HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-2-3
~"P~
Lyft.
11:"lljlrt;"U~'~~'IIIJ~gl~l.
CLIENT
EWEB
500E. 4th Ave.
Eugene, Oregon.
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 3 SAMPLED
TEST
DATE
02-06-09
02-27-09
02-27-09
Hold
AGE
(DAYS)
7
28
28
"*1 - End Cones
Gb.J~ " .i;aJ & Construction Servires
Compressive Strength of Concrete
(ASTM C 39)
PROJECT
DATE
PROJECT NO.
REPORT NO.
02c06-09
2087168
6186
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
B.P.NO.
2008-00225
01-30-09 CAST BY A. Fenstermacher DATE RECEIVED 01-31-09
4000 psi SPECIMEN SIZE 4" x 8"
4000 psi SACKS SUPPLIER Knife River
40-SE7 CEMENT MAX SIZE AGG. 3/4"
Super; Eclipse; Hot water AIR CONTENT 3.5%
3 TICKET NO. 3354055 SLUMP 8 1/4"
580 F YARDAGE 10.0 OF 44.0 TIME 10:30 AM
380 F WEATHER Fog. SPECIMEN STORAGE ASTM C31
Ramp slab on grade up to sump area; elevated walkway above wall #21; east and west raw water
channel walls above wall #24.
From west end of ramp slab.
AREA
(IN.')
12.56
WEIGHT
(LBSI
8.4
TOTAL
LOAD (LBSI
54600
COMPRESSIVE
STRENGTH (PSn
4350
AVERAGE
STRENGTH
(PSI)
TIME OF
TEST
10:40 AM
TYPE OF
FRACTURE..
4
,
2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Jake Stucky (Wildish) was advised of on-site test results.
Reviewed By:
/1.'-/.~
Michael L. Meyer '
Technjcal Manager
c:
EWEB- Mike Stickling (email)
. EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wi/dish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the. client to whom it is addressed and pertains to the specific.
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
?ElJMN CaneIIAvenue' CavaIIls, Oregm 97330, phone (541) 757-4698, fax (541) 757-2991
29540 B Airport Road . Eugene, Oregm 97402. phone (541)684-3849 . fax (541 )lJ84..3851
630EIJ Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 3824846
(~FEJ
11:"'lliltl:.lt"'~~lIllll~liIlilCIII
CLIENT
EWEB
500E. 4th Ave.
Eugene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 2 SAMPLED
Geotechnical & Olns1rudion Services
Compressive Strength of Concrete
(ASTM C 39)
PROJECT
DATE
PROJECT NO.
REPORT NO.
02-05-09
2087168
6162
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
B.P.NO.
2008'00225
01-08-09 CAST BY A. Fenstermacher DATE RECEIVED
4000 psi SPECIMEN SIZE
4000 psi SACKS SUPPLIER
40-SE7 CEMENT MAX SIZE AGG.
Super; Eclipse; AEA; Hot water AIR CONTENT
2 TICKET NO. 3160663 SLUMP
640 F YARDAGE 10.0 OF' 40.0 TIME
520 F WEATHER Showers SPECIMEN STORAGE
Baffle wall north of wall #29; wall #21; remaining ramp walls (except west end).
01-09-09
4" x8"
. Knife River
3/4"
4.6%
6"
1:10PM
ASTM C31
From 1" lift in number 21.
AVERAGE
TEST AGE AREA WEIGHT TOTAL COM PRESSIVE STRENGTH TIME OF TYPE OF
DATE (DAYS) (IN.') (LBS) LOAD (LBS) STRENGTH (PSI) . (PSI) TEST FRACTURE"
01-15-09 7 12.56 8.3 47800 3810 8:30 AM 5
02-05-09 28 12.56 8.4 65400 5210 8:05 AM 5
02-05-09 28 12.56 8.3 64400 5130 5170 8:10AM 4
Hold
....1 - End'Cones 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom)
REMARKS: Jake Stucky (Wildish) and Mike Stickling (EWEB) was advised of on.site test results.
Reviewed By:
!~~;2~~
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fltzjarrell (em ail)
Wildish Building Co.- Jake Stucky (email)
City of Springfieid
Knife River
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or malerial evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
7fIJ tom Comel Avenue' eavanis, Oegon 97330, phone (541) 757-4698 'fax(541) 757-2991
29540 B AIrport Road . Eugene, Oegon 97402 . phone (541) 684J849. fax (541) 684-J851
63050 Corporate Place, Suile2. Bend, Oregon 97701. phone (541) 382-4844 . fax (541) 3824846
Sf!J
"""""'~"'''"IlI'.''la <Xv~ "lical & Construction Servires
Page. 1 of 1
Report of Inspection Services
Welding/High-Strength Bolting_
,
i
Client: Mr. Kevin Fitzjarrell
Wild ish Building Co.
PO Box 7428 '
Eugene, Oregon 97401
Project: Hayden Bridge- Steel
Springfield, Oregon
Date:
Project No.:
Report No.:.
Inspector:
ID No.:
, .
Inspection of:
Fabricator or Erector:
, Contractor:
Welding
Double A Fabrication
Shop: Ii'!
Weather:
BPNo.:
02-04-09
2097009
E-22331
L. Postier
06120541
AWS CWI
Field: 0
Inside
2008-00225
Performed visual inspection on 1he following structural steel components: stair stringers- (2) S-01; ladder
connection plates- (6) S-.01; door frame- S-02; mixer support brackets and sill angle- (2) S-03, door
frames- (3) S-03; stainless steel channels- (4) S-06; stainless steel beams- (3) S-07; ladder- (1) S-08;
FTW flume pipe supports- (4) S-10; exterior pipe support braces-. (2) S-11; stop log guide frames- (3) S-
13, (3) S-14, (3) S-15 and (4) s-16; stainless steel ladder- (2) S-14. Completed welds were checked for
size, length, profile and location.
Dave (Double A) was asked to notify our office when additional services are needed.
To the best of our knowledge, the work inspec1ed is in conformance with drawings dated 11-04-08 and
applicable AWS 01.1 and 01.6 codes.
Reviewed By:
/h.<;;'~
Michael L. MJ;?
Technical Manager
c:
Wildish Building Co.- Jake Stucky (em ail)
EWEB- Wally McCullough (em ail)
EWEB- Michael Stickling (em ail)
OBEC- Pete Slocum (em ail)
City of Springfield
MLM:sc
This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FE' Testing & Inspection, Inc.'s written authorization.
750 NW Comell Avenue. Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 BAirportRoad' Eugene, Oregon 97402. phone (541)684-3849' fax (541) 684-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4646
,..i/l".....~.t..r...l
~''''.
- .
.,.. ..
Page 1 of 1
II~'I h\lrt;..r~~'lI~'lllli.Ill.~
Geotechnical & Construction SeIvices
I Report of
UltrasOI)ic Examination
Client: Mr. Kevin Fitzjarrell
Wildish Building Co.
PO Box 7428
Eugene, Oregon 97401
Project:
Date:
Project No.:
Rpt. No.:
Technician:
10#:
. Shop [;'I
Weld 10:
Joint 10:
Hayden Bridge- Steel
Springfield, Oregon
BP# 2008-00225
Contractor:
Fabricator or Erector:, Double A Fabrication
02-04-09
2097009
E-22330
L. Postier
AS.N.T. Level II
:Field D
Complete Penetration
'Stair Stringer Splices
Decibels Discontinuity
. c . c c ,
" 0 0
" '" o~ u :::: ~ .2 CD u
. c : 0 E~ - c c ~
a: . << o > ~u o- S Distance
Location a: u 0 .l! . .!:!'l;
. t ;;~ c 0 . E
~ 0 0 .~ l!~ ~a: 0
0 '8 u u E a: E ,g
u , . << ~ 0
U ." ~ -5'g u
" .!! . E '" = 0
. c m c m' ~'t From X FromY
. .. " E 0 , b c d 0 c 0 0 ,
" ~ ... ~ ~ ~ <<... co"'
Stair 5.01
1 Stringer #1 (3) locations
1 Stringer #2 (3) locations
1
I
I
x 17001 A 11 &21 137 db
x 7001 A 11 &21 137 db
I 1 1 1
I I I I
I I 1 I
I Frequency: 2.25mhz
I Equipment No.: Panametrics 48
I calibra~on Blocks: IIW, DSC
I Gode Criteria: AWSD1.1-Da
Reviewed By:
1h.'7.~
Michael L. Miter
Technical Manager
c:
Wildish Building Co.- Jake Stucky (em ail)
EWEB- Wally McCullough (email)
EWEB- Michael Stickling (em ail)
OBEC- Pete Slocum (email)
City of Springfield
MLM:sc
Couplet: Ullragelll
I **Gain dB a-b-c=d
. - I .
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
. ,
750 NoN ComeIIAvenue' CoI1IaIIis, CJre90n 97330, phone (541) 757-4698, fax (541) 757-2991
29540 BAirportRoad . Eugene, 01ig0n 97402 . phone (541)684-3849' fax(541)6&h3851,
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846
JP<t('
~ <tlv
(),9 t$'.o
~
~fEI
Page 1 of 1
11~'II~Lct:tl~lio'~:'.IIII~_
Geoted1nical & Construction Services
. Daily Field Report
Client: EWEB Project: Hayden Bridge Water Filtration Date: 02-04-09
500E. 4:" Ave. Plant Expansion Project No.: 2087168
I . . Springfield, Oregon Report No.:
Eugene: Oregon E-22328
Inspector: A. Fenstermacher
ID. No.: 5258882-49
ICC
Inspection of: Reinforced Concrete Weather: Clear Continuous Inspection: D
Contractor: Wildish Building Co. BPNo.: 2008-00225 Periodic]nspection: 0
Performed Inspection on the reinforcing steel. for raw water channel lids above wall
numbers 24 and 25. Reinforcing steel was checked for grade, size, laps, quantities,
locations, ties, clearance and supports. '
Observed the placement of 10 yards of Knife River 4000 psi concrete (mix 40-SE7) into
areas noted above. Concrete was placed by pump and was mechanically
consolidated. Cast one (1) set of four (4) 4" x 8" compressive strength cylinders.
Notified Jake Stucky (Wildish) of the on-site results. Concrete temperature-63F; air
temperature- 37F; slump- 7"; air content- 4.6%. .
Mr. Stucky was asked to notify our office when additional services are needed. ,'.
To the best of our knowledge, the work inspected was in accordance with plans dated
02/2008 and applicable workmanship provisions of the I.B.C., except if noted above.
Reviewed By:
(lJ. '-!:~
Michael L: M{;Ier
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (em all)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (em ail)
City of Springfieid
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc,'s Written authorization.
7m r-m ComeII Avenue' eavams, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 BAirportRoad. Eugene, Oregon 97402, phone (541 )684;3849. fax (541 )684-J851
630m Corporate Place, Su~e2' Bend, Oregon 97701. phone (541) 382-4844. fax (541) 3824846
SfEI
Page 1 of 1
. 1I:lI.'mICl.41~.'iI;fllfU'IWI
Geotechnical & 0JnstrucIi0n Services
Daily Field Report .
I
Client: EWEB I Project: Hayden Bridge Water Filtration Date: 02-02-09
500E. 4~h Ave. Plant Expansion Project No.: 2087168
Eugene, Oregon Springfield, Oregon Report No.: E-22309
Inspector: A. Fenstermacher
ID No.: 5258882-49
ICC
Inspection of: Reinforced Concrete Weather: Clear Continuous Inspection: 0
Contractor: Wildish Buiiding Co. BPNo.: 2008-00225 Periodic Inspection: 0'
Performed final inspection on the reinforcing steel for alum tank pedestals and elevated
walkway stem walls at the southwest corner of the coagulant building. Preliminary
inspections were performed on 01-20-09 and 01-30-09 (reference FEI reports E22238
and E22302).
Observed the placement of 30 yards of Knife River 3000 psi concrete (mix 30-1K) into
areas noted above. Concrete was placed by pump and was mechanically
consolidated. Cast one (1) set of four (4) 4" x 8" concrete test cylinders. Notified Jake
Stucky (Wildish) of the on-site test results. Concrete temperature- 58F; air
temperature- 41F; slump- 61/2"; air content- 5.3%.
Mr. Stucky was asked to notify our office when additional services are needed. '
To the best of our knowledge, the work inspected was in accordance with plans dated
02/2008 and applicable workmanship provisions of the I.B.C., except if noted above.
Reviewed By:
/IJ. ~ ./Ju;j.
Michael L. MeUr
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wiidish Building Co.- Kevin Fitzjarrell (emaii)
Wildish Building Co.- Jake Stucky (emaii)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and "pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
7f/J NN CaneII Avenue' Caval6s, Oregm 97330 . phone (541) 757-4698, fax (541) 757-2991
29540 BAirportRoad . Eugene, Oregm 97402, phone (541) 684J849 . fax (541 )684-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701. phone (541) 382-4844 . fax (541)382-4846
~ftl
Page 1 of 1
11~'II~lct;41I~~'~1'llllll_
GcvW ,,1ica1 & 0:Jns1rucOOn Servioos
Daily Field Report
Client: EWEB Project: Hayden Bridge Water Filtration Date: o 1-30-09
500E. 41~ Ave. Plant Expansion Project No.: 2087168
Eugene,; Oregon Springfield, Oregon Report No.: E-22302
Inspector: A. Fenstermacher
ID No.: 5258882-49
ICC
Inspection of: Reinforced Concrete Weather: Fog Continuous Inspection: 0
Contractor: Wild ish Building Co. BPNo.: 2008-00225 Periodic Inspection: [;'}
Performed final inspection on the reinforcing steel for east and west raw water,'channel
walls above wall #24. A preliminary inspection was performed on 01-27-09 (reference
FEI report number E-22278). Also, performed inspection on the reinforcing steel for
elevated walkway above wall #21, ramp slab on grade up to slump area and coagulant
building elevated walkway support walls. Reinforcing steel was. checked for grade,
size, laps, quantities, locations, ties, clearance and supports.
Observed the placement of 44 yards of Knife River 4000 psi concrete (mix 40-SE7) into
areas noted above excepCcoagulant building walls. Concrete was placed by pump and
was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" compressive
strength cylinders, Notified Jake Stucky (Wildish) of on-site results. Concrete
temperature- 58F; air temperature- 38F; slump- 81/4"; air content- 3.5%.
Mr. Stucky was asked to notify our office when additional services are needed.
. To the best of our knowledge, the work inspected was in accordance with plans dated
02/2008 and applicable workmanship provisions of the I.B.C., except if noted above.
Reviewed By:
~,7i'~
Michael L. Me.;lr
Technical Manager
c:
EWEB- Mike Stickling (em ail)
EWEB- Wally McCullough (email)
. OBEC- Pete Siocum (email)
Wildish Building Co.- Kevin Fitzjarrell (emall)
Wildish Building Co.- Jake Stucky (em all)
City of Springfield
RECEIVED
FEB 0 4 1009
MLM:sc
This report and/or enclosed test data is' the confidential property of. the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such; infonnation contained ,herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEl Testing & Inspection, Inc,'s written authorization.
7EiJ NN Coo1e1lAvenue' CorvaIUs, Qegcr197330' phone (541 ) 757-4698, fax (541) 757-2991
29540 BAirpcrtRoad . Eugene, Qegcr197402' phone (541 )684J849. fax (541) 684.J851 ,
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541 ) 382-4840
SFEI
Page 1 of 1
11;"'llllrf;"II~':lalllll~.I~1j
Geotechnical & Construction SeIVices
Daily Field Report
Client: Mr. Jim Thomas Project: LCAFRC- Fuel Truck Date: 02-06-09
Wildish Building Co. Parking Structure Project No.: 2097015
PO Box 7428 3110 Pierce Parkway Report No.: E-22342
Eugene, Oregon 97401 Springfield, Oregon Inspector: A. Fenstermacher
10 No.: 5258882-49
ICC
Inspection of: Reinforced Concrete Weather: Showers Continuous Inspection: D
Contractor: Wildish Building Co. BP No.: COM2008-01506 Periodic Inspection: 0'
Performed inspection on the reinforcing steel in the fuel truckk parking monolithic slab
on grade at the northwest corner of the maintenance building. Reinforcing steel was
checked for grade, size, laps. quanIities, locations, ties, clearance and supports.
Anchor bolts were checked for size, quantity and embedment and were secured in-
place with templates.
Observed the placement of 51.25 yards of Eugene Sand and Gravel 4000 psi concrete
(mix 314065) into areas noted above. Concrete was placed by pump and was
mechanically consolida1ed. Cast one (1) set of four (4) 4" x 8" compressive strength
cylinders. Notified Ian (Wildish) of on-site results. Concrete tempera1ure- 68F; air
temperature- 45F; slump- 3 1/4".
Ian. was asked to notify our office when additional services are needed.
To the best of our knowledge, the work inspected was in accordance with Farwest
drawings dated 11-14-08 and applicable workmanship provisions of the I.B.C., except if
noted above. .
Reviewed By:
A,'I..~
Michael L. ~eyll
Technical Manager
c:
Barrantine Bates Lee - (e-mail)
kpff Consulting Engineers - (e-mail)
Oregon Military Dept. - (e:mail)
Wildish- Tony Dean (email)
City of Springfield
R~C _
FE, E:.IV~
800 D
199,9
MLM:sc
This report and/or enclosed. test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/of.material evaluated. As such, information contained hereinlshall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testin9.& Inspection, Inc.'s written. authorization.
7ffJ rm 0:meII Avenue' CootaIlis, CJregm 97330, phone (541 ) 757-4698' fax (541) 757-2991
29540 BAirport Rood . Eugene, CJregm97402' phone (541)Ei84;J849 . fax(541)EJ84..3851
63050 Corporate Place, Suite 2 . Bend, Ore90n 97701 . phone (541) 3824844 . fax (541) 382-4846
~fEI
IJ~'tIII'lrl;"I~~'1:;;'lntl\'l.Il'I" Geotechnical & Cortstrudion Services
Page 1 of 1
Report of Inspection Services
Welding/High-Strength Bolting
Client: Mr. Jim Thom~s
Wildish Building Co.
P.O. Box 7428:
Eugene, Oregon 97401
Project: LCAFRC Complex
Phase II
3110 Pierce Parkway
Springfield,. Oregon
Date: .
Project No.:
Report No.:
Inspector;:
ID No.:
Inspection of:
Fabricator or Erector:
Contractor:
Shop: G
Weather:
BPNo.:
Welding
Wild ish Building Co.
Wildish Building Co.
02-03-09
2077102
E-22319
K. Green
8003776
ICC
Field: Ii'!
Clear
COM2007 -00828
Performed visual re-inspection of rifle range baffle to L3" x 3" x 1/4" angle connections (per detail 1 on S-
2). The twelve (12) missing welds on Ihe upper ends of the diagonal angle to baffle connections have
been added (reference FEI report number E-22284, dated 01-28-09). Completed welds were checked for
size, length, profile and location.
Ian (Wildish) was asked to notify our office when additional services are needed.
To the best of our knowledge, the work checked is in conformance with drawings dated 10-24-08 and
applicable AWS D1.1 code, except if noted above. '
Reviewed By:
iJ1.>('~
Michael L. M/{er
Technical Manager
c:
Barrantine Bates Lee - (e-mail)
kpff Consulting Engineers - (e-mail)
Oregon Military Dept. - (e-mail)
Wildish- Tony Dean (email)
City of Springfield
MLM:sc
-P~
~ (\~
<90 /t-
6'.~
~ {)
~
This report and/or enclosed test data is the confidential property of the client to whom. it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection. Inc.'s written authorization.
750 NW ComellAvenue' Corvallis, Oregon 97330, phone (541) 757-4698 . fax (541) 757-2991
29540 B Airport Road . Eugene, Oregon 97402' phone (541) 684-3849 . fax (541) 684-;3851
63050 CU, "U'Q~C Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4644 . fax (541) 382-4846