Loading...
HomeMy WebLinkAboutComments SUB 2/27/2008 "'i~-- .- , , : :'. S'!'R(t Ni<;3'FIEl/[) lilT! LfTY anA RD ELECTiU}:.S-f-JI,VICIH:E1\'T(B,: -fOOl Main SJte.~t' :Springf.ield, OR 9/4?T.481~ T:eI541.7:26;'2395 f:~rx 54,1.726;23.9~. www;~ubutil.corri To: City of Springfield Development Services Department Development Review Committee Planner: STEllE //OPIfJNS DRC- 200S -roro8 . .... HS :JaUUBld - .:pa^!a:>a~ aJBQ Case: Date Receiven. A -2.1-0'6 Planner: SH I. Overhead Service [ Underground Service M II. Location of nearest electrical connection: l/iJ PuE ON ilK /i/ot?TI-I sloE of PRofbS"EO Dll/ilE<P'A y/ / III. Easement location and width: FXiSTI/Jr; EASL:;v,dv/5 ARE SuFFlC/c/U( AIl/liS 77-0L: ,cUTW(t! EA.r;/~Mc/1/T5 ftiA V BE R;Ourt<cO A?72!'k 7i<AN..rJ:=o/.,/'4i1( L ourn o--J I-I/JJ gz.:~/J DETERM/AJeD. IV. Comments: From: Springfield Utility Board - Electric Service Center ft-;;J Tech: 02/27/2008 09:39 FAX 7477348 WSC FAX I4J 001/002 \ \ SPRINGFIELD UTILITY BOARD W;\TI:H .'Eit\ it> (.:1:, ITR 202 South 18th Street Springfield, OR 97477.5240 loi 541.726.2396 Felli. 541.747,7348 www.subutil.r.:om February 26, 2008 Steve Hopkins City of Springfield 225 N. 5th Street Springfield, OR 97477 Date Receivoo' - Z. -7..u, -QC6 Planner: SH Dear Steve: SUBJECf: SITE PLAN TENTATIVE #DRC2008-00008 IRISH GLEN/HAMMERlARAMARK Tax Map 17-02-30-44, Tax Lot 100 & 200, 1230 40th Street Listed below are our comments for the above referenced development proposal: I. The proposed development is witbin the Springfield city limits and win receive water service from the Springfield Utility Board (SUB). A 12" waterline is located in front of this property and we can construct a service at any location along the right-of-way to serve the property. 2. All new water system facilities and modifications to water system facilities both inside and adjacent to the proposed development shall be placed in street right-of-way at a location and depth of bury that meets the standards of the SUB Water Division. 3 _ All water facility materials shan be to a standard that must meet SUB Water Division specifications. - 4, All workmanship shan be performed to meet or exceed SUB Water Division construction standards. 5. Size of waterline and other facilities, including water meters, must meet tbe needs of the SUB Water Division arid the long-range needs of the City. These needs include, but are not limited to, meter location and access, sizes of water distribution and transmission lines, pwnping facilities, - and communication lines. 6. Please ask the developer to contact the SUB Water Division for detailed information on the materials and construction standards, detailed costs for installing SUB water facilities, and a _ schedule of construction. Construction expenses may be reduced with good planning of required water facilities, good timing of facilities installation, and joint trench opportunities. 7. All water meters will be placed in public right-of-way at a location identified by the developer. Each lot or parcel must have its own water service. 8. Water service facilities will be installed upon collection of development charges. Development policies and charges identified in this letter are subject to change. Actual charges win be those in effect at the time water service is requested. ' S:\SI1EPLANl1230 40th Street site plan 2-26-08.doex 02127/2008 09: 40 FAX' 7477348 WSC FAX ~ 0021002 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from wells. In every instance, care shall be taken to prevent groundwater contamination. Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfieid Utility Board Water Division for details at 726"2396. 10. Bacldlow prevention devices will be required for this service. Please contact Chuck Davis at 726-2396 prior to installing water service. Chuck can help in the selection of the most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. , SiO=tt- Z; L Rebecca Templin, P.E. Water Engineering Supervisor - Water Division RAT:mk cc: John Hammer, Irish Glen, LLC, P.O. Box 2266, Eugene, Oregon 97402 RobertL. Shaw, 656 Charnelton Street, Eugene, Oregon 97401 Scott Morris, P.E., Olson & Morris, 380 Q Street, Suite 200, Springfield, Oregon 97477 Robert Stevens, AIel>, Metro Planning, Inc., 370 Q Street, Springfield, Oregon 97477 S,\SITE~LAN\1230 40th Slreet site plan 2-26-OB.docx