE!>,- KESULTS I ~ Composite seating slab in auditoriums 16 and 17. Sample taken at auditorium 16. Contractor was advised of on-site 'test results. ~ 02/06/99 23.3 2510 7 day 02/27/99 .1 23.2 I 3220 28 day I 02127/99 I 23.3 I 3270 3245 28 day I nOLO t_ _I HOLD ,I c' City of Springfield Kip Daniel, Architect L.A. Fuess Partners Cincmark U.S.A. , Morse Bros, Inc. , This report is submitted as theconfidentiaJ propeny of (lur client and is intended for me use of our client only. No orner person. or entity may utilize mis -report or any portion thereof \~ithout our written authorization. f: \groups\pub-data \wpdoc\cyJinders\csi0275 .cin ,BRAUNS' INTERTEC ~raun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments February 23, 1999 Project EBXX'98-0 181 Report 12-019'0255 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. Spri!,g~dd, Oregon II.P. No. 98-U538'/'P.O.No. 56,; ~ 01/26/99 CONCRETE INFORMATION J~X+.Jfij8*B!~~....'.I.'."."'" 01/27/99 112" 3000 II , I I , Pumic & superplastlcizer I I , ~ 6 J: 12 71/2" 30-LW Morse Bc'os., Inc. 390825 'ASTM 'I - ~. ,... t<:>;'8ijti.-ii~pI.b."."""", 60' 49' fO:30 a:m. 10.0 Overcast R. Crawford I Composite seating slab in auditoriums 8 and 10. Sample taken at auditorium 8. Bill II with CSI Construction was advised of on~'site test results. i . COMPRESSION TE"l1<t.SULTS .Wiiiiiilt)iI .....Jj>ijiJ~.iJ~b 02/02/99 22.6 2670 7 da~ 02/23/99 22.7 3500 28 day I l 02/23/99 22.6 3620 3560 28 day HOLD HOLD '.""",' ., I "/f _..r." c' .. '.City ,of Springfield L:A.':Fuess-Partners Mors~' Bros, Inc.~ -..._- "I' :.; _..Kip-_Danie1, Architect., , " Cinemark U.S.A. , ~. \ This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion thereof w,ith9ut our written authorization. f: \groups\pu b-data \ wpdoc\cylinders\csi0255. do \ - ~"." BRAUN~M I NTE RTEC Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541.746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environmenfs February 19, 1999 Project EBXX-98-0181 Report E-66182 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr. Godwin: Re: Cinemark USA - Movies 17 2900 Gateway Springfield, Oregon B,P. #98-0538 I P.O. #506 / Weldments . February 15, 1999 D. Webber AWS# 930508011 ICBO# 1033346-85 Wisco Fabrication Performed visual inspection on stairway installed at grid line 6 between D and F. Advised contractor to get approval from engineer of record for as fit.up condition at second floor connection. Front entry way on west side' of building is 90% completed. Notifiedcontractor that the structural steel components for the stairway were not inspected prior to erection. Advised erector to have approved shop drawings on-site so final inspection can be done on all structural steel components for front entry way. Contractor was asked to notify our office when additional services arc needed. I , Sincerely, (/l- L-m t ~ {J Michael L. Meyer, Principal Willamette Valley Operations Manager If.- J - A-/; Ivd:;f CtJ Raymond V. Aliperti, Supervisor Eugene Branch c: Kip Daniel - Architect Cine mark Theaters L.A. Fuess Partners City of Springfield ",0 f:\groups\pub-data\wpdoc\reports\welds\csi66182.cin ~.-.... BRAUNSM I NTE RTEC Braun Intertec: Corporation 1040-A Shelley Street Springfield; OR 97477 541.746-9649 fax: 746-7163 Engineers and Scientisfs Serving fhe Built and Natural Environmenfs February 19, 1999 Project EBXX-98-0181 , Report 12-0 19~0246 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900.Gateway Blvd. Springfield, Oregon B-.PiNo. 98'C538 I ~;O. No. 506 CONCRETE INFORMATION ~ 01/22/99 ,...".,...:.,...,..-.,..-.-:-......:,.,:.,.-.:"..,-,:.:'-':':':"'-' ...,.....-.....-.-.-.-,....,...-..,-,..,.,..,..........-.. DATE RECEIVED.. ________. .--.--...-----,--,,-..... 01/23/99 1:20 p.m: 3000 6112 1/2". 9" 30 LW Morse Bros., Inc. 390757 ASTM Pumic Ie Superplastlcizer '43' 56' 10.0 Ram R. Crawford IlliE~~!~QN::,~~.:.~py~:..I::::) Composite seating slab, audit~rium 8. C~nt";'~r was advised of on-site test results. COMPRESSION TEST RESULTS c: City o(Spripgfield L.A. Fuess Partners... .-- Morse Bfos, Inc.: .:~~ .:.....,~-~.,.- . "~~':.,' :)-"':"'_:' t'! 1J/~) :". :~.1 I; "I . ,1.:....:.:..--.---.. ._. _.. _.~.. __..__. .~_n._ ........ ...-... J; '. \. ' : " ~l( : ~" '~.\ I 'kip Dani~I, Architect -.Cineinarki'U.S.A. ,. '1 ......_.......J .__.,."'" '. .1._,'\. . ;'J , - - .... -.-:...--......-. .:~. .~:.~-.:.~;.-;,..; ,.\ It,: :.:'~'" \. : '-' . ! \: . ~...-..., I' '. " " .. Ii'" ~: .",!",;' \,.~. . ,--"--....,.. -"/;.. , I", " This report' is submitted-as the' confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or a~y po,:~on thereof 'Yithout our written authori7.ation, f:\groups\pub-dala\wpdoc\cylinders\csi0246.cin BRAUNSM I NTE RTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541.746-9649 Fax: 746.7163 Engineers and Scientists Serving the Built and Natural Environments February 16, 1999 Project EBXX.98-0181 Report 12.019-0238 Mr. Gabc Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900~.Gateway Blvd. . Spri!,gfield, Oregon B.P. No. 98-0538 I P.O. No. 506' CONCRETE INFORMATION 01/19/99 iOATE..RECE!'VEOi..... ,-.,-.......,..,."."..........._".... 01/20/99 -I I I I I I 6 x 12 3000 3/4" 4" 30 IN Morse Bros., Inc. 390676 ASTM 45' 53' 8:108.m. 10.0 Rain R. Crawford .j I Remainder of canopy, pier Cootins, southside of building - easthalf. Contractor was advised of on~site test results. COMPRESSION TEST RESULTS 01/26/99 28.6 2740 7 day 01/26/99 28.6 2690 2715 7 day 02/16/99 28.6 3880 28 day 02/16/99 28.7 3840 3860 28 day JI .. - c: City of Springfield Kip Daniel, Architect L.A. Fuess Partners Cinemark U.S.A. Morse Bros, Inc. This repon is submitted as the. confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion Ihereof without our written authorization. . f: \groups\ pub-data \ wpdoc \cy 1 inders \csi02 3 8. cin BRAUNS' I NTE RTEC Braun Intertec ,Corporation 1 040-A Shelley. Street Springfield, OR 97 477 541-746-9649 Fax: 746-7163 Engineers and Scientists Serving fhe Buj/f and Nafural Environments February 12,1999 Project EBXX-98-0181 Report 12-019-0223 Mr. Gabe Godwin CS1 Construction 7515 NE Ambassador PI. Portland, OR 97228 Rc: Cincmark u.s.A. ~ Movies 17 2900 Gateway Blvd. Springfield, Oregon B.P. No. 98-0538 I P.O. No. 506 CONCRETE INFORMATION Morse Bros., Inc. I I I 6 x 12 3/4" 4" ASTM 530 2:35 p.m. 1 Canopy piers (10). Contractor was advised of on-site test results. COMPRESSION TEST RESULTS 01/22/99 I 29.2 3020 7 day 02112/99 I 29.1 4230 28 day I 02/12/99 I 29.2 I 4190 4210 28 day I HOLD I I HOLD II c: City of Springfield Kip Daniel, Architect L.A. Fuess Partners Cinemark U.S.A, Morse Bros, Inc. This report is submitted as the confidential property of our client and is intended for the use of our client oll1y. No other person o( entity may utilize this report or any portion thereof without our writte.n authorization. f: \groups \pub-data \ wpdoc \cylinders \csi0223 . cin . BRAUNSM I NTE RTEC Braun Intertec Corporation 1040-A Shelley ,Street Springfield, OR 97477 541-746-9649 fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments Fcbruary 8, 1999 Project EBXX-98-0181 . Report 12-019-0275 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 G~teway Blvd. Springfield, Oregon B.P. No. 98-0538 I P.O. No. S06 CONCRETE INFORMATION 01130/99 3000 I I I I 6 x 12 1/2" 8" 30-LW Morse Bros., Inc',' " 390944 ASTM Pumic &'superpJasticizer ~I" ..' ",', . .. . .. LOCATlONOFPOUR . .---.-..-..-.._?...,..."-..-',-................,....-..-."-"",-,, ,.._,..."."."".._-..-......-,_.-....-........-..... ',.-.-..,..-..-..-...-,.........-...-.....,.........,........,.-..... ....,'.'.".".".,.,.....-.-.-.-....-.-..-....-..............' _...._,...,....-...-.-.,-....-..-.-..............._......... ....-....--...---...,.-.-..--.-.-.-....-..........-..--.... ~o 610 I 6:15 a.m, 10.0 'I Overcast I R. Crawford ! Composite seating s!ab in auditoriums 16 and 17. Sample taken at auditorium 16. Bill , with CSI Construction was advised of on-site 'test results. II COMPRESSI01'< li<::;;l-K~SUL TS I I I [...... .' . . ,,"'. 02/06/99 23.3 2510 02/27/99 02/27/99 HOLD c: - .. City of:Swingfie!d L.A. :.Fue'ss~Partners ,Morse Bras, Inc. Kip Daniel, Architect . Cinemark IIU.S.A, ., II This report is submined as -the" confidential property of our client and is ime~ded for the use of our client only. No other person or entity mayurilize this report or a.ny portion thereof without our,wrinen authorization. f: \~roups\pub-data\wpdoc\cylinders\csi027~ .cin BRAUNSM I NTE RTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541.746-9649 fax: 746-7163 Engineers and Scientisfs Serving the Buil, and Natural Fnvironmerits February 04, 1999 Project EBXX-98-0181 . Report E-66065 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr. Godwin: r:fi c \I ~l!~~ ftp 0" Re:" CinellI ark 'USA ~ Movies. 17 . . 29~0 Gateway Springfield, Oregon ~.P.#~8~0538 I P.O. #506 February 03, 1999 D. Webber. AWS# 930508011 ICBO# 1033346-85 Wisco Performed visual inspection on the stadium structural steel seating frames for auditorium 16 and' 17, Cross bracing was installed and the A325 high strength bolts were brought into snug tight condition. To the best of our know ledge the work checked is .in conformance with approved plans, change orders; specifications, and applicable codes, Contractor was asked to notify our office when additional services are needed, "-- Sincerely, ff!0..~0) Mi_e~ael:L. Mey~i-, Prjnclpal . 'Wlllamette Valley. OperatIOns Manager ~! . !1 ~:~(.,,!~:..~ . .' " '. ,_' , :c :--,:.':: ':Kip' b'amet-- Ar~hlt~C{ --.-.. " .: ,,'i' '. ' _,' ' ,;. ~ t. ~ ._' _' . . _.... ,.' " . . . Cinemark TheaterS " .' .-.- -._.- ..... ............._.r .... ,- ._. _ ." .LA fuess Partners ,., City of Springfield f{y~tU0) Raymond V Aliperti, Supervisor Eugene B!'lneh ' . ".. . ~.. _ _WI. - -~.- -._--~ - I f:\groups\pub-data\wpdoc\reports\welds\csi66065.cin BRAUNSM I NTE RTEC 'I Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 HeR 1999 Engineers and Scientists Serving the Builf and Natural Environments February 03, ]999 Project EBXX ~98-0 181 Report E-66053 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr. Godwin: Re: Cinem-ark USA - Mo~ies.IT -. 2900 1Gate~ay,. Springfield, Oregon ~ ...----._-', RP. .#98;053~ lP.O. #506 -...... , Febmary 02, 1999. D. Webber AWS# 93050801 /ICBO# 1033346-85 Wisco CSI ConstiUction reinspection on the stadium structurdl steel seating frames for auditoriums 16 and 17. severdl locations the A325 high strength bolts are not in snug tight condition in both auditoriums. Seating support hanger weldments are undersize and the remaining of the. \ for the stairways in auditomims listed above need'to be slag before fmal accetpance. Coutraetor was uotified of repairs needed and asked to notify our office when additional services needed. . Sincerely, m ( ffl{jtV 0) Michael L. Meyer, Principal Willamelle Valley Operations Manager f(V~6;) Raymond V. Aliperti, Supervisor Eugene Branch e: Kip Daniel - Architect Cinemark Theaiers L.A, Fuess Partners City of Springfield f:\groups\pub-data\wpdoc\reports\welds\csi66053.cin BRAUN'. INTERTEC Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541-74&9649 fax: 746-7163 Engineers and Scienfists Serving the Built and Natural Environments Februal)'.'03;.'1999 <','l . . -', ,",.. .. _r ~. " . \< . ~. t' \ .,.'. Project EBXX"98-0 l~.'b:,r,",'[ . Report E-66059 ....;,..,. ':':<:',: "'V Mr. Gabe Godwin CSI Construction 7515 NE Ambassador Pl., Ste. E Portland, Oregon 97228 Dear Mr. Godwin: Re: Cinemark USA - 'Muvies Ii 2900:Gateway S.pr:!~gli~ld, Oregon' B.P. #98-0538 I P.O. #506 . '. f ...:....." ..?.:,'.......H.~~"',\~~.. Pcrformed visoi inspection on the stadium structural steel seating frames for auditorium 16 and 17, Puddle welds and button ponchwas 'completed on steel metal decking. Cross bracing was .. II i~stailed but the A3i5 high strength bolts ,were not bro~ght into snug tight condition' at-this' time.- To the best of our knowledge the work checked is in conformance with approved plans, change orders, specifications, and applicable code:, unless otherwise noted above. Contractor was asked to notify our office when additional services are needed. Sincerely, . , m L !1};[PUftJ) Michael L. Meyer, Principal Wilhimette Valley" Operations'Manager rf{ vtLLLfD1/W-J Cbj) Raymond V. Aliperti, Supervisor Eugene Branch ~ . " " c: Kip Daniel-' Architect Cine mark Theaters: L,A. Fuess Partners , City of Springfieid f: \groups\pub-data \wpdoc \reports \ welds \csi660 5 9. cin ',:"'-' BRAUNSM INTERTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541.746-9649 Fax: 746.7163 Engineers and Scientists Serving . the Built ancJ Natural Environments February 2, 1999 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 GaleWllY Blvd'. -Sprj"gfield,,9regoD' . B.1"cNo. Q8-0.s.3]J fRO. l'Jo"_.506 - ' CONCRETE INFORMATION 01/26/99 6 x 12 1/2" 71/2" Morse Bros., Inc. ASTM 49' 10:30 a.m. 1 Project EBXX -98-0181 Report] 2-0 19-0255 01/27/99 3000 30-LW 390825 Pumic & 'superplasticizer 60' 10.0 Overcast R. Crawford Composite seating slab in auditoriums 8 and 10. Sample taken at auditorium 8. Bill with CSI ConStruction was advised of on-site test results. COMPRESSION .TEST RESULTS 02/02/99 22.6 2670 02/23/99 I 02/23/99 I , HOLD I -. c: City of Springfield L.A. Fuess Partners Morse Bros, Inc. Kip Daniel, Architect CinemarkUS,A. 7 day I 28 duy I 28 day I HOLD I -- ~ This report is s!Jbmitte~ as the confidential ,propeny of our client and is intended for me use of our cljent only. No other person or entity may u!ilize this report or any portion thereof without our wrinen audlorization. f: \groups\pub-dam\wpdoc\cylinders\csi0255 .do BRAUNSM I NTE RTEC ',. DAilY FIELD REPORT 30, 1999 CSI Construction, Inc. Cinemark USA - Movies 17 - 2900 Gateway BI<. Springfield, Oregon Reinforcing Steel, Reinforced Concrete Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541.746-9649 fax: 746.7163 Engineers and Scientists Serving the Built and Natural Environments EBXX-98-0181 :~.~l\gttN.~.m.~~t;f""""""""" E-660 3 0 506 .!NH~i~gg~ti!ijfN4i!i~~ti 98-0538 Clear Composite seating slab '<'::""<'." Composite seating slab for auditoriums 16 (except first riser) and 17 (except risers), II I I Performed visual inspection of reinforcing 'steel and welded wire fabric in locations listed above. Reinforcing steel was chccked for grade, size, lap, placement and clearances where applicable. Reinforcing steel and welded wire fabric were placed in accordance with approved plans and specifications. As directed by client, conti,mous inspection during placement of concrete is not required, Cast one set of four (6 x 12) concrcte test cylinders. Contractor was advised of on-site test results and asked to notify our office when additional services are needed. l.yp{ofMat~ri~I">"""""""'" ...--..-.,.,-,-.',.....,........'............-...................,...................,.......... ..--....-...,....--.,.,....,....,..,.. .... ... .. .......................-.,.,...,.,'""",.-... ...........................",........................"....-. ..........................-.................-..-...-..........~ .--........-..-.----..----..............,... ................................... ..-..............-. Concrete Morse Bros., Inc. 30-LW 8" 61 46 6.15 a.m. 416 x 12) 3000 10.0 U you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. e. Kip Daniel, Architect Cinemark Jobsite fax - 746-1881 Cine mark Theaters L.A, Fuess Partners City of Springfield Ii I I As a mutual protection to clients, the public, and ourselves, all reports arc submitted as the confidential property of clients and are intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. f:\groups\pub-data \ wpdoc\reports\insp \csi66030. cin BRAUNSM INTERTEC Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541.746-9649 fax: 746-7163 Engineers and Scientists Serving the Built and Nafural Environments January 29, 1999 Project EBXX-98-0181 Report 12-019-0246 Mr. Gabc Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR . 97228 Re: Cinemark U.S.A. ~ Movies 17 2900 Gateway Blvd. Springfield, Oregon B.P. No. 98-0538 I P.O. No. 506 ,. CONCRETE INFORMA nON 1/2" 30 LW 6 x 12 9" Morse Bros., Inc. 390757 ASTM P_umic &- Superplasticizer . 430 560 1:20 p.m. 10.0 Rain R. Crawford Composite seating slab, auditorium 8. Contractor was advised of on-site tcst results. COMPRESSION TEST RESULTS-- I 01/29/99 22.7 2120 7 day l 02/19/99 28 day 02/19/99 28 day HOLD HOLD J c: City of Springfield Kip Daniel, Architect L.A. Fuess Partners Cinemark:'U.S.A. Morse Bros, Inc. This report is submitted as the confidential property of our client and is intended for the use of our client only. No other p'erson or entity may utilize this report or any portion thereof ~ithout our written authorizatio,n. f: \groups\pub-data\ wpdoc\cylinders\csi0246. dn .4~..~!;.\:1r..~!~~lt;:., -"'" BRAUNSM I NTE RTEC "Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-74&9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments January 29, 1999 Project EBXX-98-0181 Report 12-128-0186 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. Springfield, Oregon B.P~' No. 98-0538 /, P.O,'.No. 506 ~ . CONCRETE INFORMATION " 12/31/98 ,,-, """"-"-"-"-""-""-",-,'-',-,',-,-" DATE RECEIVED 01/01/99 II 3500 I 35-IN 395518 No Air 54' 10.0 Overcast D, Smith 6 x 12 3/4" 4" Morse Bros" Int. ASTM 45' 8:20 a.m. 1 Void form steps in auditoriums ]] and 12, mezzanine stairs at lo.bby, and tiered seating steps auditorium 2 lower half and auditorium 3 east side. Contractor was advised of on-site test results." " COMPRIc~~lUl' TEST RESUL~ 01/07/99 I 28.6 4070 7 day 01/07/99 I 28.6 4030 4050 7 day 01128/99 I 28.7 4990 28 day 01/28/99 I 28.7 5060 5025 28 day c: Clty of Spnngheld Kip Daniel, Architect L.A. Fuess Partners Cinemark U.S.A. Morse Bros, Inc. ,. This report is submitted as the cOnfidential property of our client and is intended for the use of our clienc only. No other person or entity may utilize this report or any portion mereof v.tithout our written authorization. f: \groups\pub-data\ wpdoc\cylinders\csiO 186 .cin '; BRAUNSM INTERTEC Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541.746-9649 fax: 746-7163 Engineers and Scientists Serving the Buil, and Natural Environments DAILY FIELD REPORT January 29, 1999 CSI Construction, Inc, Cinemark USA - Movi~s 17 . 2900 Gateway BI.- Springfield, Oregon Project Number: ,. . . .', , I EBXX-98-0I8I E-66040 506 98-0538 Clear Reinforcing Steel, Walls St)1!ctllral Masonry 8" CMU block w'aIls for wheel chair accessibility ramp (0' to 0'4" to 0'1'8") auditorium I, 2, 6 and 7, Perfonned visual inspection of reinforcing steel in locations listed above. Reinforcing steel was checked for grade, size, lap, placement, and elearances where applicable. . Reinforcing steel was placed in accordance with approved plans and specifications. Grout cells were relatively clean and free of excessive mortar projections, Performed continuous inspection doring the placement of grout. Grout was placed by pump arid mechanically consolidated. All celi> grouted solid. Contractor'was asked to notify oUF office when additional services are needed. Grout Morse Bros., Inc, 7-G 9" 530 640 4:00 p.m. o I I I If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) .746-9649. I ,. . . , c: Kip Daniel, Architect .' . .' . . "Cinemark Jobsite fax"" 746'1881 "..'. .-,' . -. . ;Ci,neinark: Theaters . . '/',. . L.A. Fuess Partners ,. City of Springfi~ld. L'" A<; a mutual protecti6n to clients, the p~blic, and ourselves, all report" are submitted as the confidential property of clients and are intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written'authorizatil:m. f: \groups \pub-data \ wpdoc \rcpor:-s \insp \csi 66040.c in I BRAUN'M , -I NTE'RTEC Braun Intertec. Corporation 1 040-A Shelley Street Springfield, OR 97477 54' -746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments January 28, 1999 Project EBXX-98-0181 Report 12-019-0238 , . Mr. Gabe.Godwm CSI Construction 7515 NE.Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900' Gateway Blvd. Springfield, Orego~ B.P. No. 98-0538 I P.O. No. 506 CONCRETE INFORMATION \ 01/19/99 -""I 6 x 12 3000 3/4" 4" 30 IN Morse Bros., Inc. 390676 ASTM 450, 53' 8:103.m. 10.0 Rain R. Crawford Remainder of canopy pier footins, southside of building - easthalf. Contractor was advised of on-site test results. . COMPRESSION TEST RESULi" 01126/99 28.6 2740 7 day 01/26/99 28_6 2690 2715 7 day O~!16/99 28 day 02/16/99 28 day c: City of Springfield L.A. Fuess Partners' Iy10rse Bros, Inc. Kip DanieL Architect Cinemark U.S.A. I , This report is submitted as the confidential propeity of our client and is intended for the use of our client only. 'No other person or entity ma1y utilize this report or any portion thereof ~ithout our written authorization, ., f:\groups\pub-data\wpdoc\cylillders\csi0238.cin I . BR4UN'M I NTE RTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and Sc;~nt;sfs 5ervi~g the Built and Natural Environments DAilY FIElD REPORT II I I Ii J)a.t~:i'iJ January 26, 1999 Il!T~H~~K~n}{+i CSl Construction, Inc. Cinemark USA - Movics 17 2900 Gatcway BI. Springfield, Oregon rroje~tNumber: . . EBXX-98-018l E-66000 506 :JJilildiiigPerniitNuJ!i~~~ . 98-0538 Overcast Rcinforcing Steel Composite seating slab Jar auditoriums 8 and 10. Composite seating slab Pcrfonncd visual inspcction of reinforcing stcel in locations listed above. Reinforcing steel was checked for grade, size, lap, placement and elearances where applicable. Reinforcing steel and welded wire fabric was placed in accordance with on-site approved plans, specifications, and was secured by tie wire. Rcinforcing steel was previously checkcd on January 22, 1999 (ref: Report E-65976) for auditorium 8. As directed by client, continuous inspection during placement of concrete is not required. Cast one set of four (6 x 12) concrete test cylinders. Contractor was advised of on-site test results and asked to notify our office when additional services are needed. Morse Bros., Inc. 30-LW 71/2" 490 600 10:30 a. m. 4 (6 x 12) 3000 70.0 I 'I I If you have any qnestions regarding this rcport, please feel free to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, Architect Cinemark 10bsitc fax - 746-1881 Cincmark Theaters L.A. Fuess Partners City of Springfield As a mutual protection to cli~nts, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. f:\groups \pu b.data \ wpdoc\reports \insp \csi66000. ein I BRAUN'M I NTE RTEC Braun Intertee Corporation. 1 040-A Shelley Street Springfield, OR 97477 541 -746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments DAilY FiElD REPORT !,Projectl'!!,mber:}" , CSI Construction, Inc. Cine mark USA - Movies 17 2900 Gateway Bl:~ Springfield, Oregon EBXX-98-0181 E-65999 506 98-0538 Overcast BuildinPermitNumbcr ." ..g ....... .. ITY~c of I~~pcctio~:," .. '1I:;~~0~;~~~\,;atiOiJn:+'.;<';!;: Reinforcing Stcel Walls, Columns 8" CMU _block walls, west siue north and south entryways (20'0" to 21 '4"), 8" CMU Performcd visual inspection of reinforcing steel in the above listed locations. Reinforcing steel was checked for grade, size, lap, placement, and clcarances where applicable. . Reinforcing steel was placcd in accordancc with approvcd jobsite 'plans and specifications. 'Grout cells are relatively clean and mortar projections within the limits of the Uniform Building Code. Contractor was asked to notify our office when additional services are needed. Inspector: R. Crawford - ICBO# 883432-88 ," ", .,. " " ", .. -. 'you'ha~e any qnestions regarding this report, please fecl free to call Raymond V. Aliperti'aq541) 746-9649'. c: Kip Daniel, Architect L.A. Fuess Partners City of Springfield Cine mark Theaters CSl Construction '. .- ....' ." .."'. . h~,,;:'r':. lJ~llh,', " '. :::(. >::~i ~. .'I\";f"'';l:'' '. ,', ,..' -;'~'l ... ". '.... '.. . . a mut~al protectio~ to' ;ii~~ts: th~ publi~, and o~rsel~'es, '~II reports arc submitted as the confidential property of clients' and' ~'c int~ndcd 'for the use of our clients ~""nly. No other person or c,n,lilY may utilize the report or any portion thereof without our written authorization. . f: \groups\pub-data \wpdoc\reports\insp\csi65999.cin " . ~~~~;~~}~j BRAUN'" INTERTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541 -746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built a~d Nafural Environments January 25, 1999 Project EBXX-98-0 181 Report E-65994 Mr. Gabe .Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 m 28 199~ v. ~~ Dear Mr. Godwin: "-#;' . -l{e: .' Cine mark USA ~ Movies' 17 . 2900 Gateway Springfield, Oregon B.P. #98-0538 I P.O. #506 - , January 25" 1999 R. Aliperti ICBO# 1017075-85 Performed visual inspection on the stadium structural steel seating frames for auditorinm 10. ,I Cross bracing was installed and the A325 high strength bolts were brought into snug tight I condition. Puddle welds and button pnnch was completca on stecl metal dCCKing. . To the best of our knowledge the work checked is in conformance with approved plans, change orders, ;specifications, and applicable codes. Contractor was asked to notify our office when additional services are necded. Sincerely, WlL. ~CPJ) Michael L. Meyer, Principal Willamette Valley Operations Manager R.I/'~~ Raymond V. Aliperti, Supervisor Eugene Branch c: Kip Daniel - Architect qinemark Theaters L.A. Fuess Partners City of Springficld ,. f:\groups\pub-data\wpdoc\reports\welds\csi~5994"cin ., BRAUN'" I NTE RTEC Braun Intertee Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments DAILY FIELD REPORT J "'-'- EBXX-98-0181 E-65993 506 98-0538. Clcar I ::Pilte:}(:::::';/'..""" ,.1 :\T,es'ted(Fcfr:\f}{ .... -'- '::":::\/)'::;' January 25, 1999 CSI Construction, Inc. Cinemark USA - Movies 17 2900 Gateway BI. Springfield, Oregon m!yj~f!N~m.~,~t:iC:. ~~~9nN.~m.~~t\ Reinforcing Steel, Walls Structural Masonry 8" CMU block walls \vestside, north and south entryways (12'0" to 20'0"). II I I t Performed visual inspection of reinforcing steel in locations listed above. Reinforcing steel was checkcd for grade, si2e, lap, placement, and clearances where applicable. Reinforcing steel was placed in accordance with approved plans and specifications. Grout cells were relatively clean and free of excessive mortar projections. Performed continuous inspection during the placement of grout. Grout was placed by pump and mechanically consolidated: All cells grouted solid. Contractor was asked to notify our office when additional services are needed. Grout Morse Bros., Inc, 7-G 9" 420 570 11:50 a.m. o 2500 , 3.0, If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, Architect Cinemark Jobsite fax - 746-1881 Cine mark Th~aters L.A. Fuess Partners City of Springfield I I I I I I I ---.Jl As a mutual protection to clients, the public, and ourselves, all reports ar~' submitted as the confidential property of clients and are intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. f: \groups \pu b-data \ wpdoc\rcports \insp \cs i65 993. cin , BR4UN'" I NTE RTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and Scienfists Serving the Built and Natural Environments DAIL YFIELD REPORT 'I irfQj~ft'N~!jj~~t,i.'.".Ii'.' EBXX-98-018! E-65976 506 98-0538 January 22, 1999 CSI Construction, Inc. Cinemark USA - Movies 17 2900 Gateway B I. Springfield, Oregon Reinforcing Steel' Composite seating $Iab~uditoriu~s 8 and 9. ;Spceifif.p~~t!ojj~~ j,:"", .....~,~,im,i9gg~fi!H..t,.'.!'I.,.,.,jjm~~r{;. ............................................................ Rain Composite 'Slab Performed visual inspcction.of reinforcing steel in locations listed above. Reinforcing steel was chcckcd' for grade, size, lap, placement and clearances where applicable. Reinforcing stcel and welded wire fabric was placed in accordance with on-site' approved plans and specifications. As directed by client, continuous inspection during placement of concrete is not required. Cast one set of four (6 x 12) concretc test cylinders. Contractor was advised of on-site test results and asked to notify onr office when additional scrvices are needed. Concrete Morse Bros., Inc. 30-LW 1 9" I 430 II 560 I 1;20 p. m. I 4 (6 x 12) 3000 I 25.0 I If you have any qnestions regarding this report, please fccl free to call Raymond V. Aliperti at (541) 746-9649. . c; , Kip Daniel, Arehitect Cinemark Job~ite fax - 746-1881 Cine mark Theaters L.A. Fuess Partncrs City of Springfield A5 a mutual protection to clients, the public, and ourselves, all reports arc submitted as the c~njidential property of clients and are intended for the use of our clients only. No other person or en~ity may utilize the report or any portion thereof without our written authorization. f:\groups\pub-data \wpdoc\reports \insp\csi6597 6 .em i BRAUN'" INTERTEC Br~un Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541,746-9649 Fax: 746-7163 Engineers and Scientisfs Serving the Bui't and Natural Environments January 22, 1999 Project EBXX-98-0181 Report E-65971 . Mr. Gabe 'Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr. Godwin: Re: 'c'inemark USA - Movies 17 .2900 Gateway Springfield, Oregon B'.P. #98-0538 I P.O. #506 January 21 and 22, 1999 D. Webber AWS# 93050801/ ICBO# 1033346-85 KD Steel II Performed visual inspection on the stadium structural steel seating frames for auditorium 8. Cross bracing was installed and the A325 high strength bolts were bronght into snug tight condition. Puddle welds and button punch was comp1ctcd on steel metal dccking. To the best of our knowledge the work checked is in conformance with approved plans, change orders, specifications, and applicable codes. Contractor was asked to notify our office. when additional services are nccded. Sinccrely, ;{{/~0) m [ /l1t1JeU 0) Michacl L. Meyer, Principal Willamelle Valley Operations Manager ! . . c: K;ip Daniel - Architect Cinemark Theaters L.A. Fuess Partners City of Springfield Raymond V. Aliperti, Supervisor Eugcne Branch . f:\groups\pub-data\wpdoc\reports\welds\csi65971.cin .r-.. BRAUN'" INTERTEC Braun Intertec Corporation 1040-A Shelley ,Street Springfield, OR 97477 541-746,9649 Fax: 746,7163 Engineers and Scientists Serving the Built and Notural Environments Jannary 22, 1999 Project EBXX"98-0181 Report 12-019-0223 Mr. Gabc Godwin CSI Constrnction 7515 NE Ambassador PI. Portland, OR 97228 Re:. Cincmark U.S.A. - Movies 17 2900 Gateway Blvd. Springfield, Oregon B.P. No. 98-0538 I P.O~ No. 506 CONCRETE INFORMATION Morse Bros., Inc. 60' /-~ .01115/99 6 x 12 3/4" 4" ASTM 53' 2:35 p.m. 10.0 I' Cloudy R. Crawford Canopy piers (10). Con,tractor was ad,,'ised of on-site test results. COl\olr~i;;;;.ii)N TEST RESULTS I I I II 01122/99 29.2 3020 -7 day 02/12/99 , ! 02/12199 , 7 day 28 day , IIOLD , HOLD c: I City of Springfield rJ.A. Fuess Partners I Morse Bras, Inc. .' Kip Daniel, Architect Cincmark U.S.A. , I . This report is submitted as the confidential property of our client and is intended for the use of our client only, No other person or entity, may utilize this report or any portion thereof without our written authorization. f: \groups \ p~b-da ta \ wpdoc \cy I ioders \cs i0223 . c in I BRAUN'" I NTE RTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541 -746-9649 Fax: 746-7163 Engineers and Scienfisfs Serving the Built and Natural Environments 'January 21, 1999 Project EBXX-98-0181 Report E-65949 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 'Dcar Mr. Godwin: Re: Cinemark USA - Movies 17 2900, Gateway Spri~gfidd, Oregon B.P. #98-0538 / P.O. #506 January 20, 1999 D. Webbcr AWS# 93050801/ICBO# 1033346-85 KD Steel Perfonncd visual inspection on the stadium structural steel seating framcs for anditorinms 9 and 11. Cross bracing was installed and the A325 high strength bolts wcrc brought into snug tight condition. Puddle welds and button punch was completcd on steel mclaldecking. To thc best of our knowledge the ,,:ork checked is in conformance with approved plans, change orders, spccifications, and applicable codes. Contractor was asked to notify our office when additional services are needed. Sincerely, KV ~~) Raymond V. Aliperti, Supervisor Eugene Branch m L 01tw.L( CPj'\ Michael L. Meyer, Principal Willametie Valley Operations Manager c: Kip Daniel - Architect Cinemark Theaters L.A. Fuess Partners ~ity of Springfield f:\groups\pub-data\wpdoc\rcports\welds\csi65949.cin I BRAUN'" INTERTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments DAIL Y FJELD REPORT January 19, 1999 CSI Construction, Inc, Cinemark USA - Movies 17 2900 Gateway BI. . Springfield, Oregon Reinforcing Steel, Reinforced Concrete Remainder of canopy pier footings and continuous footings between piers south of building, east half. ProjectNunib~r:. . '. .l Report Niiinber:.. EBXX"98-0181 E-65934 506 98-0538 Rain Canopy Piers Performed visual inspection of reinforcing stec1 in locations listed above. Reinforcing steel was checkcd for gradc, size, lap, placement and clearances where applicable. Reinforcing steel was secured with lie wire and manually. supported during placement of concrete to ensure proper clearance. Rebar was placed in accordance with on-site approved plans and specifications. Performed periodic inspection during placement of concrete. Concrete was placed by pump and mechanically oonsolidated. Cast one set of four (6 x 12) concrete test cylinders. Contractor was advised of on-site test results and notity our office whcn additional serviccs are needed. ~otal cub~c yardsplaced: Inspector' ~trawford - ICBO# 883234-88 Concrete Morse Bros., Inc. I 40-IN I 4" I , 450 I 530 I 30:10 a.m. il , 4 (6 x 12) 'I 3000 I 20.0 I U you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, Architect Cinemark lobsite fax - 746-1881 . , Cine mark Theaters. L.A. Fuess Partners City of Springfield As a muhlal prote'ction to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and,are intended for the use of our clients only. No' other person or entity may utilize the report or any portion thereof without our written authorization. . f:\groups\pu b-data \ wpdoc \reports \insp \csi6 5934:cin ~.., I BRAUN'" INTERTEC Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and ScientistS Serving the Built and Natura! Environments January 18, 1999 Project EBXX.98-0 181 Report 12-128-0166 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. Springfield, 9rego,n fl.P_ No. Y8-0S,8 ; P.O. No. 5U6 CONCRETE INFORMA nON 6 x 12 3000 71/2" 30-LW Morse Bros., Inc. 390427 2 day F.C./remainder UBC Super Plasticizer 50' 10.0 Clear D. Smith Auditorium # 6 and 7 tiered seating base. Contractor was advised of on-site test. results. I II I l c' " (;lty 01 Sprmgfie1d " LI.A,"Fuess Part~e~s" ".: ;" Mor'se:-B'~~s,_ i~c, . JI . . I "j I I , ti/28/98 22.1 2410 , I I t2/28/98 22.1 2530 01/16199 I 22.2 3290 01;16/99 I 22.1 3330 - 2470 7 da)'" 7 da)" 28 day I 28 day I 3310 KIP Uaniel, Architect Cinemark U.S.A. This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or emity may utilize this report or any portion thereof without our written authorization. f\groups\pub-data\ wpdoc\cylinders\csiO 166 .cin BR4UN'" I NTE RTEC , ~raun Intertec Corpt?ration 1 04~A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and Scientists Serving the Buil, and Natural EnvIronments DAILY FIELD REPORT . ] <,-:-:-. January 15, 1999 CSI Conslruction, Inc. Cinemark USA - Movies 2900 Gateway !'l1::. Springfield, Oregon Reinforcing Steel, Reiruorced Concrete Ten (lO)'west canopy piers south of building. Project Number:. .... J Report Number: "1 17 P,O. Number: . . .... . .1 Building Permit Number I Date:.' EBXX-98-0181 E-65892 506 98-0538 Cloudy Canopy Piers Tested For: Performed visual inspection of reinforcing steel in location listed abovc. Reinforcing steel was checked for grade, size, lap, placemcnt and clearances where applicable. ,Reinforcing steel was secured with tie wire and mats supported manually during placement of concrete to ensure proper clearance. Rebar was placed in accordance with on-site approved plans and :specifications. Performed cominuous inspection during placement of concrete. Concrete was placed directly from truck and mechanically consolidated. Cast one set of four (6 x 12) concrete test cylinders. Contractor was advised of on-site test results and asked to notify our office when additional services are needed. Concrete Morse Bros., Inc. 30-1N 4" 530 600 2:35 p.m. 4 (6 x 1,2) 20.0 ,I JI -,('\1"" .;JJ'Y..-'. R. Crawford - ICBO# 883234-88 I , If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, Architect , Cinemark Jobsitc fax - 746-1881 Cinemark Theaters L.A. Fuess Partners City of Springfield , As a mutual protection to c1i~nts, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients only. No other person' or entity may utilize the report or any portion thereof without our ~ritten authorization. f\groups\pub-data \wpdoc \reports\insp \csi6 5 892.cin I BRAUN'" I NTE RTEC Braun Intertec Corpor:ation 1 040-A Shelley Street Springfield, OR 97477 541-746-9649 Fox: 746-7163 Engineers and Scientists Serving the Built and Natural Environmenfs January 13,1999 Project EBXX-98-0181 Rep?rt .12-128-0148 Mr. Gabe 'Godwin CSl Construction 7515 NE Ambassador PI. Portland,.OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. Springfield, Oregon B.P. No. 98-0538 I P.O. No: 506 CONCRETE INFORMATION 12115/98 4000 2x2 sand 10.0 22" Mix 10 Eugene Sand & Gra,:eI 1611590 ASTM' 44' 58' 4:00 p.m. 25.0 2 Partly "Ooudy S. Wilder Auger Pine nlimbers 1 thru 20. Load 2 placed 7 thru 14. on-site test results. COMPRESSIUJ' i >:,,1 Ki"l1L TS Contractor was advised of -1 I 12/22/98 I I 3900 7 day I 12122/98 I I 3625 3765 7 day I 01/1219,9 I I 4750 28 day 01lt2/99 I I 5050' 4900 28 day HOLD I I ,HOLD ., nOLD I J HOLD c: City of SpnngfIe1d Kip Daniel, ArChltcct L.A. Fuess Partners Cinemark U.S.A. Morse Bros., Inc. This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion thereof without our written authorization. f: \groups\pu:b-data \wpdoc\cylinders\csiO 148 .cin i I , I I 1 I i BR4UN'" INTERTEC , Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746,7163 Engineers.and Scientists SelYing the Built and Notllral Environments January 13, 1999 Project EBXX"98-0181 Report 12-128-0149 Mr. Gabe.Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: . Cinemark U$.A. - Movies 17 2900 Gateway Blvd, Springfield, Oregon . B.P. No. 98-0538 I P.O. No. 506 CONCRETE INFORMATiON Eugene San~ & Gravel 12/17/98 ~1 4000 I 10.0 I Mix 10 I 1612090 2x2 Mix 10 25 I I I I I Auger Pile nuinbers 21 thru 44. Load 3 placed 37 thru 44. Contractor was advised of I on~site test results. 11 ASTM 58' 39' 12:30 p.m. 27.0 3 Fog S. Wilder COMPRESS1ul"ii:ST RESULTS 12/23/98 3430 I 12/23/98 3350 I 0l/13/99 5750 L 0l/13/99 5930 HOLD I HOLD I c: <;lty of Spnngheld Kip Damel, ArchItect L.A. Fuess ~artners Cinemark U.S.A. Eugene Sand and Gravel 7 day 3390 7 day 28 daJo: 5840 28 day HOLD HOLD This reportis submitted as the confidential property of our client and is intended fOf the llse of our client only. No other person or entity mdy utilize this report or any ponio~ thereof without our written authorization. f: \grou ps \ pu b-data \ wpdoc \c y linders \csiO 149. cin I I I BR4UN'" INTE'RTEC , ' , Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541-746-9649 Fox: 746-7163 Engineers and Scienfists Serving the Bvilf and Natural Environments DAILY FIELD REPORT CS1 Construction, Inc. Cinemark USA - Movies 17 2900 Gate'way Bl.o 'Ili1H~i!igg~rijij(Ni1ijib.~ri Springfield, Oregon EBXX-98-0181 E-65887 506 98-0538 Reinforcing Steel, Structural Masonry 8" interior-"CMU'block w'lil'south exit on west side, (0 to 8" CMU'olock walls trash enclosure (0109'4'');' 8'.CMU columns north and south exit on west side (0 to 4101'). Rain Performed visual inspection of reinforcing steel in locations listed above. Reinforcing steel was checked for grade, size, lap, placement, and clearances where applicable. Reinforcing steel was placed in accordance with approved plans and I specifications. Grout cells were relatively clean and frec of excessive mortar projections. Perfonned continuous inspection during the placement of grout. Grout was placed by pump and mechal}ically , 'consolidated. All cells grouted solid except for interior CMU walls at south exit on west side where only cells oontaining reinforcing stecl were grouted. Contractor was asked to notify our office when additional services are II needed.' . . I Grout Morse Bros., Inc. 7-G 9" 510 610 11 :30 a.m. o 2500 9.0 11 I , I Design Strength.' . .... ....1 II Total cubic yards placed: '1 Inspector: R. Crawford - ICBO# 883234-84 If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, Arcliitect Cinemark Johsite fax - 746-1881 Cinemark Theaters L.A. Fucss Pkners City of Springfield , As a mutual protection to c1i~nts, the public, and ourselves, all reports are submitted.a..~ the Confidential property Of clients and are intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without OUf written "-authorization. , f: \groups \pub-data \wpdoc\reports\insp \csi6 5 887. ein .., I , . I BRAUN'" I NTE RTEC I , Braun Intertec Corporation 1040-A Shelley Street . Springfield, OR 97477 541-746,9649 Fax: 746,7163 Engineers and Scie~tists Serving the Bu;!t and Natural Environments January 12, 1999 Project EBXX -98-0181 Rcport E-65812 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr. Godwin: . Re: .Cincinark USA "" 1\'lovic~.17' 2<)00 -Gateway Springfield, Oregon B.P. #98-0538 1 P.O. #506 Weldments January 07, 1999 D. Webber AWS# 930508011 ICBO# 1033346-85 KD Steel' CS1 Construction , Performed visual inspection on the stadium structural steel seating frames for auditoriums 12, 13, '.1 and 14. Cross bracing was installed and the A325 high strength bolts were brought into snug tigbt c'J!!ci!ion. .To'ihe b~kt"~f our knowledge the work checked is in conformance with approved drawings, change ordcrs, specifications, and applicable codes. Contractor was asked to notify our office when additional services arc needed. ,., Sincerely, m L rYlelJ{ fY)) Michael L.- Meyer, Principal Willamette'Valley Operations Manager , . RV OtJt{U/WJUJ;) Raymond V. Aliperti, Supervisor Eugenc Branch. c: Kip Daniel - Architect Cinemark Theaters I L.A: Fuess Partners , City of Springfield i f:\grou ps\pub-~ata \ wpdoc\reports \we Ids\csiG 5 812.cin -;..:.c,.. I I I BR4UN'" INTERTEC Braun Intertec Corporation 1040-A Shelley Streer Springfield, OR 97477. 541 -746-9649 Fax: 746-7163 Engineers and Scientists Serving the Buil, and Natural Environments January 11, 1999 Project EBXX-98-0181 Report E-6581O . Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr. :Godwin: . Re: qinemark USA, Movies 17 2900 Gateway Springfield,Oregon B:P. #98-0538 / P,O.'#506 Weldments/HSB January 06, 1999 D. Webber AWS# 93050801/ICBO# 1033346-85 KD Steel I I PerfonIled visual inspection on the stadium structural steel seating frames for auditoriums 3, 4, 6,' and 7- Cross bracing was installed and the. A325 high strength bolts were all brought"into "snugltight" conditi(}~.' Sheet met:!! ,deckip..g was also completed. . Performed inspection on all typical slide bearing assemblies (detail 8/S502 at roof level grid'line . L between 5 and 19. Joint assemblies were all completed at the time of inspection. To the'bcst of our knowledge the work checked is in conformance with approved drawings, change o~ders, specifications, and applicable codcs. Contractor was asked to notiJy our office when additi9nal services are needed. Sincerely, /Jl t /lJa;tIV 1:1) Michael L. Meyer, Principal Willamette Valley Operations Manager I({/ ~U?) Raymond V. Aliperti, Supervisor Eugene Branch c: Kip Daniel, Architect Cine mark Theaters I L.A. Fuess Partners City of Springficld I I\groups\pub-data\wpdoc\repor1s\welds\csi658l a.cin . I . BRAUN'" INTERTEC Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541,746-9649 Fax: 746-7163 Engineers and ScientiSfS Serving the Built and Natural Environments Janua.ry 11:, 1999 Project EBXX-98-0181 Report 12-128-0186 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cincmark U.S.A. - Movies 17 2900 Gateway Blvd. Spri~gfield, Oregon B.P, i~o. 9~-u538 IP;O;i'~o.' 506- . -- - ~ . .'. -' ".. " ~ .... CONCRETE INFORMATION :~ 12/31/98 II I I I I I I' i I I 6 x 12 :3/4" 4" Morse Bros., Inc. ASTM 45' 8:20 a~m. 1 Void fonn stcps in auditoriums 11 and 12, mezzanine stairs at lobby, a~d tiered se,ating. steps auditorium 2 lower half and auditorium 3 east side, Contractor 'Xas ad"'iscdof on site test. results. TLS'I' K~SUl./r:S 01/07/99 I I' 01/28/99 I CIty of SpringfIeld . L.kFuess .Partners Morse Bro~; Inc. , 28.6 4070 7 day 28,6 4030 4050 7 daJ' I 28 day ~ 28 day 01/07/99 I 01/28/99 c: Kip Daniel, Archltcc~ Cincmark U.S.A. This report i~ submitted as the corifidential property of our client and is intended for the use of our client only. No other person or entity ma}; utilize this report Dr any PC:!:0fl thereof without our written authorization. I f:\groups\pub-data\ wpdoc\cylinders\csiO 186.cin. , _t ~_I '-:" _.. ..... BRAUN'" , INTE[RTEC , Braun Intertec Cor'poration 1040-A Shelley Street Springfield, OR 97477 541,746-9649 'Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environmenfs January 5, 1999 Project EBXX-98-0 18) RcportI2-128-0114 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland; OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gate,,:'ay Blvd. 'SI)' rir;-(Jfjplrl Or~'>.(TDn~ ~. - ....e..- .", ---e B.P. No. 98-0538 / P.O. No. 506 CONCRETE INFORMA nON . IMTEREO;ivED' ..' 112/09/98 12/08/98 6 x t2 3000 3/4" S", 30-LW Morse Bros., luc; 390222 ASTM Light Weight 400 590 8:15 a.m. 10.0 I - S. Wilder Stadium seating - Auditorium 2. Contractor was advised of on-site test, resul;~s. COl"iPRESSiOi, i EST RESULTS. i I 12/15/98 22.7 2900 I I I 12/15/98 . 22.7 2760 I 1 I lI05/98 22.7 3570 l lI05/98 I 22.7 3620 c. City of Springfield Kip Datiiel, Architect L.A. Fuess Partners Cincmark U.S.A. .J.,__ Morse Bros., Ine. \ 7 day 2830 7 day 28 day 3595 28 day This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity may, utilize this report or any .porti90' thereof without our written authorization. f: \groups\pub-data \wpdoc\cylinders\csiO 114.cin I BRAUN'" I NTEjRTEC , Braun Intertec Corporation 1040-A Shelley'Street Springfield, OR 97477 541,746-9649 Fax: 746-71'63 Engineers and Scientists Serving the Built and Nafural Environmenfs DAIL Y FIELD REPORT January 04, 1999~t9j~~tN~m~~t:i CSI Construction, Inc. Cinemark USA - Movies 17 2900 Gateway BL ) Springfield, On;gon Reinforcing Steel EBXX-98-0181 E-65767 506 , 98-0538 Clear Footings I II - Sman-ilOSC step !"iJ(}lliS I! and -12; large nose step moms 13 and 14; tier ~eatii1g steps room 3; suspended roof slab exits rooms 11, 12, and 15; footings west side exits of north and south hall. Pcrformed visual inspection of reinforcing slee] in the above listed locations. Rcinforcing steel was checked for size, lap, placement,. and clearances where applicable. Reinforcing steel was sccured with tie wire and supported by concrete dobie blocks and previously placed concrete whcre applicable 'and was placed in accordance' with approved jobsitc plans, specifications, and latest revisions. Contractor was asked to notify our office when additional services are needed. pector: -rCrawford - ICBO# 883432-88 If you have any questions reg~rding this report, please feel frcc to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, A'rchitect LA Fuess Partners Cinemark Jobsite fax - 746-1881 City of Springfield < Cine mark Theaters CSI Construction As a mutual protection"to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and arc intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. f: \groiJ ps \pu b -data \wpdoc\rcp:orts \insp \csi6 5 7 67. em . I , , ". .~ -, -, ...., , . , BRAUN'" I NTE RTEC Braun Intertec Corporation 1 040-A Shelley Street Springfield, OR 97477 541,746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments DAILY FIELD REPORT ".!lt~j~~t..'N~ii\~.~.e. ~.'-"""""""""""--"""""'" . .. .. ,..,.,...,....-,.,.......,..,........,... .......-...--,--..... .. ....................... .... .................. ___._u___.__....... o. .. ............... ....... ............. CSI Construction, Inc. Cinemark USA - Movics 17 2900 Gatcway BI. ~. Springfield, Oregon Reinforcing Stcel, Reinforced Conctetc" EBXX-98-0181 E-65749 ?Q6, 98-0538 . P,O:Numbc.r:>' . '.. Hu ild ing .Perrilit..N urn bc~">. Overcast II I I Stairs Il~jjf~;nsM?f~1jjm(m;i(.... See Field Obscrvations Perfonncd visual inspcction of reinforcing steel of void form steps of auditorinm 11, 12, and tiered scating steps of auditorium 2 (lower half), and auditorinm 3 (east side). Reinforcing steel was chccked for gradc, size, lap, placcment and clearances wherc applicable. Reinforcing steel was sccured with tic wirc and placed in accordancc with on-site approvcd plans. Embeds were p1accd at void form stcps to line up with structural scating'snpport mcmbers. ..Cast one set of four (6 x 12) concrete test cylinders. Contractor was asked to notify our office whcn additional scrvices are nccdcd. Concretc Morse Bros., Inc. 35-IN 4" 450 540 8:20 a.m. IPf~i~rT~!ff~~~.:.)'i'........... ........................ ................ 1'!;~t~Ffjj~gillf~~pl~Sf(\:'" . Inspector: D. Smith - ICBO# 87332 I I If yon havc any qncsti9ns regarding this rcport, please fccl frec to call Raymond V. 4 (6 x 12) 3500 30.0 I JI Aliperti at (541) 746-9649. c: ! Kip Daniel, Architect Cinemark Jobsitc fax - 746-1881 Cincmark Thcaters L.A. Fucss Partners City of Springfield As a mutua] protection to clients, the public, and ourselves, all reports arc submitted as the confidential property of clients and arc intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written authorization.' f: \groups\pub-data \wpdoc\reports\insp \cs i6 5 7 4 9. cin ,~, BRAUN'" INTE'RTEC December 30, 1998 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. Portland, OR 97228 Re: Cincmark U.S.A. - Movics 17 2900 Gatcway Blvd. Springfield,' Oregon B.P. No. 98-0538 I P.O. No. 506 Braun Intertec Corporation 1040-A Shelley Street . Springfield, OR 97477 541-746-9649 'Fax: 746-7163 Engi,neers and Scientists Serving the Built and Natural Environments Project EBXX-98-0181 Rcport 12-128-0099 CONCRETE INFORMATION 12/02/98 D. Delatte Auditoriums 1 and 2, 'void form steps. Load ~Iaced in auditorium 1. Contractor I was advised of on-site test results., , ~ COMPRESSION TEST RESULTS 12/01/98 6 x t2 3/4" 4)/2" Morse Bros., Inc. ASTM 46' 1:00 p.m. 3500 35-IN 390175 60' 10,0 Overcast 12/08/98 28.3 3010 7 day , I 12/08/98 28.4 3010 3010 7 day t2/29/98 28.3 3750 28 day 12129/98 28.4 3910 3830 28 day c: CIty of Springfield Kip Daniel, Architect L.A. Fuess Partners Cinemark U.S.A. I Morse Bros., Inc. :. This report is submitted as the confidential propehy of our c1iem and is intended for the use of our client only, No other person or entity ma'y utilize this report or any portion thereof without our written'au~orization, L \grou ps \pu b-data \ wpdoc \c y I inders \csi0099 ' cin >_~.i BRAUNS" INTERTEC \"' Braun Intertec Corporation 1 040-A Shelley Street . Springfield, OR 97477 541-746-9649 Fax: 746,7163 Engineers and Scientists Serving \ the Built and Natural Environments December 30, 1998 Project EBXX-98-0181 Report 12-128-0166 Mr. Gabc Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Cinemark U,S.A. - Movies 17 2900 Gateway Blvd, Springfield, Oregon B.P. No, 9~-0538 I P.O. No. 506 CONCRETE INFORMATION I DATE CAST' 12/t9/98 12/20198 . 6 x 12 3000 71/2" 30-LW I " !\.-lorse Bros., Inc. 390427 2 day F.C.lremamder UBC Super Pla'sticizer 25' 50' 9:00 a.m. 10.0 I Clear [i D. Sinith Auditorium # 6 and 7 tiered seating base. Contractor was advised of o.n-site test results. . cOlVi~i{i,,:;i01~i ",~T RESULTS .J II 12/28/98 22.1 24tO 7 day I 12/28198 22.1 2530 2470 7 day I I 01/16/99 28 day I , I' I I L 01116/99 28 day c: City of Springfield Kip Danie1,ArchItect rJ.A. Fuess Partners 'Cinemark U.S.A. , Morse Bros, Inc. I , This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity mar utilize th.is report or any portion thereof wi~out our written authorizatio'n. f: \grou ps \pu b-data \ wpdoc \c Y [inders \cs iO 166. c in BRAUN'" INTERTEC Braun Intertee', Corporation 2285 Nugget Way Eugene, Oregon '97403 541-746-9649 Fax: 746-7163 Engineers 'and Scientists Serving the Built and Natural Environments December 29, 1998 Project EBXX-98-0181 Report 12-128-0149 Mr. Gabc Godwin CST CO!lstruction 7515 NE Ambassador PI. Portland, OR 97228 Rc: Cincmark U.S.A. - Mc,,'ics 17 . 2900 GHtcwa~' BI\'t1~ Springfield, Orcg~m B.P. Nu. 98-11538 ('P.O. No. 5lJG CONCRETE INFORMATION 12/16/98 12/17/98 2 x 2 4000 l\lix 10 10.0 25 l'\'lixlll Eugene Sand & Grll\'d 1612090 I ASTl\1 .390 58.0 12:30 p.m. 27.11 I 3 Fog I S. Wilde.' I Augel' l)ile numhers 21 thn.i .U. Ln:ul 3 plac('d 37 thru +t COlltmctUl' WllS advised of I on-site test results. . COMrKt,S"ION TEST RESULTS -, II 12/23198 I 3-130 7 day I . 12/23/98 I 3350 3390 7 day I I 101/13/99 I 28 day I I 0l1t3/99 I 28 dll:Y I' I HOLD I I HOLD I ,I HOLD 1____L~ 1I0LD J c: 'Clly or SpnngfJelcl Kip Dan"icC-Architccl L.A. Flll':SS Partners Cincmark U.S.A.' ~ Eugl:lll: Sand Ilnd Gruvcl This r<:poi1 is sllbl1litt~d as the ('onlid~l1tiaJ propeny of our client and is iJ1t~nd~d for the use of our client only. or entity l;nay tllilize this r~p()n or any pOl1ion Illereo[ without ollr wrill~ll authorizatkm. , No other person f:\groups\pub-dala \wpdoc\cy limkn;\csiO 149 .ci~ BRAUN'" I NTE!RTEC 1 Braun Jntertec corporatJlN ~ II U . 1l/0n 1040-A She ey Street '~<.u Springfield, OR 97477 541 -746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Nafural Environments " DAILY FIELD REPORT December 28, 1998 CSI Construction, Inc: Cinemark USA - Movics 17 2900 Gateway Bl, I ~W'9iijggsffuitNijm~(;r . Springfield, oregon Reinforcing Steel Steps 'and. ramps for auditorium 1. - '~...". EBXX-98-0181 E-65713 506, '- 98-0538 :7 N/A Steps, Ral,!ps I j-t Perfonned visual inspection of reinforcing steel in thc above listed locations. Reinforcing stecl was checked for grade, size, lap, placement, and clearances where applicable. Reinforcing stccl was secured with tie wire and placed in accordance with approved plans. Contractor was askcd to notify our office when additional services are, necded. Inspector: ,S. Wilder - ICBO#.72031 If you havc any questions regarding this report, please fcel free to call Raymond V. Aliperti at (541) 746-9649. '\ Kip Daniel, Architcct L.A. Fuess P~rtners Cinemark Jobsite fax - 746-1881 City of Springfield Cinemark Theaters , ,co'j ., ::. '~ I 1. ~ " J~.. .,' As a mutual.protection to clients, the public; and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our c\ients only. No. other person or entity. may utilize the report or any portion thereof without our written authorization. f: \grou ps \pub-data \ wpdoc \reports \ins p \cs i65 713. cin , 1 I ;:C :, BRAUN'" , INTERTEC Braun Intertec: Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers. and Scienfists 'Serving the Buil, and NatUral Environments December 23, 1998 Project EBXX-98-0181 Report 12-128-0149 Mr. Gabe Godwin csr Construction 7515 NE Ambassador PI. Portland, OR 97228 , Rc: Cinemark,U.S.A. - Movics 17 .2900 Gateway Blvd. Springfield, Oregon B.P. No. 98-0538 I P.O, No. 506 CONCRETE INFORMATION 12/16/98 4000 2 x 2 Mix 10 10.0 25 ;Vlix 10 Eugene Sand & Gravel 161209D ASTM 39' 58' 12:30 p.m. 27.0 i I I 3 Fog I Auger Pile ,numbers 21 thru 44. Load 3 placed 37 thru 44. Contractor was ad,"'jsed of II, on-site test results. S. Wilder COMPRESSION TESl i<I:i>uLTS 12/23/98 I I 3430 I 7 day t2123/98 I I 3350 3390 7 day , i I I 01113/99 28 day , 01113/99 I I 28 da:r HOLD I I HOLD HOLD I, I HOLD ,. C;ity of Spnngfield Kip Daniel, Architect L'.A. Fucss Partners Cincmark U.S.A. ;.. Morse Bros., Inc. I I I I This report i,s submitted as the confidential property of our client and is intel~ded for the use of our client only. No other, person or entity may utilize this report or any ponion thereof without our written authorization. f: \groups\pub-data\wpdoc\cylinders\csiO j 49.cin I I r BRAUN'" I NTERTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and Scientisfs Serving the Builf and Natural Environments December 22, 1998 Project'EBXX-98-0 181 Report 12-128.0148 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Re: Ci~emark~'U.S.A. - Mo,-ies 17 2900 Gateway Blvd. Springfield, Orcg:~n B.P, No. 98-0538 I P.O. No, 506 CONCRETE INFORMATION 12/15198 2 x 2. sand 22" Eugene Sand & G['3nl ASTM 44' 4:00 p.m. 2 Auger Pine numbers 1 thlll 20. Load 2 placed 7 thru 14. Contractor was ad"'Lscd of on-site test results. COMPRESSION T"-,,, K"-,,ul,TS I 12/22/98 3900 7 day I 12/22/98 3625 3765 7 day I 01/12/99 28 day I , I 01/12199 28 day HOLD HOLD I HOLD HOLD ~. CIty otSpnngt'lcld Kip Daniel, Architect L.A. Fuess Partners Cinemark U.S.A. ,~ Morse Bros., Inc. This report is submitted as the confidential property of our client and is intended for the use of our client only: No other person or entity may utilize this report or any portion thereof without our written authorization. f: \groups \ pub-d ata \ wpdoc \cy] inders \cs iO 148. c j n :' '."," ~, ;..f) BRAUN'" INTERTEC Braun Intertec Corporation 1040-A Shelley Street Springfield, OR 97477 541-746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments I Date: .' . DAilY FiElD REPORT December 19, 1998!'T9j~~!N~wb~hi CSI Construction, Inc. Cinemark USA - Movies 17 2900 Gateway Bt Springfield, Oregon Reinforcing Steel, Reinforced Concrete EBXX-98-0181 E-65691 596 98-0538 Clear. Tiered Seating I I '\ I I I Performed visual inspection of reinforcing steel on auditorium #6 and #7, tiered seating area. Reinforcing steel was checked for gra?e, size, lap, placement and clearances wherc applicab1c. Reinforcing steel was secured with tie wirc and placed in accordancc with on-site approved plans. Performed continuous inspection during placement of concrete. Concrete was placed by pump and hand screeded. Cast set of fonr (6 x 12) concretc test cylindcrs. Contractor was asked to notify our office when additional services are nceded. r Concrete Morse Bros., Inc. 30-LW 7 1/2" 500 I 250 I 9:00 a.m. I 4 (6 x 12) I 3000 \ 50.0 I If you have any questions regarding this report, please fce1 free to call Raymond V. Aliperti at (541) .746-9649. c: Kip Daniel, Architect Cinemark Jobsite fax - 746-1881 Cine mark Theaters L.A. Fuess Partners City of Springfield As a mutual protection to cli~nts. the public, and ourselves. all reports ar~ submitted as the corifldential property of clients and are intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. f:\groups\pub-data\wpdoc\reports\insp\csi65691.cin .' ,..- >- ( BRAUN'" INTERTEC , Braun InterteC Corporation 2285 Nugget Way Eugene, Oregon 97403 541.746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments December 18, 1998 Project EBXX-98-0181 Repon E-65679 Mr. Gabe Godwin CSI Construction, Inc. 7515 NE Ambassador PI., Ste. E Ponland, Oregon 97228 Re: Cinemark USA - Movies 17 2900 Galeway Blvd. . Springfield, Oregon B.P. No. 98-0538 I P.O. No. 506 Dear Mr. Godwin:. Performed continuous inspection during the installation of the auger cast piling on December 15 and 16, 1998, at the above referenced project. All piling were drilled into the native gravel strata using a crane lilOunted 14" continuous flight hollow shaft auger.' Reinforcing steel cages were secured with tie wire and placed in accordance with approved prints with the following exception: Venical rebar was 20' long (18' specified) eliminating the need for thc four #5 dowels specified in detail 02/S3.0 1. (Note: Advised by contractor that project engineer:veJbally approved revision).' Clearances on rebar cages was maintained with plastic radial . spacers. Grout test cubes were cast daily and compression results will he reponed under separate cover as tests are completed. Please see attached log for additional data and eoclosed panial copy of drawing S2.05 for pile locations. .. If you have any questions or need additional infonnation, please feel free to contact our office. Sincerely, m L ItJ&jw C4) Michael L. Mcyer, Principal Willamette Valley Operations Manager I c: City of Springfield Kip Daniel, Architect L.A. Fuess Panners Architects Cinemark Theaters Attachment ,- f: \g roup s \pu b-data \wpdoc \reports\p iling\c si6 5 6 79 . c in -;-- CSI Constmction, Inc. Project EBXX-98-0I8I Report E-65679 pecember 18, 1998 .Page 2 Pile Log I December 15, 1998 I I I 14 20' I 2 14 20 I 3 14 20 " I 4' . -- - . 15 20 I 5 15 20 I 6 15 20 I 7 15 20 I '8 15 20 I I 9 14 20 I I 10 14 20 I I 1I 14 I 20 I I 12 15 I 20 I 13 ]4 I 20 I 14 I 14 I 20 I I 15 I ,15 I 20 I I 16 [5 I 20 I I 17 15 20 I I 18 15 20 I I 19 15 20 I I 20 15 20 I I December 16, 1998 I I 21 15 / 20 I 22 15 I 20 I 23 15 I 20 I I 24 14 I 20 I .or" ~ CSI COIlSlmClioll, Inc. Project EBXX-98-0181 . Report E-65679 December 18, 1998 Page 3 Pile Log (con!.) I , December 16, 1998 (cont.) I 25 15 20 , I 26 -15 20 , ' 27 :15 20 28 - -- 15 20 I 29 14 20 , I 30 .15 20 , ;: 31 ,15 20 'I I 32 :15 20 I I 33 15 20 'I I 34 15 20 Ii 35 I '14 20 I , I I , 36 :15 20 I I I 37 '15 20 I 38 I )5 20 I I j I 39 15 20 II I I I 40 15 20 I At approximate lines 15 20 I I-P i I At approximate lincs :15 20 I l-N ; i , I At approximate lines 16 20 I I-A ! I I At approximate lines i6 20 J I-B ! ,'~ I , i '--- . / i J.-- 'Lo LO,l - - ---r-- .21:~- @l -G)/ III I I Z7.!S t.o> --:::.~h . ~ -, I I I I I I ;1 /1,'-0" (-O"~ @~_ J ' \ :~r;P@ @iW~ --- ~~~~:i:D ~,-,,' :\\ 111 1'1' I I I I ,I I \ 1>,c< LA~ It../" F". OBis> 0 , I Ijz.o[s..a, I '" h. &...",;"",1 I II , I I 'T'IP. I . S,H U",,"F. I I 'I ~ r-I \ \' i r-I, -, '1'1~. - ,- ' _ ~~\~c:m= ~ e ~~;~tj (Lf)- -.r1J)[~yt ~.~ fL)" -"-Z'-b" . _~== 1~-'\ 1_\~ -(I 1'->'1," ~ ""'-'P'Il~e S" _ 1J1/s%..o~ '?12.0.....ICE 'Xx, <;,.T1t In e:J "'T""i'?l TY'P. I . I. i -Z-o'-Cfl ,q '-10" . rlh'f' NO. @ l'3Q.PJoN FOUNb. P\.,,~ - "I" I " 'B = I -0 ....~.. _/':;:.-. '.><:'--"'~ .), ..' .~5-01-98 O~. ..:'l<'- "~-<>Q ~ ~~ 'BRAUN'" INTERTEC J; ,~.,.I Braun Intertee Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments Deccmber'17, 1998 Project EBXX-98-0181 Report 12-118-0079 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PL, Ste. Portland, OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. Spririgfieid, Oi'cgon B.P. No. 98-0538 I P.O. No. 506 -":'--- CONCRETE INFORMATION ll/19/98 ll/20/98 ~I I I I 6 x t2 3500 1/2" 5" 35-58 Morse Bros., Inc. 394067 ASTM AEA 52' 63' t:45 p.m. 5.5 'overcast R. Crawford I I -JI' 'Yhe~l chair ramp a,t auditorium 1 and 2; cntryway roof slabs in auditOriums 3, ~;G! '''.lid 7. ,$.:;.mpJ.t.; t...~....u :it roof :;;L~:T;;'I~~:~~':':.1~; #4.. ~~m ....:.:t~ C~! ~ '.~~ advised of on~site test results. - . . ---COMPRESSION TEST RESULTS 1lI25/98 27.7 3340 6 day t2/t7/98 27.7 4210 ~"J , 12/t7/98 I 27.6 4120 4165 28 day .. City of Springfield Kip Daniel, Architect L.A. Fuess Partners Cinemark USA. ,Morse Bros., Inc. This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion thereof without our written authorization. f: \grou ps \pu b-data \ wpdoc \cy linders \csi0079 . c in .~ BRAUN'" I NTE RTEC Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon, 97403 541-746-9649 fax: 746-7163 Engineers dnd Scientists Serving' the Built and Natural Environments Dcccmber 16, 1998 Projcct EBXX-98-0 181 Report ]2-]28-0114 Mr. Gabc Godwin CSI Construction 7515 NE Ambassador PI. Portland, OR 97228 Rc: Cinemark U.S.A; - Movics 17 2900 Gateway Blvd. Springficld, Oregon B.P. No. 98-053S:lP.O. No~506 . CONCRETE INFORMATION 12/08/98 3000 6 x 12 3/4" 8" 30-LW Murse Hros., Inc. 390222 ASTM Light \Veigllt 40' 59' 8: 15 a.m. to.O s. Wilder I St~dium seating - Auditorium 2. Contractor ":as advised of on-site test results. j , COMPRESSION TEST RESULTS I I I l Itl15/98 22.7 2900 7 da:y 12/15/98 22.7 2760 2830 ,7 day lI05/98 I 28 day lI05/98 .~28day = c: City of Springfield L.A. Fucss Partners Morse Bros., Inc. Kip Daniel, Architcct Cincmark U.S.A. ":-0:.."'" This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or emity. may iJtilize this report or any portion thereof without our written authorization. f:\groups\pub-data\ wpdoc\cylinders\csiO 114. cin ~- , BRAUN'" INTERTEC Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746.9649 Fax: 746-7163 Engineers and Scientisfs Serving the Built and Notural Environments December 16, 1998 . Project EBXX-98-0181 Report E-65644 .' Mr. Gabc Godwin CSI Construction 7515 NE Ambassador PI, Ste. E Portland, Oregon 97228 Dear. Mr. Godwin: ,., Re: Cinenlurk USA - 'l\'!o,.ies 17 2900 Gateway Springfield, Oregon B.P. #98-0538 I P.O. #506 Decembcr 15, 1998 D. Webber AWS# 930508011 ICBO# 1033346-85 KD S tccl Pcrformed visual inspection .on the stadium structural steel seating frames for auditoriums 5. ' Cross bracing was installed and the A325 high strength bolts, were all brought into ':snug tight" condition. Sheet metal decking was puddle welded at ev~,ry low !lute and 6" on cenler at I I perimet~rs. To. the h,est .of our. .1<no\vledge) 'york c-J~ecke(l is in, c<:nfonnance .wittl. design I drawings, spccifications and applicable codes with thc exception of ihe following: Typical slidc 1\ bcaring asscmblies (detail 8/55.02) at roof level grid line L betwcen' 5 and 19 arc in nonconformance with approved drdwings. Contractor was notified of on-site inspection results , . and was asked to notify our office when additional serviccs are needed, 5inccrcly, rv\;lJ .~ CJj') Michael L. Mcyer, Principal WilIamette Vallcy Operations Manager rzv ~C/;) Raymond V. Aliperti, Supervisor Eugene Branch' c: Kip Danicl, Architect Cinemark Theatcrs L.A. Fuess Partners City of Springfield f:\groups\pub-data\wpdoc\reports\welds\csi65G44.cin . r- BRAUN'" INTERTEC Braun l-:atertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541,746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments December 14, 1998 Project EBXX-98:0181 Report 12-128-0069 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador Pl, Ste. Portland, OR 97228 Re: . Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. .^'- __~prirjgf!eld.Q!:~gon_ ~._ : "B.P. No. 98-0538 I P.O. No. 506 CONCRETE INFORMATION ;8;1/4" ._ _,. .~ _. '!:lo: Morse 'Bros., Inc. 11/13/98 11/14/98 I 6 x 12 3000 3/4" 080130-LW I - "I ., ~ . .... --- ..- . ..~ - . 390053 . ASTM Super pilastizer, glass u. mountain pumice, AEA 2:00 p.m. 10.0 I I I I I II 59' 63' I Overcast R. Crawford . Composite mezzanine deck slab along linc6 from N to B; along line ~ from 1 . to 6: Sample taken on line 81.5. Bill with CSI w;8s advised of o":-.s~te test results. . . COMPRESSION TEST RESULTS II " .. . ;',. '12/11/98. . ," ~..:..". .' 22.6 3660 3635 7 day I 28 day I 28 day. . I -- HOLD"" I 11120/98 . Set #1 22.6 2900 12/11198 22.5 3610. ~!}~:~i~S:~~L9,:\:. ". . c-:"' CityofSpnp.gfield . LA. Fuess Part~ers Morse' Bros'., Inc. ~ip Danie,l.~rchltect ., j' .., Cinemark usA. . .;;:;'- :"-i'.:1. ___ ,~__'l I: This report is submitted as !:he confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion thereof without our written authom:ation. . f:\groups\pub-data\wpdoc\cylinders\csi0069.cin ,"'7- BRAUN'" I NTE RTEC ". Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541,746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments December 11, 1998 Project EBXX-98-0181 Report E-6560 I Mr. GabeGodwin CSI Construction .7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr. Godwin: Re:. " Cineinark",USA - Movies 17 2900 Gateway Springfield, Oregon B.P. #98-0538 I P.O. #506 December 07 and 08, 1998 D. Webber AWS# 93050801 /ICBO# 1033346-85 I Perform'ed visual inspection on the stadium structural steel seating frames for auditoriurus I and , 2. Cross bracing was installed and the A325 high strength bolts were all brought into "snug , tight" conditions, Sheet metal decking was puddle welded at every low I1nte and at 6" on center at perimeters. To the besl 0.1 our knowlcdg-e, 'york chccke.d is in: conformam;:e wi.thdesigil drawings, specifications and appiicable codes. Contractor was asked to notifY our office when additional services are needed. ;rt:~(J/ Michael L. Meyer, Principal Willamette Valley Operations Manager f{ V CltLpiAIU ~~ Raymond V. Aliperti, Supervisor Engene Branch ' c: Kip Daniel, Architect Cine mark Theaters L.A. Fuess Partners City of Springfield -. f:\groups\pub-data\wpdoc\reports\welds\csi6560 l.cin ~-" BRAUN'M INTERTEC ';.t,i Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746,9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments December 11, 1998 Project EBXX-98-0181 Report E-65600 Mr. Gabe Godwin CS1 Construction 7515 NE,Ambassador PI., Ste. E' Portland, Oregon 97228 Dear Mr.Godwin:' Re: Cinemarl,,: USA - Movies 'I ( 2900 Gateway Springfield, Oregon B.P. #98-0538 1 P:O. #506 December 03, 1998 D. Webber AWS# 930508011 ICBO# 1033346-85 KD Steel Met on-site with contractor to verify the A325 high strength bolts are in "snug tight" condition at grid lines P to Q between 19 and 25 and at M to N between 1 and 19 (roof level connections)., Checked minimum of two (2) bolts or 10% of each connection using a 14" . ~TeHch: T0th~ 'U~:;l :t!i uui'k~owl;;dge, SlirJ.l'l~ciiDn~_ c~~ckcd)ii. grid, li~~5 :istcd' ~bcYe ,vi11 J;i.1cet the minimum requi~ements per plans and specifications of snug tight conditions. Contractor was asked t9 notify our office whcn additional services are needed. . Sinccrely, m ( ff/1J.jaJ (7) Michael L. Meyer, Principal Willamette Valley Operations Manager }{ tI ~q) Raymond V. Aliperti, Supervisor Eugene Branch c: Kip Daniel, Architect Cine mark Theaters L.A. Fuess Partners City of Springfield -- f:\groups\pub-data\wpdoc\reports\welds\csi65600.cin ir- BRAUN'" INTERTEC Braun Intertec'Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 Fax: 746-7163 Engineer5 and'Scienti5t5 Serving the Built and Natural Environment5 DAILY FIELD REPORT December II, 1998 CSI Construction, Inc. Cincmark USA - Movies 17 2900 Gateway Be Springfield, Oregon Fireproofing See Field Observations EBXX-98-0181 E-65625 506 .Building Permit Nuii1ber,L?~~0538 Rain Beams results of the in-place density. obtaincd on Deccmber 03, 1998 from the following location is as follows: support beam at grid line A-6 north side of bcam: 19.4 lbs.lcu.ft. D. Smith - ICBO# 87332 If you 'have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746"9649. c: CSI Construction, Gabe Godwin Kip Daniel, Architect City of Springfield L.A. Fuess Partners CinemarkTheaters "'"~ .' -I I I I I' I II I J As a mutual protection to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients only. No other per~on or entity may utilize the report or any portion thereof without our written authorization. f: \grou ps \pub-data \ wpdoc\rcports \insp \esi6 5 625 .c in - . -." BRAUN'" I NTE RTEC Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746.9649 Fax: 746.7163 . Engineers and Scientists Serving the Built and Natural Env;ronments December 8, 1998 Project EBXX-98-0181 Report 12-128-0099 Mr. Gabe Godwin CSl Construction 7515 NE,Ambassador PI., Ste. Portland,. OR 97228 Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. Springfield,_Or~gon.,... '''h. B.P. No. 98-0538 1 P.O. No. '506 CONCRETE INFORMATION -~) 12101/98 12/02/98 6 x 12 3500 3/4" 41/2" 35-IN ~ Morse Bros., .I!lC. ',. 390175 II I ASTM 46' .600 1:00 p.m. 10.0 Overcast D. Delatte Auditoriums 1 and 2, void fo~m steps. Load placed in a~ditorium 1. Contractor I was adV~~~d. ~f_o~.si_~e_ ~e~~ results. ' ~ \...,t~r"H~illi~;-'iVI.~ TEST RESV~TS I 12/08/98 ,I 12108198 I , I 12/29198 I:. .. 12/29/98 ~.. ~ I 28.4 3010 3010 I . 7 day I 7 day I r. 28 day I_ 28 day. -.J 28.3 3010 I '1.' I ':',' ,I . . : Kip Daniel, Architect. ._Ci!,e!l1ark U.S.A. . c: " . .City: of.~pringfield.. . . ,.;+~~.__;L .A.. Fuess:Partners , '. ,', .\.Mo~e.B;os, Inc. ". " .~. . ~J .1 Thi~ report is submitted as the confidential property of our client and is intended ~or the use of our client only. No other person or entity may utilize [his report or any portion thereof without our"":,,ritten authorization. . f: \groups \ p~b-data \ wpdoe \c y linders \cs i0099 . em l,i; -~ BRAUNS" INTERTEC December 4, 1998 Mr. Gabe Godwin CSl Construction 7515 NE Ambassador Portland, OR 97228 PI., SIC. Re: Cinemark U.S.A, - Movie, 17 2900 Call'wa)' Blvd, Springf'it:ld, Oregoll 13.P. ~'O. 98.(}5JS / P.'O. No. 506 CONCRETE INFORMATION Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746,9649 .Fax: 746-7163 Engineers and Scientisfs Serving the Buill and Natural Environments Project EBXX-98-0181 Report 12-118~0042 l,i;5X)JiL~si . Spi':CI\tE>': ,\;;XXStzl'~ .IGG, T~ 1/05/~S D;\TERECEIVEH 1 I/lloNH Ii x 12 I'SI 1.12" SACK~\'IIX I. ,'" -srY~I_!':. . I SOURCE', " I. CONIl"cill SToit,\CI: I. AliI 1):,';1' I 1 I !',AItt II:: LOCATIO:'> OF I'OUR 7" PROIJUCT CqlJE TICKET, Nu\nibt :-'lorsl' Brus.. In('. AST,\'! ,\DIHTI VES' 4S0 C( )NC,I~ !:;XI';',,'(~,~}vH): CUBICY ARI;S :::::':'::>::::::::>-:',--1__", Tl~tECAST ;::0::":;'0::::'::;':>:,:'_.)-. . .LOAD I'U\1BER li:()():\;lII. \\'EATIIEH, CAST 1.1\ ,\Il'I.zaninl' I'lltll' SI:tII'\,l'!IH'l-lI /\alld B. from It II IX.2. sil(- k~1 n'.~lllts_ 3000 IlXIlI3Il-LW , t7tY22 Super pilastizer. glallmin" Jl\lllli('(~.11. W. ()(lO tlI,1I (hercast S. Wildt'1"" Conlra('lor was advised lIf Oll~ ~"c."" ...............................t'I'.SHI' "..'.-,,-....-. ' ':':'-".-."',-' .. ;,>'d:'.,;,,:::.,... . .....-.-.. ". I I I I COtllPRESSIOI'i TEST RESULTS-- __H ___u~'H___ ":\:rE'. --~I{K~~ ~~:JCllT I,OAI) "-- --:"/~~'I~~{A.(~~--.~ ,.,~.~~~.;~~'.~~~;~~~;l. \ I'(H);\'I):-\ I.BS./SQ.Ii\. .1 I I II I 22:~ 25Stl t IIIlIYS 22.1) 2650 t III2IYS 22.S tl103/9S ;\.150 22 ~ 7 3570 35111 28 da:r IllOJIYX CIty 01 S[lrj!l~l'jt'ld L.A. Fut'-ss P;lrtllef." Morse 8ros.. Inc. Kip Daniel, ;\i"L'hik'L'\ Cill(~ma['k U.S.A. '~.;o 7 day 2615 7 day 2N day This l\.'lhlrl is '.,uhmilll..'d JJ.~ 1110 C:(llIrld~nllal PI\)p<:1"I)' of lllH di<:lll :lnd i~ inkmkd for th<: US0 of our cli~1l1 I)nly. NI) 011101' p~rson or ~nlily m:l)' ulili/,<: Ihis r,"pun Ill' any pl\ni\1I1 lh~rl.'\lr Will1\ltll ollr wrilh'n'allllwri:I.Hlioll. f: \gr(\ups\puh-dalil \wpdl K' \1.' Y 1 i nd~ l'~',l' sl(l()4?' .c'lll ~ BRAUN'" INTERTEC Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541,746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Natural Environments DAll Y FIElD REPORT December 03, 1998 CSI Construction, Inc. Cinemark USA,- Movies 17 2900 Gateway B[' Springfield, Oregon Reinforcing Steel, Reinforced Concrete See Below EBXX-98-0181 E-65551 506 Building Permit Number . 98-0538 Partly Cloudy Steps J Performed visual inspection of reinforcing steel on auditorium #3 void form step and auditorium # I and #2 tiered step south of void form step. Reinforcing steel was checked for' grade, size, lap, placement and clearances where applicable. Reinforcing steel was secured with tie wire and place in accordance with on-site approved. plans. Weld plate embeds at auditorium #3 at north side of steps were placed to line up with structural seating support members. Performed continuous inspection during the placement of concrete. Concrete was placed by pump and mechanically I. consolidated. No samples of concrete were taken. per request by on-site contractor (CSI Construction). Contractor was' asked to notify our office when additional services are needed. inspector: D. SIpith - ICBO# 87332 I I I I I .I I I I I II Concrete Morse Bros., Inc. 35-IN 390 7:30 a.m. 3500 15.0 If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, Architect Cinemark Jo~site fax - 746-1881 Cine mark Theaters L.A. Fuess Partne,rs City of Springfield As a mutual protection to dienes, the public, and ourselves, all reports are submitted,as the confidential property of clients'and are intended for the use of OUf clients only. No other person or entity may utilize the report or any portiontheieof without our written authorization. f: \grou ps \pub-data \ wpdoc \repons \insp \csi65 5 51 . cin BRAUN'" INTERTEC DEe 18 1998 Braun Intertec Corporation 2285 Nugget Way Eugene; Oregon 97403 541,746-9649 Fax: 746-7163 Engin.eers o(Jd S~ienii5'fs 'Serving tHe 'Built and Nci't{;rci/.EnYif-o~m-enfs DAILY FIELD REPORT December 03, 1998 CSl Construction, Inc. . Cinemark USA - Movies 17 2900 Gateway BI.~jji'4@igrhiml"Am~er Springfield, Oregon Fireproofing See Field Observations EBXX-98-0181 I E-65552I 506 I 98-0538 I Partly Cloudy I Mezzanine Support Beams I rnate: determination test on the Cafco spray applied fireproofing of the mezzanine structural support beams. The thickness test" was performed in accordance with the Uniform Building Code Standard 7-6 (1994). The on- site.fireproofing thiCkness will meet and/or exceea the submitted thicknesses from Pro-Tec Fireproofing, Inc. dated October 0 I, 1998. In-place density test will be reported nnder separate cover. Contractor was 'advised to notify onr office to perform final ,inspection of fireproofing patching. D. Smith - ICBO# 87332 nspecto r: 'you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746_9649. c: CSI Construction, Gabe Godwin Kip Daniel, Architect City of Springfield L.A. Fuess Partners Cinemark Theaters ~ . I . ,.....(- As a mutual protection to clients, the public, and, ourselves, all reports are submitted as the confidential property of clients and are intended for the' use of ~u~ clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. f:\groups\pub-data\wpdoc\reports\insp\csi65552.cin - BRAUN'" INTERTEC Braun Intertec,Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 Fax: 746-7163 Engineers and Scientists Serving the Built and Naturol Environments DAilY FiElD REPORT CSI Construction, Inc. Cinemark USA" Movies 17 2900 Gatcway BL.Il#H~@:g~fljijtN#fu~~fI Springfield, Oregon Reinforcing Steel See Field Observations EBXX-98-0181 E-65535 506 98-0538 I' I \ I Overcast Steps Petformed visual inspection of reinforcing steel of auditoriums 1 imd 2 at void form steps. Reinforcing steel was checked for grade, size, lap, placement, and clearances where applicable. Reinforcing steel was secured with tie wire and placcd in accordance with approved plans. Embeds at same location at north side steps were placed. to line up with stmctnral seating support members. Each embed -plate consists of two studs 1/2" x 4" long. Contractor was asked to notify our office when additional services are needed. I' Inspector: D. Smith - ICBO# 87332 '-"you have any questions' regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. c: Kip Daniel, Architect Cinemark Jobsite fax - 746-1881 Cinemark Theaters L.A. Fuess Partners City of Springfield ,'. As a mutual protection to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. BRAUN'" I NTE RTEC Braun Intertee -Corporation 2285 Nugget Way . Eugene, Oregon 97403 541,746-9649 Fax: 746-7163 Engineers and Scientisfs Serving the Built and Natural Environments DAilY FIELD REPORT I I II I I I Project Number: ..... ..... .' I CSI Construction, Inc. Cinemark USA - Movies 17 2900 Gateway BI, . Springfield, Oregon Reinforcing Steel, R,einfo.~ced. Concrete Auditorium I and 2 void fonn steps. EBXX-98-0181 E-65527 Building Permit Number.. .. 98-0538 Partly Cloudy Slab on Grade " Reenforcing steel forthe area listed above was inspected on December 01, 1998 (ref report E-65535). Perfonned continuous inspection during the placement of concrete in thc area listed above. Concrete was placed by pump and mechanically consolidated. Cast one set of four (6 x 12) concrete test cylinders. First load on jobsite was rejected by contractor due to wrong mix (3000 psi). Contractor was advised of on-site test results. and was asked to '11 notify our office when additional services are needed. ~ I I 1 Concrete . Morse Bros., Inc. , 35-IN 4 1/2" ,/fota; ctiiiic yards played: . .. ..' ".' InspectoL D. Delatte - ICBO# 1080867-88 460 60~ I LOO p.m. I 4 (6 x 12) , I 3500 II lC,fI J..U,V. II If you have any questions regarding this report, pleasc feel free to call Raymond V. Aliperti at (541) 746-9649. I c Kip Daniel, Architect Cinemark Jobsite fax - 746-1881 Cine mark Theaters . L.A. Fuess Partners City of Springfield . As a murual protection [Q clients, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients only. No other person. or entity may utilize the report or any portiori thereof without our written authorization. f: \groups \pub-data \ wpdoc \reports\insp \csi6552 7 . cin ~~- BRAUN'" INTERTEC Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 Fax: 746-7163 Engineers'ond Scientists Serving the Built and Notural Environments Dccembcr 0 I. 100X Project EBXX-0X-O I X I Report E-65521 Mr. Gabe Godwin CS1 Conslnlclion 7515 NE Ambassador PI.. POrllancL Oregon 9722X SIC. E Dear Mr. Godwin: Re: Cinemar!.. lJSA - l\'lo\'ics 17 HIIII Gateway Springfield. On'gO}l B.P, #9X-1I5JX 1 P.O, #511(, 'Projl'l't InfonnatiulI ..-...'_....-. , Ir;sl":,,i'i';1l Of: 1~.?B:~~:f~.t~~'::' I 11 ~,i),~ti1~): ;\.r:~ ~:.~}... I I 1:::G;~:-!itJ:~lt{i'-r: .'. " I: ShOll: ' Wcldll1ClllS November 25. J 1)1),X l~Y~)t.~f,_(~)(: J:l,l -, J :1' :-jt:';;.~; :\,:::::",:::.:'A;;JJ, .,<~;'{~. .n'-P:;"~:" E.il)l~ii.'jitor or' Erl't'for: D. Webber A IVS# 9]050XO I IICBO# IO]].H6-X5 KD Sleel . '('SI Conslrllclion I Field: xx \Vl'alhl'r: ~hcrc:lsl J Fil'ltI Ohsl'rratiuns and Comml'nts Performed \'is\l;d inspection all puddlc,,\\'Clds ,old Se;t1l1 welds m roor le\ocl in the lobby arca. audiloriullls'!(J am!" 17, ;Ind lhe.corridor nt gricllillcs.5 to (, belween,S and N. WeldlllClllS were checked ror sizc:'lcnglh, profile ;Iud. location. To Ihe besl of ol'lrkno'\\'lcclgc, welcllllellls checked arc in conformance ,'rilh approved drawings, specifications and applic8ble 10 A \VS D 1,3 code. I Contractor was asked to IloUfy Ollr officc whcll additional services arc needed. , Sincerely. ml ~~) Mich:Jcl L. MeH'r, Pl'lllcipai, :Willalllcll'c V;lllcy Operations ~1,i;lilgcr .!(V~~ R:l\lllOllC!--\': Alipcni."Supcl\'isor. '" ,.. Eugene Branch 5~ "~""~~... :j~jl~.~.D';'l~']~~I:'-~~;\I:~~iJ\I(':-I,.l~~: .":,,~,~ "... ,,_.__.~.."_. "---- 'n_~_.._"~ 'I F,'~''':''Gillcll\ark Thc<llers ,~: t',';" ';,",'< \. :I"\~'':'; hl--- ;(,,1/"'-;,',:(:";","(' .~". . , ,..........-...-.L":A.- FuCss~P;lrll1crs--" L_.._., ." ......., .~, , ,-, ," ," : ~ i " !'; l' f 1_" ~ '," , ' A'. .' ',. CIty or Spnngfield . ---,,"'.. ---- - "....... -......-- -..... -"" j ~l ._..,...,.,_i! I':\grollJls\pll\Hb1a\\\'pd,)\'~r~'lllln~"\\';,'llh"~';;i(;~ ~21 ,::ill ) BRAUN'" INTERTEC .hi' Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403' 541-746-9649 Fax: 746-7163 ,Engineers and ScienfistsServing the Built and Natural Environments November 25, 1998 Project EBXX-98-0181 Report 12-108-0005 Mr. Gabe Godwin CSI Construction, Inc. 7515 NE Ambassador PI., Ste E Portland, OR 97228 Re: Cinemark USA Movies 17 2900 Gateway Blvd. Springfield, OR B.P. #98-0538 / P.O. #506 MASONRY INFORMATION 10/28/98 """""'-:""""""""":'-'::;:-:;;:;';':'-'-:':-,.:.:-,.:-:-,'..,._.,-,....,._.,-,'. DATE RECEIVED. .. .' 10/29/98 Solid 12" f'm - 1500 3/8 ....."",".,....".,,_..-,., ' I MORTAR PSiDESIGJI/.' Morse-Bros., Inc. TypeS 8007-G 260463 580 "680 12,10 p.m. 8.0 I Overcast C. Halstead '. '....~ '. 8" interior eMU alcove walls at exits in auditoriums S, 6, 7, 11, 12,and 15 (0' to 8' above ~;F; 3t!ditorium 4 (0' to 41 above F.F). Mark (T.M.C. Inc.) was advised of on-site t~t results.. _.' . COrvU!!;{.E~S.i()Ni~TJ:ST~.l3:EStJL~,S. 11/04/98 172.000 1940 7 day I 11/25/98 19},5oo 2230 28 day , 11/25/98 199,500 2250 2240 .28 day c: City of Springfield Kip Daniel, Architect L.A. Fuess Partners Cinemark Theaters Morse Bros., Inc. This report is submitted as the confidential property of OllT client and is intended for the use of our client only. No other person or entity may utilize this report or any portion the"reaf without our written authorization. . f:\groups\pub-dara\wpdoc\prisms\csi0005.cin .1 ! , BRAUN;M INTERTEC Braun Intertec. Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 Fax: 746-7163 Eng;ne~rs pnd Scientists Serving the Built and Natural Environments November 25, 1998 Project EBXX-98-O 181 Report E-65494 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI.; Ste. E' Portland, Oregon 97228 Dear Mr. .Godwin: Re:. Cinem-ark USA -Movies 11 .2900 Gateway' 'Springfield, Oregon B.P. #98-0538/ P.O. #506 '. - I I I I I I Weldnients November 24, 1998 D. Webber AWS# 93050801/ICBO# 1033346-85 Met on-site with erector to perform visual inspection of roof decking for auditoriums 16 and 17. Puddle welds and seam weldments were not' completed at the time of inspection. In-progress welding being performed was applicable to A WS D 1.3 code. Contractor was asked to notify our IL office when additional services are needed. Sincerely, mL ~&)) Michael!'.. Meyer, Principal Willamette Valley Operations Manager j(/I~UJ) Raymond V. Aliperti, Supervisor Eugene Branch c: Kip Daniel, Architect Cine mark Theaters L.A. Fuess Partners. ,City of Springfield r~,-; f:\groups\pub~data\wpdoc\reports\welds\csi65494.cin '.', I BRAUN'" INTERTEC Br~un Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 fax: 746-7163 Engineers and Scientists Serving the Built and Natura! Environments November 25, 1998 Project EBXX-98-0181 Report 12-118-0079 . . Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. Portland, OR 97228 Re: Cinemark U.S.A. - Movies I7 . 2900 Gateway Blvd. Springfield, Oregon B:P. No. 98-0538 1 P.O. No. 506 CONCRETE INFORMATION 11119/98 .,.._.__.-.-,-.-.'.-.-.'.-:.,.:.:',..:'-'.':':,....,.. ",",'.'-','-'-'-'.'-'-'.'-'-..-."-- DATE RECEIVED' 11120/98 11211 3500 6 x t2 5" 35-5B Morse Bros., Inc. 394067 ASTM AEA 52' 63' 1:45 p.m. 5-5 Overcast R. Crawford wheel chair ramp at auditorium 1 and 2; entryway roof slabs in auditoriums 3, 4, 6, and 7. Sample taken at roof slab auditorium #4. Bill with CSI was advised of on-site test results. I _U CUMHlliSSIUN 1";,s'1 Jtl;SlJLTS' 11125/98 27.7 3340 6 day 12/t7/98 28 day I2/t7/98 28 day HOLD HOLD " CIty ot Spnngl1eld Kip Daniel, ArchItect L.A, Fuess Partners Cinemark D,S,A. Morse Bros., Inc. This report is submitted as the confidential property of our client and is intended for the use of our client on!y. No other person or ~ntity may utilize this report or any portion thereof without our"written authorization. f: \groups \pub-{lata \ wpdoc \c y 1 ind~rs\csi0070 . cin ~- BR4UN'" INTERTEC 'Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746,9649 Fax: 746-7163 Engineers and Scientists Serving . the Built and Natural Environments November 24, 1998 Project EBXX-98-0181 Report 12-108-000 I NOV ::I f} 1998 Mr. Gabe Godwin CSI Construction, Inc. 7515 NE Ambassador PI-, Ste E Portland, OR 97228 Re:Cinemark USA Movies 17 2900 Gateway Blvd. . Snri!!glield, .oR. . B.P. #98-0538/ P.O. #506 " - MASONRY INFORMATION 10/27/98 ......,-,-,-.._._-..._,.............,.... ,........"."-.._.......-..-..,.,, " DATE RECEiVED' . 10/28/98 'I I I 12:30 p,m. f'm - 1500 Solid 12l! 3/8 UBC TypeS 8017-G 171744 Morse Bros., Inc. 62' 680 10.0 I Clear C. Halstead Auditorium 8; eMU for south wall - 201 to 281 above F.F. West wall of SW hallway 201 to 241 above F.F. ,Mark (T.M.C. Inc.) was advised of on-site test results. . . \JUlVIl'f(l,;SSfON TEST RESULTS I I 11103/98 185,000 2090 7 day I I 11(24/98 189,500 214() 28 day I i 11(24/98 187,000 2110 2125 28 day I c' <;:ity of Springfield Kip Daniel, Architect L.A. Fuess Partners ci:inemark Theaters ~orse Bros., Inc. This repot:t is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion thereof without our written authorization. f:\groups\pub-data\ wpdoc\prisms\csiOOO l.cin BRAUN'" INTERTEC November 23, 1998 Mr. GabeGodwin CSI Construction 7515 NE Ambassador PI., Ste. Portland, OR 97228 Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. .S;lringfield, Oregon is.f'. No. 9g'(i5:~81 P;O. Nil. 506 Re: CONCRETE INFORMATION Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403' 541-746,9649 Fax: 746,7163 Engineers and Scientists Serving the Built and Natural Environments Project EBXX-98-0181 Report 12-118-0070. NOV 24 1998 I I I I I I I II I J I DATE CAST .... 1l/13/98 , ""....,...-....-.--.--..:....:..:.:..,.:.'" .:'-,......'..........,-,..,-,..,-,.,..-...............-,'-',' DATE RECEIVED" .......-.--.--....--.--.,....... 6 x t2 3/4" 6112" Morse Bros., Inc. ASTM 55' 4:20 p.m. 5 11/14/98 3000 080130-LW 390061 Super pilastizer, glass mountain pumice, AEA 65' 50.0 Overcast R. Crawford Composite mezzanine deck slab along line 6 from N to B; along line B from 1 to 6. Sample taken on lipe J6. ';Bill with CSI was a~vised of on-site tcst results. I I 1l/20/98 22.7 2620 7 day , I ti/ll/98 28 day I 12/l1/98 28 day I II HOLD HOLD J , c: Cay of Sprmgheld Kip Daniel, Architect U. A. Fuess Partners Cinemark U.S.A. Morse Bros., Inc. . This report i,s submitted as the confidential property of Our client and is intended for the use of OUT client only. No other person or entity may utiJize this report or any portion thereof without our written authorization. f: \grau ps \pub-data \ wpdoc \c Y I inders \csi0070 . cin ( . .;",:,.,-" ,.>.. .:", BRAUN'M INTERTEC !. . Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 Fax: 746-7163 Engineers and Scienti~fs Serving the Built and Natural Environments November 23, 1998 Project EBXX-98-0181 Report 12-118-0069 Mr. Gabe Godwin . CS1 Construction 7515 NE Ambassador PI., Ste. Portland, ,OR 97228 . Re: Cinemark U.S.A. - Movies 17 2900 Gateway Blvd. . ~pringfield, Oregon , :B.P. No. 98-0538 1 P.O. No. 506 CONCRETE INFORMATION 1l/14/98 Il/t3/98 II I I 6 x 12 3000 3/4" 8114T1 080130-LW Morse Bros., Inc. 390053 ASTM Super pilastizer, glass mountain pumice, AEA 59' 63' 2:00 p.m. 10.0 Overcast R. Crawford Composite mezzanine deck slab along line 6 from N to H; along line B from 1 to 6. Sample taken on line 81.5; Bill with CSI was advised of on-site test results. . ~...:;;'vfPREu~Ivr. .................. "-.L.o..)' .}'..I: 1l/20/98 22.6 2900 7 day t2/1l/98 28 day 12/1l/98 28 day HOLD HOLD c: CIty of Sprmgl1e1d KIp DanIel, ArchItect 1;. A. Fuess Partners Cinernark U.S.A. Morse Bros., Inc. This report is submitted as the confidential property of our client and is intended for lhe use of our client only. No other person or entity may utjlize this report or any portion thereof without our written a'uthorizati~n. f: \groups \pub-data \ wpdoc \c y 1 inders \csi0069 . cin BRAUN'" INTERTEC Braun Intertec Corpora~ion 2285 Nugget Way Eugene, Oregon 97403 541-746-9649 Fax: 746.7163 Engineers and Scientists Serving the Built and Natural Environments November 23, 1998 Project EBXX-98-0181 'Report 12-108-9989 Mr. Gabe Godwin CSI Construction, Inc. 7515 NE' Ambassador PI., Ste E Portland, OR 97228 Re: Cinemark USA Movies 17 2900 Gateway Blvd. Spi'li'igfleld,OR, B.P. #98-0538 iP.O. #506 MASONRY INFORMATION 10/26/98 DATE RECEIVED' 10/27/98 Solid 12n f'm - 1500 3/8 Morse Bros., Inc. TypeS 8017'G 171718 UBC 5ZO 680 11:30 a.m. 10.0 I Clear C. Halstead North eMU wall for auditoriums 6 & 7, west wall of SW han~ay both areas 121 to 16' above F.F. West wall of auditoriums 9 & 10361 to 40'8" above F.F. Mark (T.M.C. Inc.) was advised of on-site test results. .COl"yIPRESSI0r~' i:t::;"i Knc,ULTS 11/02/98 101,500 1860 7 day 11(23/98 11/23/98 Damaged in field 203,000 2290 L 28 day 28 day c: City of Springfield Kip Daniel, Architect L.A. Fuess Parmers Cinemark Theaters Morse Bros." Inc. This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person or entity may utilize this report or any portion thereof without our written authorization. f: \groups\pub-data\wpdoc\prisms\csi. 9989 .cin , BRAUN'" INTERTEC Braun Intertec Corporation 2285 Nugget Way Eugene, Oregon 97403 541-746,9649 Fax: 746,7163 ( Engineers and Scientists Serving the Built and Nafural En'(ironmenfs November 20, 1998 Project EBXX-98-0181 Report E-65462 Mr. Gabe Godwin CSI Construction 7515 NE Ambassador PI., Ste. E Portland, Oregon 97228 Dear Mr.Godwin: -.-.',-:. -_ ,.r+~_ ". ..... Re: Cinemark USA - Movies 17 2900 Gateway Blvd. Springfield, Oregon B.P. #98-0538 1 P.O. #506 Weldments , 1998 C. Halstead - ICBO# 35636 I Performed vIsual mspe~tion on completed welds on stadIUm seating frames (28) 257A and (~I ,I 256A Weldments were, .checked for SIze, length, profile and location. To the best of our 'lknOWleage WOrK cneckeci.'IS III con1onnance wlth'.shop-~rawmgs, specll1canons and appiIcable A WS D 1.1 (static) code Fabncator was asked to notify our office when addlllOnal servIces are needed I -- Sincerely, YY\;l ~ CI)) Michael L. Meyer, Pnncipal Willamette Valley Operations Manager . fZ-V ~ ~ Raymond V. Aliperti, Supervisor Eugene Branch c: Kip Daniel, Architect . LA Fuess Partners City of Springfield Cincmark Theaters f:\grollps\pu~-data\wpdoc\rcports\welds\csi65462.cin '" BRAUN'M INTERTEC Braun I"tertee Corporation 2285 Nugget Way Eugene, Oregon 97403 541,746-9649 Fax:746-7163 . Engineers and Scientists Serving the Built and Natural Environments DAILY FIELD REPORT November 19, 1998 CSI Construction, Inc. Cinemmk USA - Movies 17 2900 Gateway BI. Springfield, Oregon Reinforcing Steel, -RcirJ'oa:ed -Concrete EBXX-98-0181 R~~lin'.N~m~~n:\....i""""""'" E-65459 506 U~~!I~ir~~~tmjt.N.~m~~tiI ,98-0538 Partly Cloudy Slab on Grade, Suspended Roof Slab Wheel chair ramp in auditoriums 1 and 2, enlryway roof slab5 in auditoriums 3, 4, 6 and 7. Performed visual inspection of reinforcing steel in area5 listed above. Reinforcing steel was checked for grade, size, lap, placement, and clearances where applicable.. Reinforcing .steel was secured with tie wire, supported with concrete dobie blocks, and placed in accordance with approved plans and specification5. Performed continuous inspection during the placement of concrete in the areas listed above. Concrete was placed by pump. Roof slab forms were tapped with hammer. Cast one set of four (6 x 12) concrete test cylinders. Contractor 'vas advised of on-site test results. and asked to notify our office when additional services are needed. Co ncrete Morse Bros., Inc. 35-5B InspectoL 5" 520 630 1:45 p.m. ,4'(6'xi2) 3500 11.0 I I I , ~';.. :i I I If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649. c. Kip Daniel, Architect Cinemark Jobsite fax - 746-1881 Cinemark Theaters L. A. F uess Partners City of Springfield As a mutual prmection to clients, the public, and ourselves. all reports are submitted as the confidential property of clients and are intended for the use afour clients only. No other person or entity may utilize the report or any portion thereof without our written authorization. f: \groups \pub-data \ wpdoc \repo rts\insp\csi65459 . ein