HomeMy WebLinkAboutPermit Field Test & Inspection Report 1999-3-23
J
~/
~..
j;-~'
J,
~
/
BRAUN
INTERTEC
PSI has acquired the Oregon assets of Braun Intertec. Inc.
March 23, 1999
Mr. Gabe Godwin
CSl Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: Cine mark U.S.A. - Movies 17
, 2900 Gaj~wayBlvd.
~ . . - - - . .. ,"
_SpringfiCld, .Oregon
B,P. No. 98-0538 I P.O. No. 506
01/22/99
6 x 12
9"
A Division O!l"'tt:!>;lInformation
. ,.,..,. .ToBuildOn
Engineering. Consulting. Jbstlng
Project EBXX-98-0 181
Report 12-019.-0246
~~ 26 1999
CONCRETE INFORMATION
1/2"
Morse Bros" .Inc.
'.'
.ASTM
430
1:20 p.m.
-::"-'"
I
I
I
I
I
Pumic &~Superplasticizer I
I
I
I
I
I,
01/23/99
3000
30 LW
390757
560
10.0
Rain
R. Crawford
Composite scating'slab, auditorium 8. SamPle taken in auditorium 8. Contractor was
advised of on-site test results.
01/29/99
02/19/99
02/19/99 I
03/19/99 l
;,
,.
'!
CIty- of Spnngfleld .
L:A~"Fuess Partners.
-.~_ Morse.Bros,.Inc.
~i.___
COJ\-!rKlC"SION TEST RESULTS
~J~~~l
22.7 2120 7 day
22.9 2740 28 day
22.8 2850 2795 28 day
22.8 I 3330 ~6 daYh
Kip pamcl, Architect
-CineinirltU.S.A.
This repon is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion thereof without our written authorization.
f: \groups \ pu b--d.ata \ wpdoc \cy I inders \cs i0246 . cm
Professional Service Industries, Inc. .lD40A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541n46-7163
"
I:'
'.
BRAUNSM
I NTE RTEC
Braun Intertec Corporation
1040-'\ Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746.7163
Engineers and Scientists Serving
the Built and Natrjral Environments
March 2, 1999
Project EBXX-98-018!
Report 12-019-0275
Mr. Gabe Godwin
CS! Construction
7515 NE Ambassador PI.
Portiand, OR 97228
Re:
Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
Springfi~ld, Oregon
B.P:l",o. 98-ti533 I P;O: No. 506
. ..~. .~
. CONCRETE INFORMATION
....,.....,.............".:',..:"..:',....
...................................'......'...-.
--".".""."".,. .,,"
DATE RECEIVED.
02/01/99 '
01/30/99
6 x 12
3000
1/2"
8"
30-LW
Morse Bros., Inc.
390944
ASTM
Pumic &superpIasticizer .
460
61'
6:15 a.h1.
10.0
1
Overcast'
R. Crawford
LU1Vtl'J<ESSJON TE!>,- KESULTS
I
~
Composite seating slab in auditoriums 16 and 17. Sample taken at auditorium 16.
Contractor was advised of on-site 'test results.
~ 02/06/99 23.3 2510 7 day
02/27/99 .1 23.2 I 3220 28 day
I 02127/99 I 23.3 I 3270 3245 28 day
I nOLO t_ _I HOLD ,I
c' City of Springfield Kip Daniel, Architect
L.A. Fuess Partners Cincmark U.S.A.
, Morse Bros, Inc.
,
This report is submitted as theconfidentiaJ propeny of (lur client and is intended for me use of our client only. No orner person.
or entity may utilize mis -report or any portion thereof \~ithout our written authorization.
f: \groups\pub-data \wpdoc\cyJinders\csi0275 .cin
,BRAUNS'
INTERTEC
~raun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
February 23, 1999
Project EBXX'98-0 181
Report 12-019'0255
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re:
Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
Spri!,g~dd, Oregon
II.P. No. 98-U538'/'P.O.No. 56,;
~
01/26/99
CONCRETE INFORMATION
J~X+.Jfij8*B!~~....'.I.'."."'"
01/27/99
112"
3000
II
,
I
I
,
Pumic & superplastlcizer I
I
,
~
6 J: 12
71/2"
30-LW
Morse Bc'os., Inc.
390825
'ASTM
'I
- ~.
,... t<:>;'8ijti.-ii~pI.b."."""",
60'
49'
fO:30 a:m.
10.0
Overcast
R. Crawford I
Composite seating slab in auditoriums 8 and 10. Sample taken at auditorium 8. Bill II
with CSI Construction was advised of on~'site test results. i
. COMPRESSION TE"l1<t.SULTS
.Wiiiiiilt)iI
.....Jj>ijiJ~.iJ~b
02/02/99
22.6
2670
7 da~
02/23/99
22.7
3500
28 day
I
l
02/23/99
22.6
3620
3560
28 day
HOLD
HOLD
'.""",' ., I "/f _..r."
c' .. '.City ,of Springfield
L:A.':Fuess-Partners
Mors~' Bros, Inc.~
-..._- "I'
:.;
_..Kip-_Danie1, Architect., , "
Cinemark U.S.A.
,
~.
\
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion thereof w,ith9ut our written authorization.
f: \groups\pu b-data \ wpdoc\cylinders\csi0255. do
\
- ~"."
BRAUN~M
I NTE RTEC
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541.746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environmenfs
February 19, 1999
Project EBXX-98-0181
Report E-66182
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr. Godwin:
Re: Cinemark USA - Movies 17
2900 Gateway
Springfield, Oregon
B,P. #98-0538 I P.O. #506
/
Weldments
. February 15, 1999
D. Webber AWS# 930508011 ICBO# 1033346-85
Wisco Fabrication
Performed visual inspection on stairway installed at grid line 6 between D and F. Advised
contractor to get approval from engineer of record for as fit.up condition at second floor
connection. Front entry way on west side' of building is 90% completed. Notifiedcontractor that
the structural steel components for the stairway were not inspected prior to erection. Advised
erector to have approved shop drawings on-site so final inspection can be done on all structural
steel components for front entry way. Contractor was asked to notify our office when additional
services arc needed. I
,
Sincerely,
(/l- L-m t ~ {J
Michael L. Meyer, Principal
Willamette Valley Operations Manager
If.- J - A-/; Ivd:;f CtJ
Raymond V. Aliperti, Supervisor
Eugene Branch
c:
Kip Daniel - Architect
Cine mark Theaters
L.A. Fuess Partners
City of Springfield
",0
f:\groups\pub-data\wpdoc\reports\welds\csi66182.cin
~.-....
BRAUNSM
I NTE RTEC
Braun Intertec: Corporation
1040-A Shelley Street
Springfield; OR 97477
541.746-9649 fax: 746-7163
Engineers and Scientisfs Serving
fhe Built and Natural Environmenfs
February 19, 1999
Project EBXX-98-0181
, Report 12-0 19~0246
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: Cinemark U.S.A. - Movies 17
2900.Gateway Blvd.
Springfield, Oregon
B-.PiNo. 98'C538 I ~;O. No. 506
CONCRETE INFORMATION
~
01/22/99
,...".,...:.,...,..-.,..-.-:-......:,.,:.,.-.:"..,-,:.:'-':':':"'-'
...,.....-.....-.-.-.-,....,...-..,-,..,.,..,..........-..
DATE RECEIVED..
________. .--.--...-----,--,,-.....
01/23/99
1:20 p.m:
3000
6112
1/2".
9"
30 LW
Morse Bros., Inc.
390757
ASTM
Pumic Ie Superplastlcizer
'43'
56'
10.0
Ram
R. Crawford
IlliE~~!~QN::,~~.:.~py~:..I::::) Composite seating slab, audit~rium 8. C~nt";'~r was advised of on-site test results.
COMPRESSION TEST RESULTS
c:
City o(Spripgfield
L.A. Fuess Partners... .--
Morse Bfos, Inc.: .:~~
.:.....,~-~.,.- . "~~':.,' :)-"':"'_:'
t'! 1J/~) :". :~.1 I; "I .
,1.:....:.:..--.---.. ._. _.. _.~.. __..__. .~_n._ ........ ...-...
J; '. \. ' : " ~l( : ~" '~.\
I
'kip Dani~I, Architect
-.Cineinarki'U.S.A.
,.
'1
......_.......J .__.,."'"
'. .1._,'\. . ;'J
,
- - .... -.-:...--......-. .:~. .~:.~-.:.~;.-;,..; ,.\ It,: :.:'~'" \.
: '-' .
!
\:
.
~...-...,
I'
'.
"
"
.. Ii'" ~:
.",!",;'
\,.~.
. ,--"--....,.. -"/;..
,
I",
"
This report' is submitted-as the' confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or a~y po,:~on thereof 'Yithout our written authori7.ation,
f:\groups\pub-dala\wpdoc\cylinders\csi0246.cin
BRAUNSM
I NTE RTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541.746-9649 Fax: 746.7163
Engineers and Scientists Serving
the Built and Natural Environments
February 16, 1999
Project EBXX.98-0181
Report 12.019-0238
Mr. Gabc Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: Cinemark U.S.A. - Movies 17
2900~.Gateway Blvd. .
Spri!,gfield, Oregon
B.P. No. 98-0538 I P.O. No. 506'
CONCRETE INFORMATION
01/19/99
iOATE..RECE!'VEOi.....
,-.,-.......,..,."."..........._"....
01/20/99
-I
I
I
I
I
I
6 x 12
3000
3/4"
4"
30 IN
Morse Bros., Inc.
390676
ASTM
45'
53'
8:108.m.
10.0
Rain
R. Crawford
.j
I
Remainder of canopy, pier Cootins, southside of building - easthalf. Contractor was
advised of on~site test results.
COMPRESSION TEST RESULTS
01/26/99 28.6 2740 7 day
01/26/99 28.6 2690 2715 7 day
02/16/99 28.6 3880 28 day
02/16/99 28.7 3840 3860 28 day JI
.. -
c: City of Springfield Kip Daniel, Architect
L.A. Fuess Partners Cinemark U.S.A.
Morse Bros, Inc.
This repon is submitted as the. confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion Ihereof without our written authorization.
. f: \groups\ pub-data \ wpdoc \cy 1 inders \csi02 3 8. cin
BRAUNS'
I NTE RTEC
Braun Intertec ,Corporation
1 040-A Shelley. Street
Springfield, OR 97 477
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
fhe Buj/f and Nafural Environments
February 12,1999
Project EBXX-98-0181
Report 12-019-0223
Mr. Gabe Godwin
CS1 Construction
7515 NE Ambassador PI.
Portland, OR 97228
Rc: Cincmark u.s.A. ~ Movies 17
2900 Gateway Blvd.
Springfield, Oregon
B.P. No. 98-0538 I P.O. No. 506
CONCRETE INFORMATION
Morse Bros., Inc.
I
I
I
6 x 12
3/4"
4"
ASTM
530
2:35 p.m.
1
Canopy piers (10). Contractor was advised of on-site test results.
COMPRESSION TEST RESULTS
01/22/99 I 29.2 3020 7 day
02112/99 I 29.1 4230 28 day I
02/12/99 I 29.2 I 4190 4210 28 day I
HOLD I I HOLD II
c: City of Springfield Kip Daniel, Architect
L.A. Fuess Partners Cinemark U.S.A,
Morse Bros, Inc.
This report is submitted as the confidential property of our client and is intended for the use of our client oll1y. No other person
o( entity may utilize this report or any portion thereof without our writte.n authorization.
f: \groups \pub-data \ wpdoc \cylinders \csi0223 . cin
.
BRAUNSM
I NTE RTEC
Braun Intertec Corporation
1040-A Shelley ,Street
Springfield, OR 97477
541-746-9649 fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
Fcbruary 8, 1999
Project EBXX-98-0181
. Report 12-019-0275
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: Cinemark U.S.A. - Movies 17
2900 G~teway Blvd.
Springfield, Oregon
B.P. No. 98-0538 I P.O. No. S06
CONCRETE INFORMATION
01130/99
3000
I
I
I
I
6 x 12
1/2"
8"
30-LW
Morse Bros., Inc',' "
390944
ASTM
Pumic &'superpJasticizer
~I" ..' ",', . .. .
.. LOCATlONOFPOUR .
.---.-..-..-.._?...,..."-..-',-................,....-..-."-"",-,,
,.._,..."."."".._-..-......-,_.-....-........-.....
',.-.-..,..-..-..-...-,.........-...-.....,.........,........,.-.....
....,'.'.".".".,.,.....-.-.-.-....-.-..-....-..............'
_...._,...,....-...-.-.,-....-..-.-..............._.........
....-....--...---...,.-.-..--.-.-.-....-..........-..--....
~o 610 I
6:15 a.m, 10.0 'I
Overcast I
R. Crawford !
Composite seating s!ab in auditoriums 16 and 17. Sample taken at auditorium 16. Bill ,
with CSI Construction was advised of on-site 'test results. II
COMPRESSI01'< li<::;;l-K~SUL TS
I
I
I
[...... .'
. . ,,"'.
02/06/99
23.3
2510
02/27/99
02/27/99
HOLD
c: - .. City of:Swingfie!d
L.A. :.Fue'ss~Partners
,Morse Bras, Inc.
Kip Daniel, Architect
. Cinemark IIU.S.A,
., II
This report is submined as -the" confidential property of our client and is ime~ded for the use of our client only. No other person
or entity mayurilize this report or a.ny portion thereof without our,wrinen authorization.
f: \~roups\pub-data\wpdoc\cylinders\csi027~ .cin
BRAUNSM
I NTE RTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541.746-9649 fax: 746-7163
Engineers and Scientisfs Serving
the Buil, and Natural Fnvironmerits
February 04, 1999
Project EBXX-98-0181
. Report E-66065
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr. Godwin:
r:fi c \I ~l!~~
ftp 0"
Re:" CinellI ark 'USA ~ Movies. 17 .
. 29~0 Gateway
Springfield, Oregon
~.P.#~8~0538 I P.O. #506
February 03, 1999
D. Webber. AWS# 930508011 ICBO# 1033346-85
Wisco
Performed visual inspection on the stadium structural steel seating frames for auditorium 16 and'
17, Cross bracing was installed and the A325 high strength bolts were brought into snug tight
condition.
To the best of our know ledge the work checked is .in conformance with approved plans, change
orders; specifications, and applicable codes, Contractor was asked to notify our office when
additional services are needed,
"--
Sincerely,
ff!0..~0)
Mi_e~ael:L. Mey~i-, Prjnclpal .
'Wlllamette Valley. OperatIOns Manager
~! . !1 ~:~(.,,!~:..~ . .' " '. ,_' ,
:c :--,:.':: ':Kip' b'amet-- Ar~hlt~C{ --.-..
" .: ,,'i' '. ' _,' ' ,;. ~ t. ~ ._' _' . . _.... ,.'
" . . . Cinemark TheaterS " .'
.-.- -._.- ..... ............._.r .... ,- ._. _
." .LA fuess Partners ,.,
City of Springfield
f{y~tU0)
Raymond V Aliperti, Supervisor
Eugene B!'lneh ' .
".. . ~.. _ _WI.
- -~.- -._--~ - I
f:\groups\pub-data\wpdoc\reports\welds\csi66065.cin
BRAUNSM
I NTE RTEC
'I
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
HeR
1999
Engineers and Scientists Serving
the Builf and Natural Environments
February 03, ]999
Project EBXX ~98-0 181
Report E-66053
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr. Godwin:
Re:
Cinem-ark USA - Mo~ies.IT -.
2900 1Gate~ay,.
Springfield, Oregon
~ ...----._-',
RP. .#98;053~ lP.O. #506
-......
,
Febmary 02, 1999.
D. Webber AWS# 93050801 /ICBO# 1033346-85
Wisco
CSI ConstiUction
reinspection on the stadium structurdl steel seating frames for auditoriums 16 and 17.
severdl locations the A325 high strength bolts are not in snug tight condition in both
auditoriums. Seating support hanger weldments are undersize and the remaining of the. \
for the stairways in auditomims listed above need'to be slag before fmal accetpance.
Coutraetor was uotified of repairs needed and asked to notify our office when additional services
needed.
. Sincerely,
m ( ffl{jtV 0)
Michael L. Meyer, Principal
Willamelle Valley Operations Manager
f(V~6;)
Raymond V. Aliperti, Supervisor
Eugene Branch
e: Kip Daniel - Architect
Cinemark Theaiers
L.A, Fuess Partners
City of Springfield
f:\groups\pub-data\wpdoc\reports\welds\csi66053.cin
BRAUN'.
INTERTEC
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541-74&9649 fax: 746-7163
Engineers and Scienfists Serving
the Built and Natural Environments
Februal)'.'03;.'1999 <','l .
. -', ,",.. .. _r ~. " .
\< .
~. t' \ .,.'.
Project EBXX"98-0 l~.'b:,r,",'[
. Report E-66059
....;,..,. ':':<:',: "'V
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador Pl., Ste. E
Portland, Oregon 97228
Dear Mr. Godwin:
Re:
Cinemark USA - 'Muvies Ii
2900:Gateway
S.pr:!~gli~ld, Oregon'
B.P. #98-0538 I P.O. #506
. '.
f ...:....." ..?.:,'.......H.~~"',\~~..
Pcrformed visoi inspection on the stadium structural steel seating frames for auditorium 16 and
17, Puddle welds and button ponchwas 'completed on steel metal decking. Cross bracing was
.. II
i~stailed but the A3i5 high strength bolts ,were not bro~ght into snug tight condition' at-this' time.-
To the best of our knowledge the work checked is in conformance with approved plans, change
orders, specifications, and applicable code:, unless otherwise noted above. Contractor was asked
to notify our office when additional services are needed.
Sincerely, . ,
m L !1};[PUftJ)
Michael L. Meyer, Principal
Wilhimette Valley" Operations'Manager
rf{ vtLLLfD1/W-J Cbj)
Raymond V. Aliperti, Supervisor
Eugene Branch
~ . " "
c: Kip Daniel-' Architect
Cine mark Theaters:
L,A. Fuess Partners
, City of Springfieid
f: \groups\pub-data \wpdoc \reports \ welds \csi660 5 9. cin
',:"'-'
BRAUNSM
INTERTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541.746-9649 Fax: 746.7163
Engineers and Scientists Serving
. the Built ancJ Natural Environments
February 2, 1999
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re:
Cinemark U.S.A. - Movies 17
2900 GaleWllY Blvd'.
-Sprj"gfield,,9regoD' .
B.1"cNo. Q8-0.s.3]J fRO. l'Jo"_.506
- '
CONCRETE INFORMATION
01/26/99
6 x 12
1/2"
71/2"
Morse Bros., Inc.
ASTM
49'
10:30 a.m.
1
Project EBXX -98-0181
Report] 2-0 19-0255
01/27/99
3000
30-LW
390825
Pumic & 'superplasticizer
60'
10.0
Overcast
R. Crawford
Composite seating slab in auditoriums 8 and 10. Sample taken at auditorium 8. Bill
with CSI ConStruction was advised of on-site test results.
COMPRESSION .TEST RESULTS
02/02/99 22.6 2670
02/23/99 I
02/23/99 I
,
HOLD I
-.
c:
City of Springfield
L.A. Fuess Partners
Morse Bros, Inc.
Kip Daniel, Architect
CinemarkUS,A.
7 day I
28 duy I
28 day I
HOLD I
-- ~
This report is s!Jbmitte~ as the confidential ,propeny of our client and is intended for me use of our cljent only. No other person
or entity may u!ilize this report or any portion thereof without our wrinen audlorization.
f: \groups\pub-dam\wpdoc\cylinders\csi0255 .do
BRAUNSM
I NTE RTEC
',.
DAilY FIELD REPORT
30, 1999
CSI Construction, Inc.
Cinemark USA - Movies 17
- 2900 Gateway BI<.
Springfield, Oregon
Reinforcing Steel,
Reinforced Concrete
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541.746-9649 fax: 746.7163
Engineers and Scientists Serving
the Built and Natural Environments
EBXX-98-0181
:~.~l\gttN.~.m.~~t;f""""""""" E-660 3 0
506
.!NH~i~gg~ti!ijfN4i!i~~ti 98-0538
Clear
Composite seating slab
'<'::""<'."
Composite seating slab for auditoriums 16 (except first riser) and 17 (except
risers),
II
I
I
Performed visual inspection of reinforcing 'steel and welded wire fabric in locations listed above. Reinforcing steel was
chccked for grade, size, lap, placement and clearances where applicable. Reinforcing steel and welded wire fabric were
placed in accordance with approved plans and specifications.
As directed by client, conti,mous inspection during placement of concrete is not required, Cast one set of four (6 x 12)
concrcte test cylinders. Contractor was advised of on-site test results and asked to notify our office when additional
services are needed.
l.yp{ofMat~ri~I">"""""""'"
...--..-.,.,-,-.',.....,........'............-...................,...................,..........
..--....-...,....--.,.,....,....,..,.. ....
... .. .......................-.,.,...,.,'""",.-...
...........................",........................"....-.
..........................-.................-..-...-..........~
.--........-..-.----..----..............,...
...................................
..-..............-.
Concrete
Morse Bros., Inc.
30-LW
8"
61
46
6.15 a.m.
416 x 12)
3000
10.0
U you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
e.
Kip Daniel, Architect
Cinemark Jobsite fax - 746-1881
Cine mark Theaters
L.A, Fuess Partners
City of Springfield
Ii
I
I
As a mutual protection to clients, the public, and ourselves, all reports arc submitted as the confidential property of clients and are intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.
f:\groups\pub-data \ wpdoc\reports\insp \csi66030. cin
BRAUNSM
INTERTEC
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541.746-9649 fax: 746-7163
Engineers and Scientists Serving
the Built and Nafural Environments
January 29, 1999
Project EBXX-98-0181
Report 12-019-0246
Mr. Gabc Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR . 97228
Re:
Cinemark U.S.A. ~ Movies 17
2900 Gateway Blvd.
Springfield, Oregon
B.P. No. 98-0538 I P.O. No. 506
,.
CONCRETE INFORMA nON
1/2"
30 LW
6 x 12
9"
Morse Bros., Inc.
390757
ASTM
P_umic &- Superplasticizer
. 430
560
1:20 p.m.
10.0
Rain
R. Crawford
Composite seating slab, auditorium 8. Contractor was advised of on-site tcst results.
COMPRESSION TEST RESULTS--
I 01/29/99 22.7 2120 7 day
l 02/19/99 28 day
02/19/99 28 day
HOLD HOLD J
c: City of Springfield Kip Daniel, Architect
L.A. Fuess Partners Cinemark:'U.S.A.
Morse Bros, Inc.
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other p'erson
or entity may utilize this report or any portion thereof ~ithout our written authorizatio,n.
f: \groups\pub-data\ wpdoc\cylinders\csi0246. dn
.4~..~!;.\:1r..~!~~lt;:.,
-"'"
BRAUNSM
I NTE RTEC
"Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-74&9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
January 29, 1999
Project EBXX-98-0181
Report 12-128-0186
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re:
Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
Springfield, Oregon
B.P~' No. 98-0538 /, P.O,'.No. 506
~
. CONCRETE INFORMATION
"
12/31/98
,,-, """"-"-"-"-""-""-",-,'-',-,',-,-"
DATE RECEIVED
01/01/99 II
3500 I
35-IN
395518
No Air
54'
10.0
Overcast
D, Smith
6 x 12
3/4"
4"
Morse Bros" Int.
ASTM
45'
8:20 a.m.
1
Void form steps in auditoriums ]] and 12, mezzanine stairs at lo.bby, and tiered seating
steps auditorium 2 lower half and auditorium 3 east side. Contractor was advised of
on-site test results." "
COMPRIc~~lUl' TEST RESUL~
01/07/99 I 28.6 4070 7 day
01/07/99 I 28.6 4030 4050 7 day
01128/99 I 28.7 4990 28 day
01/28/99 I 28.7 5060 5025 28 day
c: Clty of Spnngheld Kip Daniel, Architect
L.A. Fuess Partners Cinemark U.S.A.
Morse Bros, Inc.
,.
This report is submitted as the cOnfidential property of our client and is intended for the use of our clienc only. No other person
or entity may utilize this report or any portion mereof v.tithout our written authorization.
f: \groups\pub-data\ wpdoc\cylinders\csiO 186 .cin
';
BRAUNSM
INTERTEC
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541.746-9649 fax: 746-7163
Engineers and Scientists Serving
the Buil, and Natural Environments
DAILY FIELD REPORT
January 29, 1999
CSI Construction, Inc,
Cinemark USA - Movi~s 17
. 2900 Gateway BI.-
Springfield, Oregon
Project Number: ,. . . .', , I EBXX-98-0I8I
E-66040
506
98-0538
Clear
Reinforcing Steel, Walls
St)1!ctllral Masonry
8" CMU block w'aIls for wheel chair accessibility ramp (0' to 0'4" to 0'1'8") auditorium I,
2, 6 and 7,
Perfonned visual inspection of reinforcing steel in locations listed above. Reinforcing steel was checked for grade, size,
lap, placement, and elearances where applicable. . Reinforcing steel was placed in accordance with approved plans and
specifications. Grout cells were relatively clean and free of excessive mortar projections,
Performed continuous inspection doring the placement of grout. Grout was placed by pump arid mechanically
consolidated. All celi> grouted solid. Contractor'was asked to notify oUF office when additional services are needed.
Grout
Morse Bros., Inc,
7-G
9"
530
640
4:00 p.m.
o
I
I
I
If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) .746-9649.
I ,. . . ,
c: Kip Daniel, Architect .' . .' .
. "Cinemark Jobsite fax"" 746'1881
"..'. .-,' . -. .
;Ci,neinark: Theaters .
. '/',. . L.A. Fuess Partners ,.
City of Springfi~ld.
L'"
A<; a mutual protecti6n to clients, the p~blic, and ourselves, all report" are submitted as the confidential property of clients and are intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written'authorizatil:m.
f: \groups \pub-data \ wpdoc \rcpor:-s \insp \csi 66040.c in
I
BRAUN'M
,
-I NTE'RTEC
Braun Intertec. Corporation
1 040-A Shelley Street
Springfield, OR 97477
54' -746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
January 28, 1999
Project EBXX-98-0181
Report 12-019-0238
, .
Mr. Gabe.Godwm
CSI Construction
7515 NE.Ambassador PI.
Portland, OR 97228
Re: Cinemark U.S.A. - Movies 17
2900' Gateway Blvd.
Springfield, Orego~
B.P. No. 98-0538 I P.O. No. 506
CONCRETE INFORMATION
\
01/19/99
-""I
6 x 12
3000
3/4"
4"
30 IN
Morse Bros., Inc.
390676
ASTM
450,
53'
8:103.m.
10.0
Rain
R. Crawford
Remainder of canopy pier footins, southside of building - easthalf. Contractor was
advised of on-site test results. .
COMPRESSION TEST RESULi"
01126/99
28.6
2740
7 day
01/26/99
28_6
2690
2715
7 day
O~!16/99
28 day
02/16/99
28 day
c:
City of Springfield
L.A. Fuess Partners'
Iy10rse Bros, Inc.
Kip DanieL Architect
Cinemark U.S.A.
I ,
This report is submitted as the confidential propeity of our client and is intended for the use of our client only. 'No other person
or entity ma1y utilize this report or any portion thereof ~ithout our written authorization, .,
f:\groups\pub-data\wpdoc\cylillders\csi0238.cin
I .
BR4UN'M
I NTE RTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and Sc;~nt;sfs 5ervi~g
the Built and Natural Environments
DAilY FIElD REPORT
II
I
I
Ii J)a.t~:i'iJ January 26, 1999
Il!T~H~~K~n}{+i CSl Construction, Inc.
Cinemark USA - Movics 17
2900 Gatcway BI.
Springfield, Oregon
rroje~tNumber: . . EBXX-98-018l
E-66000
506
:JJilildiiigPerniitNuJ!i~~~ . 98-0538
Overcast
Rcinforcing Steel
Composite seating slab Jar auditoriums 8 and 10.
Composite seating slab
Pcrfonncd visual inspcction of reinforcing stcel in locations listed above. Reinforcing steel was checked for grade, size,
lap, placement and elearances where applicable. Reinforcing steel and welded wire fabric was placed in accordance
with on-site approved plans, specifications, and was secured by tie wire. Rcinforcing steel was previously checkcd on
January 22, 1999 (ref: Report E-65976) for auditorium 8.
As directed by client, continuous inspection during placement of concrete is not required. Cast one set of four (6 x 12)
concrete test cylinders. Contractor was advised of on-site test results and asked to notify our office when additional
services are needed.
Morse Bros., Inc.
30-LW
71/2"
490
600
10:30 a. m.
4 (6 x 12)
3000
70.0
I
'I
I
If you have any qnestions regarding this rcport, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c:
Kip Daniel, Architect
Cinemark 10bsitc fax - 746-1881
Cincmark Theaters
L.A. Fuess Partners
City of Springfield
As a mutual protection to cli~nts, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.
f:\groups \pu b.data \ wpdoc\reports \insp \csi66000. ein
I
BRAUN'M
I NTE RTEC
Braun Intertee Corporation.
1 040-A Shelley Street
Springfield, OR 97477
541 -746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
DAilY FiElD REPORT
!,Projectl'!!,mber:}" ,
CSI Construction, Inc.
Cine mark USA - Movies 17
2900 Gateway Bl:~
Springfield, Oregon
EBXX-98-0181
E-65999
506
98-0538
Overcast
BuildinPermitNumbcr ."
..g ....... ..
ITY~c of I~~pcctio~:," ..
'1I:;~~0~;~~~\,;atiOiJn:+'.;<';!;:
Reinforcing Stcel Walls, Columns
8" CMU _block walls, west siue north and south entryways (20'0" to 21 '4"), 8" CMU
Performcd visual inspection of reinforcing steel in the above listed locations. Reinforcing steel was checked for grade,
size, lap, placement, and clcarances where applicable. . Reinforcing steel was placcd in accordancc with approvcd jobsite
'plans and specifications. 'Grout cells are relatively clean and mortar projections within the limits of the Uniform
Building Code. Contractor was asked to notify our office when additional services are needed.
Inspector: R. Crawford - ICBO# 883432-88
," ", .,. " " ", .. -.
'you'ha~e any qnestions regarding this report, please fecl free to call Raymond V. Aliperti'aq541) 746-9649'.
c: Kip Daniel, Architect
L.A. Fuess Partners
City of Springfield
Cine mark Theaters
CSl Construction
'.
.- ....'
."
.."'. . h~,,;:'r':. lJ~llh,', "
'. :::(. >::~i ~. .'I\";f"'';l:''
'. ,', ,..' -;'~'l ... ". '.... '.. . .
a mut~al protectio~ to' ;ii~~ts: th~ publi~, and o~rsel~'es, '~II reports arc submitted as the confidential property of clients' and' ~'c int~ndcd 'for the use of our clients
~""nly. No other person or c,n,lilY may utilize the report or any portion thereof without our written authorization. .
f: \groups\pub-data \wpdoc\reports\insp\csi65999.cin
"
. ~~~~;~~}~j
BRAUN'"
INTERTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541 -746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built a~d Nafural Environments
January 25, 1999
Project EBXX-98-0 181
Report E-65994
Mr. Gabe .Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
m 28 199~
v.
~~
Dear Mr. Godwin:
"-#;'
. -l{e: .' Cine mark USA ~ Movies' 17 .
2900 Gateway
Springfield, Oregon
B.P. #98-0538 I P.O. #506
- ,
January 25" 1999
R. Aliperti ICBO# 1017075-85
Performed visual inspection on the stadium structural steel seating frames for auditorinm 10.
,I Cross bracing was installed and the A325 high strength bolts were brought into snug tight
I condition. Puddle welds and button pnnch was completca on stecl metal dCCKing. .
To the best of our knowledge the work checked is in conformance with approved plans, change
orders, ;specifications, and applicable codes. Contractor was asked to notify our office when
additional services are necded.
Sincerely,
WlL. ~CPJ)
Michael L. Meyer, Principal
Willamette Valley Operations Manager
R.I/'~~
Raymond V. Aliperti, Supervisor
Eugene Branch
c:
Kip Daniel - Architect
qinemark Theaters
L.A. Fuess Partners
City of Springficld
,.
f:\groups\pub-data\wpdoc\reports\welds\csi~5994"cin
.,
BRAUN'"
I NTE RTEC
Braun Intertee Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
DAILY FIELD REPORT
J
"'-'-
EBXX-98-0181
E-65993
506
98-0538.
Clcar
I ::Pilte:}(:::::';/'..""" ,.1
:\T,es'ted(Fcfr:\f}{ .... -'- '::":::\/)'::;'
January 25, 1999
CSI Construction, Inc.
Cinemark USA - Movies 17
2900 Gateway BI.
Springfield, Oregon
m!yj~f!N~m.~,~t:iC:.
~~~9nN.~m.~~t\
Reinforcing Steel, Walls
Structural Masonry
8" CMU block walls \vestside, north and south entryways (12'0" to 20'0").
II
I
I
t
Performed visual inspection of reinforcing steel in locations listed above. Reinforcing steel was checkcd for grade, si2e,
lap, placement, and clearances where applicable. Reinforcing steel was placed in accordance with approved plans and
specifications. Grout cells were relatively clean and free of excessive mortar projections.
Performed continuous inspection during the placement of grout. Grout was placed by pump and mechanically
consolidated: All cells grouted solid. Contractor was asked to notify our office when additional services are needed.
Grout
Morse Bros., Inc,
7-G
9"
420
570
11:50 a.m.
o
2500
, 3.0,
If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c: Kip Daniel, Architect
Cinemark Jobsite fax - 746-1881
Cine mark Th~aters
L.A. Fuess Partners
City of Springfield
I
I
I
I
I
I
I
---.Jl
As a mutual protection to clients, the public, and ourselves, all reports ar~' submitted as the confidential property of clients and are intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.
f: \groups \pu b-data \ wpdoc\rcports \insp \cs i65 993. cin
,
BR4UN'"
I NTE RTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and Scienfists Serving
the Built and Natural Environments
DAIL YFIELD REPORT
'I
irfQj~ft'N~!jj~~t,i.'.".Ii'.'
EBXX-98-018!
E-65976
506
98-0538
January 22, 1999
CSI Construction, Inc.
Cinemark USA - Movies 17
2900 Gateway B I.
Springfield, Oregon
Reinforcing Steel'
Composite seating $Iab~uditoriu~s 8 and 9.
;Spceifif.p~~t!ojj~~ j,:"",
.....~,~,im,i9gg~fi!H..t,.'.!'I.,.,.,jjm~~r{;.
............................................................
Rain
Composite 'Slab
Performed visual inspcction.of reinforcing steel in locations listed above. Reinforcing steel was chcckcd' for grade, size,
lap, placement and clearances where applicable. Reinforcing stcel and welded wire fabric was placed in accordance
with on-site' approved plans and specifications. As directed by client, continuous inspection during placement of
concrete is not required. Cast one set of four (6 x 12) concretc test cylinders. Contractor was advised of on-site test
results and asked to notify onr office when additional scrvices are needed.
Concrete
Morse Bros., Inc.
30-LW 1
9" I
430 II
560 I
1;20 p. m. I
4 (6 x 12)
3000 I
25.0 I
If you have any qnestions regarding this report, please fccl free to call Raymond V. Aliperti at (541) 746-9649. .
c;
,
Kip Daniel, Arehitect
Cinemark Job~ite fax - 746-1881
Cine mark Theaters
L.A. Fuess Partncrs
City of Springfield
A5 a mutual protection to clients, the public, and ourselves, all reports arc submitted as the c~njidential property of clients and are intended for the use of our clients
only. No other person or en~ity may utilize the report or any portion thereof without our written authorization.
f:\groups\pub-data \wpdoc\reports \insp\csi6597 6 .em
i
BRAUN'"
INTERTEC
Br~un Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541,746-9649 Fax: 746-7163
Engineers and Scientisfs Serving
the Bui't and Natural Environments
January 22, 1999
Project EBXX-98-0181
Report E-65971 .
Mr. Gabe 'Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr. Godwin:
Re: 'c'inemark USA - Movies 17
.2900 Gateway
Springfield, Oregon
B'.P. #98-0538 I P.O. #506
January 21 and 22, 1999
D. Webber AWS# 93050801/ ICBO# 1033346-85
KD Steel
II
Performed visual inspection on the stadium structural steel seating frames for auditorium 8.
Cross bracing was installed and the A325 high strength bolts were bronght into snug tight
condition. Puddle welds and button punch was comp1ctcd on steel metal dccking.
To the best of our knowledge the work checked is in conformance with approved plans, change
orders, specifications, and applicable codes. Contractor was asked to notify our office. when
additional services are nccded.
Sinccrely,
;{{/~0)
m [ /l1t1JeU 0)
Michacl L. Meyer, Principal
Willamelle Valley Operations Manager
! . .
c: K;ip Daniel - Architect
Cinemark Theaters
L.A. Fuess Partners
City of Springfield
Raymond V. Aliperti, Supervisor
Eugcne Branch
. f:\groups\pub-data\wpdoc\reports\welds\csi65971.cin
.r-..
BRAUN'"
INTERTEC
Braun Intertec Corporation
1040-A Shelley ,Street
Springfield, OR 97477
541-746,9649 Fax: 746,7163
Engineers and Scientists Serving
the Built and Notural Environments
Jannary 22, 1999
Project EBXX"98-0181
Report 12-019-0223
Mr. Gabc Godwin
CSI Constrnction
7515 NE Ambassador PI.
Portland, OR 97228
Re:. Cincmark U.S.A. - Movies 17
2900 Gateway Blvd.
Springfield, Oregon
B.P. No. 98-0538 I P.O~ No. 506
CONCRETE INFORMATION
Morse Bros., Inc.
60'
/-~
.01115/99
6 x 12
3/4"
4"
ASTM
53'
2:35 p.m.
10.0
I'
Cloudy
R. Crawford
Canopy piers (10). Con,tractor was ad,,'ised of on-site test results.
COl\olr~i;;;;.ii)N TEST RESULTS
I
I
I
II
01122/99
29.2
3020
-7 day
02/12/99
,
!
02/12199
,
7 day
28 day
,
IIOLD
,
HOLD
c:
I
City of Springfield
rJ.A. Fuess Partners
I
Morse Bras, Inc.
.'
Kip Daniel, Architect
Cincmark U.S.A.
,
I .
This report is submitted as the confidential property of our client and is intended for the use of our client only, No other person
or entity, may utilize this report or any portion thereof without our written authorization.
f: \groups \ p~b-da ta \ wpdoc \cy I ioders \cs i0223 . c in
I
BRAUN'"
I NTE RTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541 -746-9649 Fax: 746-7163
Engineers and Scienfisfs Serving
the Built and Natural Environments
'January 21, 1999
Project EBXX-98-0181
Report E-65949
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
'Dcar Mr. Godwin:
Re:
Cinemark USA - Movies 17
2900, Gateway
Spri~gfidd, Oregon
B.P. #98-0538 / P.O. #506
January 20, 1999
D. Webbcr AWS# 93050801/ICBO# 1033346-85
KD Steel
Perfonncd visual inspection on the stadium structural steel seating framcs for anditorinms 9 and
11. Cross bracing was installed and the A325 high strength bolts wcrc brought into snug tight
condition. Puddle welds and button punch was completcd on steel mclaldecking.
To thc best of our knowledge the ,,:ork checked is in conformance with approved plans, change
orders, spccifications, and applicable codes. Contractor was asked to notify our office when
additional services are needed.
Sincerely,
KV ~~)
Raymond V. Aliperti, Supervisor
Eugene Branch
m L 01tw.L( CPj'\
Michael L. Meyer, Principal
Willametie Valley Operations Manager
c: Kip Daniel - Architect
Cinemark Theaters
L.A. Fuess Partners
~ity of Springfield
f:\groups\pub-data\wpdoc\rcports\welds\csi65949.cin
I
BRAUN'"
INTERTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
DAIL Y FJELD REPORT
January 19, 1999
CSI Construction, Inc,
Cinemark USA - Movies 17
2900 Gateway BI. .
Springfield, Oregon
Reinforcing Steel,
Reinforced Concrete
Remainder of canopy pier footings and continuous footings between piers south of
building, east half.
ProjectNunib~r:. . '. .l
Report Niiinber:..
EBXX"98-0181
E-65934
506
98-0538
Rain
Canopy Piers
Performed visual inspection of reinforcing stec1 in locations listed above. Reinforcing steel was checkcd for gradc, size,
lap, placement and clearances where applicable. Reinforcing steel was secured with lie wire and manually. supported
during placement of concrete to ensure proper clearance. Rebar was placed in accordance with on-site approved plans
and specifications.
Performed periodic inspection during placement of concrete. Concrete was placed by pump and mechanically
oonsolidated. Cast one set of four (6 x 12) concrete test cylinders. Contractor was advised of on-site test results and
notity our office whcn additional serviccs are needed.
~otal cub~c yardsplaced:
Inspector' ~trawford - ICBO# 883234-88
Concrete
Morse Bros., Inc. I
40-IN I
4"
I
, 450 I
530 I
30:10 a.m. il
,
4 (6 x 12) 'I
3000 I
20.0 I
U you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c:
Kip Daniel, Architect
Cinemark lobsite fax - 746-1881
. ,
Cine mark Theaters.
L.A. Fuess Partners
City of Springfield
As a muhlal prote'ction to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and,are intended for the use of our clients
only. No' other person or entity may utilize the report or any portion thereof without our written authorization. .
f:\groups\pu b-data \ wpdoc \reports \insp \csi6 5934:cin
~..,
I
BRAUN'"
INTERTEC
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and ScientistS Serving
the Built and Natura! Environments
January 18, 1999
Project EBXX.98-0 181
Report 12-128-0166
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
Springfield, 9rego,n
fl.P_ No. Y8-0S,8 ; P.O. No. 5U6
CONCRETE INFORMA nON
6 x 12
3000
71/2"
30-LW
Morse Bros., Inc.
390427
2 day F.C./remainder UBC
Super Plasticizer
50'
10.0
Clear
D. Smith
Auditorium # 6 and 7 tiered seating base. Contractor was advised of on-site test.
results.
I
II
I
l
c' " (;lty 01 Sprmgfie1d
" LI.A,"Fuess Part~e~s"
".: ;" Mor'se:-B'~~s,_ i~c,
. JI . .
I
"j
I
I
,
ti/28/98 22.1 2410
,
I I
t2/28/98 22.1 2530
01/16199 I 22.2 3290
01;16/99 I 22.1 3330
-
2470
7 da)'"
7 da)"
28 day I
28 day I
3310
KIP Uaniel, Architect
Cinemark U.S.A.
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or emity may utilize this report or any portion thereof without our written authorization.
f\groups\pub-data\ wpdoc\cylinders\csiO 166 .cin
BR4UN'"
I NTE RTEC
,
~raun Intertec Corpt?ration
1 04~A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Buil, and Natural EnvIronments
DAILY FIELD REPORT
. ]
<,-:-:-.
January 15, 1999
CSI Conslruction, Inc.
Cinemark USA - Movies
2900 Gateway !'l1::.
Springfield, Oregon
Reinforcing Steel,
Reiruorced Concrete
Ten (lO)'west canopy piers south of building.
Project Number:. .... J
Report Number: "1
17 P,O. Number: . . .... . .1
Building Permit Number
I Date:.'
EBXX-98-0181
E-65892
506
98-0538
Cloudy
Canopy Piers
Tested For:
Performed visual inspection of reinforcing steel in location listed abovc. Reinforcing steel was checked for grade, size,
lap, placemcnt and clearances where applicable. ,Reinforcing steel was secured with tie wire and mats supported
manually during placement of concrete to ensure proper clearance. Rebar was placed in accordance with on-site
approved plans and :specifications.
Performed cominuous inspection during placement of concrete. Concrete was placed directly from truck and
mechanically consolidated. Cast one set of four (6 x 12) concrete test cylinders. Contractor was advised of on-site test
results and asked to notify our office when additional services are needed.
Concrete
Morse Bros., Inc.
30-1N
4"
530
600
2:35 p.m.
4 (6 x 1,2)
20.0
,I
JI
-,('\1""
.;JJ'Y..-'.
R. Crawford - ICBO# 883234-88
I
,
If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c:
Kip Daniel, Architect
,
Cinemark Jobsitc fax - 746-1881
Cinemark Theaters
L.A. Fuess Partners
City of Springfield
,
As a mutual protection to c1i~nts, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients
only. No other person' or entity may utilize the report or any portion thereof without our ~ritten authorization.
f\groups\pub-data \wpdoc \reports\insp \csi6 5 892.cin
I
BRAUN'"
I NTE RTEC
Braun Intertec Corpor:ation
1 040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fox: 746-7163
Engineers and Scientists Serving
the Built and Natural Environmenfs
January 13,1999
Project EBXX-98-0181
Rep?rt .12-128-0148
Mr. Gabe 'Godwin
CSl Construction
7515 NE Ambassador PI.
Portland,.OR 97228
Re: Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
Springfield, Oregon
B.P. No. 98-0538 I P.O. No: 506
CONCRETE INFORMATION
12115/98
4000
2x2
sand
10.0
22"
Mix 10
Eugene Sand & Gra,:eI
1611590
ASTM'
44'
58'
4:00 p.m.
25.0
2
Partly "Ooudy
S. Wilder
Auger Pine nlimbers 1 thru 20. Load 2 placed 7 thru 14.
on-site test results.
COMPRESSIUJ' i >:,,1 Ki"l1L TS
Contractor was advised of
-1
I 12/22/98 I I 3900 7 day
I 12122/98 I I 3625 3765 7 day
I 01/1219,9 I I 4750 28 day
01lt2/99 I I 5050' 4900 28 day
HOLD I I ,HOLD
.,
nOLD I J HOLD
c: City of SpnngfIe1d Kip Daniel, ArChltcct
L.A. Fuess Partners Cinemark U.S.A. Morse Bros., Inc.
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion thereof without our written authorization.
f: \groups\pu:b-data \wpdoc\cylinders\csiO 148 .cin
i
I
,
I
I
1
I
i
BR4UN'"
INTERTEC
,
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746,7163
Engineers.and Scientists SelYing
the Built and Notllral Environments
January 13, 1999
Project EBXX"98-0181
Report 12-128-0149
Mr. Gabe.Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: . Cinemark U$.A. - Movies 17
2900 Gateway Blvd,
Springfield, Oregon .
B.P. No. 98-0538 I P.O. No. 506
CONCRETE INFORMATiON
Eugene San~ & Gravel
12/17/98 ~1
4000 I
10.0 I
Mix 10 I
1612090
2x2
Mix 10
25
I
I
I
I
I
Auger Pile nuinbers 21 thru 44. Load 3 placed 37 thru 44. Contractor was advised of I
on~site test results. 11
ASTM
58'
39'
12:30 p.m.
27.0
3
Fog
S. Wilder
COMPRESS1ul"ii:ST RESULTS
12/23/98 3430
I 12/23/98 3350
I 0l/13/99 5750
L 0l/13/99 5930
HOLD I
HOLD I
c: <;lty of Spnngheld Kip Damel, ArchItect
L.A. Fuess ~artners Cinemark U.S.A.
Eugene Sand and Gravel
7 day
3390
7 day
28 daJo:
5840
28 day
HOLD
HOLD
This reportis submitted as the confidential property of our client and is intended fOf the llse of our client only. No other person
or entity mdy utilize this report or any ponio~ thereof without our written authorization.
f: \grou ps \ pu b-data \ wpdoc \c y linders \csiO 149. cin
I
I
I
BR4UN'"
INTE'RTEC
, '
,
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fox: 746-7163
Engineers and Scienfists Serving
the Bvilf and Natural Environments
DAILY FIELD REPORT
CS1 Construction, Inc.
Cinemark USA - Movies 17
2900 Gate'way Bl.o 'Ili1H~i!igg~rijij(Ni1ijib.~ri
Springfield, Oregon
EBXX-98-0181
E-65887
506
98-0538
Reinforcing Steel,
Structural Masonry
8" interior-"CMU'block w'lil'south exit on west side, (0 to 8" CMU'olock walls
trash enclosure (0109'4'');' 8'.CMU columns north and south exit on west side (0 to
4101').
Rain
Performed visual inspection of reinforcing steel in locations listed above. Reinforcing steel was checked for grade, size,
lap, placement, and clearances where applicable. Reinforcing steel was placed in accordance with approved plans and
I specifications. Grout cells were relatively clean and frec of excessive mortar projections.
Perfonned continuous inspection during the placement of grout. Grout was placed by pump and mechal}ically
, 'consolidated. All cells grouted solid except for interior CMU walls at south exit on west side where only cells
oontaining reinforcing stecl were grouted. Contractor was asked to notify our office when additional services are
II needed.' . .
I
Grout
Morse Bros., Inc.
7-G
9"
510
610
11 :30 a.m.
o
2500
9.0
11
I
,
I Design Strength.' . .... ....1
II Total cubic yards placed: '1
Inspector: R. Crawford - ICBO# 883234-84
If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c: Kip Daniel, Arcliitect
Cinemark Johsite fax - 746-1881
Cinemark Theaters
L.A. Fucss Pkners
City of Springfield
,
As a mutual protection to c1i~nts, the public, and ourselves, all reports are submitted.a..~ the Confidential property Of clients and are intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without OUf written "-authorization.
,
f: \groups \pub-data \wpdoc\reports\insp \csi6 5 887. ein
..,
I
,
. I
BRAUN'"
I NTE RTEC
I
,
Braun Intertec Corporation
1040-A Shelley Street
. Springfield, OR 97477
541-746,9649 Fax: 746,7163
Engineers and Scie~tists Serving
the Bu;!t and Natural Environments
January 12, 1999
Project EBXX -98-0181
Rcport E-65812
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr. Godwin:
. Re: .Cincinark USA "" 1\'lovic~.17'
2<)00 -Gateway
Springfield, Oregon
B.P. #98-0538 1 P.O. #506
Weldments
January 07, 1999
D. Webber AWS# 930508011 ICBO# 1033346-85
KD Steel'
CS1 Construction
,
Performed visual inspection on the stadium structural steel seating frames for auditoriums 12, 13,
'.1 and 14. Cross bracing was installed and the A325 high strength bolts were brought into snug
tigbt c'J!!ci!ion.
.To'ihe b~kt"~f our knowledge the work checked is in conformance with approved drawings,
change ordcrs, specifications, and applicable codes. Contractor was asked to notify our office
when additional services arc needed.
,.,
Sincerely,
m L rYlelJ{ fY))
Michael L.- Meyer, Principal
Willamette'Valley Operations Manager
, .
RV OtJt{U/WJUJ;)
Raymond V. Aliperti, Supervisor
Eugenc Branch.
c: Kip Daniel - Architect
Cinemark Theaters
I
L.A: Fuess Partners
,
City of Springfield
i
f:\grou ps\pub-~ata \ wpdoc\reports \we Ids\csiG 5 812.cin
-;..:.c,..
I
I
I
BR4UN'"
INTERTEC
Braun Intertec Corporation
1040-A Shelley Streer
Springfield, OR 97477.
541 -746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Buil, and Natural Environments
January 11, 1999
Project EBXX-98-0181
Report E-6581O
. Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr. :Godwin: .
Re: qinemark USA, Movies 17
2900 Gateway
Springfield,Oregon
B:P. #98-0538 / P,O.'#506
Weldments/HSB
January 06, 1999
D. Webber AWS# 93050801/ICBO# 1033346-85
KD Steel
I
I
PerfonIled visual inspection on the stadium structural steel seating frames for auditoriums 3, 4,
6,' and 7- Cross bracing was installed and the. A325 high strength bolts were all brought"into
"snugltight" conditi(}~.' Sheet met:!! ,deckip..g was also completed. .
Performed inspection on all typical slide bearing assemblies (detail 8/S502 at roof level grid'line .
L between 5 and 19. Joint assemblies were all completed at the time of inspection. To the'bcst
of our knowledge the work checked is in conformance with approved drawings, change o~ders,
specifications, and applicable codcs. Contractor was asked to notiJy our office when additi9nal
services are needed.
Sincerely,
/Jl t /lJa;tIV 1:1)
Michael L. Meyer, Principal
Willamette Valley Operations Manager
I({/ ~U?)
Raymond V. Aliperti, Supervisor
Eugene Branch
c: Kip Daniel, Architect
Cine mark Theaters
I
L.A. Fuess Partners
City of Springficld
I
I\groups\pub-data\wpdoc\repor1s\welds\csi658l a.cin
. I .
BRAUN'"
INTERTEC
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541,746-9649 Fax: 746-7163
Engineers and ScientiSfS Serving
the Built and Natural Environments
Janua.ry 11:, 1999
Project EBXX-98-0181
Report 12-128-0186
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re:
Cincmark U.S.A. - Movies 17
2900 Gateway Blvd.
Spri~gfield, Oregon
B.P, i~o. 9~-u538 IP;O;i'~o.' 506-
. -- - ~ . .'. -' ".. " ~ ....
CONCRETE INFORMATION
:~
12/31/98
II
I
I
I
I
I
I'
i
I
I
6 x 12
:3/4"
4"
Morse Bros., Inc.
ASTM
45'
8:20 a~m.
1
Void fonn stcps in auditoriums 11 and 12, mezzanine stairs at lobby, a~d tiered se,ating.
steps auditorium 2 lower half and auditorium 3 east side, Contractor 'Xas ad"'iscdof
on site test. results.
TLS'I' K~SUl./r:S
01/07/99
I
I'
01/28/99
I
CIty of SpringfIeld
. L.kFuess .Partners
Morse Bro~; Inc.
,
28.6 4070 7 day
28,6 4030 4050 7 daJ'
I 28 day
~ 28 day
01/07/99
I
01/28/99
c:
Kip Daniel, Archltcc~
Cincmark U.S.A.
This report i~ submitted as the corifidential property of our client and is intended for the use of our client only. No other person
or entity ma}; utilize this report Dr any PC:!:0fl thereof without our written authorization.
I
f:\groups\pub-data\ wpdoc\cylinders\csiO 186.cin.
,
_t ~_I '-:" _..
.....
BRAUN'"
,
INTE[RTEC
,
Braun Intertec Cor'poration
1040-A Shelley Street
Springfield, OR 97477
541,746-9649 'Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environmenfs
January 5, 1999
Project EBXX-98-0 18)
RcportI2-128-0114
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland; OR 97228
Re: Cinemark U.S.A. - Movies 17
2900 Gate,,:'ay Blvd.
'SI)' rir;-(Jfjplrl Or~'>.(TDn~
~. - ....e..- .", ---e
B.P. No. 98-0538 / P.O. No. 506
CONCRETE INFORMA nON
. IMTEREO;ivED' ..' 112/09/98
12/08/98
6 x t2
3000
3/4"
S",
30-LW
Morse Bros., luc;
390222
ASTM
Light Weight
400
590
8:15 a.m.
10.0
I
- S. Wilder
Stadium seating - Auditorium 2. Contractor was advised of on-site test, resul;~s.
COl"iPRESSiOi, i EST RESULTS.
i I
12/15/98 22.7 2900
I
I I
12/15/98 . 22.7 2760
I
1 I
lI05/98 22.7 3570
l lI05/98 I 22.7 3620
c. City of Springfield Kip Datiiel, Architect
L.A. Fuess Partners Cincmark U.S.A.
.J.,__ Morse Bros., Ine.
\
7 day
2830
7 day
28 day
3595
28 day
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity may, utilize this report or any .porti90' thereof without our written authorization.
f: \groups\pub-data \wpdoc\cylinders\csiO 114.cin
I
BRAUN'"
I NTEjRTEC
,
Braun Intertec Corporation
1040-A Shelley'Street
Springfield, OR 97477
541,746-9649 Fax: 746-71'63
Engineers and Scientists Serving
the Built and Nafural Environmenfs
DAIL Y FIELD REPORT
January 04, 1999~t9j~~tN~m~~t:i
CSI Construction, Inc.
Cinemark USA - Movies 17
2900 Gateway BL )
Springfield, On;gon
Reinforcing Steel
EBXX-98-0181
E-65767
506
, 98-0538
Clear
Footings
I
II
- Sman-ilOSC step !"iJ(}lliS I! and -12; large nose step moms 13 and 14; tier ~eatii1g steps
room 3; suspended roof slab exits rooms 11, 12, and 15; footings west side exits of north
and south hall.
Pcrformed visual inspection of reinforcing slee] in the above listed locations. Rcinforcing steel was checked for
size, lap, placement,. and clearances where applicable. Reinforcing steel was sccured with tie wire and supported by
concrete dobie blocks and previously placed concrete whcre applicable 'and was placed in accordance' with approved
jobsitc plans, specifications, and latest revisions. Contractor was asked to notify our office when additional services are
needed.
pector:
-rCrawford - ICBO# 883432-88
If you have any questions reg~rding this report, please feel frcc to call Raymond V. Aliperti at (541) 746-9649.
c: Kip Daniel, A'rchitect
LA Fuess Partners
Cinemark Jobsite fax - 746-1881
City of Springfield <
Cine mark Theaters
CSI Construction
As a mutual protection"to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and arc intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.
f: \groiJ ps \pu b -data \wpdoc\rcp:orts \insp \csi6 5 7 67. em .
I
, ,
".
.~ -, -, ...., , .
,
BRAUN'"
I NTE RTEC
Braun Intertec Corporation
1 040-A Shelley Street
Springfield, OR 97477
541,746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
DAILY FIELD REPORT
".!lt~j~~t..'N~ii\~.~.e.
~.'-"""""""""""--"""""'"
. .. ..
,..,.,...,....-,.,.......,..,........,...
.......-...--,--..... ..
.......................
.... ..................
___._u___.__....... o.
.. ...............
....... .............
CSI Construction, Inc.
Cinemark USA - Movics 17
2900 Gatcway BI. ~.
Springfield, Oregon
Reinforcing Stcel,
Reinforced Conctetc"
EBXX-98-0181
E-65749
?Q6,
98-0538
. P,O:Numbc.r:>' .
'.. Hu ild ing .Perrilit..N urn bc~">.
Overcast
II
I
I
Stairs
Il~jjf~;nsM?f~1jjm(m;i(.... See Field Obscrvations
Perfonncd visual inspcction of reinforcing steel of void form steps of auditorinm 11, 12, and tiered scating steps of
auditorium 2 (lower half), and auditorinm 3 (east side). Reinforcing steel was chccked for gradc, size, lap, placcment
and clearances wherc applicable. Reinforcing steel was sccured with tic wirc and placed in accordancc with on-site
approvcd plans. Embeds were p1accd at void form stcps to line up with structural scating'snpport mcmbers.
..Cast one set of four (6 x 12) concrete test cylinders. Contractor was asked to notify our office whcn additional scrvices
are nccdcd.
Concretc
Morse Bros., Inc.
35-IN
4"
450
540
8:20 a.m.
IPf~i~rT~!ff~~~.:.)'i'........... ........................ ................
1'!;~t~Ffjj~gillf~~pl~Sf(\:'" .
Inspector: D. Smith - ICBO# 87332
I
I
If yon havc any qncsti9ns regarding this rcport, please fccl frec to call Raymond V.
4 (6 x 12)
3500
30.0
I
JI
Aliperti at (541) 746-9649.
c:
!
Kip Daniel, Architect
Cinemark Jobsitc fax - 746-1881
Cincmark Thcaters
L.A. Fucss Partners
City of Springfield
As a mutua] protection to clients, the public, and ourselves, all reports arc submitted as the confidential property of clients and arc intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.'
f: \groups\pub-data \wpdoc\reports\insp \cs i6 5 7 4 9. cin
,~,
BRAUN'"
INTE'RTEC
December 30, 1998
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste.
Portland, OR 97228
Re: Cincmark U.S.A. - Movics 17
2900 Gatcway Blvd.
Springfield,' Oregon
B.P. No. 98-0538 I P.O. No. 506
Braun Intertec Corporation
1040-A Shelley Street .
Springfield, OR 97477
541-746-9649 'Fax: 746-7163
Engi,neers and Scientists Serving
the Built and Natural Environments
Project EBXX-98-0181
Rcport 12-128-0099
CONCRETE INFORMATION
12/02/98
D. Delatte
Auditoriums 1 and 2, 'void form steps. Load ~Iaced in auditorium 1. Contractor I
was advised of on-site test results., , ~
COMPRESSION TEST RESULTS
12/01/98
6 x t2
3/4"
4)/2"
Morse Bros., Inc.
ASTM
46'
1:00 p.m.
3500
35-IN
390175
60'
10,0
Overcast
12/08/98 28.3 3010 7 day
,
I
12/08/98 28.4 3010 3010 7 day
t2/29/98 28.3 3750 28 day
12129/98 28.4 3910 3830 28 day
c: CIty of Springfield Kip Daniel, Architect
L.A. Fuess Partners Cinemark U.S.A.
I
Morse Bros., Inc.
:.
This report is submitted as the confidential propehy of our c1iem and is intended for the use of our client only, No other person
or entity ma'y utilize this report or any portion thereof without our written'au~orization,
L \grou ps \pu b-data \ wpdoc \c y I inders \csi0099 ' cin
>_~.i
BRAUNS"
INTERTEC
\"'
Braun Intertec Corporation
1 040-A Shelley Street
. Springfield, OR 97477
541-746-9649 Fax: 746,7163
Engineers and Scientists Serving \
the Built and Natural Environments
December 30, 1998
Project EBXX-98-0181
Report 12-128-0166
Mr. Gabc Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: Cinemark U,S.A. - Movies 17
2900 Gateway Blvd,
Springfield, Oregon
B.P. No, 9~-0538 I P.O. No. 506
CONCRETE INFORMATION
I DATE CAST'
12/t9/98
12/20198
. 6 x 12
3000
71/2"
30-LW
I
"
!\.-lorse Bros., Inc.
390427
2 day F.C.lremamder UBC
Super Pla'sticizer
25'
50'
9:00 a.m.
10.0
I
Clear
[i
D. Sinith
Auditorium # 6 and 7 tiered seating base. Contractor was advised of o.n-site test
results. .
cOlVi~i{i,,:;i01~i ",~T RESULTS
.J
II 12/28/98 22.1 24tO 7 day I
12/28198 22.1 2530 2470 7 day I
I 01/16/99 28 day I
,
I' I I
L 01116/99 28 day
c: City of Springfield Kip Danie1,ArchItect
rJ.A. Fuess Partners 'Cinemark U.S.A.
,
Morse Bros, Inc.
I
,
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity mar utilize th.is report or any portion thereof wi~out our written authorizatio'n.
f: \grou ps \pu b-data \ wpdoc \c Y [inders \cs iO 166. c in
BRAUN'"
INTERTEC
Braun Intertee', Corporation
2285 Nugget Way
Eugene, Oregon '97403
541-746-9649 Fax: 746-7163
Engineers 'and Scientists Serving
the Built and Natural Environments
December 29, 1998
Project EBXX-98-0181
Report 12-128-0149
Mr. Gabc Godwin
CST CO!lstruction
7515 NE Ambassador PI.
Portland, OR 97228
Rc: Cincmark U.S.A. - Mc,,'ics 17
. 2900 GHtcwa~' BI\'t1~
Springfield, Orcg~m
B.P. Nu. 98-11538 ('P.O. No. 5lJG
CONCRETE INFORMATION
12/16/98
12/17/98
2 x 2
4000
l\lix 10
10.0
25
l'\'lixlll
Eugene Sand & Grll\'d
1612090
I
ASTl\1
.390
58.0
12:30 p.m.
27.11
I
3 Fog I
S. Wilde.' I
Augel' l)ile numhers 21 thn.i .U. Ln:ul 3 plac('d 37 thru +t COlltmctUl' WllS advised of I
on-site test results.
. COMrKt,S"ION TEST RESULTS
-,
II 12/23198 I 3-130 7 day
I . 12/23/98 I 3350 3390 7 day I
I 101/13/99 I 28 day I
I 0l1t3/99 I 28 dll:Y I'
I HOLD I I HOLD I
,I HOLD 1____L~ 1I0LD J
c: 'Clly or SpnngfJelcl Kip Dan"icC-Architccl
L.A. Flll':SS Partners Cincmark U.S.A.'
~ Eugl:lll: Sand Ilnd Gruvcl
This r<:poi1 is sllbl1litt~d as the ('onlid~l1tiaJ propeny of our client and is iJ1t~nd~d for the use of our client only.
or entity l;nay tllilize this r~p()n or any pOl1ion Illereo[ without ollr wrill~ll authorizatkm.
,
No other person
f:\groups\pub-dala \wpdoc\cy limkn;\csiO 149 .ci~
BRAUN'"
I NTE!RTEC
1
Braun Jntertec corporatJlN ~
II U . 1l/0n
1040-A She ey Street '~<.u
Springfield, OR 97477
541 -746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Nafural Environments
"
DAILY FIELD REPORT
December 28, 1998
CSI Construction, Inc:
Cinemark USA - Movics 17
2900 Gateway Bl, I ~W'9iijggsffuitNijm~(;r .
Springfield, oregon
Reinforcing Steel
Steps 'and. ramps for auditorium 1.
- '~...".
EBXX-98-0181
E-65713
506,
'-
98-0538 :7
N/A
Steps, Ral,!ps
I
j-t
Perfonned visual inspection of reinforcing steel in thc above listed locations. Reinforcing stecl was checked for grade,
size, lap, placement, and clearances where applicable. Reinforcing stccl was secured with tie wire and placed in
accordance with approved plans. Contractor was askcd to notify our office when additional services are, necded.
Inspector:
,S. Wilder - ICBO#.72031
If you havc any questions regarding this report, please fcel free to call Raymond V. Aliperti at (541) 746-9649.
'\ Kip Daniel, Architcct
L.A. Fuess P~rtners
Cinemark Jobsite fax - 746-1881
City of Springfield
Cinemark Theaters
,
,co'j
., ::. '~ I
1. ~ "
J~..
.,'
As a mutual.protection to clients, the public; and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our c\ients
only. No. other person or entity. may utilize the report or any portion thereof without our written authorization.
f: \grou ps \pub-data \ wpdoc \reports \ins p \cs i65 713. cin
,
1
I
;:C :,
BRAUN'"
,
INTERTEC
Braun Intertec: Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers. and Scienfists 'Serving
the Buil, and NatUral Environments
December 23, 1998
Project EBXX-98-0181
Report 12-128-0149
Mr. Gabe Godwin
csr Construction
7515 NE Ambassador PI.
Portland, OR 97228
,
Rc: Cinemark,U.S.A. - Movics 17
.2900 Gateway Blvd.
Springfield, Oregon
B.P. No. 98-0538 I P.O, No. 506
CONCRETE INFORMATION
12/16/98
4000
2 x 2
Mix 10
10.0
25
;Vlix 10
Eugene Sand & Gravel
161209D
ASTM
39'
58'
12:30 p.m.
27.0
i
I
I
3
Fog
I
Auger Pile ,numbers 21 thru 44. Load 3 placed 37 thru 44. Contractor was ad,"'jsed of II,
on-site test results.
S. Wilder
COMPRESSION TESl i<I:i>uLTS
12/23/98 I I 3430 I 7 day
t2123/98 I I 3350 3390 7 day
,
i I I
01113/99 28 day
,
01113/99 I I 28 da:r
HOLD I I HOLD
HOLD I, I HOLD
,. C;ity of Spnngfield Kip Daniel, Architect
L'.A. Fucss Partners Cincmark U.S.A.
;..
Morse Bros., Inc.
I
I
I
I
This report i,s submitted as the confidential property of our client and is intel~ded for the use of our client only. No other, person
or entity may utilize this report or any ponion thereof without our written authorization.
f: \groups\pub-data\wpdoc\cylinders\csiO j 49.cin
I
I
r
BRAUN'"
I NTERTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and Scientisfs Serving
the Builf and Natural Environments
December 22, 1998
Project'EBXX-98-0 181
Report 12-128.0148
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Re: Ci~emark~'U.S.A. - Mo,-ies 17
2900 Gateway Blvd.
Springfield, Orcg:~n
B.P, No. 98-0538 I P.O. No, 506
CONCRETE INFORMATION
12/15198
2 x 2.
sand
22"
Eugene Sand & G['3nl
ASTM
44'
4:00 p.m.
2
Auger Pine numbers 1 thlll 20. Load 2 placed 7 thru 14. Contractor was ad"'Lscd of
on-site test results.
COMPRESSION T"-,,, K"-,,ul,TS
I
12/22/98 3900 7 day I
12/22/98 3625 3765 7 day I
01/12/99 28 day I
, I
01/12199 28 day
HOLD HOLD I
HOLD HOLD
~. CIty otSpnngt'lcld Kip Daniel, Architect
L.A. Fuess Partners Cinemark U.S.A.
,~ Morse Bros., Inc.
This report is submitted as the confidential property of our client and is intended for the use of our client only: No other person
or entity may utilize this report or any portion thereof without our written authorization.
f: \groups \ pub-d ata \ wpdoc \cy] inders \cs iO 148. c j n
:' '."," ~,
;..f)
BRAUN'"
INTERTEC
Braun Intertec Corporation
1040-A Shelley Street
Springfield, OR 97477
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
I Date: .' .
DAilY FiElD REPORT
December 19, 1998!'T9j~~!N~wb~hi
CSI Construction, Inc.
Cinemark USA - Movies 17
2900 Gateway Bt
Springfield, Oregon
Reinforcing Steel,
Reinforced Concrete
EBXX-98-0181
E-65691
596
98-0538
Clear.
Tiered Seating
I
I
'\
I
I
I
Performed visual inspection of reinforcing steel on auditorium #6 and #7, tiered seating area. Reinforcing steel was
checked for gra?e, size, lap, placement and clearances wherc applicab1c. Reinforcing steel was secured with tie wirc
and placed in accordancc with on-site approved plans.
Performed continuous inspection during placement of concrete. Concrete was placed by pump and hand screeded. Cast
set of fonr (6 x 12) concretc test cylindcrs. Contractor was asked to notify our office when additional services are
nceded.
r Concrete
Morse Bros., Inc.
30-LW
7 1/2"
500 I
250 I
9:00 a.m. I
4 (6 x 12) I
3000 \
50.0 I
If you have any questions regarding this report, please fce1 free to call Raymond V. Aliperti at (541) .746-9649.
c:
Kip Daniel, Architect
Cinemark Jobsite fax - 746-1881
Cine mark Theaters
L.A. Fuess Partners
City of Springfield
As a mutual protection to cli~nts. the public, and ourselves. all reports ar~ submitted as the corifldential property of clients and are intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.
f:\groups\pub-data\wpdoc\reports\insp\csi65691.cin
.' ,..-
>-
(
BRAUN'"
INTERTEC
,
Braun InterteC Corporation
2285 Nugget Way
Eugene, Oregon 97403
541.746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
December 18, 1998
Project EBXX-98-0181
Repon E-65679
Mr. Gabe Godwin
CSI Construction, Inc.
7515 NE Ambassador PI., Ste. E
Ponland, Oregon 97228
Re: Cinemark USA - Movies 17
2900 Galeway Blvd.
. Springfield, Oregon
B.P. No. 98-0538 I P.O. No. 506
Dear Mr. Godwin:.
Performed continuous inspection during the installation of the auger cast piling on December 15 and
16, 1998, at the above referenced project.
All piling were drilled into the native gravel strata using a crane lilOunted 14" continuous flight hollow
shaft auger.' Reinforcing steel cages were secured with tie wire and placed in accordance with
approved prints with the following exception: Venical rebar was 20' long (18' specified) eliminating
the need for thc four #5 dowels specified in detail 02/S3.0 1. (Note: Advised by contractor that project
engineer:veJbally approved revision).' Clearances on rebar cages was maintained with plastic radial
. spacers. Grout test cubes were cast daily and compression results will he reponed under separate cover
as tests are completed. Please see attached log for additional data and eoclosed panial copy of drawing
S2.05 for pile locations. ..
If you have any questions or need additional infonnation, please feel free to contact our office.
Sincerely,
m L ItJ&jw C4)
Michael L. Mcyer, Principal
Willamette Valley Operations Manager
I
c: City of Springfield
Kip Daniel, Architect
L.A. Fuess Panners Architects
Cinemark Theaters
Attachment
,-
f: \g roup s \pu b-data \wpdoc \reports\p iling\c si6 5 6 79 . c in
-;--
CSI Constmction, Inc.
Project EBXX-98-0I8I
Report E-65679
pecember 18, 1998
.Page 2
Pile Log
I December 15, 1998 I
I I 14 20'
I 2 14 20
I 3 14 20 "
I 4' . -- - . 15 20
I 5 15 20
I 6 15 20
I 7 15 20
I '8 15 20 I
I 9 14 20 I
I 10 14 20 I
I 1I 14 I 20 I
I 12 15 I 20
I 13 ]4 I 20
I 14 I 14 I 20 I
I 15 I ,15 I 20 I
I 16 [5 I 20 I
I 17 15 20 I
I 18 15 20 I
I 19 15 20 I
I 20 15 20 I
I December 16, 1998 I
I 21 15 / 20
I 22 15 I 20
I 23 15 I 20 I
I 24 14 I 20 I
.or"
~
CSI COIlSlmClioll, Inc.
Project EBXX-98-0181 .
Report E-65679
December 18, 1998
Page 3
Pile Log (con!.)
I ,
December 16, 1998 (cont.)
I
25 15 20
,
I
26 -15 20
, '
27 :15 20
28 - -- 15 20
I
29 14 20
,
I
30 .15 20
, ;:
31 ,15 20 'I
I 32 :15 20 I
I 33 15 20 'I
I 34 15 20
Ii 35 I '14 20 I
,
I I ,
36 :15 20
I I I
37 '15 20
I 38 I )5 20
I I j I
39 15 20
II I I I
40 15 20
I At approximate lines 15 20 I
I-P i
I At approximate lincs :15 20 I
l-N ;
i
, I
At approximate lines 16 20
I I-A !
I
I At approximate lines i6 20 J
I-B !
,'~
I
,
i
'---
.
/
i
J.--
'Lo LO,l
- - ---r--
.21:~-
@l -G)/
III
I I
Z7.!S t.o>
--:::.~h
.
~
-,
I
I
I
I
I
I
;1 /1,'-0" (-O"~
@~_ J ' \
:~r;P@ @iW~ --- ~~~~:i:D ~,-,,'
:\\ 111 1'1'
I I I I ,I I \
1>,c< LA~ It../" F". OBis> 0 ,
I Ijz.o[s..a, I '" h. &...",;"",1 I II
, I I 'T'IP. I . S,H U",,"F. I I 'I
~ r-I \ \' i r-I, -, '1'1~. - ,- '
_ ~~\~c:m= ~ e ~~;~tj (Lf)- -.r1J)[~yt ~.~ fL)" -"-Z'-b"
. _~== 1~-'\ 1_\~ -(I 1'->'1,"
~ ""'-'P'Il~e S" _ 1J1/s%..o~ '?12.0.....ICE
'Xx, <;,.T1t In e:J "'T""i'?l
TY'P. I .
I.
i
-Z-o'-Cfl
,q '-10"
. rlh'f' NO. @
l'3Q.PJoN FOUNb. P\.,,~
-
"I" I "
'B = I -0
....~.. _/':;:.-.
'.><:'--"'~ .),
..'
.~5-01-98
O~. ..:'l<'- "~-<>Q ~
~~
'BRAUN'"
INTERTEC
J; ,~.,.I
Braun Intertee Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
Deccmber'17, 1998
Project EBXX-98-0181
Report 12-118-0079
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PL, Ste.
Portland, OR 97228
Re:
Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
Spririgfieid, Oi'cgon
B.P. No. 98-0538 I P.O. No. 506
-":'---
CONCRETE INFORMATION
ll/19/98
ll/20/98
~I
I
I
I
6 x t2
3500
1/2"
5"
35-58
Morse Bros., Inc.
394067
ASTM
AEA
52'
63'
t:45 p.m.
5.5
'overcast
R. Crawford
I
I
-JI'
'Yhe~l chair ramp a,t auditorium 1 and 2; cntryway roof slabs in auditOriums 3,
~;G! '''.lid 7. ,$.:;.mpJ.t.; t...~....u :it roof :;;L~:T;;'I~~:~~':':.1~; #4.. ~~m ....:.:t~ C~! ~ '.~~
advised of on~site test results. - . .
---COMPRESSION TEST RESULTS
1lI25/98 27.7 3340 6 day
t2/t7/98 27.7 4210 ~"J
,
12/t7/98 I 27.6 4120 4165 28 day
.. City of Springfield Kip Daniel, Architect
L.A. Fuess Partners Cinemark USA.
,Morse Bros., Inc.
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion thereof without our written authorization.
f: \grou ps \pu b-data \ wpdoc \cy linders \csi0079 . c in
.~
BRAUN'"
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon, 97403
541-746-9649 fax: 746-7163
Engineers dnd Scientists Serving'
the Built and Natural Environments
Dcccmber 16, 1998
Projcct EBXX-98-0 181
Report ]2-]28-0114
Mr. Gabc Godwin
CSI Construction
7515 NE Ambassador PI.
Portland, OR 97228
Rc: Cinemark U.S.A; - Movics 17
2900 Gateway Blvd.
Springficld, Oregon
B.P. No. 98-053S:lP.O. No~506 .
CONCRETE INFORMATION
12/08/98
3000
6 x 12
3/4"
8"
30-LW
Murse Hros., Inc.
390222
ASTM
Light \Veigllt
40'
59'
8: 15 a.m.
to.O
s. Wilder I
St~dium seating - Auditorium 2. Contractor ":as advised of on-site test results. j
,
COMPRESSION TEST RESULTS
I
I
I
l
Itl15/98 22.7 2900 7 da:y
12/15/98 22.7 2760 2830 ,7 day
lI05/98 I 28 day
lI05/98 .~28day
=
c:
City of Springfield
L.A. Fucss Partners
Morse Bros., Inc.
Kip Daniel, Architcct
Cincmark U.S.A.
":-0:.."'"
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or emity. may iJtilize this report or any portion thereof without our written authorization.
f:\groups\pub-data\ wpdoc\cylinders\csiO 114. cin
~-
,
BRAUN'"
INTERTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746.9649 Fax: 746-7163
Engineers and Scientisfs Serving
the Built and Notural Environments
December 16, 1998
. Project EBXX-98-0181
Report E-65644 .'
Mr. Gabc Godwin
CSI Construction
7515 NE Ambassador PI, Ste. E
Portland, Oregon 97228
Dear. Mr. Godwin:
,.,
Re: Cinenlurk USA - 'l\'!o,.ies 17
2900 Gateway
Springfield, Oregon
B.P. #98-0538 I P.O. #506
Decembcr 15, 1998
D. Webber AWS# 930508011 ICBO# 1033346-85
KD S tccl
Pcrformed visual inspection .on the stadium structural steel seating frames for auditoriums 5. '
Cross bracing was installed and the A325 high strength bolts, were all brought into ':snug tight"
condition. Sheet metal decking was puddle welded at ev~,ry low !lute and 6" on cenler at I
I perimet~rs. To. the h,est .of our. .1<no\vledge) 'york c-J~ecke(l is in, c<:nfonnance .wittl. design
I drawings, spccifications and applicable codes with thc exception of ihe following: Typical slidc 1\
bcaring asscmblies (detail 8/55.02) at roof level grid line L betwcen' 5 and 19 arc in
nonconformance with approved drdwings. Contractor was notified of on-site inspection results
, .
and was asked to notify our office when additional serviccs are needed,
5inccrcly,
rv\;lJ .~ CJj')
Michael L. Mcyer, Principal
WilIamette Vallcy Operations Manager
rzv ~C/;)
Raymond V. Aliperti, Supervisor
Eugene Branch'
c:
Kip Danicl, Architect
Cinemark Theatcrs
L.A. Fuess Partners
City of Springfield
f:\groups\pub-data\wpdoc\reports\welds\csi65G44.cin .
r-
BRAUN'"
INTERTEC
Braun l-:atertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541,746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
December 14, 1998
Project EBXX-98:0181
Report 12-128-0069
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador Pl, Ste.
Portland, OR 97228
Re: . Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
.^'- __~prirjgf!eld.Q!:~gon_ ~._
: "B.P. No. 98-0538 I P.O. No. 506
CONCRETE INFORMATION
;8;1/4"
._ _,. .~ _. '!:lo:
Morse 'Bros., Inc.
11/13/98
11/14/98
I
6 x 12
3000
3/4"
080130-LW
I
- "I
., ~
. .... --- ..- .
..~ - .
390053 .
ASTM
Super pilastizer, glass u.
mountain pumice, AEA
2:00 p.m.
10.0
I
I
I
I
I
II
59'
63'
I
Overcast
R. Crawford
. Composite mezzanine deck slab along linc6 from N to B; along line ~ from 1
. to 6: Sample taken on line 81.5. Bill with CSI w;8s advised of o":-.s~te test
results. . .
COMPRESSION TEST RESULTS
II
" ..
. ;',. '12/11/98. .
," ~..:..". .'
22.6
3660
3635
7 day I
28 day I
28 day. . I
-- HOLD"" I
11120/98 .
Set #1
22.6
2900
12/11198
22.5
3610.
~!}~:~i~S:~~L9,:\:. ". .
c-:"'
CityofSpnp.gfield .
LA. Fuess Part~ers
Morse' Bros'., Inc.
~ip Danie,l.~rchltect
., j' ..,
Cinemark usA. .
.;;:;'-
:"-i'.:1.
___ ,~__'l
I:
This report is submitted as !:he confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion thereof without our written authom:ation. .
f:\groups\pub-data\wpdoc\cylinders\csi0069.cin
,"'7-
BRAUN'"
I NTE RTEC
".
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541,746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
December 11, 1998
Project EBXX-98-0181
Report E-6560 I
Mr. GabeGodwin
CSI Construction
.7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr. Godwin:
Re:. " Cineinark",USA - Movies 17
2900 Gateway
Springfield, Oregon
B.P. #98-0538 I P.O. #506
December 07 and 08, 1998
D. Webber AWS# 93050801 /ICBO# 1033346-85
I Perform'ed visual inspection on the stadium structural steel seating frames for auditoriurus I and
, 2. Cross bracing was installed and the A325 high strength bolts were all brought into "snug
,
tight" conditions, Sheet metal decking was puddle welded at every low I1nte and at 6" on center
at perimeters. To the besl 0.1 our knowlcdg-e, 'york chccke.d is in: conformam;:e wi.thdesigil
drawings, specifications and appiicable codes. Contractor was asked to notifY our office when
additional services are needed.
;rt:~(J/
Michael L. Meyer, Principal
Willamette Valley Operations Manager
f{ V CltLpiAIU ~~
Raymond V. Aliperti, Supervisor
Engene Branch '
c:
Kip Daniel, Architect
Cine mark Theaters
L.A. Fuess Partners
City of Springfield
-.
f:\groups\pub-data\wpdoc\reports\welds\csi6560 l.cin
~-"
BRAUN'M
INTERTEC
';.t,i
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746,9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
December 11, 1998
Project EBXX-98-0181
Report E-65600
Mr. Gabe Godwin
CS1 Construction
7515 NE,Ambassador PI., Ste. E'
Portland, Oregon 97228
Dear Mr.Godwin:'
Re: Cinemarl,,: USA - Movies 'I (
2900 Gateway
Springfield, Oregon
B.P. #98-0538 1 P:O. #506
December 03, 1998
D. Webber AWS# 930508011 ICBO# 1033346-85
KD Steel
Met on-site with contractor to verify the A325 high strength bolts are in "snug tight" condition
at grid lines P to Q between 19 and 25 and at M to N between 1 and 19 (roof level
connections)., Checked minimum of two (2) bolts or 10% of each connection using a 14"
. ~TeHch: T0th~ 'U~:;l :t!i uui'k~owl;;dge, SlirJ.l'l~ciiDn~_ c~~ckcd)ii. grid, li~~5 :istcd' ~bcYe ,vi11 J;i.1cet
the minimum requi~ements per plans and specifications of snug tight conditions. Contractor was
asked t9 notify our office whcn additional services are needed. .
Sinccrely,
m ( ff/1J.jaJ (7)
Michael L. Meyer, Principal
Willamette Valley Operations Manager
}{ tI ~q)
Raymond V. Aliperti, Supervisor
Eugene Branch
c:
Kip Daniel, Architect
Cine mark Theaters
L.A. Fuess Partners
City of Springfield
--
f:\groups\pub-data\wpdoc\reports\welds\csi65600.cin
ir-
BRAUN'"
INTERTEC
Braun Intertec'Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746-7163
Engineer5 and'Scienti5t5 Serving
the Built and Natural Environment5
DAILY FIELD REPORT
December II, 1998
CSI Construction, Inc.
Cincmark USA - Movies 17
2900 Gateway Be
Springfield, Oregon
Fireproofing
See Field Observations
EBXX-98-0181
E-65625
506
.Building Permit Nuii1ber,L?~~0538
Rain
Beams
results of the in-place density. obtaincd on Deccmber 03, 1998 from the following location is as follows:
support beam at grid line A-6 north side of bcam: 19.4 lbs.lcu.ft.
D. Smith - ICBO# 87332
If you 'have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746"9649.
c: CSI Construction, Gabe Godwin
Kip Daniel, Architect
City of Springfield
L.A. Fuess Partners
CinemarkTheaters
"'"~
.'
-I
I
I
I
I'
I
II
I
J
As a mutual protection to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our
clients only. No other per~on or entity may utilize the report or any portion thereof without our written authorization.
f: \grou ps \pub-data \ wpdoc\rcports \insp \esi6 5 625 .c in
- .
-."
BRAUN'"
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746.9649 Fax: 746.7163
. Engineers and Scientists Serving
the Built and Natural Env;ronments
December 8, 1998
Project EBXX-98-0181
Report 12-128-0099
Mr. Gabe Godwin
CSl Construction
7515 NE,Ambassador PI., Ste.
Portland,. OR 97228
Re: Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
Springfield,_Or~gon.,... '''h.
B.P. No. 98-0538 1 P.O. No. '506
CONCRETE INFORMATION
-~)
12101/98
12/02/98
6 x 12
3500
3/4"
41/2"
35-IN
~ Morse Bros., .I!lC. ',.
390175
II
I
ASTM
46'
.600
1:00 p.m.
10.0
Overcast
D. Delatte
Auditoriums 1 and 2, void fo~m steps. Load placed in a~ditorium 1. Contractor I
was adV~~~d. ~f_o~.si_~e_ ~e~~ results. ' ~
\...,t~r"H~illi~;-'iVI.~ TEST RESV~TS
I 12/08/98
,I 12108198
I , I
12/29198
I:. .. 12/29/98 ~.. ~ I
28.4
3010
3010
I . 7 day
I 7 day
I r.
28 day
I_ 28 day.
-.J
28.3
3010
I
'1.'
I
':',' ,I
. .
: Kip Daniel, Architect.
._Ci!,e!l1ark U.S.A. .
c: " . .City: of.~pringfield.. . .
,.;+~~.__;L .A.. Fuess:Partners
, '. ,', .\.Mo~e.B;os, Inc.
".
" .~. .
~J
.1
Thi~ report is submitted as the confidential property of our client and is intended ~or the use of our client only. No other person
or entity may utilize [his report or any portion thereof without our"":,,ritten authorization. .
f: \groups \ p~b-data \ wpdoe \c y linders \cs i0099 . em
l,i;
-~
BRAUNS"
INTERTEC
December 4, 1998
Mr. Gabe Godwin
CSl Construction
7515 NE Ambassador
Portland, OR 97228
PI., SIC.
Re: Cinemark U.S.A, - Movie, 17
2900 Call'wa)' Blvd,
Springf'it:ld, Oregoll
13.P. ~'O. 98.(}5JS / P.'O. No. 506
CONCRETE INFORMATION
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746,9649 .Fax: 746-7163
Engineers and Scientisfs Serving
the Buill and Natural Environments
Project EBXX-98-0181
Report 12-118~0042
l,i;5X)JiL~si .
Spi':CI\tE>':
,\;;XXStzl'~ .IGG,
T~ 1/05/~S
D;\TERECEIVEH
1 I/lloNH
Ii x 12
I'SI
1.12"
SACK~\'IIX
I. ,'"
-srY~I_!':. .
I SOURCE', "
I. CONIl"cill SToit,\CI:
I. AliI 1):,';1'
I
1
I !',AItt
II:: LOCATIO:'> OF I'OUR
7"
PROIJUCT CqlJE
TICKET, Nu\nibt
:-'lorsl' Brus.. In('.
AST,\'!
,\DIHTI VES'
4S0
C( )NC,I~ !:;XI';',,'(~,~}vH):
CUBICY ARI;S
:::::':'::>::::::::>-:',--1__",
Tl~tECAST
;::0::":;'0::::'::;':>:,:'_.)-. .
.LOAD I'U\1BER
li:()():\;lII.
\\'EATIIEH,
CAST 1.1\
,\Il'I.zaninl' I'lltll' SI:tII'\,l'!IH'l-lI /\alld B. from It II IX.2.
sil(- k~1 n'.~lllts_
3000
IlXIlI3Il-LW
, t7tY22
Super pilastizer. glallmin"
Jl\lllli('(~.11. W.
()(lO
tlI,1I
(hercast
S. Wildt'1""
Conlra('lor was advised lIf Oll~
~"c.""
...............................t'I'.SHI'
"..'.-,,-....-. '
':':'-".-."',-' ..
;,>'d:'.,;,,:::.,... .
.....-.-.. ".
I
I
I
I
COtllPRESSIOI'i TEST RESULTS-- __H ___u~'H___
":\:rE'. --~I{K~~ ~~:JCllT I,OAI) "-- --:"/~~'I~~{A.(~~--.~ ,.,~.~~~.;~~'.~~~;~~~;l. \
I'(H);\'I):-\ I.BS./SQ.Ii\. .1
I
I
II
I
22:~
25Stl
t IIIlIYS
22.1)
2650
t III2IYS
22.S
tl103/9S
;\.150
22 ~ 7
3570
35111
28 da:r
IllOJIYX
CIty 01 S[lrj!l~l'jt'ld
L.A. Fut'-ss P;lrtllef."
Morse 8ros.. Inc.
Kip Daniel, ;\i"L'hik'L'\
Cill(~ma['k U.S.A.
'~.;o
7 day
2615
7 day
2N day
This l\.'lhlrl is '.,uhmilll..'d JJ.~ 1110 C:(llIrld~nllal PI\)p<:1"I)' of lllH di<:lll :lnd i~ inkmkd for th<: US0 of our cli~1l1 I)nly. NI) 011101' p~rson
or ~nlily m:l)' ulili/,<: Ihis r,"pun Ill' any pl\ni\1I1 lh~rl.'\lr Will1\ltll ollr wrilh'n'allllwri:I.Hlioll.
f: \gr(\ups\puh-dalil \wpdl K' \1.' Y 1 i nd~ l'~',l' sl(l()4?' .c'lll
~
BRAUN'"
INTERTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541,746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Natural Environments
DAll Y FIElD REPORT
December 03, 1998
CSI Construction, Inc.
Cinemark USA,- Movies 17
2900 Gateway B['
Springfield, Oregon
Reinforcing Steel,
Reinforced Concrete
See Below
EBXX-98-0181
E-65551
506
Building Permit Number . 98-0538
Partly Cloudy
Steps
J
Performed visual inspection of reinforcing steel on auditorium #3 void form step and auditorium # I and #2 tiered step
south of void form step. Reinforcing steel was checked for' grade, size, lap, placement and clearances where applicable.
Reinforcing steel was secured with tie wire and place in accordance with on-site approved. plans. Weld plate embeds at
auditorium #3 at north side of steps were placed to line up with structural seating support members.
Performed continuous inspection during the placement of concrete. Concrete was placed by pump and mechanically
I. consolidated. No samples of concrete were taken. per request by on-site contractor (CSI Construction). Contractor was'
asked to notify our office when additional services are needed.
inspector:
D. SIpith - ICBO# 87332
I
I
I
I
I
.I
I
I
I
I
II
Concrete
Morse Bros., Inc.
35-IN
390
7:30 a.m.
3500
15.0
If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c:
Kip Daniel, Architect
Cinemark Jo~site fax - 746-1881
Cine mark Theaters
L.A. Fuess Partne,rs
City of Springfield
As a mutual protection to dienes, the public, and ourselves, all reports are submitted,as the confidential property of clients'and are intended for the use of OUf clients
only. No other person or entity may utilize the report or any portiontheieof without our written authorization.
f: \grou ps \pub-data \ wpdoc \repons \insp \csi65 5 51 . cin
BRAUN'"
INTERTEC
DEe 18
1998
Braun Intertec Corporation
2285 Nugget Way
Eugene; Oregon 97403
541,746-9649 Fax: 746-7163
Engin.eers o(Jd S~ienii5'fs 'Serving
tHe 'Built and Nci't{;rci/.EnYif-o~m-enfs
DAILY FIELD REPORT
December 03, 1998
CSl Construction, Inc. .
Cinemark USA - Movies 17
2900 Gateway BI.~jji'4@igrhiml"Am~er
Springfield, Oregon
Fireproofing
See Field Observations
EBXX-98-0181 I
E-65552I
506 I
98-0538 I
Partly Cloudy I
Mezzanine Support Beams I
rnate:
determination test on the Cafco spray applied fireproofing of the mezzanine structural support
beams. The thickness test" was performed in accordance with the Uniform Building Code Standard 7-6 (1994). The on-
site.fireproofing thiCkness will meet and/or exceea the submitted thicknesses from Pro-Tec Fireproofing, Inc. dated
October 0 I, 1998. In-place density test will be reported nnder separate cover. Contractor was 'advised to notify onr
office to perform final ,inspection of fireproofing patching.
D. Smith - ICBO# 87332
nspecto r:
'you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746_9649.
c: CSI Construction, Gabe Godwin
Kip Daniel, Architect
City of Springfield
L.A. Fuess Partners
Cinemark Theaters
~ . I .
,.....(-
As a mutual protection to clients, the public, and, ourselves, all reports are submitted as the confidential property of clients and are intended for the' use of ~u~
clients only. No other person or entity may utilize the report or any portion thereof without our written authorization.
f:\groups\pub-data\wpdoc\reports\insp\csi65552.cin
-
BRAUN'"
INTERTEC
Braun Intertec,Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Built and Naturol Environments
DAilY FiElD REPORT
CSI Construction, Inc.
Cinemark USA" Movies 17
2900 Gatcway BL.Il#H~@:g~fljijtN#fu~~fI
Springfield, Oregon
Reinforcing Steel
See Field Observations
EBXX-98-0181
E-65535
506
98-0538
I'
I
\
I
Overcast
Steps
Petformed visual inspection of reinforcing steel of auditoriums 1 imd 2 at void form steps. Reinforcing steel was
checked for grade, size, lap, placement, and clearances where applicable. Reinforcing steel was secured with tie wire
and placcd in accordance with approved plans. Embeds at same location at north side steps were placed. to line up with
stmctnral seating support members. Each embed -plate consists of two studs 1/2" x 4" long. Contractor was asked to
notify our office when additional services are needed.
I'
Inspector: D. Smith - ICBO# 87332
'-"you have any questions' regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c:
Kip Daniel, Architect
Cinemark Jobsite fax - 746-1881
Cinemark Theaters
L.A. Fuess Partners
City of Springfield
,'.
As a mutual protection to clients, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.
BRAUN'"
I NTE RTEC
Braun Intertee -Corporation
2285 Nugget Way .
Eugene, Oregon 97403
541,746-9649 Fax: 746-7163
Engineers and Scientisfs Serving
the Built and Natural Environments
DAilY FIELD REPORT
I
I
II
I
I
I
Project Number: ..... ..... .' I
CSI Construction, Inc.
Cinemark USA - Movies 17
2900 Gateway BI, .
Springfield, Oregon
Reinforcing Steel,
R,einfo.~ced. Concrete
Auditorium I and 2 void fonn steps.
EBXX-98-0181
E-65527
Building Permit Number.. ..
98-0538
Partly Cloudy
Slab on Grade
"
Reenforcing steel forthe area listed above was inspected on December 01, 1998 (ref report E-65535).
Perfonned continuous inspection during the placement of concrete in thc area listed above. Concrete was placed by
pump and mechanically consolidated. Cast one set of four (6 x 12) concrete test cylinders. First load on jobsite was
rejected by contractor due to wrong mix (3000 psi). Contractor was advised of on-site test results. and was asked to '11
notify our office when additional services are needed. ~
I
I
1
Concrete .
Morse Bros., Inc.
,
35-IN
4 1/2"
,/fota; ctiiiic yards played: . .. ..' ".'
InspectoL D. Delatte - ICBO# 1080867-88
460
60~ I
LOO p.m. I
4 (6 x 12) , I
3500 II
lC,fI
J..U,V. II
If you have any questions regarding this report, pleasc feel free to call Raymond V. Aliperti at (541) 746-9649.
I
c
Kip Daniel, Architect
Cinemark Jobsite fax - 746-1881
Cine mark Theaters
. L.A. Fuess Partners
City of Springfield
. As a murual protection [Q clients, the public, and ourselves, all reports are submitted as the confidential property of clients and are intended for the use of our clients
only. No other person. or entity may utilize the report or any portiori thereof without our written authorization.
f: \groups \pub-data \ wpdoc \reports\insp \csi6552 7 . cin
~~-
BRAUN'"
INTERTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746-7163
Engineers'ond Scientists Serving
the Built and Notural Environments
Dccembcr 0 I. 100X
Project EBXX-0X-O I X I
Report E-65521
Mr. Gabe Godwin
CS1 Conslnlclion
7515 NE Ambassador PI..
POrllancL Oregon 9722X
SIC. E
Dear Mr. Godwin:
Re: Cinemar!.. lJSA - l\'lo\'ics 17
HIIII Gateway
Springfield. On'gO}l
B.P, #9X-1I5JX 1 P.O, #511(,
'Projl'l't InfonnatiulI
..-...'_....-. ,
Ir;sl":,,i'i';1l Of:
1~.?B:~~:f~.t~~'::' I 11 ~,i),~ti1~): ;\.r:~ ~:.~}...
I
I
1:::G;~:-!itJ:~lt{i'-r: .'. "
I: ShOll: '
Wcldll1ClllS
November 25. J 1)1),X
l~Y~)t.~f,_(~)(: J:l,l -, J :1' :-jt:';;.~;
:\,:::::",:::.:'A;;JJ, .,<~;'{~. .n'-P:;"~:"
E.il)l~ii.'jitor or' Erl't'for:
D. Webber A IVS# 9]050XO I IICBO# IO]].H6-X5
KD Sleel
. '('SI Conslrllclion
I Field:
xx
\Vl'alhl'r: ~hcrc:lsl
J
Fil'ltI Ohsl'rratiuns and Comml'nts
Performed \'is\l;d inspection all puddlc,,\\'Clds ,old Se;t1l1 welds m roor le\ocl in the lobby arca.
audiloriullls'!(J am!" 17, ;Ind lhe.corridor nt gricllillcs.5 to (, belween,S and N. WeldlllClllS were
checked ror sizc:'lcnglh, profile ;Iud. location. To Ihe besl of ol'lrkno'\\'lcclgc, welcllllellls checked
arc in conformance ,'rilh approved drawings, specifications and applic8ble 10 A \VS D 1,3 code. I
Contractor was asked to IloUfy Ollr officc whcll additional services arc needed.
,
Sincerely.
ml ~~)
Mich:Jcl L. MeH'r, Pl'lllcipai,
:Willalllcll'c V;lllcy Operations ~1,i;lilgcr
.!(V~~
R:l\lllOllC!--\': Alipcni."Supcl\'isor. '" ,..
Eugene Branch
5~ "~""~~... :j~jl~.~.D';'l~']~~I:'-~~;\I:~~iJ\I(':-I,.l~~: .":,,~,~ "... ,,_.__.~.."_. "---- 'n_~_.._"~
'I F,'~''':''Gillcll\ark Thc<llers ,~: t',';" ';,",'< \. :I"\~'':'; hl--- ;(,,1/"'-;,',:(:";","(' .~".
. ,
,..........-...-.L":A.- FuCss~P;lrll1crs--" L_.._., ." ......., .~,
, ,-, ," ," : ~ i " !'; l' f 1_" ~ '," , ' A'. .' ',.
CIty or Spnngfield
. ---,,"'.. ---- - "....... -......-- -..... -"" j
~l
._..,...,.,_i!
I':\grollJls\pll\Hb1a\\\'pd,)\'~r~'lllln~"\\';,'llh"~';;i(;~ ~21 ,::ill
)
BRAUN'"
INTERTEC
.hi'
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403'
541-746-9649 Fax: 746-7163
,Engineers and ScienfistsServing
the Built and Natural Environments
November 25, 1998
Project EBXX-98-0181
Report 12-108-0005
Mr. Gabe Godwin
CSI Construction, Inc.
7515 NE Ambassador PI., Ste E
Portland, OR 97228
Re: Cinemark USA Movies 17
2900 Gateway Blvd.
Springfield, OR
B.P. #98-0538 / P.O. #506
MASONRY INFORMATION
10/28/98
"""""'-:""""""""":'-'::;:-:;;:;';':'-'-:':-,.:.:-,.:-:-,'..,._.,-,....,._.,-,'.
DATE RECEIVED. .. .' 10/29/98
Solid 12"
f'm - 1500
3/8
....."",".,....".,,_..-,., '
I MORTAR PSiDESIGJI/.'
Morse-Bros., Inc.
TypeS
8007-G
260463
580
"680
12,10 p.m.
8.0
I
Overcast
C. Halstead
'. '....~ '.
8" interior eMU alcove walls at exits in auditoriums S, 6, 7, 11, 12,and 15 (0' to 8'
above ~;F; 3t!ditorium 4 (0' to 41 above F.F). Mark (T.M.C. Inc.) was advised of
on-site t~t results..
_.' . COrvU!!;{.E~S.i()Ni~TJ:ST~.l3:EStJL~,S.
11/04/98 172.000 1940 7 day
I
11/25/98 19},5oo 2230 28 day
,
11/25/98 199,500 2250 2240 .28 day
c: City of Springfield Kip Daniel, Architect
L.A. Fuess Partners Cinemark Theaters
Morse Bros., Inc.
This report is submitted as the confidential property of OllT client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion the"reaf without our written authorization. .
f:\groups\pub-dara\wpdoc\prisms\csi0005.cin
.1
!
,
BRAUN;M
INTERTEC
Braun Intertec. Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746-7163
Eng;ne~rs pnd Scientists Serving
the Built and Natural Environments
November 25, 1998
Project EBXX-98-O 181
Report E-65494
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI.; Ste. E'
Portland, Oregon 97228
Dear Mr. .Godwin:
Re:. Cinem-ark USA -Movies 11
.2900 Gateway'
'Springfield, Oregon
B.P. #98-0538/ P.O. #506
'. -
I
I
I
I
I
I
Weldnients
November 24, 1998
D. Webber AWS# 93050801/ICBO# 1033346-85
Met on-site with erector to perform visual inspection of roof decking for auditoriums 16 and 17.
Puddle welds and seam weldments were not' completed at the time of inspection. In-progress
welding being performed was applicable to A WS D 1.3 code. Contractor was asked to notify our
IL office when additional services are needed.
Sincerely,
mL ~&))
Michael!'.. Meyer, Principal
Willamette Valley Operations Manager
j(/I~UJ)
Raymond V. Aliperti, Supervisor
Eugene Branch
c: Kip Daniel, Architect
Cine mark Theaters
L.A. Fuess Partners.
,City of Springfield
r~,-;
f:\groups\pub~data\wpdoc\reports\welds\csi65494.cin
'.',
I
BRAUN'"
INTERTEC
Br~un Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 fax: 746-7163
Engineers and Scientists Serving
the Built and Natura! Environments
November 25, 1998
Project EBXX-98-0181
Report 12-118-0079 .
. Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste.
Portland, OR 97228
Re: Cinemark U.S.A. - Movies I7
. 2900 Gateway Blvd.
Springfield, Oregon
B:P. No. 98-0538 1 P.O. No. 506
CONCRETE INFORMATION
11119/98
.,.._.__.-.-,-.-.'.-.-.'.-:.,.:.:',..:'-'.':':,....,..
",",'.'-','-'-'-'.'-'-'.'-'-..-."--
DATE RECEIVED'
11120/98
11211
3500
6 x t2
5"
35-5B
Morse Bros., Inc.
394067
ASTM
AEA
52'
63'
1:45 p.m.
5-5
Overcast
R. Crawford
wheel chair ramp at auditorium 1 and 2; entryway roof slabs in auditoriums 3, 4, 6,
and 7. Sample taken at roof slab auditorium #4. Bill with CSI was advised of on-site
test results.
I
_U
CUMHlliSSIUN 1";,s'1 Jtl;SlJLTS'
11125/98 27.7 3340 6 day
12/t7/98 28 day
I2/t7/98 28 day
HOLD HOLD
" CIty ot Spnngl1eld Kip Daniel, ArchItect
L.A, Fuess Partners Cinemark D,S,A.
Morse Bros., Inc.
This report is submitted as the confidential property of our client and is intended for the use of our client on!y. No other person
or ~ntity may utilize this report or any portion thereof without our"written authorization.
f: \groups \pub-{lata \ wpdoc \c y 1 ind~rs\csi0070 . cin
~-
BR4UN'"
INTERTEC
'Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746,9649 Fax: 746-7163
Engineers and Scientists Serving .
the Built and Natural Environments
November 24, 1998
Project EBXX-98-0181
Report 12-108-000 I
NOV ::I f} 1998
Mr. Gabe Godwin
CSI Construction, Inc.
7515 NE Ambassador PI-, Ste E
Portland, OR 97228
Re:Cinemark USA Movies 17
2900 Gateway Blvd.
. Snri!!glield, .oR.
. B.P. #98-0538/ P.O. #506
" - MASONRY INFORMATION
10/27/98
......,-,-,-.._._-..._,.............,....
,........"."-.._.......-..-..,.,, "
DATE RECEiVED' .
10/28/98
'I
I
I
12:30 p,m.
f'm - 1500
Solid 12l!
3/8
UBC
TypeS
8017-G
171744
Morse Bros., Inc.
62'
680
10.0
I
Clear
C. Halstead
Auditorium 8; eMU for south wall - 201 to 281 above F.F. West wall of SW
hallway 201 to 241 above F.F. ,Mark (T.M.C. Inc.) was advised of on-site test
results. . .
\JUlVIl'f(l,;SSfON TEST RESULTS
I I
11103/98 185,000 2090 7 day
I
I 11(24/98 189,500 214() 28 day
I i
11(24/98 187,000 2110 2125 28 day
I
c' <;:ity of Springfield
Kip Daniel, Architect
L.A. Fuess Partners
ci:inemark Theaters
~orse Bros., Inc.
This repot:t is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion thereof without our written authorization.
f:\groups\pub-data\ wpdoc\prisms\csiOOO l.cin
BRAUN'"
INTERTEC
November 23, 1998
Mr. GabeGodwin
CSI Construction
7515 NE Ambassador PI., Ste.
Portland, OR 97228
Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
.S;lringfield, Oregon
is.f'. No. 9g'(i5:~81 P;O. Nil. 506
Re:
CONCRETE INFORMATION
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403'
541-746,9649 Fax: 746,7163
Engineers and Scientists Serving
the Built and Natural Environments
Project EBXX-98-0181
Report 12-118-0070.
NOV 24 1998
I
I
I
I
I
I
I
II
I
J
I DATE CAST ....
1l/13/98
, ""....,...-....-.--.--..:....:..:.:..,.:.'"
.:'-,......'..........,-,..,-,..,-,.,..-...............-,'-','
DATE RECEIVED"
.......-.--.--....--.--.,.......
6 x t2
3/4"
6112"
Morse Bros., Inc.
ASTM
55'
4:20 p.m.
5
11/14/98
3000
080130-LW
390061
Super pilastizer, glass
mountain pumice, AEA
65'
50.0
Overcast
R. Crawford
Composite mezzanine deck slab along line 6 from N to B; along line B from 1 to 6.
Sample taken on lipe J6. ';Bill with CSI was a~vised of on-site tcst results.
I I
1l/20/98 22.7 2620 7 day
,
I ti/ll/98 28 day
I 12/l1/98 28 day I
II HOLD HOLD J
,
c: Cay of Sprmgheld Kip Daniel, Architect
U. A. Fuess Partners Cinemark U.S.A.
Morse Bros., Inc.
. This report i,s submitted as the confidential property of Our client and is intended for the use of OUT client only. No other person
or entity may utiJize this report or any portion thereof without our written authorization.
f: \grau ps \pub-data \ wpdoc \c Y I inders \csi0070 . cin
( .
.;",:,.,-" ,.>..
.:",
BRAUN'M
INTERTEC
!. .
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746-7163
Engineers and Scienti~fs Serving
the Built and Natural Environments
November 23, 1998
Project EBXX-98-0181
Report 12-118-0069
Mr. Gabe Godwin
. CS1 Construction
7515 NE Ambassador PI., Ste.
Portland, ,OR 97228
. Re: Cinemark U.S.A. - Movies 17
2900 Gateway Blvd.
. ~pringfield, Oregon ,
:B.P. No. 98-0538 1 P.O. No. 506
CONCRETE INFORMATION
1l/14/98
Il/t3/98
II
I
I
6 x 12
3000
3/4"
8114T1
080130-LW
Morse Bros., Inc.
390053
ASTM
Super pilastizer, glass
mountain pumice, AEA
59'
63'
2:00 p.m.
10.0
Overcast
R. Crawford
Composite mezzanine deck slab along line 6 from N to H; along line B from 1 to 6.
Sample taken on line 81.5; Bill with CSI was advised of on-site test results.
. ~...:;;'vfPREu~Ivr. .................. "-.L.o..)' .}'..I:
1l/20/98 22.6 2900 7 day
t2/1l/98 28 day
12/1l/98 28 day
HOLD HOLD
c: CIty of Sprmgl1e1d KIp DanIel, ArchItect
1;. A. Fuess Partners Cinernark U.S.A.
Morse Bros., Inc.
This report is submitted as the confidential property of our client and is intended for lhe use of our client only. No other person
or entity may utjlize this report or any portion thereof without our written a'uthorizati~n.
f: \groups \pub-data \ wpdoc \c y 1 inders \csi0069 . cin
BRAUN'"
INTERTEC
Braun Intertec Corpora~ion
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746.7163
Engineers and Scientists Serving
the Built and Natural Environments
November 23, 1998
Project EBXX-98-0181
'Report 12-108-9989
Mr. Gabe Godwin
CSI Construction, Inc.
7515 NE' Ambassador PI., Ste E
Portland, OR 97228
Re: Cinemark USA Movies 17
2900 Gateway Blvd.
Spi'li'igfleld,OR,
B.P. #98-0538 iP.O. #506
MASONRY INFORMATION
10/26/98
DATE RECEIVED'
10/27/98
Solid 12n
f'm - 1500
3/8
Morse Bros., Inc.
TypeS
8017'G
171718
UBC
5ZO
680
11:30 a.m.
10.0
I
Clear
C. Halstead
North eMU wall for auditoriums 6 & 7, west wall of SW han~ay both areas 121 to
16' above F.F. West wall of auditoriums 9 & 10361 to 40'8" above F.F. Mark
(T.M.C. Inc.) was advised of on-site test results.
.COl"yIPRESSI0r~' i:t::;"i Knc,ULTS
11/02/98
101,500
1860
7 day
11(23/98
11/23/98
Damaged in field
203,000
2290
L
28 day
28 day
c: City of Springfield
Kip Daniel, Architect
L.A. Fuess Parmers
Cinemark Theaters
Morse Bros." Inc.
This report is submitted as the confidential property of our client and is intended for the use of our client only. No other person
or entity may utilize this report or any portion thereof without our written authorization.
f: \groups\pub-data\wpdoc\prisms\csi. 9989 .cin
,
BRAUN'"
INTERTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746,9649 Fax: 746,7163
(
Engineers and Scientists Serving
the Built and Nafural En'(ironmenfs
November 20, 1998
Project EBXX-98-0181
Report E-65462
Mr. Gabe Godwin
CSI Construction
7515 NE Ambassador PI., Ste. E
Portland, Oregon 97228
Dear Mr.Godwin:
-.-.',-:. -_ ,.r+~_ ". .....
Re: Cinemark USA - Movies 17
2900 Gateway Blvd.
Springfield, Oregon
B.P. #98-0538 1 P.O. #506
Weldments
,
1998
C. Halstead - ICBO# 35636
I Performed vIsual mspe~tion on completed welds on stadIUm seating frames (28) 257A and (~I
,I 256A Weldments were, .checked for SIze, length, profile and location. To the best of our
'lknOWleage WOrK cneckeci.'IS III con1onnance wlth'.shop-~rawmgs, specll1canons and appiIcable
A WS D 1.1 (static) code Fabncator was asked to notify our office when addlllOnal servIces are
needed
I --
Sincerely,
YY\;l ~ CI))
Michael L. Meyer, Pnncipal
Willamette Valley Operations Manager
.
fZ-V ~ ~
Raymond V. Aliperti, Supervisor
Eugene Branch
c: Kip Daniel, Architect
. LA Fuess Partners
City of Springfield
Cincmark Theaters
f:\grollps\pu~-data\wpdoc\rcports\welds\csi65462.cin
'"
BRAUN'M
INTERTEC
Braun I"tertee Corporation
2285 Nugget Way
Eugene, Oregon 97403
541,746-9649 Fax:746-7163
. Engineers and Scientists Serving
the Built and Natural Environments
DAILY FIELD REPORT
November 19, 1998
CSI Construction, Inc.
Cinemmk USA - Movies 17
2900 Gateway BI.
Springfield, Oregon
Reinforcing Steel,
-RcirJ'oa:ed -Concrete
EBXX-98-0181
R~~lin'.N~m~~n:\....i""""""'" E-65459
506
U~~!I~ir~~~tmjt.N.~m~~tiI ,98-0538
Partly Cloudy
Slab on Grade, Suspended
Roof Slab
Wheel chair ramp in auditoriums 1 and 2, enlryway roof slab5 in auditoriums 3, 4, 6 and
7.
Performed visual inspection of reinforcing steel in area5 listed above. Reinforcing steel was checked for grade, size,
lap, placement, and clearances where applicable.. Reinforcing .steel was secured with tie wire, supported with concrete
dobie blocks, and placed in accordance with approved plans and specification5.
Performed continuous inspection during the placement of concrete in the areas listed above. Concrete was placed by
pump. Roof slab forms were tapped with hammer. Cast one set of four (6 x 12) concrete test cylinders. Contractor
'vas advised of on-site test results. and asked to notify our office when additional services are needed.
Co ncrete
Morse Bros., Inc.
35-5B
InspectoL
5"
520
630
1:45 p.m.
,4'(6'xi2)
3500
11.0
I
I
I
, ~';..
:i
I
I
If you have any questions regarding this report, please feel free to call Raymond V. Aliperti at (541) 746-9649.
c.
Kip Daniel, Architect
Cinemark Jobsite fax - 746-1881
Cinemark Theaters
L. A. F uess Partners
City of Springfield
As a mutual prmection to clients, the public, and ourselves. all reports are submitted as the confidential property of clients and are intended for the use afour clients
only. No other person or entity may utilize the report or any portion thereof without our written authorization.
f: \groups \pub-data \ wpdoc \repo rts\insp\csi65459 . ein