HomeMy WebLinkAboutRecommendation Sheet PLANNER 10/5/2007
Notice of Decision - Tree Felling
Project Name: Tree Felling - Game Farm Dental
Project Proposal: The applicant proposes to remove 13 trees to develop the property with a
dental clinic.
Case Number: DRC2006-00022
Project Location: 17-03-22-00 Tax Lot 2708
Zoning: Community Commercial (CC)
Metro Plan Designation: CC
Refinement Plan: Gateway
Application Submitted Date: March IS, 2006
RECEIVED
Application Accepted as Complete: April 13, 2006
Recommendation: Approval with Conditions
11'2E-5U~
By: LQ- C:'v07
Decision Issued Date: May IS, 2006
Appeal Deadline Date: May 30, 2006
Associated Applications: PRE 2006-00026 (Site Plan Game Farm Dental)
CITY OF SPRINGRELD"DEVELOPMENT REVIEW TEAM
-,
I~PHONEI
726-4608 I
I 726-4585 I
1736-1036 I
736-1036 I
I 726-2293 I
I 726-3668 I
I
I
rpOSITION REVIEW OF NAME
L Planner II Land Use Planning Linda Pauly
I Transportation Plannin/l Engineer Transportation Gary McKenney
I Public Works En~neermg Utilities & Easements Steve Barnes
I Public Works Enllmeering I Sanitary & Storm Sewer Steve Barnes
I Deputy Fire Marshall I Fire and Life Safety I Gilbert Gordon
1 Community Services Manager 1 Building I Dave Puent
I- -- -.APPUCANrSDEVELOPMENT REVIEW TEAM. --
...-
ADDlicant:
Carol Schirmer
374 West 4"', Suite 20 I
Eugene, OR 97401
'-Owner:
3-D Professional Group, LLC
175 West B Street
Springfield, OR 97477
NATURE OF APPLICATION: The applicant submitted a Type II Tree Felling Application to
the City of Springfield requesting approval to fell 13 trees from property located east of
Pheasant Boulevard, west of Game Farm Road in Springfield. The property is more accurately
Tree Felling
DRQ006-00022
described as Tax Lot 2708 on Assessor's Map 17-03-22-00. The purpose of the proposed tree
felling is to develop the subject property with a new commercial land use. The owner has
submittal a Pre-submittal application for a Site Plan to develop the property with a dental clinic.
DECISION: Approval, with conditions, as of the date of this letter. Tree Felling and required
revegetation must conform to this decision. At the time of this decision, the Game Farm Dental
Site Plan application has not been submitted. The proposed felling is warranted by the site
development, and the required revegetation will be provided through the installation of site plan
landscaping improvements. The tree planting provided for the Game Farm Dental Site Plan as
approved in the Final Site Plan for that development shall count as the required revegetation to
mitigate for the proposed tree felling. Since the site plan has not yet been reviewed or
approved, this Tree Felling decision has been conditioned to require approval of the Site Plan
and completion of the Development Agreement prior to felling. This ensures that the proposed
revegetation shown in the Site Plan will be installed to mitigate the tree felling.
This is a limited land use decision made according to city code and state statute. Unless
appealed, the decision is final. Please read this document carefully. The standards of Springfield
Development Code (SDC) Article 38 applicable to each criterion of Tree Felling Approval are
listed herein and are satisfied by the submitted plans and notes unless specifically noted with
findings and conditions necessary for compliance. Please note that the review contained herein
pertains to Tree Felling only.
OTHER USES THAT MAY BE AUTHORIZED BY THE DECISION: None. The
proposed use is permitted in accordance with Springfield Development Code (SDC). Final Site
Plan, Building Plans must conform to this decision. Other uses permitted in the zone but not
listed on the applications require additional review and permits.
REVIEW PROCESS: This application is reviewed under Type II procedures listed in SDC
3.080 and the Tree Felling criteria of approval 38.040. This application was accepted as complete
on April 13, 2006. This decision is issued on the 32nd day of the required 120 calendar day
review period mandated by the state.
SITE INFORMATION: The approximately 74,052 sq. ft. (1.70 acre) development site is
currendy undeveloped. The property is zoned Community Commercial (CC) by the Springfield
Zoning Map, and des:6"A.~J CC by the Metro Area General Plan and the Gateway Refinement Plan.
The northern and southern boundaries of the property abut Community Commercial (CC)
zoned land. Land west of Pheasant is zoned CC, land east of Game Farm Road is zoned Low
Density residential (LDR). The eastern property line of the site abuts Game Farm Road, a Lane
County facility. Site topography is relatively level. The land is vegetated with mature trees and
grass.
WRITTEN COMMENTS: Applications for Limited Land Use Decisions require the
notification of property owners/occupants within 300 feet of the subject property allowing for a
14 day comment period on the application (SDC 3.080 and 14.030). The applicant and parties
submitting written comments during the notice period have appeal rights and are mailed a copy
of this decision for consideration. In accordance with SDC 3.080 and 14.030, notice was sent to
owner/occupants within 300 feet of the subject site on April 13, 2006. No written comments
were received.
Tree Felling
DRQ006-00022
2
Conformance with SDC Article 38 -Tree Felling Standards
,
SDC 38.040 Tree Felling Standards
The Director, in consultation with the Public Works Director and the Fire Chief
shall approve, approve with' conditions or deny the request based on the standards
of SDC 38.040 (1-8).
Finding: The application proposes to fell thirteen trees and to preserve three trees as follows:
)
.1
1 Tree #
II
I 3
15
17
I 16
I 17
I IS
1 19
1 20
121
122
1 23
124
1
1 Tree #
I~
16
. Tree Fe!/ing
I Size (DBH)
66"
140"
,49"
1 39"
172"
1 2S"
1 52"
12"
20"
31"
33"
IS"
35'~
Size
54"
45"
42"
Trees to Be Felled
Species
Acer macraphyflum ~ Oregon maple
Acer macrophyflum - Oregon maple
Acer macrophyflum - Oregon maple
Acer macraphyflum - Oregon maple
. ,Robinio pseudoacacia- Black locust
Robinia pseudoacacia- Black locust.
Acer macrophyflum - Oregon maple
Picea sitchensis - Sitka spruce
T axus brevifolia - Pacific yew
Juglans nigra - Black walnut '
Juglans nigra - Black walnut
Pyrus communis - Pear
Juglans nigra - Black walnut
Trees to Be Preserved
Species
Acer macrophyflum - Oregon maple
. Acer macrophyflum - Oregon maple
Acer macrophyflum - Oregon maple
DRQOO6-00022
3
Springfield Development Code (SDC) Article 38.0 I 0 (I) states: This Article ensures that
tree felling is in accordance with Metro Plan policies which call for the retention of
natural vegetation, natural water features and drainageways, scenic quality, wildlife
habitat, and archaeological sites to the maximum extent possible on'urbanizable
land. The natural amenities of developable properties are to be retained to
enhance their future urban use on the Metropolitan Area General Plan, until these
properties are ready for urban development. Significant tree removal is permitted
only when specific development plans have been approved by the City, consistent
with plan policies and City development regulations.. Interim' removal of trees may
be permitted to the extent that such removal does not significantly detract from .
the natural and cultural amenities that make a particular site attractive for future
I.
development. I
I
Finding: No development plan for this site has been: approved by the City. The applicant has
submitted an application for P~e-submittal Meeting for a Site Plan for the Game Farm Dental
development (PRE 2006-00026). The Pre-submittal Meeting was held and the application was
deemed incomplete. At the time of this decision, the completed Game Farm Dental Site Plan
application has not been submitted. When a complete Site Plan is submitted, the proposed
felling will be warranted by the site development, and the required revegetation will be provided
through the installation of site plan landscaping impro~ements. The tree planting provided for
the Game Farm Dental Site Plan as approved in the Final Site Plan for that development shall
,
count as the required revegetation to mitigate for the proposed tree felling.
I
,
Finding: The felling proposed by the applicant will remove 13 significant trees. The site is
occupied by a prominent grove of large mature trees vJhich is identified as a natural asset in the
Gateway Refinement Plan, Natural Assets Map I. I. .
1
Condition I : To ensure that the proposed revegetation shown in sheet TR2 will be installed
to mitigate the tree felling, the applicant shall receive development approval from the City for
the Final Site Plan for the Game Farm Dental development, and shall enter into a Site Plan
Development Agreement with the City, prior to the felling of trees from the site. The
Development Agreement is required to ensure that the terms and conditions of the site plan
review, which include the provision of required site re~egetation, are binding upon both the
applicant and the City. This agreement will be prepared. by Staff upon approval of the Final Site
Plan and must be signed by the property owner prior to commencement of tree felling. If a
Land Drainage and Alteration Permit is issued prior to the signing of the Development
Agreement, site grading shall be allowed to commence only after tree protection fencing is
installed around the drip line of all live trees.
Finding: As conditioned, the proposed felling is consistent with SDC 38.0 I 0 (I).
Tree Felling Standard I
SDC 38.040 (I): Whether the conditions!)f trees with respect to disease, hazardous or
unsafe conditions, danger of falling, proximity to existing structures or proposed
'construction, or interference with utility services or pedestrian or vehicular traffic safety
, .
I warrants the proposed felling. .
Finding: The trees on this site were evaluated by an ISA Certified Arborist Nathaniel Sperry in
May, 2003 as part of a study of the Game Farm Tree Grove' contracted by the City. In his
Tree Felling
DRCl006-00022
'4
report, Game Farm Road Tree Evaluation, May 29, 2002, Mr. Sperry stated ':In general this stand
of very large trees is comprised of mature, declining trees with numerous structural and
pathogenic problems. Many of the trees were "topped" within the last forty years, which has
led'to significant internal decay and structural defects in the existing scaffold limbs, trunks and
presumably roots." Mr. Sperry found that "significant hazard issues are currently present."
. Finding: The proposed felling is Warranted by the proposed construction of the Game Farm
Dental site plan improvements or by the hazardous and unhealthy condition of the trees. Trees
# 16 and #23 are located in the interior of the site where buildings are proposed. Trees # 17,
IS, 19,20,21 and 22 are located where a parking lot is proposed. Tree # 7 is located where
the site driveway is proposed. Trees # 3,and 5 were identified as hazard trees in the evaluation,
thus felling is warranted with respect to unsafe conditions.
Conclusion: The proposal meets Tree Felling Standard I.
Tree Felling Standard 2
SDC 38.040 (2): Whether the proposed felling is consistent with State standards, Metro
Plan policies and City ordinances,and provisions affecting the environmental quality of
the 'area, including but not limited to, the protection of nearby trees and windbreaks;
wildlife; erosion, soil retention and stability; volume of surface runoff and water quality
of streams; scenic quality; and geological sites.
"
The Natural Resources Study, the National Wetlands Inventory, the Springfield Wetland
Inventory Map, the Water Quality Limited Waterways Map, applicable refinement plans, the
Wellhead Protection Overlay District Map and the list of Historic Landmark Sites have been
consulted.
Finding: The site is occupied by a prominent grove of large mature trees which is identified. as
a natural asset in the Gateway Refinement Plan, Natural Assets Map I.
Gateway Refinement Plan Natural Assets, Open Space/Scenic Areas, and Recreation Element
(page 32) addresses' the natural and cultural features within the Gateway Refinement Plan Area.
The purpose of the Element is to provide site-specific application of Metro Plan
policies and provisions concerning natural resources, including prominent and
plentiful vegetation.
Gateway Refinement Plan Natural Assets, Open Space/Scenic Areas, and Recreation Element,
Goal 9 states: Maintain prominent mature vegetation, as shown on the Natural
Assets Map on page 39, for its scenic, air filtration, and noise reduction qualities to
the greatest degree page 39, for its scenic, air filtration, and noise reduction
qualities to the greatest degree practicable.
Gateway Refinement Plan Natural Assets, Open Space/Scenic Areas, and Recreation Element,
Goal 12 states: Acknowledge the importance of trees and other landscape features
to the overall image and livability of the Refinement Plan area.
Gateway Refinement Plan Goal I states: Provide for development of the Gateway
Refinement Plan area that is sensitive to and integrates, to the maximum degree
practicable, the multiple functions and values associated with the area's natural
assets, open space/scenic areas, and recreation opportunities. '
Tree Felling
DRC2006-00022
5
Gateway Refinement Plan Policy 8,4 states: Through the site plan review process, the City
shall encourage reasonable retention of existing trees, paying particular attention
to those inventoried in this Element as prominent and ple':'tiful vegetation. ,
Finding: The significant grove of trees on the site has been evaluated. In 2002, the City
Planning Division contracted with,two professional consultants to gather the information
needed to assist with decision making concerning preservation and/or replacement of these
trees. A certified arborist, Nathaniel Sperry of Sperry Tree Care, evaluated the health of the
trees and prepared an arborist report, Game Farm Road Tree Evaluation, for the entire grove.
Ann Christensen prepared Vegetation/Revegetation Plan for the Game Farm Road Grove to provide
guidance for future 'site development. These reports v.:ere made available to the applicant.
Finding: The applicant's proposal maintains the prominent mature vegetation of the site for itS
scenic, air filtration, and noise reduction qualities to thJ greatest degree practicable, given the
site's designation for commercial development ~nd give'n the condition of many of these trees.'
, The plan will: ' i
. Retain three mature Oregon maples along Game Farm Road
I
. Remove dead, unhealthy and hazardous trees' I
. Revegetate the site with 89 new trees !
Thus, a strong presence of trees, deciduous and everg~een; will continue at this location after
the site is developed. The proposal is consistent with ~he Gateway Refinement Plan policies as
they apply to this site development.
I
Finding: The applicant's landscape plan to revegetate ~he site implements the Tree
Preservation/Revegetation Plan far the Game Farm Road G~ove for this site.
,
I
EROSION PROTEalON, SOIL RETENTION AND STABIUT;Y
VOLUME OF SURFACE RUN-OFF AND WATER QUAUTY.OF STREAMS
Finding: The proposed felling will initially increase th~ amount and rate of surface runoff when
canopy is removed. '. i
,
,
Finding: The site will be subject to landscape disturbance and changes in land cover as it is
converted to more intensive urban uses. The loss of tree canopy can be replaced as new
replacement trees mature.
Finding: The activity of tree remoVal has the potential to and will likely disturb areas of soil,
which could impact water quality. The activities associated with the tree felling must be
'performed in accordance with City codes'to proteCt, retain and stabilize soil during
construction.
Condition 2: All felling activities, including ingress and egress for the logging operations, shall
include erosion control measures in conformance with the Engineering Design Standards and
Procedures Manual.
IMPAas TO WILDLIFE HABITAT
Finding: Local effects of tree loss can be at least partially mitigated by on-site replanting, but
the ability to maintain contiguous, mature tree stands helps conserve wildlife habitat value. The
level of disturbance may also degrade habitat value.
Tree Felling
DRG006-00022
6
PROPOSED TREE RETENTION.
Finding: The applicant proposes to retain three large, mature existing trees located along the
Game .Farm' Road frontage. The applicant's site plan (shown in sheet TR I) indicates a generous
buffer area will be r'Otained around these existing trees. The buffer width ranges from 27 feet in
the north to -42 feet wide at the south end. Thisbuffer will extend from the sidewalk along to
the e~stern edge ofthe proposed parking lot.
Finding: The proposed tree retention will retain habitat for urban wildlife;. protect soils from
erosion; intercept and n;tain rainfall to reduce the volume and rate of stormwater runoff; and
enhance scenic quality. These'trees currently function as street trees and provide bufferin'g
between the commercial and residential districts.
Condition 3: The existing trees to be retained shall be clearly flagged, ;'dentified, and protected
from damage due to the adjacent tree removal and other sit~ clearing work. All felling and
removal activities shall be .performed in a manner which avoids site impacts, including but not
limited to: soil compaction around trees to be preserved, soil compact!on in the root zones of
trees on neighboring properties, and damage to trunks of trees to be preserved. Any soil and
debris tracked into the street by vehicles and equipment leaving the site snail be cleaned up with
shovels in a timely manner and not washed into the storm drain syste~ [SDC 38.040(2)].
Condition 4: The Tree Protection Notes on sheet TR I shall be included in the cover sheet of
the applicant's ,final site plan for the Game Farm Dental, development and in the Land Drainage
and Alteration plans.
Conclusion: As conditioned, the tree felling proposal is consistent with State standards, Metro
Plan policies and City ordinances and provisions affecting the, environmental quality of the area.
The proposal meets Tree Felling Standard 2. .
Tree Felling Standard 3
SDC 38.040(3): Whether it is necessary to rem~ve trees in order to construct 1'roJ>osed
im1'rovements in accordance with on of>1lroved deve/oJ>ment.1'Ian, grading 1'ermits and
constructio'n drawings. ' ,
Finding: The applicant has not, submitted nor received development approval for the Game
Farm Dental Site Plan. No grading permits or construction plans have. been submitted.
Condition I requires the applicant to received development'approval prior to felling.
Conclusion: As conditioned, the proposed tree felling is necessary to construct site
improvements in accordance with approved development plans., As conditioned, the proposal
meets Tree Felling Standard 3.
Tree Felling Standard 4
SDC 38.040 (4): In the event that no deve/oJ>ment 1'Ion has been af>1lraved by the City,
felling of trees shall be 1'ermitted on a limited basis consistent with the 1'reservation of
the site's future deve/oJ>ment 1'otential as 1'rescribed in the Metro Plan and City
development regulations, and consistent with the following criteria. '
Finding: This tree felling approval has been conditioned to require Site Plan approval prior to
tree felling.
.Tree Felling
DRQ006-il0022
,7
Conclusion: As conditioned, the proposal meets Tree Felling Standard 4.
Tree Felling Standard 5 '
SDC 38.040 (5): Whether the applicant's proposed replanting of new trees or vegetation
is an adequate substitute for the trees to be felled. . .
SDC 3S.030 (2) states that an application-for a permit to fell trees shall include: "A description
of any plan (Vegetation and Re-vegetation Report) to replace, landscape, or
otherwise reduce the effect ofthe felling that addresses the applicable standards in
Section 38.040."
PROPOSED REPlACEMENT PlANTING/REVEGETATION
Finding: The applicant did not submit a .revegetation plan with th'e tree felling application. The
Site Plan application for the Game Farm D!,ntal Site Pla~ will include the landscape plan to
revegetate the site. This plan .has only received a completeness review thus far. Thus, this tree
felling approval has been conditioned to require Site Plan approval prior to tree felling.
I .
Finding:
trees:
I
I Quantity
17
12
I 3
IS
I 15
14
15
14
I~
I 3
12
I 12
II .
I 10
I ~9
The applicant's landscape plan proposes to rJvegetate the site with the following
I
,
Proposed Trees
I
I
Size
( caliper/ft)
2"
3"
2"
2"
12"
, 4-5 ft.
I Y2".
.2"
2"
2"
5"
I 3"
12"
2"
4-5'
2"
Species
Acer macrophyllum - Oregon maple
Acer saccharum - Bonfire sugar maple
Acer saccharum - Bonfire sugar maple
Aesculus cameo - Red chestnut
I Betula jacqu. emontii - Jacquemcintii birch
Calocedrus decurrens - Incenselcedar
I Cercis canadensis - Redbud
I Fraxinus pennsylvanica 'Cimarron' - Cimarron green ash
I Ha/esia moticola - Mountain silverbells
Pyrus ca/leryana 'Chanticleer" -l2hanticleer pear
Quercus rubra - Red oak
Qu~rcus rubra - Red oak '
Quercus rubra - Red oak
Styrax japonicus - Japanese snowbell
Thuja plicata - Western red cedar
Tilia tamentosa - Silver linden
Total replacement trees to be planted
Finding: The applicant's landscape plan will provide for the revegetation of the site with 89
new trees. A new tree grove will be established on the site. The retention of the three existing
mature Oregon maples will be augmented with 17 Red ,oaks, 7 new Oregon maples,S Sugar
maples, 8 red chestnuts, 15 Jacquemontii birch, 4 Incense cedars, 4 Cimarron ash, 10 Western
red cedar and 7 Silver linden. These large canopy trees will be distributed throughout the
,developed site, with a grove of IS tre~s (including 3 existing maples) in the buffer along Game
Tree Felling
DRCl006.Q0022
8
Farm Road. In addition, 12 smaller flowering trees will be added: 5 Redbuds, 4 Mountain
silverbells, J Japanese snowbell, and 2 Callery pears.
Finding: The applicant's tree replacement plan will retain a strong presence of trees, including
deciduous and evergreen, native and horticultural varieties, on this site.
CRITERIA USED TO EVALUATE THE REPLACEMENT PLANTING PROPOSAL
SDC Article 38.040 (5) does not establish the review criteria to be used to evaluate
replacement planting proposals to determine whether they provide "an adequate substitute for
the trees to be felled". The SDC does not establish tree replacement formulas or revegetation
requirements. Replacement planting ratios for this site have been established through the Tree
Preservation/Revegetation Plan for the Game Farm Road Grove. The applicant's submittal includes a
chart "Game Farm Dental replacement Options" which demonstrates the proposal to
implement the recommendations of the Tree Preservation/Revegetation Plan for the Game Farm
Road Grove. The applicant's revegetation proposal is'consistent the recommendations contained
within the Tree Preservation/Revegetation Plan for the Game Farm Road Grove.
Finding: As conditioned, the applicant's site plan will provide for the revegetation of the site in
accordance with SDC articles 31 and 32 and consistent with the recommendations in the Tree
Preservation/Revegetation Plan for the Game Farm Raad Grove.
MITIGATION
Finding: Replanting of trees on-site is a mitigation measure which will prevent the net loss of
tree canopy or forest type from a site. Over the short term, the proposed felling will reduce
tree canopy on the site. The planting of replacement trees has the potential to prevent long-
term net loss if:
. Mitigation ratio is at least I successful new tree for each tree removed.
. Replacement species have similar mature canopy spread.
. Replanting or natural regeneration maintains the mitigation planting in perpetuity
(Mitigating for Tree Loss, Phytosphere.com).
Finding: In general, on-site replanting does not mitigate for loss of mature canopy over the
short term (e.g. not until new plantings mature).
Finding: In general, on-site replanting does not mitigate for aesthetic impacts associated with
the loss of mature trees over the short term.
Finding: In general, on-site replanting does not mitigate for loss of habitat values associated
with mature trees over the short term. New plantings do have habitat values, but these
typically differ from those values associated with mature trees and stands.
Finding: In general, on-site replanting usually reduces age diversity of a woodland or grove.
Plantings typically give rise to even-age stands. New landscaping provided by the applicant will
provide new trees all at once. The resultant age diversity of the site's woodland will be a
mixture of 89 young trees and three mature trees.
Finding: Condition I requires the applicant to enter into a Development Agreement with the
City prior to the felling of trees from the site. The Development Agreement is required to
ensure that the terms and conditions of the site plan review, which include the provision of
required site revegetation, are binding upon both the applicant and the City.
Tree Felting
DRQ006-00022
9
Conclusion: As conditioned, the proposed replanting of new trees on the site is an adequate
substitute for the trees to be felled, therefore the proposal meets Tree Felling Standard 5.
Tree Felling Standard 6
SDC 38.040 (6): Whether slosh left on the property poses significant fire hazard or
liability to the City.
Finding: The applicant states that "all slash will be removed from the site."
Condition 5: Trees and slash shall be removed within 72 hours offelling [SDC 38.040 (6)].
Conclusion: As conditioned. the Tree Felling Standard of SDC 38.040 (6) has been met.
Tree Felling Standard 7
SDC 38.040 (7): Whether the felling is consistent with the guidelines set forth in the Field
Guide to Oregon Forest Practices Rules published by the Oregon Department of Forestry
as they apply to the northwest Oregon region.
Since the reforestation stocking standards given in the Forest Practices Reforestation Rules are
designed for commercial timberlands, not urban development, and were established to assure
continuous growing and harvesting of forest tree species and the continued productivity and
stabilization of soils, the reforestation portion of Felling Standard 7 is not applicable.
Finding: The Tree Felling Standard of SDC 38.040 (7) has been met.
Tree Felling Standard 8
SDC 38.040 (8): Whether transportation of equipment to and equipment and trees fram
the site can be accomplished without a major disturbance to nearby residents.
Condition 6: All felling and bucking shall occur between the hours of 8AM and 5PM Monday
through Saturday to limit noise impacts to the neighbors. The Applicant shall notify the City
Planner at the Development Services Department 5 days prior to commencement of the felling
activity [SDC 38.040 (8)].
Finding: As conditioned below, the Tree Felling Standard of SDC 38.040 (8) has been met.
Conclusion: Considering these findings of faCt, the proposed tree felling, as conditioned
through this decision, will be in conformance with the applicable criteria of Springfield
Development Code Article 38.
Conditions of ADDroval:
The following summary of conditions are the minimum necessary to ensure that the proposed
tree felling will be in conformance with the approval criteria of Springfield Development Code
Article 38.
Tree Felling
DRQ006-00022
10
Condition I : To ensure that the proposed revegetation shown in sheet TR2 will be installed
to mitigate the tree felling, the applicant shall receive development approval from the City for
the Final Site Plan for the Game Farm Dental development, and shall enter into a Site Plan
Development Agreement with the City, prior to the felling of trees from the site. The
Development Agreement is required to ensure that the terms and conditions of the site plan
review, which include the provision of required site revegetation, are binding upon both the
applicant and the City. This agreement will .be prepared by Staff upon approval of the Final Site
Plan and must be signed by the p. _~~. ~/' owner prior to commencement of tree felling. If a
Land Drainage and Alteration Permit is issued prior to the signing of the Development
Agreement, site grading shall be allowed to commence only after tree ~' _.~~~jon fencing is
installed around the drip line of all live trees.
Condition 2: All felling activities, including ingress and egress for the logging operations, shall
include erosion control measures in conformance with the Engineering Design Standards and
Procedures Manual.
Condition 3: The existing trees to be retained shall be clearly flagged, identified, and protected
from damage due to the adjacent tree removal and other site clearing work. All felling and
removal activities shall be performed in a manner which avoids site impacts, including but not
limited to: soil compaction around trees to be preserved, soil compaction in the root zones of
trees on neighboring properties, and damage to trunks of trees to be preserved. Any soil and
debris tracked into the street by vehicles and equipment leaving the site shall be cleaned up with
shovels in a timely manner and not washed into the storm drain system [SDC 38.040(2)].
Condition 4: The Tree Protection Notes on sheet TR I shall be included in the cover sheet of
the applicant's final site plan for the Game Farm Dental development and in the Land Drainage
and Alteration plans.
Condition 5: Trees and slash shall be removed within 72 hours offelling [SDC 38.040 (6)].
Condition 6: All felling and bucking shall occur between the hours of 8AM and 5PM Monday
through Saturday to limit noise impacts to the neighbors. The Applicant shall notify the City
Planner at the Development Services Department 5 days prior to commencement of the felling
activity [SDC 38.040 (8)].
NOTE: An encroachment permit and a Land Drainage and Alteration Permit may be required
for this development. The applicant shall not commence any construction activities on the site
without an approved Land Drainage and Alteration Permit approved by City Public Works
Department.
ADDITIONAL INFORMATION: The application, all documents, and evidence relied upon
by the applicant, and the applicable criteria of approval are available for free inspection and
copies are available at a cost of $0.75 for the first page and $0.50 for each additional page at the
Development Services Department, 225 Fifth Street, Springfield, Oregon.
APPEALS: If you wish to appeal this Tree Felling Approval, a Type II Limited Land Use
decision, your application must comply with SDC Article 15, APPEALS. Appeals must be
submitted on a City form and a fee of $250.00 must be paid to the City at the time of submittal.
Tree Felling
DRQ006-00022
/I
The fee will be returned to the appellant if the Planning Commission approves the appeal
application. In accordance with SDC 15.020 which provides for a 15 day appeal period and
Oregon Rules of Civil Procedures, Rule 10(c) for service of notice by mail, the appeal period for
this decision expires at 5:00 p.m. on May 30, 2006.
QUESTIONS: Please contact Linda Pauly at the City of Springfield Urban Planning Division if
you have questions regarding this process.
PREPARED BY:
Linda Pauly
Planner II, 726-4608
Tree Felling
DRQ006-00022
12