HomeMy WebLinkAboutPermit Field Test & Inspection Report 1998-2-4
BRAUN'M
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541-746-9649 Fax: 746-7163
""
Engineers and Scientists Serving
the Built and Natura! Environments
Final Summary Report
J'
February 04, 1998
. Project EBXX-97-0280
Report E-61638
Mr_ Roy Gray,-Jr.
P.O. Box 117
Walterville, Oregon 97489
Re: Callie Court Apartments
960 Anderson
Springfield, Oregon
B.P. No. 97-0523-
Dear Mr. Gray:
This is to certify that we have performed observation and testing services at the above listed location
on the f~llowing .items:. '. ,. .
.' I','. .'1'.,'"
L Earthwork Excavations , .,. .
2. Epo~y A~~hored' Bolts' ~. Load testi'ng in accordance with letters from Ang Engineering,
dated Septembe.r 02, 1997 and January 29, 1998.
,
All requested observations and tests were performed and reported according to the jobsite
specifications and as directed by our client. To the best of our knowledge, the work observed and
. tested for the above listed areas was perfofmed in accordance with the jobsite specifications and
project engineer's instructions. .
In addition to the above listed services, our firm also performed in-place nuclear density testing
during the construction of the building pads ~nd concrete compression testing sampling as requested
by t.I,e client.
Note: For specific details regarding ObservationlTesting Services; please reference our previously
submitted reports.
Sincerely,
t\-\.. L ~e.L{.eA(~)
Michael L. Meyer, _ ,rinclIJl!1 .
WilIamette Y,alley O~erations Manager
K.Y. f1 ~.A-R-VCt:.
RaymondV Ai~erti,Supervis'~
.,. ,_ Eugene Branch
~:
"
APAZ Architects~ A~t Paz
Hoover Construction
Centennial Bank - Ti' Draggoo
.City of.Springfield .
. ,
f: \group s \pub-data \ wpdoc \finals\gra6163 8 . cal
r
"
BRAUN'.
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregan 97403
541-746-9649 Fax: 746-7163
Engineers and Scienfists Serving
fhe BuUt and Natural Environments
November 26, 1997
,
Project EBXX-97-0280
Report E-60942
Mr. Roy Gray, Jr.
P.O. Box 117
Walterville, Oregon
97489
Dear Mro Gray:
Re: Callie Court Apartments
960 Anderson
Springfield, Oregon
BoP. No. 97-0523
Subject:
Results of field density tests performed at the above referenced project by one
of our representatives on" November 25, 1997.
Report:
. Field Density Tests - Nuclear Densimeter - all tests performed at finished
grade of base rock in driveway at locations listed below.
....'...........'.........,r...,...................DL........'...b~yS..............D/i..c......,.~.,....'ur.....s...F1...tty....... 1t,}i~Fi~htI c'.
., ...'....M6isiiire}'>>
I South driveway mid panel 130.1 7.5 100+
I West driveway mid panel 125.7 6.10 99.7
l North driveway mid ~anel 129.3 8.2 100+
Note: Moisture/Density Relationship of 126.0 Ibs.lcu.ft. at 11.2% moisture was supplied by
the client. (Eugene Sand & Grayel - 3/4" -0 crushed aggregate).
Sincerely, . 0
~. V.;J/p~ --c;(;J
Raymond V. Al iperti, Supervisor
Eugene Branch
c: Hoover Construction
Centennial Bank - Tom Draggoo
APAZ Architects - Art Paz
City of Eugene .
f:\groups\pub-dala\wpdoc\reports\fdts\gra60942.cal
BRAUN'.
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregan 97403
541.746-9649 Fax: 746-7163
Engineers and Scienfists Serving
the Built and Natural Environments
June 25, .1997
Project EBXX-97-0188
Report E-59546
Mr. Chris Holvey
Hoover Construction
P.O. Box 7341
Eugene, Oregon 97401
Dear Mr. Holvey:
Re: Callie Court Apartments
960 Anderson Lane
Springfield, Oregon 2-
Job No. 1518 / BoP. No. 97-O5-'lO3
Project Information
Sitework '
June 24, 1997
R. Alip~rti
Hoover:'Construction
Clear
Report
On site in afternoon to observe a proofroll on imported bar-run fill materials being placed
for the construction of the building pad. During our site visit, compactive efforts were
being applied with a small Bomag vibratory smooth drum roller. '
The proofroll was performed at approximate elevation 429', using a ten-wheeled dump
truck weighing approximately 47,000 lbs. No deflections were observed under the wheel
loads and no wheel tracking occurred indicating a relatively stable fill surface at this time.
Contractor has scheduled a return visitforus tomorrow at I :00 pm for in-place nuclear
density testing on imported crushed aggregate.
S incerel y ,
, ((0 i). A-I,.'P~ uC/t)
Raymond V. Aliperti, Supervisor
Eugene Branch
c: .
Branch Engineering - Jay Bosevich
"
Roy Gray, Jr. '
Centennial Bank - John Morretti
AP AZ Architects - Art Paz
f:\groups\pub-data\wpdoc\reports\soils\hoo59546.cal
BRAUNS.
INTERTEC
Braun Intertec C. ," . tion
2285 Nugget Way
Eugene, Oregan 97403
541.746-9649 Fax: 746-7163
Engineers and Scienfists Serving
the Built and Natural Environments
June 25, 1997
Project EBXX-97-0188
Report E-59545
Mr. Chris Holvey
Hoover Construction
P.O. Box 7341
Eugene, Oregon 97401
/
Dear Mr. Holvey:
Re: Callie Court Apartments
960 Anderson Lane
Springfield, Oregon 2,'
Job Noo 1518 / KPo Noo 97-05-103
Project Information
Sitework :
June 23, 1997
R. Alipe'1i
I,
I
I
Hoover Construction
Partly Cloudy
/
Report
Met on-site with Mr. Bill McCarty with Hoover Construction to observe the excavation of subgrade
materials from within the limits of the building pad area. The loose, silty sand materials are being
removed in accordance with our Altemative'l recommendations in our Geotechnical Evaluation
Report for Proposed Callie Court Apartments, dated June 13, 1997. At the time of our site visit,
approximately 5.5 to 6 feet of loose silty sand subgrade material had been removed, exposing
native sa~dy "bar-run" gravels at the base of the excavation with the exception of the southwest
comer. Approximately three to faur additional feet still needed to be removed to expose the sandy
gravels. Materials being excavated from southwest comer included wood debris and abundant tree
roots. Contractor to use imported bar-run gravels to bring the building pad fill to within two feet
of the bottom of footings. The remainder of the fill will be brought up with I 1/2"-0 crushed
aggregate. Advised contractor that proofrolls should be performed during the placement of bar-run
II fills to assist in determining compactive efforts. Contractor advised to contact OUf office when
. additional services are needed.
Sincerely, ..
f( Ii A-kph If'N
Raymond V. Aliperti, ,SupeiViso~
Eugene Branch
c:
Branch Engineering - Jay Bosevich
Roy Gray, Jr.
Centennial Bank - John Morretti
APAZ Architects - Art paz
f: \groups\pub-dala \ wpdoc \rcpor1s\soi Is \boo5 9 545 . cal
BRAUN'.
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregan 97403
541-746-9649 Fax: 746-7163
Engineers and Scientists Serving
the Sui/tand Natural Environments
June 05, 1997
Project EBXX-97-0188
Report E-59425
Mr. Chris Holvey
Hoover Construction
P.O. Box 7341
Eugene, Oregon 97401
Re: Callie Court Apartments
960 Anderson Lane
Springfield, Oregon
B.P. Noo 97-05~3 I Job No. 1518
'2.. '
Project Information
June 03, 1997
R. AI iperti
Hoover Construction
Clear
, Report
Met on-site with Bill of Hoover Construction.to observe a proofroll on the exposed
subgrade surface (approximate elevation 432 feet). However, standing water was on the
surface from recent rains and it also appeared that the surface would not support the
weight of the loaded dump truck.
After speaking with Mr. Chris Holvey, the owner Me Roy Gray, Jr., wants building
foundation design recommendations. Me Holvey was informed that we would need to
I ""fu,m, ,oo<~h" '''' ~,' ,,"'" or" "wll '''' <h, ho II",", p'" '00'''''" her,,"
recommending preparation of subgrade. ,'Three backhoe test pits were scheduled for
tomorrow _ '
I,
Sincerely,
~- I). AJi'Ph -tr(1Y
Raymond V. Aliperti, Supervisor
Eugene Branch
c: Branch Engineering - Jay Bosevic~
Roy Gray, Jr.
Centennial Bank - John Morretti
f: \groups\pu b-data \ wpdoc \reports \soils\hoo5 9425 . c Ii
I
i
i
i.
p
BRAUN'.
I NTE RTEC
Braun Intertec Corporation
2285 Nugget Way
Eugene, Oregon 97403
541.746-9649 Fax: 746-7163
Engineers end Scientists Serving
the Built and Natural Environments
May 27, 1997
Project EBXX-97-0188
Report E-59359
Mr. Chris Holvey
Hoover Construction
P.O. Box 7341
Eugene, Oregon 97401
Re: Callie Court Apartments
960 Anderson Lane
Springfield, Oregon
B.P. No. 97-05-103 I Job No. 1518
'1..-
Project Information
'1fli~~~il~~~r!{{;!1 Sitework
I;Q~(~;~rJli~~~!i~li! 'If:! May 22, 1997
'R. Aliperti
Hoover Construction
Partly Cloudy - 680
Report
~ Met on-site with represe~tatives with Hoover Constructio~ to observe exposed subgrade
soils at designed subgrade elevation for the Callie Court building pad. Informed by Mr.
Holvey that a geotechnical report has not been prepared for the site. He also stated that
I soft areas were observed during excavation of subgrade soils especially near the northeast
' corner. Mr. Holvey also said a large tree had been removed from the southwest corner
and backfilled with imported bar-run materials. Using a geotechnical hand probe, soft
areas were observed especially in the northeast corner (probe easily penetrated 30 inches).
, Recommended to Mr. Holvey that a proofroll with a loaded dump truck be performed to
I assist in identifying soft, unstable subgrade areas. Also recommended that all design team
'~' representatives be notified of proofroll ,observations. Advised contractor to contact our
office when add itional services are needed.
I
Sincerely, ,
/l..- J. A-f/'f0 U~J
Raymond V. Aliperti, Supervisor
Eugene Branch
c: Branch Engineering - Jay Bosevich
Roy 'Gray, Jr.
Centennial Bank - John Morretti
'~