Loading...
HomeMy WebLinkAboutApplication APPLICANT 3/14/2007 ~ City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 Final Site Plan Application, Type I , Application Type (Applicant: check one) . , Site Plan Review: ~ Applicant Name: Company: Address: Applicant's Rep.: Company: Address: Property Owner: Company: Address: Site Plan Major 0 Modification Type II: Site Plan Minor Modification Type I: 0 OreQon UroloQY Institute IOreQon UroloQY'Institute 12400 Hartman lane, SprinQfieJd OR 9747.7 [Terrv Fitzpatrick IGStreet UroloQY Center LLC 11457 G Street, SprinQfield OR 97477 !G Street UroloQY Center LLC IG Street UroloQY Center LLC 11457 G Street. SprinQfield OR 97477 Iphone: [541.746.1618 I Fax: 1541.746.4569 [Phone: 1541. 746,1618 1 Fax: 1541.746.4569 ASSESSOR'S MAP NO: i7-03-36-22 TAX LOT NO(s): 6800& 7000 Property Address: 1457 G Street Name of P. _;.;._.1:: OreQon UroloQY Institute Radiation Center Description of Proposal: Construction of a new Radiation Center building, associated site improvements (parking areas, bio-swales, landscape plantings and lighting), and infrastructure. Required Property Information (City l'1take Staff: comp~ete this s~et;tiqn) Associated Applications: Dfl...c. 'LDD7.-Qrn/() . t'RE.2C07-0COO2.. Au 2001-00005 . Case No.:DrLLl{j()7~rmOq' Date SUb~itted: ~ !IL( ! Dr' APPlication' Fee: '# 3t(t;.OO-f 'l'1:l"o(f.'4) ")!1tl'i8. W Reviewed by: 1 I (Applicant: complete this section) I ~resent th~ aJl*i>~n to be complete for submittal to the City. owner/U~~ ) Date: ~117.j07' . (, I (Signature) . t ---r;1?t7\~ ~ i "P~'L%' , \ . (Print) " ~ I 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Job/Journal Number DRC2007-00009 DRC2007-00009 DRC2007-00009 Payments: Type of Payment Check cReceintl - :~ " RECEIPT #: City of Springfield Official Receipt Development Services Department Pnblic Works Department 2200700000000000343 Date: 03/14/2007 1:57:15PM Item Total: Check Number Authorization Received By Batch Number Number How Received Amount Due 396,00 792,00 59.40 $1,247.4U Description. CTY 10% Final Site Dev Agrmnt Expedited Proc Fee Add'l X 2 + 5% Technology Fee Paid By OREGON UROLOGY INSTITUTE Amount Paid emm 6100 $1,247.40 In Person Payment Total: $1,247,4U Page 1 Of 1 3/14/2007 . \. City of Springfield r...<!?evelopment Services Department i ,,.. 225 Fifth Street Springfield, OR 97477 Site Plan Application, Type II Site Plan Review: t8J Major Site Plan Major Modification 0 Applicant Name:' DreQon UroloQY Institute Company: OreQon Urology Institute Address: 2400 Hartman lane, Springfield OR 97477 ~:<:,('1iO",,';'r.:0'f~Xj;;,:;.cj{::;[tr~~i:,::;~_:':';.::'~M~i~ij;;<;:0'L:':";;:;;,:oiii"':;;-;~_~,$]~C{;;i,l:_k,;:;;;':"'~';:;4J_~w' ;-'>';~jii,~;W:'(ij.(r:1;:.;,:q'}~ ?:.~K/'~:~;-~:~' - -~.' · -It. · Phone: 541.343.9259 I Fax: 541.485.1957 Applicant's Rep.: Terry Fitzpatrick Phone: Company: G Street UroloQV Center liC ' IFax: I Address: 1457 G Streett Springfield OR 97477 I' ';;~;~;; ~~:'~er~"~I~;;:::~:;:~;~=~t:~~~~ie"i"'~ ",""S.",'" ~I Company: IG Street Urology Center liC 1 Address: J 1457 G Street. Springfield OR 97477 I ,:~':'i.V'':' '~.-.2t~\/'~ir ,- ~<,~:"'>",,:(:Y;;:;W~'j};:':7t::f;;7:f/'!:;?J: \::!{_;''<jd't';:,-,~'(>~ :1t;;,; ~ .,,';. J-~ ' .:;'~'.t: ~r;;","~dj" ;':"",ll'J:i.,,". ",_,'1f~:::;;",~",,'-~:;c,;'th>';T';;_V,'i,X\:f ,-::;4,.- '.~}~-,,*,:::-:;';,3::;'_"':jr...:.,:-l';;:: <.~ .:': '''1'1 ASSESSOR'S MAP NO: 17-03-36-22 TAX LOT NO(s): 6800 & 7000 Property Address: 1457 G Street I Size of Property: 0.96 Acres ~ Square Feet 0 P~p~~'!l.~ NiI~l!l)fProjl!~: Oregon Uroloqy Institute Radiation Center . ; J: 'J'"'M:c.'<;L't,':S~'i,'i'.0J~,.:_,;,,<~,7.;;w",%i';::;':':"~,/";"'" (.,t"",,,,. :>=. '~,;A.J'",,-x AkV,,'_,""'410. _.,"'" --"r'f',_.,',,' '~_"H .:.,';, /A,~",,',,~,~,,".""%"'J~; .M.';": ,~""""."",..,,:',',, ,.",""~''''_' . ~.:""'H~ -,.,," .... .'<. '"1M, ..".~.:"-:_ '."'.""".<.'M 'v_,.l Construction 'of a new Radiation Center building, associated site improvements (parking areas, bio-swales, landscape plantings and lighting), and infrastructure. Description of Proposal: # of Lots/Parcels: 2 Avg.' lot/Parcel Size: ~ew.IIII~~rvi~.u~ S~~_~. Co~er.agl!~_ 1 .'. ;;;<,,:\;-"';!~.~,:'" ,,;<' ;,",{~:\_ :'{"",,;;:- <:'\,'Cc'; ,;>< ~Jr;,;:,:;~'_",'L,,:4r252f:*J::-t4,q~"\ ::JD;:-,:,-,"'~,,_ NA du/acre a,=, -B,2J2, ~/ .. "f;~:1/.~,;~;x,-,::.\:,"-",,; ~,,~ Zoning:. Overlay District: Applicable Refinement Plan: Plan Designation: location: City Limits 0 Urban Growth Boundary 0 Associated Applications: NA ' "'J)i'4r;,'::;-'::~1Hit~;J:::t::~'~:ilf1\iJt::~?jr~<-~:).r::~,:1:0,\jt~b';:FWi;'.~~fTt;:\-:-~0'i..:,~s,~:,'~i:b' '.J:i :i~~;jft:.&ii:;4}-;;;'-0;:~~~\>_)j~-;~"$ti:; _~:~';"':0:Jt:i-/,;<~~j!~$,:j;jj0;;i;:';;;"(:i,.(~'-1~,;:;"t?-'. :,'"\.-.( ::''1:' ;:;..__ .ii;tth ;.\~; i'""".-:-' . Pre-Submittal Case No.: Date: Case No.: bP-C:l.oOl-Ooro'-l Date: 2. /0,- / 0 '=r t . Application Fee: $'39kD-rf/zroTechnical Fee: $ ~4q., TOTAL FEE'S $ Ce"1:"?<<=.w~) /1//" 9,S:9l ,CSD '.. \ ::.. I ) QJ. "\ NYl ~ J\NV\ .s I S:/ OV" c;,., ~ \-0' ~ sh ~eGQs rvJ lJl]JV . U' C~\i) Reviewed by: Reviewed by: Postage Fee: LM I T2-T<--. $ lru Steps in the Process: ,\t, I 1. The Applicant Submits a Pre-Submittal Meeting Application The Pre-Submittal Application is mandatory. Please refer to the Springfield Fee Schedule for the Pre-Submittal Application fee. The submittal package must conform to the application completeness checklist attached to this form. You are required to submit Nine (9) copies of the submittal require'!lents packet for pre-submittal review. Pre-submittal meetings will be conducted every Tuesday and Friday between 10:00 am and noon. We will strive to conduct the Pre-Submittal meeting within five to seven working days of receiving the application. 2. Applicant and the City conduct the Pre-Submittal Meeting We strongly encourage you, the owner and design team to attend the Pre-Submittal meeting. The meeting will be held with representatives from Public Works Engineering and Transportation, Community Services (Building), Fire Marshall's office, and the Planning Division. The meeting will be scheduled for 30 to 60 minutes. The Planner will provide you with a Pre-Submittal Checklist at the end of the meeting specifying the items required to make the application complete-if it isn't already complete. You will then have 180 days to make the application complete for submittal and acceptance by the City. 3. Applicant Submits a Complete Application When you have addressed all of the items on the Pre-Submittal Checklist, please submit 18 copies of the complete application to the City. A fee will be collected at that time and the 120 day calendar review period will begin. When the Planner has prepared a draft land use decision, the draft will be mailed/faxed to the applicant/owner/design team for their review. At the applicant's request, the planner will schedule a meeting to review the draft with appropriate staff if certain issues need resolution before the final land use decision is issued. Owner's Signature This application will be used for both the required Pre-Submittal Meeting and subsequent complete application submittal. Owner's signatures are required at both stages in the application process, An application without the Owner's signature will not be accepted. The undersigned acknowledges that the information in this application is correct and accurate for scheduling of the Pre-Submittal Meeting. . Owner: Date: . Signature Print Case Number: DQC2eD'1-6Wli1 zjr JCJ+- I I represent this application to be complete for submittal to the City. Consistent with the completeness check performed on this application at the Pre-Submittal Meeting, I affirm the information identified by the City as necessary for processing the application is provided herein or the information will not be provided if not otherwise contained within the submittal, and the City may begin processing the application with the information as submitted. This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a complete application Owner: //..._ ~ f . -----;6~ ~-r&>--~~c.. Print Date: t /3 I /0'7 Site Plan Submittal Requirements Checklist *If you feel an item does not apply, please state the reason why and attach the explanation to this form. 1. Application fee-refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development Services Department. The application fee and current postage fee is collected at the time of complete application submittal. 2. Copy of the deed and a preliminary title report-one copy issued within the past 30 days documenting ownership and listing all encumbrances. If the applicant is not the property owner, written permission from the property owner is required. . 3. One additional copy of the Site Plan reduced to 811z"x 11", which will be mailed as part of the required neighboring property notification packet. 4. Right-of-Way Approach Permit application must be provided where the property has frontage on an Oregon Department of Transportation (ODOT) facility. 5. Stormwater Management System Study-four copies of a study with the completed Storm water Scoping Sheet attached. The plan, supporting calculations and documentation must be consistent with the Engineering Design Standards and Procedures Manual. 6. Traffic Impact Study-four copies of a study prepared by a Traffic Engineer in accordance with SDC Section 32.020(1)(c). Traffic Impact Studies (TIA) allow the City to analyze and evaluate the traffic impacts and mitigation of a development on the City's transportation system. In general, a TIA must explain how the traffic from a' given development affects the transportation system in terms of safety, traffic operations, access and mobility, and immediate and adjoining street systems. A TIA must also address, if needed, City, metro plan and state land use and transportation policies and objectives. 7. Nine (9) copies of the following plan sets for the Pre-Submittal Meeting OR Eighteen copies of the following plan sets for Complete Application Submittal All of the following plans must include the scale (appropriate to the area involved and sufficient to show detail of the plan and related data, such as I" = 30', I" = 50' or I" = 100'), north arrow, and date of preparation. All plan sets must be folded to 8Y2" by 11" and bound by rubber bands for submittal. a. Site Assessment of Existing Conditions ~ Prepared by an Oregon licensed Landscape Architect or Engineer Vicinity Map ~ The name, location and dimensions of all existing site features including buildings, curb cuts, trees and impervious surface areas, clearly indicating what is remaining and what is being removed ~ Required setbacks to the proposed new property lines for existing structures to remain on site ~ The name, location, dimensions, direction of flow and top of bank of all watercourses and required riparian setback that are shown on the Water Quality Limited Watercourse Map on file in the Development Services Department 1ZI The 100-year floodplain and f100dway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision 1ZI The Time of Travel Zones, as specified in Article 17 of the Springfield Development Code and delineated on the Wellhead Protection Areas Map on file in the Development Services Department 1ZI Physical features including, but not' limited to trees 5" in diameter or greater when measured 4 V2 feet above the ground, significant clusters of trees and shrubs, riparian areas, wetlands and rock outcroppings 1ZI Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted concurrently if the Soils Survey indicates the proposed development area has unstable soils and/or a high water table b. Site Plan 1ZI Prepared by an Oregon Licensed Architect, Landscape Architect or Engineer 1ZI Proposed buildings: location, dimensions, size (gross floor area applicable to the parking requirement for the proposed use(s)), setbacks from property lines, distance between buildings 1ZI Location and height of existing or proposed fences, outdoor equipment, storage, trash receptacles, and signs 1ZI Location, dimensions and number of typical, compact and disabled parking spaces; including aisles, wheel bumpers, directional signs and striping 1ZI Lot coverage calculations of all parking and vehicular areas 1ZI On-site loading areas and vehicular and pedestrian circulation o Access to streets, alleys and properties to be served, including the location and dimensions of existing and proposed curb cuts and curb cuts proposed to be closed 1ZI Location of on-site exterior lighting 1ZI Location, type and number of bicycle parking spaces 1ZI Location of existing and proposed transit facilities Phased Development Where applicable, the Site Plan application shall include a phasing plan that indicates any proposed phases for development, including the boundaries and sequencing of each phase as may be permitted in Section 3.040 of this Article, Phasing shall progress in a sequence that promotes street connectivity between the various phases of the development and accommodates other required public improvements, including but not limited to, sanitary sewer, stormwater management, water and electricity. c. Improvement and Public Utilities Plan 1ZI Prepared by an Oregon Licensed Civil Engineer 1ZI Location of all existing and proposed easements 1ZI Location, widths and names of all existing and proposed streets, alleys, dedications or other right-of-ways within or adjacent to the proposed development. , 1ZI Location and type of existing and proposed street lighting 1ZI Location of existing and required traffic control devices, fire hydrants, power poles, transformers, neighborhood mailbox units and similar public facilities 1ZI Location and width of all existing and proposed sidewalks, sidewalk ramps, pedestrian access ways and trails I:8J Location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points d. Grading and Paving Plan I:8J Prepared by an Oregon Licensed Civil Engineer I:8J Planting plan prepared by an Oregon Licensed Landscape Architect where plants are proposed as part of the stormwater management system I:8J Roof drainage patterns and discharge locations I:8J Pervious and impervious area drainage patterns I:8J The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainageways to be retained I:8J Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot intervals) I:8J Amount of proposed cut and fill e. Landscape Plan I:8J Location and dimensions of landscaping and open space areas to include calculation of landscape coverage I:8J Vegetative screening in accordance with SDC Section 31.160 I:8J Written description, including specifications of the permanent irrigation system I:8J Location and type of street trees I:8J List in chart form the proposed types of landscape materials (trees, shrubs, ground cover). Include in the chart genus, species, common name, quantity, size, spacing and method of planting f. Architectural Plans: I:8J Exterior elevations of all buildings and structures proposed for the development site I:8J Conceptual floor plans I:8J Type, height and area of exterior lighting G. On-Site lighting Plan: I:8J Location, orientation and maximum height of exterior light fixtures I:8J Type and extent of shielding, including cut-off angles and type of illumination, wattage and luminous area I:8J Photometric test report for each light source 8. Additional materials that may be required IT IS THE APPUCANT'S RESPONSIBIUTY TO DETERMINE IF ADDITIONAL STANDARDS/APPUCATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPUCANT SHOULD CONSIDER UTlUZING EITHER THE DEVELOPMENT ISSUES OR THE PRE-APPUCATlON REPORT AS DISCUSSED IN SDC 31.030: o Where a multi-family development is proposed, any additional materials required to demonstrate compliance with SDC Section 16.110 o Riparian Area Protection Report For properties located within 150 feet of the top of bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the top of bank of any direct tributaries of WQLW IZI A Geotechnical Report prepared by an engineer must be submitted concurrently if there are unstable soils and/or a high water table present o Where the development area is within an overlay district applicable, address the additional standards of the overlay district o If five or more trees are proposed to be removed, a Tree Felling Permit as specified in SDC Article 38 o A wetland delineation approved by the Oregon Division of State Lands must be submitted concurrently where there is a wetland on the property o Any required federal or state permit must be submitted concurrently or evidence the permit application has been submitted for review o Where any grading, filling or excavating is proposed with the development, a Land and Drainage Alteration permit must be submitted with the land use application o Where applicable, any Discretionary Use, Variance or Modification of Provisions as specified in SDC Article 10 or 11 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Job/Journal Number DRC2007-00009 DRC2007-00009 DRC2007-00009 DRC2007-00009 DRC2007-00010 DRC2007-00010 Payments: Type of Payment Check cReceintl RECEIPT #: r -', of Springfield Official Receipt b"velopment Services Department Public Works Department 2200700000000000174 Date: 02/07/2007 Description Expedite Process Fee/Flat Rate CTY Site Plan Review + 5% Technology Fee Postage Fee Type 11- $150 CTY Drinking Water Protection + 5% Technology Fee Paid By OREGON UROLOGY INSTITUTE PC Item Total: Check Number Authorization Received By Batch Number Number How Received tj 5749 In Person Payment Total: Page I of I 9:03:25AM Amount Due 11,000,00 3,960,00 748,00 150,00 957,00 47,85 $16,H62.H5 Amount Paid $16,862,85 $16,862.H5 2/7/2007 )' ~ _ BALZHISm & HUBBARD ENGINEERS LETTER OF TRANSMITTAL 100 West 13111 Avenue, Eugene, Oregon 97401 (541) 686-8478 (phone) / (541) 345-5303 Ifax) www;bhengineers.com Mechanical. Electrical.- Civil_ Surveying To: Company: Address: Project: From: City of Springfield Development Services 225 Fifth ,Street Springfield, OR 97477 Oregon Urology Institute Radiation Center Mikael Shields January 17, 2007 WE ARE SENDING YOU THE FOLLOWING: ITEM COPIES DATE DESCRIPTION 1, 18 2/2i07 Site Review Application and Narrative 2. 1 1/31/07 Application Fee Check (No, 5681) $18,585,80 3. 18 1/16/07 Reduced Site Plan - Sheet A 1.1 4. 1 1/15/07 Geotechnical Report 5, 4 2/2/07 Drainage Study 6, 18 2/2/07 Site Review Drawings -Sheets G1-E1,1 7, 6 2/2/07 DWP Overlay Application REMARKS: COPIES TO: Terry Fitzpatrick, Oregon Urology Institute P:\2100-071-06ICIVILltm mds 070117 COS Tent SPR.doc Page 1 of 1 '. . CITY ()F SPRINGFIELD:, 17-03-36-22 TL6800, 7000', i' 0(.,\ > ..i "M0~'" i..,. 'I ,)Q',\~'b~'I""" " ,'''- , ~~'" 8' \ i>,' ,. h~ if------,-'-------::~..!:.~21J~l~'..s:n!rl( !, 5~J:.~ . ."' s....,.............o-::;.-,l........:'_'E. (f.o:"''''I~1 "14: ___, (VACATED)" 5"'",,-,_ ~-: . !~~ '//1,; 4601j-"'o1~''-'-'.''',.. . ..,. 'I-';'/~- - ,,\~rftil A" UJ' '- - -- _ -". . . .~ I \) --.~ .i:::!.~ ~,u;:;~.,.' ~ ~ ~ ~ ~ -:~,,7 .~-,~-=> · -~:-;-~ - -:-- - - c~N:iCc.;;:p: YI , :.., . . . "BRATTAIN I ' .', '" D.L.C. No.53 C \--. \) .;< to~ lolled 'Oil Mop ( I. I I I, I I ' ... '. ,', ~. ."'...... I', ~.' I" . . . '.' "" ~ +--..:_---------- ...,..-- - r' . ~ - ~ ~ ~1~ "'~ . I / I ; I 'I ' I' I ., ,~, .~ '\. '1 ? ~~ , g (?~. I 'I <::{' II ~~~" rif'~ . ,:,- ~.. %:A~ _ _.1 . . ",5.0_= 12<'" /~ / ~<:J 14a 1\ 6'7 ~!il~r7GO~~~~,.~.P.. t. __1700~~~.- -. -.' . .~---~. 'n ~ . -.' -.... ~,. ';, ',.-~' '. -.~ ,,,',,:.'" .: .,' " l!...; '. G ~ - J .0' ~ " :,'-'.~, 60" r." I I' "i .w I -----:- ~520~ ; ~ 4800 . :901 .. 500' .~;OOO \ '15300:~\y , .. ," ~ I. . . ~ I,~ . .. 5400 -....." " I,' 'I ','" s, /. I '11" '0000 I .-",," , -5999--: ~. - 5500 O.~6AC I 1 5vl52D r( 0i1P1 ~ 5.700 5600 I <5 U 9d O\'-\ 5801 I \C ;\ ~ ~ ,I ..1\,-1 - 6001'. I' , \1)\ alBAe M~' \)'~J'o' " 00' ~",_' . ; \''-ZO".td5i dr "'WE.r+ .!..~{.L,,,..Jlot"~1 ~'. ;.,€.'";.;~t~ F a'd/tA,,,">>,,,,. . , ~ ~.. ~~ .17 0'3 -35 1,1 . " ~: . .'"'. '. .P08,~',:... " I . I , '1,,: i' . I 1"1.1 I )' ' , . 9 '( p,' - . -~"'''''~'~ roo ~~e 89<9" 6200 ' . f801 ; . t) ~" ~,,' , . ------,;::, r 6300 ~ . (,"'''' ). "r 6700 ,6500 '. .. '~5.46' 6400 ....~- .1", .. .. , ' ,. ;:'''' I' I 'J~. I- <>t . , , l I~ ~ ,."J _6"'. dO' - .,.. ~~. sa.9";""'" ...... , See Mop 17, 03 36 2 3 -""""- \ , .-'< p,\\' ~\ \ . c:,<;:\r 0' s"'-u.... ,,~..,.;.. .~~_ ~ 8..~J.. ,,,..,,,, FO",... .."'. ~O'. C> ~ ~.~~'.... .58'''~5.,'1i' 9 ".10 STREET. ~18".S7111'! I 1'p'>:66' I ~BOO ,::; 0 ~ . _L~ \01 .. ':l..ool-u"J :~It ,_ ""~' 2-tHJe:- c..~~ I'SITEl. I ~ ~ .' <2S'~" ';D' \, g' 6900 7000 Z IE ~ 'e "'~lf'.f'l:,!o",V 1%.29' .~ t . 6"r"'''' .0' ---"~'---:-.- ST. STREET~ , I --'-- N "' .." ~ .., 0 0- -' .' ~ "0 , " , " . . ~ ~"1'6l' 1 I 1 I I I I \1_ .'79.6 ;~O'~~{I "v:2~L.~,c," l7Ib;'~C,... .]. 2,96~C"-;:':~ "~'" . ~~~!~?itiffi'7~. . '~~~~~~:r';~'_c~'"o.-.~ . '"I' ' " 0"; . ~l ~ ;; ~ ~ ~ ~ I I- U) VOO'OO'JOO!": ...5"'.-. . Jj<Jf'Jf....O-W 13e..3S" _'~o:...-/It' ", , ,Y.~:CD" ..Ie- E"13~RT {JLC.No"7~ ~~..~.~,.~..'N' + .<50' f9~_le' :F. ,- ..~...,,'. ,,~ ( , II , 5\00 6200 r----------------------,c~- . I 6JO~ L1 .J ~ ~ "' ~ ~ I 11 ,I i 5400 10 11Site Plan 3CALE:NOTT03CALE ttJ TRUE NORTH ,,~-.,. , , j ""'u"""""'~" 0.1'"'' "".., """'.w......,,, I ~.':~:~t..,~ON G STREET 'o"."{""ON_\..~""::.';"~~~.."""'" ""'O><,,~,. ,_~_~~}.~_ 'RE.;"'''''. '_,.~. ,'.--'~_L_ ,,,,,.,,,,",,,,,,, "..'" ""'ON ......... ,:',;,.-+,=, ........i~~,}=..T""'" ",.r:. - f. ~--=',~',:4,: '''''':':'~- , ,.....1" ~,_ I'~/f~ I.""",;.,....}_/,\"""""""""......Tm: ,i~'r. ~-_-:1. I.v ',- - ~J I ~ """"."""..::::;-.:l.""",,--, ___________,~...._:;;:_, ------;---:t---::::._O,."..tr1"''''0- '.r-;~----- f.:\!,0'_\l'~t'€fjlrl'I~---OII' fi--T-f--I--~l-----r---'l--'~~f: 'f.i' '~r~]~~'"' - ---LJ-.:.-..I"~jl "''''1'-'''''''' \ '"'''''' " _fL'''''' 1 \_\,. .. I _, , ,-,"'!' , ". ,: ' "i, -,~, i"/j -I ~'~i -~~~"'_"D'~*~"'""'~\'Y:I: i """..-' , '''-Ln: I r "_INC"" \ . 'N'"'/''''' 1 -', >; f"""'''' I ~~::'~,J:"" '\ "'""'" , I "'" "S "1 ,:.:.~~/ ~-- , ~JC.:!. ,_....~, " ~~, ': ':::':::':=~:-IJ ~:=~:..~~:~~rm::.~11 b~[""~~y~~ :J~:~~~,L:l' ! .s; t _:::_.l! ~I i1'Ilb!J%'>,:,,~,.:~'r.-.r"'':('-4-/_'~''''1,.'i'J''-7,.'~J "'''', ' 6801 'I ' . -;::or"....' 'c. .: ~,_,_ =~=-2~or_.:,~~.: ':;;i'-"t........_ '8- """"" """[. -! L':'~.';'.,~I III II. 0 ::;:;'~',~"'" ~ "H''''''''' '. ".....""'-------- ) -. ,-,.....- ""_ """......."""'1 ;& [lP"""'" ~ :& ""0\0.",,' ., =~iP~"-Ii1-fr,':?~_ ~ ~~~~- -{~i ro._"",,,-,_ ,t - :'~-~I~.-~; 8>JlUtlNcrOOlPRINT~' "llYJ_ '.:~,_.,'.~_':",:. I ---.,-, ".-..",~, I" r,. '~,'" I S<.1<"'" """" ~~.:.. '~I ~~ Ell ~':/._""""'."""'"" . r !,,",,,,,,"._~,;,~,~,."",""'"'.>'''''~' ',J :'1 ,.""'.--------..,,---G~i: " L_'-___ -,'---7.-~"~'~ '. 'r-'""'"'''O'''''" \g.:;.~.7._, !"",,:':~:: I ~."..~~I,;~;'~ :/:-;-' ,'-""."" : ~'~-:'I':'"'''' ,,',N', '""' ~~~'SC--C";I!' -. 0 ,"'.- ~ Ol'~ ~ 0 ,- I ,,~, I ~ ('''''''>S) i 10____ ~~=:;t~~~~'J-d.~~" ~.:-'~ ..'.. ,- [ ~""'IL::'::'-']',,! f--- ,..::-- ~'~'iio:;~:!b'f:', "...- z / f-c-- .~. ~c: ,J,,~~,~, [.".",""" ".",,,-,,,,,[,,n,,,, "..! lO..~... I ;::,::<- i ~!-- 690C ....,"-''''1.~:i::~~= 7000 ~..~-..~ :1....' ; b ~,~~~.;t:_~ $ ~ ...... ~I. '!J;;:;'-;;~""' I ~ -" '.I;,=;---=--. "'";:;~ 'Idj=" ~~,~..,;.;-- j ~~':,'",i~,"-~_ -~~I~!"; ,"r,~". """''' 1'1 I ,T_,'.i_;, "'"'''''''- [~". "'."""'''''''''- '-iiiS'iT", """."",. I .,.',.... .<' , -~-,,;-~-(- r""'"""'''''''Sl[ ,...""'''',,,.,, 6500 I ~ 6700 J 'I" F STREET 0' c !;,O' GRAPHIC SCALE: ~~ ",' 10' Project Information BUILDING UNDER ROOF TRASH ENCLOSURE l--crrALAREA- . Lot 6800 Area Lol7000Area TolalLolarea 10.1993.1'. 1005.1'". 10,299S:'1'~ = 33,559.96 s.f " 7.552.15s.f. "41.112.11 s.f~ Max Building Area (35%)= 14,389.24s.f. Max Parking (45%) = 18.500.45sJ. Mln L"ndscape (20%) = 8,222.42s.1. Parking Building Area Parking Area Landscaping Building setback Parkingselback Sidewalk Area Provided 38 10,299sJ. 18,0075J. 11.6465J. W' S'min 1.746s.1. Required 27 (lO~O s.l.) 14,389 s.f. max 18.S00max.(4S%) 8.222s.l.min. W' 10' avS' min. I' ii g '''1 t; ~ lii ! .c:~ -- '" i;;o "I I" Q"la..~~;1 ~~ 3 ~-5 ';1 ~ g.30 :::,..1 i .;11 Urology Healthcare, r.C New IMRT Facility . t";,--,,,~,,, ,"<"'~'''''',n""" 9:":7 ';",..,~...,,,-,,~.._.' .."..."_.~ ....,-.-....,....... :.~:;.::-:.:;:.;..:.',';..:.~,.":.,~~:::;t .... .,~._.' ~..'~...- ~"- {)R;"W'iHY; -,;~SL;E'REC(-j"O ;'0" 1M" '''''''',~_ ~""~~.~.."', --"-----;,.jo.I""'._,,_,,.C"'..h "--',;;;M=. -I ~~ 1;;': ~;'''~~L?i._; . ,cJ .,,-9"'--=[ )'..1-,-------- : ==-,C== ~I<:Y .00" -,,' -,0- -~ SHE",mlE SilePlan ~"FETNO. A1.1 2 of' SITE PLAN REVIEW APPLICATION Oregon Urology Institute Radiation Center Oregon Urology Institute 2400 Hartman Lane Springfield, OR 97477 Assessor's Map #17-02-36-22 Tax Lot #6800 & #7000 February 2, 2007 February 2, 2007 SITE PLAN REVIEW APPLICATION Oregon Urology Institute Radiation Center Written Explanation of the Proposal Applicant: Oregon Urology Institute 2400 Hartman Lane Springfield, OR 97477 Property Owner: G Street Urology Center LLC 14S7 G Street Springfield, OR 97477 Applicant's Representative: Terry Fitzpatrick G Street Urology Center LLC 14S7 G Street Springfield, OR 97477 Project Name: Oregon Urology Institute Radiation Center Project Location: 14S7 G Street Springfield, OR 97477 Assessor's Map #: 17-03-36-22 Tax Lot #: 6800, 7000 Property Size: 0,96 acres Plan Designation: Low Density Residential Zoning: General Office (GO) Overlay Districts: Drinking Water Protection (lOWP) Refinement Plan and Designation: Associated Applications: PRE2007-00002 ZON2006-00063 January 76.2007 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center 1.0 Description of Proposal As illustrated in the attached plans, Oregon Urology Institute ("the Applicant") requests approval to construct a new Radiation Center building, and associated site improvements (parking areas, bio-swales, landscape plantings and lighting) and infrastructure, on the site located at 14S7 G Street in Springfield, The subject site is comprised of two parcels identified on County Assessor's Map 17-03-36-22 as Tax Lots 6800 and 7000, both owned by G Street Urology Center LLC. The applicant has previously participated in Development Issues (ZON2006-00063) and Pre-Submittal (PRE2007-00002) meetings with City staff. The proposal complies with all applicable Code requirements in Articles 20, 31, and 32, as well as the submittal requirements in Article 3 and the Type II Site Plan Review application form. 2.0 Background Designed as an Intensity Modulated Radiation Therapy (IMRn facility, the proposed Oregon Urology Institute Radiation Center building will contain doctor's offices and associated clinic and treatment facilities, IMRT is used as a treatment for eariy"stage prostate cancer. The subject site is comprised of two parcels (Map 17-03-36-22, Lots 6800 & 7000) located south of McKenzie-Willamette Regional Medical Center (MWMC) in central Springfield between G and F Streets. Tax Lot 6800 is 0.79 acres and has frontage on G Street. Tax Lot 7000 is 0.17 acres and has frontage on F Street. The combined size of the parcels is 0,96 acres. Both parcels area designated Low Density Residential on the Metro Plan Diagram and classified General Office (GO) on the Springfield Zoning Map, Doctor's offices are permitted outright in the GO Zone, subject to Site Plan Review, The subject property is surrounded by Low Density Residential (LDR) zoned property to the east, south, and west; and Community Commercial (CC) zoned property to the north. Uses on Tax Lot 6800 consist of a 7,780 square foot medical clinic and associated parking, landscaping, and infrastructure. Access is provided by two curb cuts at G Street, The parcel is fully served by water and gas lines located in the G Street right-of-way, a sanitary sewer line located along the southern property boundary, and an overhead electric line along the east property line, No storm sewer service is currently provided to the parcel and the nearest connection point is at the intersection of G Street and 14'" Avenue/Mohawk. Tax Lot 7000 is currently vacant and formerly contained a single-family residence that was demolished. A storage shed is the only existing structure on the property. The remainder of the property contains a gravel parking area and landscaping. Access to Tax Lot 7000 is provided by an existing curb cut at F Street. Prior to the acquisition ofthe parcel by G Street Urology Center LLC in 2006, parking areas on Tax Lot 7000 were rented by McKenzie Willamette Medical Center (MWMC) through a parking agreement between MWMC and the former property owner Willamette Community Health Solutions. This agreement was terminated on October 2, 2006 by MWMC. The Site Plan proposes the following improvements: >> Oregon Urology Institute Radiation Center building (8,222 square feet); >> Paving for parking, driveways, and sidewalks (19,7S3 square feet); >> Landscaping and screening surrounding the building and in required setback areas, including bio-swales for storm water management (11,646 square feet); >> Associated utility infrastructure, February 2,2007 2 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center All improvements identified in the attached plans will be constructed in a single phase (Phase 1). The Site Plan, Sheet ALl, identifies a possible future second vault building expansion area (1 ,390 square feet) to be constructed by the applicant based on future need (Phase 2). The applicant seeks development approval for both phases, 3.0 Review Process The proposed Oregon Urology Institute Radiation Center Site Pian Review (SPR) application is submitted with required plans and supporting materials. SDC 31.020(2)(b) requires Site Plan Review for commercial uses, Pursuant to SDC 18.020(3)(u), Doctors offices are a permitted use in the General Office (GO) Zoning District, a Commercial Zoning District, subject to Site Plan Review, Site Plans are processed under the Type II review procedure. 4.0 Site Plan Submittal Requirements 1. Application fee The application fee is provided with the application, 2. Copy of deed and p,eliminary title report Copies of the deed and title report are provided with the application, 3. Copy of reduced (B.5"x11 ") Site Plan A reduced sized copy of the Site Plan is attached. 4. Right-of-way Approach Permit application Not applicable, since the subject site does not have frontage on any ODOT facility or require a right-of- way approach permit. 5. Stormwate, Management System Study The Stormwater Management System Study and required stormwater scoping sheet are submitted with the application, 6. T,affic Impact Study Not applicable, since the applicant is not requesting a variance, the use is not expected to generate more than 250 vehicle trips per day, and no traffic signals are warranted. 7. Copies of the following plans: 18 copies of the required plan set are submitted with the application, a. Site Assessment of Existing Conditions Sheet L 1.0 is the Site Assessment. A vicinity map is included on G1.1. Soil types and water table information are included in the Geotechnical Report submitted with the application. b. Site Plan Sheet A 1,1 is the required Site Plan. Lot coverage calculations of all parking and vehicular areas are shown on Sheet A 1,1. Exterior lighting is described on Sheet ELl, February 2. 2007 3 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center c. Landscape Plan Sheet L3,O depicts the location and dimensions of proposed plantings as well as Irrigation Outline Specifications, d. Improvement and Public Utilities Plan Utility locations are illustrated on Sheet C2.0, e. Grading and Paving Plan Grading and paving is illustrated on Sheets L2,O and 0,0, Stormwater drainage is identified on Sheet C1,O, Plantings associated with the stormwater drainage plans are included in the landscape plan on Sheet L3,O, f. Phased Development Plan Project phasing is indicated on the Site Plan, Sheet ALL g. A"hitectu,al Plans Exterior elevations for the Radiation Center building are included on Sheet AS,1. The conceptual floor plan is shown on Sheets A2.1. h. On-Site Lighting Plan Exterior building and site lighting is identified on Sheet E1,l. 8. Additional materials that may be required: a. Where a multi-family development is proposed, any additional materials requi,ed to demonst,ate compliance with SDC Section 16.110 No residential development is proposed; therefore this provision is not relevant. b. Ripa,ian Area Protection Report fo, p,operties located within 150 feet of the top of bank of any Wate, Quality Limited Watercou,ses (WQLW) or within 100 feet of the top of bank of any direct t,ibutaries of WQLW. The site is not located within 150 of a WQLW or within 100 of any tributary of a WQLW; therefore this provision is not applicable. c. A Geotechnical Report prepa,ed by an engineer must be submitted concu"ently if there are unstable soils and/or a high water table present A Geotechnical Report for the proposed Radiation Center is submitted with the application, d. Where the development area is within an overlay district applicable, address the additional standa,ds of the overlay dist,ict The subject property is located primarily within the 5-10 year TOTl, with the exception of the southwest portion ofTax Lot 6800, which is within the 10-20 year TOTl, The Site Assessment, Sheet,L 1.0, shows the TOTl's extending through the subject site. No hazardous materials will be stored, used, or produced onsite, therefore a DWP Overlay Development Application is not required. e. A wetland delineation approved by the Oregon Division of State Lands must be submitted concurtently whe,e there is a we'tland on the property There are no jurisdictional wetlands located within the proposed development area; therefore this provision is not applicable February 2, 2007 4 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center f. Whe,e any grading, filling or excavation is proposed with the development, a Land and Drainage Alteration Pe,mit must be submitted with the land use application A Land and Drainage Alteration Permit for the proposed development will be submitted with the complete application. g. Where applicable, any Discretionary Use, Variance or Modification of Provisions as specified in SDC Article 70 0' 7 7 The proposal does not require a Variance, Modification of Provisions or Discretionary Use application, 5.0 Site Plan Review Information Requirements SDC 3 7.050(7) General requirements. A Site Plan shall be drawn. in ink on quality paper no smaller than 8 \2" x 74" and shall contain the following information: (a) The scale, north arrow, and date of preparation. The attached plans conform to these requirements. (b) The street address and assesso,'s map and tax lot number. The development area is located at 1457 G Street and identified on Assessor's Map No, 17-03-36-22, as Tax Lot No, 6800 and 7000, (c) The dimensions and size of the development area. The proposed development area is approximately 39.952 square feetwith longest dimension (north- south) approximately 565 feet and the widest dimension (east-west) approximately 190 feet. (d) P,oposed and existing buildings. Proposed and existing buildings are illustrated on the attached plans, (e) Location and height of proposed and existing fences, walls, etc. Consistent with (d) and (e) above, existing buildings and conditions are shown on the Site Assessment, Sheet L 1.0; proposed buildings and walls on the Site Plan, Sheet A 1,1, (f) Proposed number of employees and future expansion plans. Approximately 20 employees are proposed upon opening of the facility. (g) Area and percentage of site p,oposed for impervious surfaces. Approximately 28,306 square feet (71%) of the development area will be devoted to impervious surfaces such as driveways, sidewalks, paths, parking areas, etc. Approximately 10,199 square feet will be devoted to building area footprints. (h) Observance of solar access requirements requi,ed by zoning district. As demonstrated in the Site Plan, the distance between the nearest property lines, buildings, and structures exceeds solar access requirements. (i) Exterior elevations of all buildings proposed. Exterior elevations for the proposed Radiation Center are included on Sheet AS,l, February 2, 2007 5 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center UJ Area and dimensions of p,operty reserved for common open spaces and public and semi-public uses. Areas reserved for open space are illustrated on the Landscape Plan, Sheet L3.0, Approximately 11,646 square feet (28%) of the total site area is reserved for landscape and open space, SDC 31.0S0(2) Site Assessment. (a) Watercourses shown on the Water Quality Limited Watercou,se map. The subject site does not include or abut a WQLW; therefore this provision is not applicable, (b) 1 OO-year floodplain and floodway boundaries on-site. The subject property is located entirely outside the FEMA 1 OO-year floodplain and floodway boundaries, as illustrated on FEMA Flood Insurance Rate Map No, 41039C1142F, (c) Time of Travel Zones. The subject property is located primarily within the 5-10 year TOll, with the exception of the southwest portion ofTax Lot 6800, which is within the 10-20 year TOTZ, The Site Assessment, Sheet L 1.0, shows the TOTZ's extending through the subject site, (d) Physical features. There are no physical features in need of protection or preservation on the subject property, (e) Soil types and water table information. Soil types and water table information is included in the Geotechnical Report submitted with the application, SDC 31.050(3) Access Circulation and Parking. (a) Location, dimension, etc. of parking spaces. Location of standard and accessible parking spaces and number of spaces in each lot is shown on the Site Plan, Sheet A 1,1. Sheet A 1.1 also illustrates accessible routes throughout the site. (b) On-site vehicula, and pedest,ian circulation. Sheet A 1,1 illustrates directional arrows for vehicular circulation within parking areas. Accessible pedestrian routes and directional arrows for truck routes are also identified on Sheet A 1,1. (c) Access to streets. Curb cut locations and dimensions are shown on Sheet A 1,1, Curb return designs for driveway entrances, and driveway designs and locations are consistent with standard City designs and specifications in SDC 32,080(3), Tables 32-2, 32-3 and 32-4, (d) Exteriot/ighting. Exterior building and site lighting is identified on Sheet E1,1, (e) Location, type and numbe, of bike pa,king spaces. The Site Plan includes 18 proposed bicycle spaces consistent with dimensions in SDC 31.210(2)(b), This number of spaces denotes 18 bike parking spaces that will be covered, consistent with requirements in SDC 31,210(2)(b). (2)(c). and (3)(d), All bicycle-parking locations are indicated on Sheet A 1,1, February 2.2007 6 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center (f) Amount of gross floor area applicable to the parking ,equirement. The gross floor area totals 8,598 square feet, upon which the required number of parking spaces is based. SDC 18.070(4) requires 1 off-street parking space per 300 square feet of gross service floor area for business and professional office uses, A total of 28 parking spaces are required by code. The Site Plan provides for 38 off-street parking spaces. (g) Location of off.street loading a,eas. No off-street loading facilities are proposed, (h) Existing and p,oposed transit facilities. No existing or proposed transit facilities are located within the development area. (i) Copy of ODOT right-of-way approach permit. Not applicable because the site has no frontage on an ODOT facility, (j) Traffic impact study. The proposed development is not expected to generate more than 250 vehicle trips per day; therefore this provision is not applicable. SDC 31.0S0(4) Landscape Plan. (a) Screening in accordance with SDC 31.160. Landscape screening is illustrated on Sheet L3,O, (b) Use of plantings in e,osion cont,ol and storm water management facilities. Sheet L3.0 illustrates plantings for all parking areas, including parking area bio~swales planted for storm water management purposes. (c) Pe,monent iffigation system. Irrigation Outline Specifications in accordance with SDC 31.140(4) are illustrated on Sheet L3.0, (d) St,eet t,ees in acco,dance with SDC 32.050. Proposed street trees are shown on the Landscape Plan, Sheet L3.0. Ie) Specifications list forall materials in Planting Plan. Sheets L3.0 lists the plants specified consistent with SDC 31.140 and their size at installation. Plants are shown on the plans at mature size. (f) Description of planting methods. Notes on Sheet L3.0 comply with requirements in SDC 31.1 SO for planting installation. SDC 31.050(5) Imp,ovements Plan complying with SDC Article 32. (a) Name and location of streets, rights-of-way, etc. No public streets are proposed. Rights.of-way and paving dimensions are shown on the Paving Plan, Sheet C3.0, (b) Location of existing and required traffic control devices, fire hydrants, etc. The locations of public facilities are provided on Sheet (2,0, February 2, 2007 7 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center Ie) Location, width and canstruction material of sidewalks, access ways and trails. Sheets A 1.1 and 0,0 show the location and width of concrete sidewalks, No access ways or trails are proposed. I d) Location and size of utilities and easements for inf,ast,ucture. Sheet C2.0 shows the location of water and wastewater utilities and connection points needed to serve the proposed development, Stormwater management facilities are illustrated on Sheet Cl.0. SDC 31.050(6) Grading, Poving and Stormwater Management Plan. (0) Roof drainage pattems and discharge locations. Stormwater collection systems and connections are identified on Sheet Cl,O, Ib) Pervious and impervious area d,ainage pattems. Drainage patterns are illustrated on the Sheet Cl,O. Ie) Size and location of sto,mwate, management systems. Stormwater management systems are shown on Sheet C1,O. Id) Existing and p,oposed elevations, site grades and contours. Existing contours and elevations are shown on the Site Assessment. Sheet L 1,0, Existing and proposed elevations are shown on the Vertical Control Plan, Sheet L2,O, and Site Grading Plan, Sheet Cl,O. Ie) Storm water management system plan with supporting calculations and documentation. A stormwater management system plan, with required documentation and calculations, is submitted with this application, SDC 31.050(7} Phased Development Plan. All improvements identified in this SPR application will be constructed in a single phase (Phase 1), The Site Plan, Sheet A 1.1, identifies a Phase 2 area proposed for a possible future second vault expansion of the Radiation Center. SDC 31.050IB) On-site Lighting Plan. On-site lighting is illustrated on Sheet El,l. Tables indicating the type and extent of shielding, wattage, luminous area, and photometric test reports are included on Sheet El,l, SDC 31.050(9) Additional information. la) Na"ative explaining the pu'pose of the development and existing use. This narrative satisfies this requirement. Ib) W,itten permission from the property owner. The property owner's original signature is provided on the application forms, Ie) Vicinity Map. The vicinity map and required information are shown on Sheet G 1,1, February 2.2007 8 Site Plan Review Appiication Narrative Oregon Urology Institute Radiation Center (d) How the proposol odd,esses the stondo,ds of applicable overlay dist,ict. The site is within the IDWP, Drinking Water Protection overlay district. No hazardous materials will be stored, used, or produced onsite, therefore a DWP Overlay Development Application is not required. (e) How the p,oposal add,esses Oisc,etionary Use criteria. Not applicable, No uses are proposed that require Discretionary Use approval. (fJ T,ee Felling permit. Not applicable. Less than five trees are proposed for removal from the development site. (g) Annexation application. Not applicable. The subject property has been previously annexed and is within the Springfield City Limits. (h) Wetland delineation. Not applicable, There are no wetlands on the subject property. (i) Evidence that federal 0' state permits have been applied. Not applicable, No federal or state permits are required for the proposed development. (j) Geotechnical report. A Geotechnical Report is submitted with the application. February 2.2007 9 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center 6.0 Approval Criteria SDC 3 7.060(7): The zoning is consistent with the Metro Plan diagram, and/or the applicable Refinement Plan diagram, Plan Dist,ict map, and Conceptual Development Plan. The subject property is classified General Office (GO) on the Springfield zoning map and designated Low Density Residential on the Metro Plan Diagram, The subject property is not located within a Refinement Plan boundary, Plan District boundary, or Conceptual Development area, This proposal is consistent with the above criterion of approval and uses allowed in the zoning district. General Office (GOl SDC 78.020 Permitted Uses The proposed Radiation Center building will be used for Doctor's offices and an associated clinic and treatment facilities, Pursuant to SDC 18,020(3)(u), Doctor's offices are a permitted use in the General Office (GO) Zoning District subject to Site Plan Review. SDC 78.030 Lot Size Standards Tax Lot 6800 is 0.79 acres (33,807 square feet), Tax Lot 7000 is 0,17 acres (7,202 square feet). The total lot size is 0.97 acres (41,041 square feet), Tax Lot 6800 contains 210 feet of frontage along G Street. Tax Lot '.7000 contains 60 feet of frontage along F Street. 80th Tax Lots 6800 and 7000 meet the required minimum lot size of 6,000 square feet with a minimum of SO feet of street frontage consistent with SDC 18.030. SDC 78.040 Lot Coverage Standa,ds There is no maximum lot coverage standard for developments in the GO zoning district, SDC 78.050 Setback Standards All proposed setbacks for the Radiation Center building meet the required standards in SDC 18.0S0. Table 1 displays the applicable setback requirements and proposed setbacks, Table 1: Required and Proposed Setbacks I Site Plan SDC Section 18.050 Requirements I Front Yard 10' - building Setback 5' - parking West Interior 10' - building Side Yard 5' - parking, driveway and storage Setback Proposed 48' - building 7' - parking 10-75' - building 7-10' - parking South Interior Side Yard Setback Rear Yard Setback (east side) 10' - building 5' - parking, driveway and storage 10' - building 5' - parking driveway , O' - building 5' - parking, driveway and storage 10- building 6' - parking driveway SDC 78.060 Height Standards SDC 18,060(1) states that when the GO district abuts a residential district to the north, the maximum building height shall be defined by the Maximum Shade Point Height requirement of SDC 16,050(a)(2). February 2.2007 10 Site Plan Review ApplicationNarrative Oregon Urology Institute Radiation Center The subject property abuts a Mixed Use Commercial zoning district to the north; therefore this provision is not applicable. SDC 18.060(2) states that when the GO district abuts a residential district to the east, west, or south, the building height limitation shall be no greater then that permitted in the residential districts for a distance of SO feet. The subject property abuts the LDR district on the east, west, and south sides, Pursuant to SDC 16.060(1), the LOR district imposes a building height limitation of 30 feet. As shown on Sheet A5.1, the proposed maximum building height is 25'-6Y2', meeting the standards of SDC 18,060(1). SOC 18.070 Off-street Parking Standa,ds SDC 18.070(4) requires 1 off-street parking space per 300 square feet of gross service floor area for business and professional office uses. The gross floor area totals 8,598 square feet, upon which the required number of parking spaces is based, A total of 28 parking spaces are required by code. The Site Plan provides for 38 off-street parking spaces, exceeding the standards of SDC 18,070(4), SOC 18.100 FenceStandards No fences are proposed within the front yard, rear yard, or sides yards on the subject property. A six foot high sight obscuring wood fence is proposed surrounding the trash receptacle as illustrated on Sheet A 1,1, consistent with the requirements of SDC 18,100(1 )(c). SDC 31.060(2): Capacity requirements of public improvements, including but not limited to, water and electricity; sanitary sewer and storm water management facilities; and streets and traffic safety controls shall not be exceeded and the public improvements shall be available to serve the site at the time of development, unless othe,wise p,ovided for by this Code and other applicable regulations. The Public Works Di,ecto, 0' a utility provider shall determine capacity issues, Necessary infrastructure capacity will be provided prior to, or as part of, the construction of the proposed Radiation Center building, Public improvements necessary to serve the development remain essentially the same as under the existing use. Utilities necessary to serve the facility will tome off public right-of- ways and/or public utility easements as illustrated in the attached plans. The subject property is currently served by existing water and gas lines are located in the G Street right of way; a sanitary sewer line located near the north property line of Tax Lot 7000; and overhead electric lines located along the east property boundary. Storm sewer service is not currently provided to the property and the nearest connection point is at the intersection of G Street and 14th Avenue/Mohawk, At the Development Issues Meeting (ZON2006-00063) held on December 27, 2006, City of Springfield staff granted the applicant approval to convey on-site stormwater through constructed vegetated swale systems to catch basins that daylight and discharge through curbs at G and F Streets, As shown In the attached plans, development can be accommodated within the capacity requirements, consistent with adopted public facilities plans and the above criterion. Utility routes and proposed infrastructure improvements are shown on Sheet C2.0, The Stormwater Management System Study and required scoping sheets are attached and proposed Storm water Management facilities shown on Sheets C2,O demonstrate that the stormwater system will not exceed capacity requirements. Improvements shown in the attached plans are proposed to be constructed in a single phase and will be available to serve the site at the time of development. February 2. 2007 11 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center SDC 31.060(3): The proposed development sholl comply with all applicable public and private design and construction standa,ds contained in this Code and other applicable regulations. The development proposed complies with applicable design and construction standards outlined in the Springfield Development Code, Springfield Engineering Design Manual, and applicable state building codes, Artie/" 3 7 - Sit" Plan R"vi"w Standa,ds SDC 31.130 - Sit" Plan R"vi"w Landscaping Standa,ds SDC 31,130 requires on-site landscaping in accordance with the requirements of SDC Article 31 and street trees and curbside planting strips in the public right of way in accordance with the requirements of SDC Article 32. In accordance with provisions listed in the SDC Section 31,130 to ensure that new development is adequately screened from less intensive developed, the proposal includes landscape screening along the west, south, and east property lines where the subject property abuts residential uses, as illustrated on Sheet L3.0. In accordance with the provision of SDC 32,050, street trees are proposed in the public right of way along G and F Streets, SDC 31. 140 - Site Plan R"view Planting Standards The Landscape Plan, Sheet L3,O, demonstrates compliance with type, quantity, and size requirements in SDC 31,140(2), Planted parking and driveway setbacks and interior parking lot islands meeting the requirements of SDC 31,140(3)(a & b) are also illustrated on Sheet L3.0, SDC 31.150 - Site Plan R"vi"w Planting Installation Standards Not applicable, Less than five trees proposed for removal from development site, SDC 31.160 - Site Plan R"view Scteening and Lighting Standa,ds The Site Plan proposes screening along the west, south, and east property lines to minimize visual impacts of the Radiation Center building upon abutting residential uses. As illustrated on the Electrical Plan, Sheet El.l, lighting will be installed throughout the parking areas and pedestrian access points. SDC 31.170 - Site Plan Review Parking Standa,ds The gross floor area totals 8,598 square feet, upon which the required number of parking spaces is based, SDC 18,070(4) specifies that business and professional office uses are required to have one parking space for each 300 square feet of floor area. In accordance with the standards of SDC 18,070(4): the Radiation Center will require 28 parking spaces. The proposed on-site parking shown in the Site Plan, Sheet A 1,1, provides 38 off-street parking spaces, sufficient to accommodate the development proposed. SDC 31.190 - Site Plan Review Parking A,ea Imp,ovement Standa,ds Parking areas meeting the improvement standards of SD 31,190 for surfacing, drainage and wheel- bumper installation are shown on Sheet 0.0, SDC 31.200 - Site Plan Review Off-Street Loading Standards No off-street loading areas are proposed, The provisions of SDC 31,200 are not applicable, February 2.2007 72 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center SDC 31.210 - Site Plan Review Bicycle Parking Standards The Site Plan includes 18 bicycle parking spaces consistent with dimensions in SDC 31.210(2)(b), This number of spaces denotes 18 bicycle parking spaces that will be covered, consistent with requirements in SDC 31.21 0(2)(b), (2)(c), and (3)(d). All bicycle-parking locations are indicated on Sheet A 1.1. SDC 31.220 - Site Plan Review Minimum Requi,ed Bicycle Parking Spaces SDC 31,220 specifies the number of bicycle parking spaces required for each use. Table 2 indicates the type and number of bicycle parking spaces required and proposed, Table 2: Bicycle Parking Spaces SOC Section Proposed Floor 31.220 Reqs. Area Hospitals, Clinics or 8,598 square other Medical feeet Health Treatment Facilities ~ 10,000 square feet or less. 25% 5T,75% LT Req. L T Bike Parking 2 LT spaces Prop. L T Bike Parking 9 LT spaces Req. ST Bike Parking 1 5T spaces Prop. ST Bike Parking 9 5T spaces SDC 31.240 - Site Plan Review Water Quality Protection The subject property does not include or abut a WQLW and no development in riparian areas is proposed; therefore the provisions of SDC 31,240 are not applicable, ArtiCle 32 - Public and Private Imorovements SDC 32.020 - Streets - Public Access to public streets meeting the requirements ofSDC32,020(1)(c) is shown on the Site Plan, Sheet A 1,1, The Site Plan proposed two driveway apron's accessing G Street and one driveway apron accessing F Street. The location of proposed driveway aprons will occur at or near existing curb-cuts along G and F Street's, with minimal widening and relocation, The proposed use is not planned to general more than 250 vehicle trips per day, and no traffic signals are warranted, therefore the provisions of SDC 32,020(1 )(e) are not applicable, SDC 32.040 - Sidewalk and Planter St,ip Standa,ds The subject property is served by existing sidewalks within the G Street and F Street right of ways. The existing sidewalk along G Street abuts the curb, The existing sidewalk along F Street is separated from the street by an eight foot planter strip. The Site Plan proposes no changes to the location of existing sidewalks, with the exception of portions that will be reconstructed as part of the installation of new driveway aprons, Existing and proposed sidewalks meeting the requirements of SDC 32,040(1) are shown on SheetsA 1,1, Proposed sidewalks conform to the City's Engineering Design Standards and Procedures Manual, the Public Works Standard Construction Specification Manual and the Springfield Municipal Code 1997 thus meeting the requirements of SDC 32,040(2), No new planter strips are proposed, SDC 32.050 - Street T,ees The subject property does not contain any existing street trees, Street trees are proposed in the public right of ways along G Street and F Street, as shown on the Landscape Plan, Sheet L3,O, Six street trees are February 2, 2007 13 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center proposed for the G Street right of way and one street tree is proposed for the F Street right of way, Proposed street trees have been sized and selected per the requirements of SDC 32,050(1). SDC 32.060 - St,eet Lighting Standards No new street lights are proposed. This criterion is not applicable. SDC 32.070 - Vision Clearance Ateos Appropriate vision clearance triangles are proposed at all street intersections as required in SDC 32.070, as shown on Sheet L3.0. SDC 32.080 - Access and Driveway Stondards Access points and driveways conform to driveway specifications outlined in SDC 32,080, as illustrated on Sheet ALL SDC 32.085 -Intersections No intersections are proposed. This criterion is not applicable, SDC 32.090 - Bikeway and Pedesttian Troils The portion of G Street abutting the subject property is identified as an "existing and programmed on- street signed route" in the Springfield Bicycle Plan, G Street is also identified as an "on-street/without road project/unprogrammed financially-constrained bikeway project" in TransPlan; and part of the "existing and planned on-street bicycle system" in the Willamalane Park and Recreation Comprehensive Plan, The subject property does not abut existing or proposed trails identified on the Willamalane Park and Recreation District Comprehensive Plan, The subject property provides public street access at G Street and F Street, The proposal does not affect existing or planned bikeways identified in the Springfield Bicycle Plan, TransPlan, or the Willamalane Comprehensive Plan. No new pedestrian trails, or accessways are proposed, The provisions of SDC 32.090 are not applicable, SDC 32.11 0 - Sanitary Sewers Sanitary sewers necessary to serve the development consistent with requirements in SDC 32,100 are shown on Sheet C3.0, SDC 32.110 - Stormwate, Management Stormwater management for development proposed on-site in conformance with the standards in SDC 32.110 is shown on Sheet C3.0. SDC 32.120 - Utilities Utilities, infrastructure, and easements necessary to support the proposed development consistent with the requirements in SDC 32,120 are shown on Sheet 0,0, February 2,2007 14 Site Plan Review Application Narrative Oregon Urology Institute Radiation Center SDC 31.060(4): Parking areas and ing,ess-egress points have been designed to: facilitate vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity within the development a,ea and to adjacent residential areas, transit stops, neighborhood activity centers, and comme,cial, industrial and public a,eas; minimize curb cuts on affe,ial and collecto, streets as specified in this Code or other applicable ,egulations and comply with the ODOT access management standa,ds fo, state highways. Facilitate Vehicula, Traffic As illustrated on the attached Site Plan. Sheet A 1,1, and Paving Plan, Sheet 0.0, parking areas and access points facilitate traffic and pedestrian safety in conformance with vision clearance and driveway design requirements in SDC 32.070 and SDC 32.080, Parking areas were designed consistent with improvement standards in SDC 31,180 and sac 31,190. Consistency with the applicable provisions in SDC Article 32 is outlined above. The proposed development and its permanent uses will generate vehicle trips and non-motorized trips. Both portions of G Street and F Street abutting the subject property are fully improved asphalt roadways with curb/gutter, sidewalk, and street lighting, Primary ingress-egress points for the Oregon Urology Institute Radiation Center will occur via driveways at G Street, The west driveway is proposed to be ingress only and the east driveway egress only, A covered drop-off area is proposed at the building entrance, Parking areas accessible by the G Street ingress-egress driveways will be primarily used by patients and visitors, Secondary access for doctors and employees is proposed to occur via an ingress- egress driveway at F Street. This two-way driveway is proposed to serve the employee parking area located south of the Radiation Center. Traffic circulation patterns and parking areas are shown in detail on the Site Plan, Sheet A 1,1 Bicycle and Pedest,ian Safety The Site Plan has been designed to accommodate safe bicycle and pedestrian traffic. New concrete sidewalks are proposed on three sides of the Radiation Center; extending from the Radiation Center entrance to the existing sidewalk at G Street, and extending to the south employee parking area. Provide Connectivity The Site Plan has been designed to facilitate pedestrian connectivity. Both G and F Streets contain public sidewalks abutting the subject property, The majority of pedestrians accessing the property from off-site are expected to enter the property from G Street. as the proposed Radiation Center fronts G Street. New private concrete sidewalks are proposed extending from G Street to the building entrance and extending from the south parking lot to the building entrance. The proposed private sidewalks shown on Sheet A 1,1 provide connectivity within the development area while the existing public sidewalks provide connectivity to adjacent residential areas and transit stops, Bus Route Accessing Site Bus service to the development site is provided by Lane Transit District's #18 Mohawk/Fairview and #19 Fairview/Mohawk Routes operating on Mohawk with a station located at the corner of the Mohawk and G Street intersection, Minimize Curb Cuts SDC 32,080(1 )(a) states that each parcel is entitled to an approved access to a public street. Access to G Street from Tax lot 6800 is currently provided by two existing curb cuts near the west and east property corners, Access to G Street from Tax Lot7000 is currently provided by a curb cut near the southeast property corner. No new curb cuts 'are proposed by the Site Plan. Access points are designed per City February 2.2007 75 {!, Site Plan Review Application Narrative Oregon Urology Institute Radiation Center Standard Construction Specifications, Based on the anticipated uses and site configuration, the proposed access locations provide safe and efficient vehicular access, ODor Access Standards The development site is not located along an Oregon Department ofTransportation (ODOn Right-ot- Way, ODOT access standards are not applicable. SDC 31.060(S): Physical featu,es, including but not limited to, significant cluste,s of trees and shrubs, watefCourses shown on the Water Quality Limited WatefCourse Map and their associated ripa,ian a,eas, wetlands, rock outcroppings and historic featu,es have been evaluated and protected as specified in this Code or other applicable regulations. Existing vegetation on Tax Lot 6800 consists of planted landscape trees, shrubs and flowers contained in plant beds surrounding the existing building, lawn areas north of the existing building, and minimal shrub plantings, Existing vegetation on Tax Lot 7000 consists of unirrigated turf areas and hedge plantings that provide screening and buffering. The development site does not include or abut a WQLW or an associated riparian area, There are no jurisdictional wetlands located on the subject property, There are no rock outcroppings or historic features located on the subject property, There are no physical features in need of preservation or protection on the subject property, February 2,2007 16 " ' , L!i;,' :' ~, ~,,,,...,,, ~.- ~.,- ,', ~~" . : ~" .. .~,jt..;" ,-"'I.' 1\ ", Evergreen- .' . ,land'Title Company , ,TITLE INSURANCE SERVICES . ESCROW CLOSINGS , ' ~" ',' ," , 1'. , 1651 CENTENNIAL BLVD. ~ SPRINGFIELD, OR 97477 P.O. BOX 931 . SPRINGFIELD, OR 97477 ',. PHONE: 541.741.1981 , : FAX: 541.741.0619,; ".' 875 COUNTRY CLUB RD. . EUGENE, OR 97401 P.O, BOX 10211 . EUGENE, OR 97440 PHONE: 541.687,9794 FAX: 541.687,0924 " , -, .. , .. December 19, 2006 .f" , G STREET UROLOGY CENTER, LLC , . 'ATTN: FINAL DOCUMENTS, ," 2400 HARTMAN , SPRINGFIELD, OR 9.7477 ' .. " " ,",- PRE~SUBM\TIAL REC'o. ':"~JAN i'7 2007 ". -, . ;~ ' , RE:, G STREETUROL.OGY CENTER, LLC "L6an No,: N/A .. :, Escrow No,: SP06-19545 '" , .:" ELTNo.: 51.80~ ..' .' ,-,,", '.. I, " -' ,.. " . , Enclosed please find 'the following documents: , OCh~ck No~ ' , in the amount Of; , ..' Buyer/Selleifinal closing statement/HUD , "':0 o ~ : Escrow instructions '0 Ciosing , 0 CollectiOll Title Policy' 0 Alta Ex!. Mtg, ' , . 0 Standard Mtg, ~ Owner's o Purchaser's Warranty/Bargain and Sale Deed' l{ecePiion No, 2006-086286 ~ o o ',0 Deed of Trust Reception No, I : " Reception No, I Reception No, ' ' , , I ' , " The enclosed documents are for your records, If you have any questIOns, please contact our main office " I" noted.above" Thank you for this opportunity to service YOU, Other: Other: 'i Very truly yours, , , " .' .. 'Evergreen Land Title Coinpany . Home Office Title, Department Enclosun;( s) "IN OUR BUSINESS, YOL IvIATTER MOST" , ~ww,ev..rgreenlanldtitle.com, -',.' 0:,' c', '." . ,." ,., , . Oregon 'Title Insurance Rating Organization (OTIRO) , , ' . OTIRO No, PO-02 " ~~~6er O~i801- 149261 . . American Land Tille Association' AL TA Owner's Policy, Revised 10/17/92 I: ~r~"""'" ) ~_... ,"',' - . , '-. .... ,)" ,', ' ' , ,EXCLUSIONS FROM COVERAGE... ' " '. I . . The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: . , .1-,,'. ' ",', " _.' .' 1. (a) Any law, orqinance or governmental regulation (including but ~ot)imited to building and zoning laws, ordinances"or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy,~use, or enjoyment of the land; (if) the character, dimensions or location of any improvement now or hereafter erected on the'land; (iii) a separation in ownership or " change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect or any violation of these laws, ordinances or governmenta, regulations, except to the extent .that a notice of the enforcement thereof or a notice 'at a defect, lien or encumbrance resulting from 'a violation or ,alle_g~d violation affec~jng the land has been recorded in the public records at Date of Policy, . ~ ' '.. '. ' " ..1 . ' (b) Any governmental police power not excluded by '(a) above, except to the extent that a notice of the exercise thereof or a notice of a defect. lien or encumbrance resulting from a violation or. alleged violation affecting the land has been recorded in the public records at Date of _ Policy. _ (, ' " '" . . '. I . .,,' - 'J . 2, Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records al Date of Policy, but not excluding from coverage any taking which has occurred prior ,to l?ate of Policy which would, be binding on the rights of a purchaser for value without "\-; knowledge, ..A!!' ... ~ 'l'. ".".'~. ~ ... --...~'...~- ~--_.= -;, ',: l. '. " POLICY OF TITLE INSURANCE '., ISSUED BY ... , I' . . . '~.' .,' . ,', , - , . ~ste,^,arf . title insurance tompany of oregon. .' " '" .' , ~ " SUBJECT TO THE EXCLUSIONS FROM COVERAGE. THE EXCEPTIONS, FROM COVERAGE CONTAINED IN SCHEDULE B AND THE \ ' ,CONDITIONS AND STIPULATIONS. STEWART TITLE INSURANCE COMPANY OF OREGON. an Oregon corporation. herein calied'lhe , Company, insures, as of Date of Policy ,shown in Schedule A, against toss or damage, not exceeding the Amount of Insurance stated in Sc~edule, A, sustained or incu~red by the insured ~y re~_son of: I ~. ',' .." , . ,^ . '1. -Title, to the estate or. 'inter~st. described in Schedule A being vested other than, as stated therein; 2, . Any delactin or, lien or encumbrance on the title; . 3>' Unmarkelabllity'of the title; " ,A. "' LaCk' of a right ofa:cc~ss to and ffO~ the I,and, > - . The -Company will also p~y thecosts,atlorneys' fees and expenses' incurred in defense' of the title, as i~sured, but only to the exlent provided in the Conditlons and Stipulations, '..' ..' . 'I' . ': .",' , ' . " . -,' "" In witnes's' whereo~, Stewarl~ilIe- Insur~nce 'c~;~pany of orego~ ~as ~'au~ed this poli~y 't~ be ~j~~e~' and sealed by it~ dUlY" authorii,ed officers a~ of Dale of P.~liC~ :h~wn in Sched~le A. . I'" _', . .," . , . . " I'" ' '''', '. ,.." .. . ' ' ,~rk.. ~/' L%_ /' Chairman ofthe Board . ';;;~.'~iP.O ":~~,\ ~ouoter"gld f~.. ,J'/JJz ~!?~,. ~b\~ Auth~f1zto erslg ature ?~r;f1"V , -VER RFFN I AND Tin [c- Company' 1651 CENTENNIAL BlvD v: SPRINGFIELD. OR 97477 . .~' / ,rA.;t.JL President City, Slate o 0, L.LJ. . , ...J' i- ,i= , . Cl ' ,2: 0<( -.,) { . .aJ ,~ ." . _ 1.LJ , ' a:: " ,(,!; 0: " ." , LLJ '~ ,f? z ." . -ti:' ' i=" . w <>:: . . .< ..,'~ .'.. . " ",' . " . s:. : :;,. ~.. .'.... . ,", . or., ~,.. . t.:':- r Olllislon of Chief OepulYCle~k:' , , Lane Counly Deeds.and Records .'~ . ~~~C.~~C~~C : .,' $46,00 '. . After recording, return to: . Eyergreen Land Title Co," :P,O, Box 93t' .., " .' . Springtield, OR97477 , , 111111111111111111111111111111111 111111/1 111111.' 0086488520 1600862860050,,52 ' , , , RPR-DEEOCnl=l Sln=6 · 12/01/2006 10:17:32 AM\ CASHIER 07: '" " ' $25.00 $11.00 $10.00 , \',0",1, ,U~til a ch~ge is requested, all" :: "ta'{ statements shall be sent to tlle following address: . , 2400 Hartman : ' , '. ."..~ .:Springfield, OR 97477 :,:' . '.- , . " . ,-', .- . .'" .. . t, ,. ,. , . ~.... ',~Lr=: )/!JccfL , . >,,?hfc~,' 'Ie" 5Y 5':' , .':".;" . , .~ ''', , ", ,r . -. ,~ - C.' ,- ",' ,:. ". r, STATUTORY SPECIAL WARRANTY DEED McKENZIE-WILLAMETIE REGIONAL MEDICAL CENTER ASSOCIATES, LLC, a Delaware limited liabi,lity company ("Grantor"), conveys and specially warranlsto G STREET UROLOGY CENTER, LLC, an Oregon limited liability company ("Grantee"), the real property described on Exhibit A, attached hereto, free of encumbrances' created or suffered by Grantor . except as specifically s~t forth on Exhibit F\, attached hereto, ' , The true consideration for tl1is,conveyance is Ninety Five Thousand and Noll 00 Dollars. ,H ($95,00000) " ' 'THis INSTRUMENT WILL NOT ALLOW USE OF THE PROPERTY DESCRIBED IN THIS INSTRUMENT IN VIOLATION OF APPLICABLE' LAND USE LAWS. AND REGULATIONS, BEFORE SIGNING OR ACCEPTING THIS INSTRUMENT, THE PERSON ACQUIRING FEE TITLE TO THE PROPERTY SHOULD CHECK WITH THE APPROPPJATE CITY . OR COUNTY pLANNING DEPARTMENT TO VERIFY APPROVED USES , AND TO DETERMINE ANY LIMITS ON LAWSUITS AGAINST FARMING' OR FOREST PRACTICES AS DEFINED IN ORS 30,930. FURTHERMORE, GRANTEE ACKNOWLEDGES ,AND AGREES THAT, ,GRANTOR HAS NOT MADE ANY WARRANTY OR REPRESENTATION AS.TOTHE NATURE AND CONDITION OF THE PROPERTY, INCLUDING, WITHOUT LIMITATION, WITH RESPECT TO.ANY ENVIRONMENTAL . ' , ' . '.- 'F.:,:'" j"': .' , .' , .,~'. " , ...., . . ," '" ..,' -\, " ,'" . ' >.,. ..t, . .t.. '. ..... ',' .,~.;..'. ':; '... " . ''-'j., .: :> : ,.~ " " '\ '. , ",V' ,'.., , '. .t',. c', .., ',' .' : ;' :'. MATIERS OR THE EXISTENCE OR ,ABSENCE OF' ANY HAZARDOUS", ,SUBSTANCES , ,OR MATERIAL WHICH, ARE RECOGNIZED, AS:' ' " HAZARDOUS OR TOXIC UNDER ANY LOCAL, STATE OR FEDERAL", LAW, STATUTE, ORDINANCE, RULE OR REGULATION PERTAINING TO ' , , ENVIRONMENTAL OR SUBSTANCE REGULATION, CONTAMINATiON," " CLEAN UP, OR DISCLOSURE :AND SHALL HAVE NO LIABILITY TO: ,GRANTEE. THEREFORE IN CONNECTION WITH, THE PROPERTY" , i , GRANTEE AGREES,' TO . ACCEPT' , THE', PROPERTY'" AND , . : ..' , ,ACKj\[OWLEDGES THAT THE SALE OF THE PROPERTY IS MADE BY-:, "" ,', GRANTOR; ON A "AS'IS, WHERE IS, AND WITH ALL FAI,JLTS" BASIS,." : ',,' ., , , , , '. ,'-.... '. ,'. . ." . , ~. , .' . BEFORE' SIGNING OR ACCEPTING THiSINSTRUMENT,THE PERSON . , ',' TRANSF,ERRING FEE TITLE SHOULD INQUIRE ABOUT .THE PERSON'S " " : ,. 'RIGHTS, IF ANY, 'UNDER CHAPTER I, OREGON LAWS 2005 (BALLOT '. MEASURE 37(2004)). THIS INSTRUMENT DOES NOT ALLOW USE OF " THE PROPERTY DESCRIBED ,IN THIS INSTRUMENT IN VIOLATION OF', ,. 'APPLICABLE LAND USE LAWS AND REGULATIONS, BEFORE SIGNING " , OR ACCEPTING THIS INSTRUMENT, THE PERSON ACQUIRING FEE , 'TITLE TO ,THE PROPERTY .SHOULD _ CHECK WITH - THE 30,930, APPROPRIATED CITY OR COUNTY PLANNING DEPARTMENT TO ',,' " VERIFY APPROVED USES, TO DETERMINE ANY LIMITS ON LAWSUITS" AGAINST FA..~G OR FOREST PRACTICES AS DEFINED IN ORS, '30,930 AND INQUIRE " ABOUT THE' RIGHTS OF NEIGHBORING, PROPERTY OWNERS IF ANY UNDER CHAPTER I, OREGON. LAWS 2005 , (BALLOT MEASURE 37 (2004)), ' '. .. . -', ','!. '. ' DATED this 15th day'ofNovember,,2006, ' , , GRANTOR: McKENZIE-WlLLAMETfE REGIONAL' , MEDICAL CENTER ASSOCIATES, LLC, a Delaware limited liability company, ' , ' By:, Triad of Oregon, LLC, a Delaware lirnited liability ~ompany, . ~:MM:L$L Name: I "'_fj~J"";<, T'tl / J 1 e: Sr \1. r~n Pre~ider.t . -2-.... '. " " ' t. '. '.:' . ,.' , ..-'.... ,'-,", . /" ~ , -?..' . ; .;. , .. '. ,. . ",'i ,i' , . ~ ;-" " , -t', . . ~ - ~ " ., ...", " .:-"" 'STATEOFTEXAS' "'.'-': ".: : ~ < '. . -)', ) , )" SS" COUNTYOF COLLIN " :)',.., ./. V Jc\'~lio\'\~n;hvMrrh. a Notary Pllqyc';f said cOl.ln19 ,and Slate, 'certify that /1f111.:VW~~ev ',whose name as '?-;NY " of Triad of Oregon, LLC, a Delaware limited liability company, as Manager of.McKenzie-Willamette Regional Medical . ,/: Center Associates, LLC; it Delaware limited liability company, is sig'ned to the foregoing ',instrument, and who is knoWl1 to me, acknowledged before me on this day,that, being informed , ,', o.f the contents of the instrument, he/she,' as such officer and with full, authority, executed the '. same voluntarily for and as the act of said limited liability company, '., '.,', .. ... G"OO~'~ ~hF' ~~ offici. ',.~ ;'wt{t{;.;;~;~~:-- ~. . ~1viA.~;~'( , "da1ttt(~a'{j~ ~Iih ~ . ,NOTARYp!'JBLIO :: , " (Printed Name), <!l If} State 01 Tell88, "l' ~OI'",VComm. Exp. 09-!HO{I7I . "'" ','" ,. .. ,,', ,', , . ~ , . . -' ~. ~. R:\Triad\J..AcKenzie-Willamette MedCtr\Sale - 1170 F Street\dee~.doc . " ' " '., ~ .1,' ,3.. " ." " ~ 'I .~ . , i '.. .;',. " "T' ..~ : ..... t:. ", . ,:;:. -,' . 'z' ',','., " .... ,,' ./'< "., "".", ' .,..'. l. "'" .' 'I.'" , " I., " , EXHIBIT k -,"" "'. :: ) , ' ..! . 1'"';,' ',.' Legal Description " :j.''. .... ." Beginning at a point 226 feet South of a point on South lineof Lot l' of S~bdivision of the p~ui " ..,:,. 'Brattain Donation Land Claim 63, Notification No, 3222, in :roWIlship 17 South, Range 3 West : of the Willamette Meridian, as platted and recorded in Volume 2, Page 20, Lane County Oregon' '~"Plat Records, \vhich point said South line of said Lot 1 is also South 268,62 feeL and North 880" 52" East 2354,88 feet from Northwest comer of said Donation Land Claim No, 63; nul thence , , South 120 feet to the North'line'of"f" Street, if extended Easterly; thence South 880 52' West60, , feet; thence North 120 feet; thence North 880,52' East 60 feet to the Point of Beginning, in Lane , ,County, Oregon, ' , . ," .'....: ,.' " .' '..-' ,. ~ , ,', '. ,', , ' ',.' '.C'., <', .... .,'- " , " ."." ','l, " .. ! " ,. .. '< ,: '} ., ,~ ," "'" "'. .-, ',:..; . .;. . J, ,-. "..-.; '.; . ,.. "~ \"' " _'4' ."~ " " .',,'," "\. " ~'. . . , :.. , ' , " ...... ':.- ." <~ .' . ~ .' . EXHIBIT B ...." '. . '.<' _...r, Encumbrances 'on Title ' 1. Grant"of'Easement and Right of,Way, granted to the City of Springfield, Oregon, a', "municipal corporation, including the terms' and provisions' thereof, by instrument Recorded February 10,1948, Book 366" Pages 303 through 306" Reception No, 59236, '.."LaneCOlmty Oregon Records,' ~~ . . '-, ." '.> ,:, 2..:,', fught-of-WayEasement for Electric Transmission or Distribution' Lines; granted to the City of Springfield, a municipal corporation, including the terms and provisions thereof, , by instrument Recorded February ,23, 1951, Book 433, Page 209, Reception No, 39871, Lane Count~ Oregon Records,:, ' '. , ' , ' , " "',.." 3,." " "Agreement "Regarding' 'Use 'Limitations, including'the terms and, provisions thereof; :between McKeniie~Willamette Regional Medical Center Associates, LLC, a Delaware ,limited liability company (New Hospital LLC), and Springfield Professional Building , ",Associates~ LLC, an ,Oregon limited liability company (SPBA), by instrument Recorded' "', ;Marc~ 7, 2006"Reception'1':Io,.z006~015382, Lane County Oregon Records - 'f' 'I " ..:,'. "", ' . "J _. :~, ... -',." ...'. , . . ' .r~... ~ ' {"'- > " . ", I" ~ "" '" ,', " . '.'..,' ': ,~,', ' :.... '. '. . - ..' .', "7 ". ." . ." , .',', " , .. ',-" . . .' ~.-:' . , :,. \. "':.' . .' ". '; ,.,.:,': -- . \", > "," " , .... ,Ii SCHEDULE "A;' '. - . ~ . ">' - " . ~ . " '.' ~.: ..' .~ '. " ", ..', . t,. .... . '_.' " ,. . ..cALTAOWNER'SPOLlCY,. ,",:'" ORDER NO: ELT-51809 " .' . .. v. ' '. ~. " POLICY NO: 0-780149261 . " ,DATE OF POLICY: December I, 2006AT 10:17 AM .,AMOUNTOF INSURANCE: $95,000,00. : -;' PREMIUM AMOUNT: $435.00 :: , :- RE-ISSUECREDlT: $Cl.OO,.. ' . , ,", EARLY ISSUE: NO $0,00 ' '. ,: - , '. ( - t i . ,J',."."'-" . ,..' . '~'. .j. ..';' . " .. ' .' -;. ,'. . .... ". ......- ~. , , ..',' ,. "'h t.., :.' ",1 .,., '" .;.. .-:' ,~. . z' '.: " . '"L1'!AME OF INSURED: , :-. , '. " .. . "'.,;, ./! . .. ",' , ",; " "- ;", . .: GSTREET UROLOGY CENTER. LLC ' , : an Oregon limited liability compnay ";0' '.'." ,-;',' . , .... - l' ..... ,-, . ,..,,,' . , . . '. - ',... ,,'.., , . '. ':2. > THE ESTATE.oR INTEREST IN THE LAND WHICH IS TO BE COVERED BY THIS POLICY IS : :',:,..' " . ", IN FEE SIMPLE ", .". ,,', . . .' 3, . TITLE TO THE'ESTATE OR INTEREST IN THE LAND IS VESTED IN: ,>G STREET UROLOGYCENTER, LLC an Oregon limited liability compnay . 4, THE LAND REFERRED TO INT-HIS POLICY IS DESCRIBED AS FOLLOWS: . "SEE ATTACHED '. ' COUNTERSIGNED: 1/lidcJK f,~}7~R1ZEDSIGNATURE ,,' > , , ',- . . ~. .....'.;. : '. . . y. ..,...',. . ~. '. .... :". :->." ,...., . .,.' " .'".': ,.-..0 ".' " :. '-'-". . . '" '.\ Sd-IEDULE"A".: ,', .",' '.' ", !":, ALTAOWNER'S POLICY '.', ORDER NO: EL T -51809 " , ,:POLrCYNO: 0-780149261 . . . '.LEGAL DESCRIPTION . PAGE 1 OF 1 .. , ~ . :- ..\.' ,',' > '.-' ':.'.'1 EXHIBIT A : '. . ,~. .;- ., , ~Begirining at a point 226'feet South ofa point on South line of Lot 1 ~fSubdivision of the Paul: _' " ;, -Brattain Donation Land Claim63, Notification No, 3222, in Township 17, SO,uth, Range 3 West, " ',' '.'ofthe Willamet~e Meridian, as platted and recorded in Volume 2, Page 20, Lane Count~ Oregon' , , Plat Records, which point said SouthJine of said Lot 1 is also South 268.62 feet and North 880 , :'52' East 2354,88 feet from Northwest corner of said Donation Land Claim No: 63; run thence , . . ,Southl20 feet to the North line of"F"Street, if extended Easterly; t~ence South'880 52' West ,60 feet; thence North 120 feet;' thence North 880' 52; East'60 feet to the Point of Beginning, in Lane County, Oregon:' , . .-,,, ", . , , ;'''. ~, . .... , , ". ,,-, . -.1- . ,,~..', , . ,'\' .' " " ,,' ",.' . , ' " I.: ...... :-:., " I": ' ,,' , -, .: ,., . '\' '1..-. " ...' ":. .,", .'",." " 'i: ,"'J' : , , " '.,,;"'.< "".., ,- ';'" ., " ", ~ ...;;.... t. ". ;SCHEDULE"B'~, ;, . ';_+ . ~ 'i. " -. ...' : >,' ~.. " ' ,0 ,-;;, '." , , 'ALTA OWNER'S POLICY ,ORDERNO: ELT-SI809' , 'POLICY,N,O: 0-780149261 " ~.: ." -, ~-'- .' '.,,--," . . , .., ."' . "> .'. '."," . , , ..} ',",' .. -. , , , , ,. ", . . ., :,: This POlicy does"not :insure against loss or damage ", .', attorney's fees or,expenses) ~hich arisebyreason of "', ' (and the Company will not pay ,costs, ,'B: GENERAL EXCEPTIONS: . '. .. ~, ,.. .... "~< . ~ ," , -'. ;' , . ',:',r:".Taxesor assessments which are not shown as,~xisting liens by the ~ecord~"'bf any taxing ',:authority that levies taxes or assessments on real property or by the public records, Proceedings" , 'by a public agency which may result in taxes or assessments, or notices, of such' proceedings, ,':':whether or not shown bY,the records of such agency or by the public records,,; :'>' " .. ,;.,.: r -,-' '.. ~. . . . 0 ,." ':.... ., ~~.. , '. .. .. ;_... '_, .. '2: Any facts, rights;interests, easements or Claims which are not shown by the public,records , , but which cbuld be ascertained by an inspection of said land.or by making inquiry of persons in, 'possession thereof., .:' ' .,' , ", ,.' ' ',,' " ",", , ,3., (a) Unpatented mining:claims; (b) reservations or exceptio~s'in patents or ~ Acts authorizing " ':'the issuance thereof; (c) water rights, claims or title to water;, whether or not the matters excepted , ;- , under (a), (b), or (c) are shown by the publicrecords. ' , 4, Discrepancies, conflicts in boundary lines, shortage in area, encroachments,orau'y otlier facts , which a survey would disclose, and which are not 'shown by the public records.' : 5, ',Statutory liens or' oiher-iiens or encumbranc'es, or claipls thereof, which are not sho:""'n by the , public records,' ' , ' , C: SPECIAL EXCEPTIONS: ',' .- " ,6, ,Grant ofEase'meniandRight of Way, granted to the City of Springfield, Oregon, a municipal corporation, including the terms and provisions, thereof, by instrument Recorded February 10, 1948, Book 366, Pages 303 through 306, ReceptionNo, 59236, Lane County Oregon Records, . - .. ... . 7, Ri'ght-ot: Way Easement for Electric Transmission or Distribution Lines, granted to the' City' ,of Springfiel1, a municipai corporation, including the terms and provisions thereof, by , instrument Recorded February 23, 1951, Book 433, Page 209, Reception No, 39871, Lane County Oregon'Records, ' ' 8, Agreelnent Regarding Use Limitations, including the terms and provisions thereof, between McKenzie- Willamette Regional Medical Center Associ!ltes, LLC, a Delaware limited liahlity company (New HospitaI,LLC), and Springfield Professional Building Associates, LLC, an Oregon limited liability company (SPBA),by instrul1ient Recorded March 7, 2006, Reception No, 2006-015382, Lane County Oregon Records.. , CONTINUED . '" ,.;' , . .. ",". ',,"',. ',',. ',' ALTA OwNER'S POLICY ORDER NO: ELTc51809 . POLICY NO: ,0-780149261 t.,' .F -t. - .;'" SCHEDULE "B" '-', '," ::" "' ,'; ,,:." NOTE: Taxes, Map No,.17-03-36-22~07000, Code 19-00, Account No, 0328144, 2006-2007, $342.94,paid infull.. . " . ~ -, ..",,'>' '"t . ~,' ", "'.' " ",,' ,. ,',I 0', ,','. ", .,', END OF EXCEPTIONS ,"j >'. " "...: r .., ." ',y: ." .' - ~, ': ,';'" " , . ~ . r '1.;t, '.:',;'. -., ."'-. .- ,"< ..: .~~ .... , .... , .~, ';. " , " - <-t-' ""' -"~fi- ~'-~ , '. ~ .... ", ',,' , ':,,'ste\Narf-':, .' , ~ title insurance company of oregon, ,'. .1- '....' . " , -, ,",; , . - , ASSUMPTION CERTIFICATE No. 0-7801-4926 I .' , . . "' " . . . , ,"'..,.' . . " :,' :fhiS Certifi'cate ~s' attached to and co~stitut~s ~ pa;tof Title In~uran~e Policy r?C;780 1-4926 1 " (the "Policy") of STEWARTTITLE INSURANCE COMPANY OF OREGON ("CEDER"). , . '. . : '", ;'," .... " ,:.:. ..;'-',:.:' . ":.-,',,' .' :'" :. ,;', -,. . " ;~. '- -. . ; .' .,; ; .: . Name ot'lnsured:' . , . " .' . , ;"' 'G STREET UROLOGY CENTER, LLC' anOregon Limited liability compmlY , '. . . ~ - ~ ,c..::. , ,. ,~ ,. . e . 'r , " , In consideration of ttie premium' paid under, the Poi icy, it is hereby understood and agreed that' STEWART TITLE GUARANTY COMPANY ("REINSURER"), of Houston, Texas, reinsun3s all liability under the Policy and that in the event STEWART TITLE INSURANCE COMPANY OF OREGON shall fail to pay any valid claim under the Policy by reason of loss or damage insured against, then such loss covered by , ,c the terms of the Policy shall be the responsibility of STEWART TITLE'GUARANTY COMPANY, .~.' . , . .. . '-.:''- . J . t t t t . I I t t t t t I t t t .... J ." -, ,". L ". In witness whereof, STEWART TITLE GUARANTY COMPAN'y' has caused this Assumption Certificate to be signed and sealed by its duly authorized oflicers tobe eflective as of the Date of Policy numbered above.' " , , . ~'-n~ ~, . LsJ~:!~_ c:U:te,ffilgned fP)/ fJ~ /( A.uthonzed couter~17)ai6re' J I , EV~RiJREElJ LAND TITLE COMPANY .f' ~' d;tJJ. / Presidelll Company . . . , 1651 Centennial Boulevard' . C' S ':;l-'I~lJ.bfil,,;~~, vn;.:=,uu ?T;--,:r; . Ity, tate . . PROVISIONS OF THIS CERTIFICATEon reverse side:, C-7899 37653 .,?, '." '. ~. ", . I .1, I I I .,..1 I I 1 '1 -.. " .... "", . .~ '. . , " . fZO II' 6 t 7 '. 7700 '~ '0 " '. ~ ~ G 7"" 4800 . I~?OO ;-~lf'. ,'. .",1<:5 'I. ." t\,I~ .. ", I -, " -.~ , ,",,' .-..:'{> " o ~. o ~ ." :1, 6000 0,56 AC, .. ~. "" , ~ " . "".' '. '. ,~ '0 .' a '. ~ 7' .5100, ---' ~ r)'<d 5500 ,fO . \; , ' , ?rl./ :JG: .-;;~ o ~ ~, ,:r..e><. IIt,.r:,..... 00' 6100 a ~ 6200 ~ en o ~ I r- ~ , 1.&!$.Q6' ,~ 6400 1l...9~~ ~ .' ~ . ~ ~ , ,,"_N!' S8(?Ga-?h--- /"'-"'\~ : .~ ........,,/' //0' --'--, I I I~ , I' I 819;Sv ..' ('(Y" . _~~''''~,J "".00 89.86' i6500 1:" I~ , I I. __.51........ ~5<t. -- 6700 ~ , 84.6'6' 1(-O~'~'5Lo 21-Y . - . '; 'J r ~::~::1. 50u1'>--1 Z(,.8.':" ..,..". "',BaeS.~'",. 7Z7Q,O>" FQ.o...... N.W.CO"'. t).l-.c.....o.<o;!. ,/ 125.86' 6800 jk \' I I ai,s-..-f".-,.' 6900 ~~ , (f'S86 , fif-"~ "'\ ~ . ''''-.,.,,,._. \) 490~ ..' 56"01 J I I L'2~' 8~~::>OO T\ '~ '. I 5800> i57~0 5600 I '\" ~ ()\'-~ ,5801 I" . r';\ '..." I ' j \ '-\ \ :: ) 6001 ~ ~ ~ I . k \~\i)\ _ . 01:8AC ' I \. 6'0' ~\J 1/2D <so' 57 I .' 1'l-::-:=-) 1. Y-;~ . ~ :'4.+0' --- \/fDz<fEa5t. a-/. ", ' 1.0 f "I .,d.: r " 'f th L _ . . H IC20teo ~ F'"),, j EaSt; I-Ine.(l 10 51, " VO)!-L1 '~!f'. ce,SIK./ .. ..... . r' . 0 __."\ tdti'po."(;.l:Lta ..... -,~ )-,. " " ' .> ~'T""E' B,I-Q,'tto.ln:5,'nJJ'<~L:\ r f , , " COMI''',NY ASSLh""', t,l(" " .'. LJA ", ." ,""-'- l1..j ::'. BIll/"( fOR fl-,her.".. 1"/"""" '. .. . "N", ~"'. ' ",_.... ..1:\1'\..... L;,,)l , / W .' COunTr:.;;)' L F ~' . (,.;, ~, l::Ve~Gr(EEN lAND HfLE co .,J' . .,:.. 741.1gel .. / .; . '1' ,,- //~. Li ~. , .~ /~',::r:: . ,-'.".,' .~'S.2' ""l!~~lO "h':>'S' ,~4' ~ ," -0'5'0" !i,-< .....-(7';00) , .., l_ -c--, '. C/. 40'1..;<0' ., "', -" ,.,7400~." .~. '. '" ',~' 3.0.1. ,;1,0--- ~ 66ee . ?801.r :::> J' (J. ~ - j? . ~ - - 0 -~-~~~d- <" , 6300 , t ' . " . ~"', \~ ..S-Ll>';!. , 41' ~ ,f '~"..,.,.,.1r , \\'-\ ~<' ~ ~\ \ , <:)~\y . 9' .' S.&r,;"'.54W g'l'lO STREET , IJB<1aYI,'re: 2.<t-i.~ :;: o , . ~ " ~ ~" ~ ~ '" ~ c' o ~ ~. '7000 .'/ . r:~ . '.-, ;::",;~ " Ne'1'S<f~"w 1%.29' j-/<:: MO. 6'0 'STREET~ RS-f.-4' ------.., I . . '. '. '. I . . . . . I I I . . . . OREGON UROLOGY Drainage Study Springfield, Oregon Engineer of Record: Monica 8. Anderson, P.E, Project Manager: Mikael D. Shields, P.E. Designers: Ryan Nossaman & Geoff Larsen January 16, 2007 Revised: February 2, 2007 BHE Project No, 2100-071-06 - BALZHISER& HUBBARD ENGINEERS Mechanical. Electrical. Civil. Surveying 100 West 13th Avenue, Eugene, Oregon 97401 Phone, (541) 686-8478. Fa" (541) 345-5303 www.bhengineers.com I ",. I I I I I I I I I I I I I I I I I I Oregon Urology Storm Drain Studv January 16, 2007 Revised: February 2, 2007 INTRODUCTION The purpose of this study is to meet the requirements Stormwater Management System Study for a Site Plan Review submittal. The study is a Mid-Level Development Study and includes an analysis of the post development flows for the WQ, 2-year, and 25-year design storms and discusses the plan for discharging and treating storm drainage, The proposed development is located on Tax Lots 6800 & 7000, Map 17-03-36-2-2 (Appendix F), The property is approximately 0.94 acres in size The existing use is a medical office building with associated parking on Tax Lot 6800, Tax Lot 7000 is unimproved with a small storage building and graveled access road connecting to F Street. The City of Springfield mapping shows that there are no public stormwater facilities within the adjacent streets to the project site (Refer to Appendix C) and the City of Springfield does not have any capacity or HGL information available for the public stormwater system downstream of the site in G Street or F Street. There is one existing public catch basin across G Street from the site, A field investigation by City maintenance staff found that this basin has no outlet. The existing developed site sheet drains to the street curb and gutter and is received by a catch basin on the southeast corner of the 14th Street/G Street intersection. Flood Insurance Rate Map No, 41039C1142F indicated that the parcel is located in Zone X-areas determined to be outside of the 500"year flood plain (Appendix G), The National Wetlands Inventory mapping does not show any wetlands on the project site (Appendix I), City of Springfield Wellhead Protection Areas-Contaminant Source Inventory mapping shows the site as being located within the 5-10 year time of travel zone and therefore is located within the Drinking Water Protection Overlay District (Appendix E), The Soil Survey for Lane County shows soil permeability for the site as being "moderate", the runoff rates as being "slow", and a "slight" hazard for water erosion (Appendix H), There are no streams or waterways running through the site, DOWNSTREAM CONDITIONS . Relative to the adjacent street grading along G Street and F Street the site is located at the upstream end of the local street drainage basin, Both streets drain west to 14th Street as verified by the topographic survey, . The City has approved site runoff to enter the curb and gutter on G Street and F Street respective to the location of the site, The City has requested that the post-development site runoff condition not exceed the pre-development site runoff condition, . The City requested we explore infiltration for roof runoff, Based on the geotechnical investigation, the onsite soil conditions will not support infiltration therefore; roof drainage will be routed through the WQ swales as discussed with City staff, ~ BALZHISER & HUBBARD ENGINllRS PAGE 1 I I I I I I I I I I I I I I I I I I I Oregon Urology Storm Drain Studv January 16, 2007 Revised: February 2, 2007 SITE STORM DRAIN CALCULATIONS SUMMARY . The proposed site storm drain system is composed of drainage sub basins A, B, C, D & R. Each sub basin will ultimately discharge through piped weep holes in the adjacent public street curb, . The northwest portion of the site as well as the roof runoff (sub-basins A & B) will drain to a swale located along the west property line (Refer to Appendix B). . The northern portion of the site will (sub-basins B & OJ drain to swales located along the north property line adjacent to G Street (Refer to Appendix B), . The southern portion of the site (sub-basin C) drain will drain to a double-chambered catch basin equipped with an oil filtration insert (Refer to Appendix B), . Based on the assumed downstream conditions the north and south sides of the site will not have backwater conditions for the 2-year storm event. with the following exception: Sub basins D and R will drain to the upstream end of on site swales through a permanently surcharged pipe system, The pipe systems for sub-basins D and R are sized to accommodate at least one foot of free board between the 2 year HGL and the finished floor elevation or structure rim respectively, Bubbler catch basins will be constructed with 2-foot sumps to accommodate maintenance and minimize long-term sediment back up, . The starting HGL for the site is governed by depth of flow in the existing curb and gutters, The existing gutter flow is expected to be relatively small because the site is located at the upstream end of the local street drainage basin, As a result, the HGL within the gutter is not considered for the 2-year storm and all outlet pipes are assumed to reach normal flow depth at the downstream end, . Approximately 0,5 ft of freeboard will be maintained between the 2 year HGL and the adjacent top of pavement grades, Because of limiting site conditions, one foot of freeboard cannot be maintained between the 2-year HGL and the rim of all structures, . Our calculations show that the required water quality design standards were met for the proposed project (Refer to the Water Quality Summary below for more details), . The post-development site runoff condition does not exceed the pre-development site runoff condition, . Analysis shows the pre-development 2-year storm event results in a net peak flow of 0,61 cfs from the site and the post-development 2-year storm event will result in a net peak flow of 0.61 cfs from the site, . The pre-development site generated flow distribution from the north and south portions of the site will remain the same for the post-development condition, OVERFLOW IMPACTS IN THE 25-YEAR DESIGN STORM . During the 25-year storm site drainage will exceed the capacity of the on-site discharge piping, and will overflow to the public right of way, Overflow will consist of surface flow across site entrances, across public sidewalks, and into public curb and gutter. Ponding in pavement areas is not expected to occur during the 25-year storm, . Gutter flows resulting from the 25,year storm are not expected to adversely impact the public roadways. According to EDSP Section 4.05(E), streets that are classified as collector or above, must have no more than 4 inches of flow depth along the face of curb, and no more than 2 feet of flow spread into the travel lane, Based on hydraulic analysis of gutter flow, the worst-case scenario would produce gutter flow depth of 24 inches at the face of curb, and spread reaching approximately 1,8 feet into the travel lane of G Street. (Refer to Appendix C), This analysis assumes that each travel lane is 12 feet wide. measured from the centerline of the roadway, Gutter flow from areas upstream from the site are not considered in this analysis, . Analysis shows the post-development 25-year storm event will result in a net peak flow of 0,96 cfs from the site, ~A BALZHISER & HUBBA~D ~NGINEmS 5~.. PAGE 2 I I I I I I I I I I I I I I I I I I I Oregon Urology Storm Drain Study January 16, 2007 Revised: February 2, 2007, WA TER QUALITY SUMMARY . City of Springfield Water Quality Design Standards require that 50% of non-building rooftop (NBR) impervious area be treated using vegetative methods, The remaining 50% of NBR impervious area must undergo pre-treatment through double-chambered catch basins with oil filtration media, For the proposed development, vegetative treatment is achieved for approximately 62% of the NBR impervious area, This area will pass through vegetated swales with single-chamber catch basins at the overflow The remaining 38% of NBR impervious area will undergo pre-treatment through a double-chamber catch basin with oil filtration media, (Refer to Appendix D). . A water quality storm of 0,83 inches in 24-hour period was used for the water quality calculations. (Refer to Appendix D), . Vegetative swales have been sized in accordance with generally accepted City of Springfield design criteria. The Water Quality Swale was designed to have minimum residence time of 9 minutes, a minimum slope of one half of a percent and 12" of permeable growing medium to allow some infiltration to the underlying soils, (Refer to Appendix D), APPENDICES Appendix A: Stormwater Scoping Sheet Appendix B: Pre and Post-Development Drainage Basin Maps and Area Calculations Appendix C: Public System Record Data and Peak Flow Calculations Appendix D: Details and Flow Calculations Appendix E: Wellhead Protection Areas-Contaminant Source Inventory Map Appendix F: Tax Map Appendix G: Flood Plain Data Appendix H: Soil Properties Data Appendix I: National Wetlands Inventory Map P:12100-071-06\Civil\SD SludylJep RNN 122806 SD Study.doc ~ BALZHISER & HUBMRD ENGIN~ERS ~~ PAGE 3 I I I I I I I I I I I I I I I I I I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX A: STORM WA TER SCOPING SHEET ,-' ---- 1,'-:/' , :; . .~.~~ ~A4 ~~~ I~O iU~~ c...;n:x Uf' .:SrtUrH;irihW t'W @002/003 '.E.~'li,~;~.~~,!:;'/~;{~~i. ,;''':Eli /~;,'::(~;;.~; :(..:.~~.:.~{}l1:-:~~::,f:!iW1:,~~ g~~S{i::'~1'~;~:;: ;~;~~~:;;::':;::, SPRINGPIeLP ~~~:..:,.,~~ L ,; I "~ ! ,~<~[,~.:.\y. ~. ::' :-_';::\-,~,; ':. r;'~:..c},~~~~t:~ n-lli PUBUC WORKS DEPARTMENT I Engineen'ng Division Phone: (541) 726-3753 Fax: (541) 736-1021 STORMW ATER MANAGEMENT SYSTEM SCOPE OF WORK I >--.~. I (Area below thi., line filled out b). Applicant) (please return 10 Man SIouder@CityajSpringfieldPublic Warks Engi".ering: Fax # 736~J021. Phone # 736-/035), ~mail:m.Jtoudt:r~~.~rinEfie.ld.0r.1u Project Name: Oe.u.ON uea..oc" V' Assessors Parcel 1I-0'3-3<O-z-2..... c..6bO.'100D Land Use(s): c.D_>yrlZ'c./r'<.- Project Size (Acres): , . '7 "f ....c Approx. Impervious Area: z." ,"oel ~r Applicant: Date: Phone #: I Fax#: Email: I1~S 1fL '- ....;.(4~ &J4....'{ %.I!:S Of'c, "I ZJ>.1, I~ 1- &eGo - Bent S"'t 1- $'K" - '5"3 ~'3 (.. r v1~4lt...,~- GJ J:JHt:.~;~cd"~ c..~""-'-" I I Project Description (Include a copy of Assessor's map): 'T~ s.-r~ ""'....~IST$ aF Z. (/<.Orz"'""E..)' '-NO ,~ L.uj r'~ (AC....~ '4 jt~t. IT d e..uc....-z-!.O DN '- s.,.~~i-, ,--"",,-1- ~ ~':<'NOA1I!.i ~<LSJ ~e........ F" S-ri<.L.l-"'-. -r/t1.. 1<1!rr,..J(" ......LOINC,.. ",-"LoL 61. P''''''L'S+''i.O. T~ Cd,J~"'cr:,o,..) ,,,.ra<-'<1- I ~ f'Q/Z ,..,. "''I,..... ",,",'<.0',,)" ",.,.,.. A "1,&00 Sf:' ~.7{f"JZJrIT -lor',. ft"S'$~C;OIt'..,.J,O' t"",L~/,.J4. ~b ,JI'TL I,...,Ni''(.,v.(,.r~. I I Drainage Proposal (public eOlUleetion(s), discharge location(s), ete, Attach additional sheel(s) ifnecessary: C.........J...'1. -t- ...., ",,,,J.-,d,,,,d ~ (.0,,- oC-...." J.,^'<.. I'~~.... 1'1-~' sl--J- '-'I J..., ('" ,J.......-!- ... J",.."'.J 1-"-- (COr"'- J., .1'-,.. ...-4.."',F, I I ~;O!;:~~ Sf~T~~~es~~an:;:~e~:~ta~~~e:~~ i?) ".~..\... ~t-rd- ",..fd" "'.....'~ s. '3.) '1'/<-c. .0-'1""1 "hn-ol.,,:\_ I I I.A.rt!D /udnw lhit lltr.<t:: filLtll (Jld bll (he CiN Oha Rl!1ul'7U!ll ta thl! Aoplicant) (At a ",inimum. all bores checla:d by the City on Ihefront and back of thi> she., shall be submitted (or an application 10 be! complete for submittal. (Jlrh(1JJ.f!h other reQw'remt!!nts mQ)I be n6ce.rsan'.J I Drainal!e Studv Tvne (EnSPM Section 4.03.2): lNote, UH mav be substituted for Rational Method), o Small Site Study - (u.,e Rational Method for calculations) {li Mid-Level Development Study - (""c Unit Hydrograph Method ror calculations) o Full Drainage Development Study - (use Unit RydrographMethod for calcul.tionB) I Environmental Considerations: iii Wellhead Zone: ~-,D -<~~ -r~ TLMtE. iI WetlandJRiparian: rJ/A , ~ S oil Type: ...",.... G:hW>c. /1('/.4. '" l..A"'!> ) {,-(b..c ,~ Hillside Development: II FloodwaylFloodplain: 114 Other Jurisdictions 101/1"1 111M I I Downstream Analvsh: I W N/A ,0 Flow line for starting water surface elevation: o Design HGL to use for starting water surface elevation:, o Manhole/Junetion to take analysis to: I Rerum 10 Mart Stouder@ City of Springfield, email: mstouder(fJJci,sDrinafield.or.us, FAX: (541) 736-1021 I ":"::""::~l;V'" ..""v .&.v. vu "".n...A. - ..,...1. '\1U ~U.J. -.?CO~LETE STUDY ITEMS \,;~.1~ U~ oJI..n....J.'\irrU:::.LV rn IgIUUJ/UUJ For Ol!icial Use Only. /IJI15; I I * Based upon the information pruvjded on rhe front of this sheet, the foll<YWing represents a minimum of what ir ="<ied for an '-"'Pplication to be completefor submittal with res peer to drainage: however, thir lirr should not be used in lieu of the Springfield , Jevdopmenr Code (SDC) or the City's Engineering Design ManuaL Compliance with these requir=ents does not constitute site .. approval; Additio>wl site specific information may be required. Note: Upon scoping sheel submittal, ensure complered form has been signed in the space prqvjded below: Interim DesigD Staudards/Water Quality (EDSPM Chapter 3) Req'd NIA. iii 0 All non-building .~~:-t' (NBR) impelvious surfaces shall be pre-treated (e.g. multi-chambered catchbasin wloil filtration media) fOr stormwater quality, Additionally, a miuimllm of 50% of the NBR imp<n'ious smface shall be treated by vegetated methods. l1EJ 0 Where required, vegetative stormwater design shall be consistent with interim design standards (EDSPM Section 3.02), set forth by the Bureau ofEnvironwental Services (BES) or Clean Water Services (CWS), ~ D For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified by the BES for vegetative treatment. ~. 0 If a stonnwaler treatroent swale is proposed, submit calculations/specifications for sizing. velocity, flow, side slopes, bottom slope, and seed mix consistent with either BES or CWS requirements. ir2l 0 Water Quality ca1cuIations as required in Section 3.03.1 oflbe EDSPM o ~ All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall be provided with secondary containment or weather resiStant enclosure. I I I I General Study Requirements (EDSPM SeetioD 4,03) Bi 0 Drninage study .... _...~..J by a Professional Civil Engineer licensed in the state of Oregon. I _Ill 0 A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map- o Calculations showing system capacity for a2.o'ye",:~torm event and overflow effects of a 25-Y.eat storm event o The time of concentration(Tc) shall be detenDined using a ,1 0 minute start time for developed basins_ I teview of Downstream System (EDSPM SectiOD 4,03.4,Q U' Ill'"' downstream drainage analysis as descnDed in EDSPM Section 4.03.4,C, On-site drainage shall be governed by the . Oregoo Plumbing Specialty Code (OPSe). ti 0 Elevations ofthc HGL and flow lines for both city and privaie systems where applicable. "_ . - I I Design oC Storm Systems (EDSPM Section 4.04) fij 0 Flow lines, slopes, rim elevationS, pipe type and sizes cle8I'ly iodicated on the plan set. ~ 0 MinimlIUl pipe cover shall be 18 inches for reinforced pipe and 36. inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 Ib load . without failure of the pipe structure. I?ii 0 Manning's"u" values for pipes shalJ be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to achieve a minimum velOCity of three (3) feet per second aT 0,5 pipe full based on T..ble 4-1 as well I I OtberlMisc I f}j 0 E~ting and proposed contour.;, located at one fo~t interva1. Include sp~t elevations and site gxades showing how site drains ~ 0 Private st..._ ",..;." eas<:menlS shall be clearly depIcted on plans when pnvate stonnwater flows from one property to another o ~ Drywells shall not receive runoff from any surface wlo being treated by one or more BMPs, with the exception of residential I building roofs (EDSP Sc:ct:ion 3.03,4.A). Additional provisions apply to this as required by the DEQ. Refer to the website: WWW_del1,!tta.te.ot'_1l.<;jwo/lZTmmdwaluichnme.hcm for more information. o gDetention ponds shall be designed to limit nmoffto pre-development ~es for the 2 through 25-year storm events I , I I I ~Thlsform ahaO bl! incl1ule4/lJ an artlUhment, insUk thl!front CDVU, of the s/o""Wa1er study /- IMPORTANT: ENGINEEB. PLEAsE READ BELOW A.NJ) SIGN! I As the engineer of record. I bereby certify the above required items are complete and included with the submined stormwater study and plao set Signature/lL----- ~Oa1e I/I"ilrrl FOrm Version 2: March 2004 I I I I I I I I I I I I I I I I I I I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX B: PRE AND POST-DEVElOPMENT DRAINAGE BASIN MAps AND AREA CALCULATIONS I - BALZHISER & HUBBARD ENGINEERS EXISTING CONDITIONS/PRE-DEVELOPMENT POST-DEVELOPMENT DRAINAGE BASINS I . ':t;, -- -~ -.. ~.' ;- i . 'TRUT ;,. I I",' . -."'" 17C\!' ~~:,:" Ii. ~,,/ '~/i;:~;~tt{ II' / ", ;,,, .,.' - nn;'~ " Ii- /,/ ll'" D..;' / \.'- Ib_.:. ~~= lChl:l CI c;a,:a..m-m-c:P- 'ta~;i'_Cl,.B_m_r at a.a - ell ....~ /./. /1'1:- . 0"" 11'"......... ...l:",~-'" ,. . . ',:;;:-. ,,-'": '" ";:<:>: jr^_~ /' ~././", . / ~.' ,~".' \::~:==:1._~.:.7._?,._~;'Ji"'=~~".=-:-r--~_;~t---==~~~""".!"__ "~ ,'fI D ,,/. f / I; /2:: ,:'-; _c, .,;,:7 . '.' ,,;;,_,:.,:~.t.~.--;, 1" - : V / ~ .". "'i~ . ;/1 -'~ n DO",:;' / . v":~ ' ~ ,I ':/'... /11 - "'''''"l;,.::C : ~i--'- _"t,- '~'/ / Ii ~ , ""..:.;,., i' : ).,.,,; "/ -11 a,.: .,::\ Y'+,' ~~V ~/ / n . u',,! . II. " -Y AI, :e" / i:'\"ii~!f / 6 ' .~)/ .~".c<~rp~Vl" ~~/CllllDINGROQ' ':, //~ "', If- / ..'" J';/;T\, 17/ )I' , . O ~ / ~~ ~ it,; ! \j ",":> ".' ',,_ ._ _. __. ,.__ ,.._ _ ___ ._ / U .' ( :1 If'" / ",- L.-i:~__ - ",- .--...- ',- .- -" -"~,~ !'F,..T.,=-,~ ~".~~"',~- :.,'--- ~--ri ,;-; .,; ';/ Ii m.,,/,;' / . ~ ~ ';/. / /.. . ;/ -,,'I ;/ ;/ / ./::~ '" '-'" 7" if / / / / II ..1 ~ \',' ;/ ;/ / " / / / "" ...." i I / / ;/ / ,:::j rJ . . /;/ /- / .... > / - .,.-' -- ".,-.' ~i I / / /;/ . -i ,..-.;. / .~ / / --. (7;. '-- -- '- --/ 17'..." , /" / ,-, / / ,<.It . .-;. , , '(, c' ,<..;:- v ... ,,,-, ~ , it t'~"_, / / ,~ ,'r.' '. ,'0 " "~:-"'1 ~,: ,~n i I,:'") ,,' ~l \,// ~. [::-t-'" ,,;/1 /"" ,:;',~ .~'..' , ~':'G;_,__""O'_____.__.-._....~~~~g"~ I., ,'" .~:~;;~. - ~'. _ ,U .\:' ii'.' ~. ,\'-' :Y: __. .:.. -.11 . . - ;i1 :'l! ( .;, .,~.: _,';./liI '. Ii , , ~ ! : : 1:1 l ; 1 ;. ,f----~. . [I .~'.-' I ' ,I t, ,!; I , , , .\" I I 'IJ '~:''',:, 1 I, ,1\'::, ' , ,-"", ,t , ,~-..Qtom~ar~.",:,,,, ; :" ".,~.it ..,.,,'~-' I! ", .::':-', "",::'".' , ,--,'" \':,'11;':'..' - ~, ....."....~' - '" l' ~..~ . "',.a...s..t.r ~-- -a~df .' , ..' - - .,~.. ~".:::: "'- '. f; ---~"\ r~---~-------, 1--~O " '~' : ' .1 :-:sWAlE Bl:-' ,...~~~,.. I '~ MECHANICAL ;'-j !; -; ,+k I -; 1 . . ELECTRICAL CIVIL . TRANSPORTATION SURVEYORS ~~ I r.ANOPYIThRH~ h... ~I ~ ........... A.. Q,20 ACRE 00-" -I ~ DO I : I 1'0 BOX 10347 EUGENE. OR 97440 1': 541-686'8478 F:,541-345-S303 I: ~ , SUB-BASIN'A :.o.~ Aaa C I -, . 1 ,,'" )-,.;... t~ , I _0 A-.Q,09~ "..SS -t; I ;>- "" >CIl g3~ CIlCll ~~ ~~ 5~ ..J::; ~~ ""0 OE-< ~_CI:l g:~ ~~ 90 E-<'..J -"" 0> z"" 00 U, "E-< ~C5 E-<o.. CIlO -z r;]-< :"-1 ~~ i i , , ll,::;'(:i ..J I I, ... ~.t : , ......... R A- Q,22 ACR[S "..ss ! I h~.:;L- - I Joo .. o J o I o '- v , --=.J":;' '.f, I'. ::!:DPERIlOOS""''''-, b ..~"" 154Qs.r. f'''.: q. #. '. '# rO #, , . ' '.. () Ii ".4 Ii -,' I!- Ii d..... "iI .. · 0 0 ,-, .- ri !il~ ". ;)\. :i D 9... 0 'i "i1 0 ~~-_O i iI "'ii' ,(/ ..'- t' , -.':. t. ,,"" ,,"'j' ,-, ..' " \ , .' .,. ,~F . ." " .- t. .'- "' "', j u ..; r.4 ~ u ::t:;>- ~S -<E-< w "" CIl eo! ::t:"" w ,= ;>-" w f- "-< ~ ti g~ f- -, 0-< w o ~~ w it ~O i)j PROJECT NOi 2100-071-06 FilENAME: SD10,DWG DESIGNER: GTl/R~JN DA TEi 01/09/07 SHEET NO I OVERALL SITE DRAINAGE HYDROLOGIC CONDITIONS ~.~ .; IJII'AWrn,m.tPQ~TYIINI' .... ... 0::' ,j~~~ -~ l':"<) ,~,~j , .- 1IIlI"_l'F1oFIlRIFNT nR.....ts ~94CC1lP091! eN- 98 0.88 ACRES (ns) IWPEIMOUS OPofli 0.04 ACRES (U) SDI-IWf'DMOOS GRA\U. 04- 880.22 ACRES(2JX)PElMCtIS (CftN SPACE-POaI: cx:wDllQ) I ....... C A- Q,2J AalES 1>-" .\ , I -f '.') PO!IT-/JFVF1 CAlntT IlRAINAts Ot-MCOWPOSIlE at- 98 0.87 ACRES (71~,IllPfROOJS ~ Be 0.27 ACRES (29~ PERVlW5---(IfOf SPACE POOR alNDlllOH """"""" NONET.lHCREAS(1N RUNOFTfROW sm: I 4'1.. :.~~~'.~:'7:\":-. ,a'Ji:i!~"' (,,<':'l;~,~,~~~" - ... ~ \~ I , ,I NON BUILDING ROOF IMPERVIOUS AREA (NBR IA)SUMMARY I r .,,' -;:}\~ '" '(i\ ."V GROSSNBRlA: Q,47ACRES N8R IANOT 1REAim: 0.18 ACRES(J8S) NBR IA TREATED: 0.29 ACRES (8~ _.'1 .-$f": )", , :11:"'-", '~fJ:::' ~..P'i ~i1 '-==-=1- , I , , t N I - I . ".--..".'.' PLAN SCALE ....~,; " H;!; ,10-' 40 I I F 'TRUT INCH 40 FT -'~".' SD1.0 ,."". I' I I I o STIlEET ~.,.OOlFALLHo.' ll!...-F - "'I:tf.:'.__l...+L.~,=:l.--';;r ,,/., V _ - -,- """"'11'.... - ~j~_-._~F~._ I ~I I ,- " " " IC8:IIi:i I'.... , I ",--1 1"'- :-:.1 }I 1 :-:-:1 i _--:-1 II I ] 1- ] I > IBUBEll ~ , .. - I " i~~"~ ~-""", ...,., I I I I I I I I I 1 I I I I I I ~ L A ( I I ~",,",:QI: I J- tl-~ .... 'LS",:,_,;;;::;:-';~;;7 r ! . CD~ ~ ill 1- 6' PORTION (FEIl$EAlD/T -:r - ,_r:: :::J .,,- ::::::~:>':--- -). ~ ~ ~ on, ~J0" / _ ~4 ~o ,;,.1 ;1 JDD t N . -- BALZHISER ~HUBBARD ENGINEERS MECHANICAL lUCT-RIC..l,l CJ~!L TR.A ,. NSrOP-TATION SURV~YORS 1'0 EVGF~PXOJ0347 , R97440 ~: ~j:~~~~~~j6~ -.l LI PLAN SCALE o 20 I I 40 J 40 FT :! . "" :1 )1 1 INCH O.SE/KNTS:' cDIO"U11U RCCOOO:; CA50IENT RECU'TlON 2/10/1948 8K l.ANC COUN'f!/R~~S 366 PC JOJ. 1%18.0' UTlUTY ~C0'?0lD65~~r NC COUNTY R{'~SREC[PTJDN NO CillO'IlNOCRGR .61828 RECOFIOC{) OUN() COINU l.ANC COUNt'ikf99O RE~r::: fAScMDlT, CORDS NO.90-J9590 - A ,,',",-,;.,::;.;.: V:,1 ~. ~'T!~':::-"-"::~'_: IlRMtCXJfEC1lCfl1.m A'II I "Ii:~ L7' \ I Iro~Td't : ;~~:'" '_l~ n=--.-J= - -~' ,.,j c.5 ~ ~ <t: u ::C:;:.. ~O <t:;:J ~ ~'~ i= ;:.. ~ W f--"~ ~ U Oz i= w ....l -:; O~ I- ~ 0::;;1 ~ 1l;:J0 I PROJECT NOVl 2100-071-06 FILENAME SD1.0.DWl~ DESIGNER GTL/RNNd DA TE- 0 C' - 2/02/07 JHEET NO ~ o ;:.. <t: ....l ::B ~ rn ;:.. rn ~ <t: 0:: o ::B 0:: i2 rn SYSTEM HYDRAUUC N lX .R6'lPJt . OTES lX/2. . 15 LIE"J( ~ YODEL ~ ':ot'" 2 PoWUa l.M:S 'lHEllE9CNfl.OW~i:s2lHSlS~AS"X"1N lX/I, IlEPRESEHTS "1:'.' _lli 1/2 (T M woon.. .c:o.CF .. PARAUEl . lHEIPQHlOW~'~4.UNES~~ AS Y IN Y:. !.Tt4 1!4(X ~r DC:, A -LJ/FlJ... LJI2-' -~ ".-"_.- _._~ ~" " =1:_~~ ~~ 0JR8 00 --..--. - I ,:::' "8TRI!ET 'IF,fU No. 3 . SD2.0 I I I I I I I I I I I I I I I I I I I - BALZH ISER & HUBBARD ENGINEERS ApPENDIX C: PUBLIC SYSTEM RECORD DATA AND PEAK FLOW CALCULATIONS I " ","~,~",.~,.","" ~ '1 ' "'-~""""'.'-"'- ,".,. :".,,'"',, ."...., .,. 'o:~.'.'''~rgW:ib':''s.: '\' ,f> I'" d'q . ;; ~-~ "'"', '":'.,1 i 4~.(1.:' !' , I ! ~ :~;. I .--'~, ;..\:.':<.'5 __1-.'-"~"">'-' SMH: 016 Rim:' 4~8.6' Depth" Proj: "20-156 I ~~ _111 _ ~--=___.-!t3 . 1-- I St.4H: 001 Rim: 459.~9' Oep~h: 0 PrOf 00-000 I o o ~z "'- -~ , 10 a 275' CON 8" "! SUH, 007 Rim: 459.;i2' Depth: 0 Proj: 00-000 '''I ~m 1 L-- " ' 1 1 I I' -- ;~. ~:,.) "'i --::-- --",-,,-,. I~ " , " :i I: SMH: 006 Rim: 459.17" Depth: 11' Pro): -- "\--.1 1460 0529 o-r" ' n' o ..- I. C-- l~ 0..;.;, ~'~~-- . _ ~:>u ~~ " .' ."f ' . ' " ~ .,.203 , " -',-' I L-J I 146(i)487 : 1.4 ~ ~I " I. - --'-- .., ,.,-' r ~ "'k-~ Lc;.~f "~r _ 2:1 _I "" f., ~\/fL- " ' ~:"""".c I II - . ..,," UJY en ~~i .-=:::.~____. .f6f/ '~I ,"' t r~~2~'51~C =.' I -iJ'''g, ~o ~ _"r . / 1458 / / '["l (( TL-'1oDO , ~.-_ 1440 :~ ,~ ( I , I :b- ------- --- .-c-.. l:~~ ,_ -r-------: ..~I __:-~ ....."~,;. __-r:----:- I , ---1 1435 , , ,\ . I !rj;~l I-y \33\ ! ilJ -.JU :3a3 I ~ ? -pu .p , + H . . no'.\: . PVCS- 0489 I . G + o I '-" .L.' . --!; .1: ,...:.' '? I c::::LW I p , ' c.', ., ~ ;\ I '4-' ~' .1..""Il. , \ \ ~:. A -v- ;:i {(I.o"'OS~ '\\ l -- '~..'9" i! Ii :r 0~7 TL: (Pac'" .... ;.'--- ,'I ..'J '.;;'.:::. ~'''''~~ L ---Y' ,-' -' I ...l,,;.I.U ,..J__ 'W \. '- 'ill ~ 1520 0" .1' I I I I I I I I I I I I I I I I I I I Hydrograph Return Period Recap Peak. Outflow (cfs) Hyd. Hydrograph Inflow No, type Hyd(s) (origin) i/...lQ., 2-Yr 3-Yr S-Yr 10-Yr 0.07 0.07 0,61 0,61 2 SBUH Runo! ' SBUH RunDI ' Proj. file: SPR-UROLOGY-PRE-POST-GROSS,gpw 2S-Yr 50-Yr 100-Yr 0,94 0,94 Page 1 Hydrograph description PRE-DEVELOPMENT RUNOFF POST-DEVELOPMENT Run date: 01-10-2007 Hvdraflow Hvdroaraohs bv Intelisolve I I I I Hydrograph Return Period Recap Hyd, Hydrograph No. . type (origin) Inflow Hyd(s) Peak Outflow (cfs) 1.Yr 3-Y~ 5-Vr 10-Vr 2.Yr SBUH Runol ' 0,02 0,15 2 SBUH Runot " 0,02 0,14 ---f ~ 3 SBUH Runo I 0,01 0,14 4 SBUH Runol ' 0,00 0,04 5 SBUH Runol ' 0.Q3 0,16 1~6 Combine 1.5 0,05 0,31 [l>7 Combine 2.4. 0.02 0.18 9 Combine 1.5. 0,05 0,31 10 SBUH Runol r 0.Q1 0,06 11 SBUH Runol r 0.Q1 0,13 I I I I I ot.'-L€.T prr-es I.:t.. . L-z.)prpe.s 0.0'\ "'.... ~we. I I I I I I I Oc, T\..e. T P:I:,'E-S L- I ~ l4J ;> ~i'e.S o~o~ ';'A..i>.~'E- . O<,l-n..e.r l":I:i"t,S L3 <.:z.) f>;P,;"S (>,O,?- EA, 'J:i'E. &- - So T'U~,e." Gr\A 11 ;rz.. 'Z- ~ yn. ~'"''''' fLu".> F"-oM. ':>l,fE, ~ r- - c" T: 1.G6-'- CnA r [1::('1- ,<.'flt. (:;" .1fCrt. h...l"o.,J fnu "1. ~Li =- ': I I I Page 1 Hydrograph description 25-Vr 50-Vr 100.Vr 0.23 SUB-BASIN A 0,21 SUB-BASIN B 0,22 SUB-BASIN C ~ 0.07 SUB-BASIN 0 0,24 SUB-BASIN R 0.46 SUB-BASINS A&R ~ 0.28 SUB-BASINS B&D ~' 0,46 wa SWALE A 0,08 wa SWALE Bl 0.20 wa SWALE B2 0.14 t;;A, p"'i>e (<-1'-')) i 0.1'2. ~, OX",; ~F-S) o. \\ eA,1'x:;>o: (<-F-S) b:fA l..F-S . O.'1:z. c'F') Proj, file: SPR-UROLOGY.gpw - -.----- --- --- -r - , Run date: 01-11-2007 . - .-- ---.------..----.------.----.-- --.-"--- Hvdraflow HvdroQraphs by Inlelisolve _ _ _,_ _ 115' _ _ _ _ _- (_, _ '_',. _ _ _ _ Hydraflow Plan View Outfan 11CB1 &2 OultanfT IllIB3 ...- Oultan --..____ 9 ---.. -----"'--. CB4&S ~ Oulfan 4 5 16 7 ~".,.,..--~ /^s CB6i3 Oulfan · Project file: SPR UROLOGY 2-YR,stm I No, Lines: 9 , 02-02-2007 Hydrallow Storm Sewers 2003 - - -, - - - - - - - - - - - - - ~ '- - bhe Page line DnStm Line Line Line line Flow Capac Invert' Invert God/Rim God/Rim HGL HGL DnStm No, Lo No 10 Size Length Slope Rate Full On Up EIOn EIUp On Up LoNo (in) (It) ('!o) (cfs) (cfs) (It) (It) (It) (It) (It) (It) Outfall L1/4 3 21.00 1,00 0.08 0,09 458.91 459,12 459.43 459,74 459,10 459,31 Outfall 2 Outfall L2/2 3 15,00 1,00 0,09 0.09 459,26 459,41 459,70 459,91 459,47 459,62 Outfall 3 Outfall L3/2 3 28,70 1.99 0,07 0.12 459,27 459,84 459,77 460,34 459.43 460,00 Outfall 4 Outfall L4 6 57,00 0.81 0,16 0,50 458,36 458,82 460,29 461,10 460,29 460,34 Outfall 5 4 L5 6 40.40 0,79 0.16 0,50 458,82 459,14 461.10 461.95 460,34 460.37 4 6 5 L6 6 26,30 0.80 0,16 0,50 459,14 459,35 461,95 461,95 460,38 460.40 5 7 6 L7 6 76.40 0,80 0,08 0,50 459,35 459,96 461,95 0,00 460,41 460.43 6 8 7 L8 6 41,50 0,80 0,08 0,50 459,96 460,29 0,00 0,00 460.43 460,47 7 9 Outfall L9 4 50,00 1.70 0.04 0,25 459.90 460,75 460.29 461.75 460.20 460,86 Outfall Projecl File: SPR UROLOGY 2-YR.stm 1 Number of lines; 9 I Date: 02-02-2007 NOTES: .. At crilical depth Hydranow Storm Sewers 2003 - - .'- - - - - _ '- -,,- - - - - - - - Hydraulic Grade Line Computations Line Size (1) 2 3 4 5 6 7 8 9 Page 1 Q Downstream Len Check Upstream JL Minor coeff loss Invert elev (in) (cfs) (It) HGL Depth Area Vel Vel EGL Sf elev head elev (It) (It) (sqlt) (ltIs) (It) (It) (%) Invert elev (It) (13) HGL Depth Area Vel Vel elev head (It) (It) (sqlt) (ltIs) (It) EGL Sf elev (It) (%) (19) (20) Ave Enrgy Sf loss (%) (It) (K) (It) (It) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (15) (16) (17) (18) (14) (21) (22) (23) (24) 3 0,08 458.91 459,10 0.19 0,04 2,03 0,06 459,16 0.993 21.0 459,12 459.31 0.19 0,04 2,04 0,06 459.37 1.005 0,999 0.210 1.00 0.06 3 0.09 459.26 459.47 0,21" 0.04 2,05 0,07 459,53 0,999 15,0 459,41 459,62 0,21 0,04 2,05 0,07 459.68 1.000 1.000 0.150 1,00 0,07 3 0.07 459.27 459.43 0.16" 0,03 2,10 0,07 459.50 1.130 28.7 459,84 460.00 0.16" 0.03 2.10 0,07 460,07 1,130 1,130 nfa 1.00 0.07 6 0,16 458.36 460.29 0.50 0,20 0,82 0.01 460,30 0.081 57,0 458.82 460.34 0.50 0.20 0,81 0.01 460,35 0,081 0.081 0,046 0.15 0.00 0,16 458.82 460,34 0,50 0.20 0,82 0,01 460,35 0,081 40.4 459.14 460.37 0,50 0,20 0,81 0,01 460,38 0,081 0.081 0,033 1.00 0.01 0,16 459,14 460.38 0,50 0,20 0,82 0,01 460,39 0,081 26,3 459,35 460,40 0,50 .0,20 0,81 0,01 460.41 0,081 0,081 0.021 1.00. 0.01 0,08 459.35 460.41 0,50 0.20 0.41 0,00 460.42 0,020 76.4 459,96 460.43 0.47 0.19 0.42 0,00 460.43 0.018 0.019 0.014 0.45 0.00 0.08 459.96 460.43 0,47 0,19 0.42 0,00 460.43 0.018 41.5 460.29 460.47 0.18 0,06 1.28 0,03 460.49 0.279 0,149 0.062 1,00 0.03 6 .6 6 6 4 0,04 459,90 460,20 0.30 0,08 0,48 0,00 460,20 0,039 50,0 460,75 460,86 0,11" 0.03 1.54 0,04 460,90 0.725 0,382 nfa 1,00 0,04 I Number of lines: 9 I Run Date: 02~02~2007 Project File: SPR UROLOGY 2- YR.stm NOTES:. Normal depth assumed., H Critical depth assumed. Hydraflow Storm Sewers 2003 - - - - - - - -, - - - - - - Hydraflow HGL Computation Procedure ~ - General Procedure; Hydraflow computes the HGL using the Bernoulli energy equation. Manning's equation is used to determine energy losses due to pipe friction. In a standard step, iterative procedure, Hydraflow assumes upstream HGLs until the energy equation balances. If the energy equation cannot balance, supercritical flow exists and critical depth is assumed at the upstream end. Col. The line number being computed. Calculations begin at Line 1 and proceed upstream. Co1. 2 The line size. In the case of non-circular pipes, the line rise is printed above the span. Col. 3 Total flow rate in the line. Cot. 4 The elevation of the downstream invert. Col. 5 Elevation of the hydraulic grade line at the downstream end. This is computed as the upstream HGL + Minor loss of this line's downstream line. COL 6 The downstream depth of flow inside the pipe (HGL - Invert elevation) but not greater than the line size. Col. 7 Cross-sectional area of the flow at the downstream end. Col. 8 The velocity of the flow at the downstream end, (Col. 3/ Col. 7). Col. 9 Velocity head (Velocity squared / 2g). Col. 10 The elevation of the energy grade line at the downstream end, HGL + Velocity head, (Col. 5 + Col. 9). Col. 11 The friction slope at the downstream end (the S or Slope term in Manning's equation). Col. 12 The line length. Col. 13 The elevation of the upstream invert. Col. 14 Elevation of the hydraulic grade line at the upstream end. Col. 15 The upstream depth of flow inside the pipe (HGL - Invert elevation) but not greater than the line size. Col. 16 Cross-sectional area of the flow at the upstream end. Col. 17 The velocity of the flow at the upstream end, (Col. 3 f Col. 16). Col. 18 Velocity head (Velocity squared /2g). Col. 19 The elevation of the energy grade line at the upstream end, HGL + Velocity head, (Col. 14 + Col. 18) . Col. 20 The friction slope at the upstream end (the S or Slope term in Manning's equation). Cal. 21 The average of the downstream and upstream friction slopes. Col. 22 Energy loss. Average Sf/100 x Une Length (Col. 21/100 x Col. 12). Equals (EGL upstream ~ EGL downstream) +/- tolerance. Col. 23 The junction loss coefficient (K). Col. 24 Minor loss. (Col. 23 x Col. 18). Is added to upstream HGL and used as the starting HGL for the next upstream line(s). _..- - Page 1 I SWALE A CONVEYANCE ANALYSIS 2-YR Worksheet for Trapezoidal Channel I I Project Description- Worksheet Flow Element Method Solve For SWALE A 2 YR Trapezoidal Cha Manning's Form Channel Depth I Input Data Mannings Coeffic 0.030 Slope 0.005000 tuft Left Side Slope 3.00 H: V Righi Side Slope 3,00 H: V Bottom Width 3.00 fl Discharge 0.31 cfs I I I Results I Depth 0.12 ft Flow Area 0.4 ft2. Wetted Periml 3.75 ft Top Width 3.71 ft Critical Depth 0.07 ft Critical Slope 0,033139 tuft Velocity 0.78 tus Velocity Head 0.01 ft Specific Enerf 0.13 ft Froude Numb, 0.42 Flow Type 3ubcritical I I I I I I I I I I I C:\...\slorm drain\spr urology-swale capacity.fm2 01/12/07 01:48:29 PM @HaestadMethods, Inc. Balzhiser & Hubbard Engineers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberger FlowMasler v6.0 [614bJ (203) 75S~1666 Page 1 of 1 I SWALE A CONVEYANCE ANALYSIS 25-YR Worksheet for Trapezoidal Channel I I Project Description Worksheet Flow Element Method Solve For SWALE A 25 YF Trapezoidal Cha Manning's Forml Channel Depth I Input Data Mannings Coeffic 0.030 Slope 0,005000 ftlft Left Side Slope 3.00 H: V Right Side Slope 3,00 H: V Bottom Width 3.00 ft Discharge 0.46 cfs I I I Results Depth O,15.ft Flow Area 0.5 ft2 Wetted Perim 3.94 ft Top Width 3,89 ft Critical Depth 0.09 ft Critical Slope 0.030651 ftlft Velocity 0.90 tus Velocity Head 0.01 ft Specific Ener{ 0.16 ft Froude Numb, 0.44 Flow Type 3ubcritical I I I I I I I I I I I I C:\...\storm drain\spr urology-swale capacityfm2 01/12/07 01:48:35 PM @Haestad Methods, tnc. Balzhiser & Hubbard Engineers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberger FlowMaster v6.0 [614b] (203) 755-1666 Page 1 of 1 I SWALE B-1 CONVEYANCE ANALYSIS 2-YR Worksheet fol' Trapezoidal Channel I Project Description Worksheet Flow Element Method Solve For SWALE B-1 2 YI Trapezoidal Cha Manning's Forml Channel Depth I I Input Data Mannings Coeffic 0.030 Slope 0,005000 ft/ft Left Side Slope 3.00 H: V Right Side Slope 3.00 H: V Bottom Width 3.00 ft Discharge 0.06 cfs I I I Results I Depth 0,04 ft Flow Area 0.1 W Wetted Perim 3.28 ft Top Width 3.27 ft Critical Depth 0.02 ft Critical Slope 0.046616 ftlft Velocity 0.43 ftIs Velocity Head 2.85e~3 ft Specific Enel"f 0.05 ft Froude Numb. 0.36 Flow Type Subcritical I I I I I I I I I I I C:\...\storm drain\spr urologycswale capacity.fm2 01/12/07 01 :48:40 PM @Haestad Methods, Ine Balzhiser & Hubbard Engineers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberger FlowMaster v6.0 [614b] (203) 755-1666 Page 1 of 1 I SWALE B-1 CONVEYANCE ANALYSIS 25-YR Worksheet for Trapezoidal Channel I Project Description Worksheet Flow Element Method Solve For SWALE B-1 25 . Trapezoidal Cha Manning's Forml Channel Depth I I Input Data Mannings Coeffic 0.030 Slope 0,005000 ftIft Left Side Slope 3.00 H: V Right Side Slope 3.00 H: V Bottom Width 3,00 ft Discharge 0.08 cfs I I I Results I Depth 0.05 ft Flow Area 0,2 ftz Wetted Periffil 3.34 ft Top Width 3,32 ft Critical Depth 0.03 ft Critical Slope 0.043651 ftIft Velocity 0.48 ftls Velocity Head 3.54e.3 ft Specific Ener~ 0.06 ft Froude Numb 0.37 Flow Type 3ubcritical I I I I I I I I I I I C:\...\storm drain\spr urology.swale capacity.fm2 01112/07 01 :48:46 PM @ Haestad Methods, Inc Balzhiser & Hubbard Engineers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberger FlowMaster v6.0 (614bJ (203) 755-1666 Page 1 of 1 I SWALE B-2 CONVEYANCE ANALYSIS 2-YR Worksheet for Trapezoidal Channel I I Project Description Worksheet Flow Element Method Solve For SWALE B-2 2 YI . TrapezoidalCha Manning's Form Channel Depth I Input Data Mannings Coeffic 0,030 Slope 0, 005000 ftIft Left Side Slope 3.00 H: V Right Side Slope 3.00 H: V Bottom Width 3.00 ft Discharge 0.13 cfs I I I Results I Depth 0.07 ft Flow Area 0.2 ft2 Wetted Periml 3.45 ft Top Width 3.42 ft Critical Depth 0.04 ft Critical Slope 0,039587 ftIft Velocity 0.57 ftIs Velocity Head 0.01 ft Specific Enerf 0.08 ft Froude Numb 0.39 Flow Type Subcritical I I I I I I I I I I I C:\,..\storm drain\spr urology-swale capacity.fm2 01/12107 01:48:50 PM @HaestadMethods, Inc. Balzhiser & Hubbard Engineers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberger FlowMaster v6.0 [614bJ (203) 755~ 1666 Page 1 of 1 I SWALE B-2 CONVEYANCE ANALYSIS 25-YR Worksheet fOr Trapezoidal Channel I Project Description Worksheet Flow Element Method Solve For SWALE B-2 25 ' Trapezoidal Cha Manning's Forml Channel Depth I I Input Data Mannings Coeffic 0.030 Slope 0, 005000 fUft Left Side Slope 3,00 H: V Right Side Slope 3.00 H: V Bottom Width 3.00 ft Discharge 0.20 cfs I I I Results I Depth 0,09 ft Flow Area 0.3 ftz Wetted Periml 3.58 ft Top Width 3.55 ft Critical Depth 0.05 ft Critical Slope 0.036205 fUft Velocity 0.67 ftls Velocity Head 0.01 ft Specific Ener~ 0.10 ft Froude Numb, 0.41 Flow Type 3ubcritical I I I I I I I I I I I C:\...\storm drain\spr urology-swale capacity.fm2 01/12/07 01:48:56 PM @HaestadMethods, loc Balzhiser & Hubbard Engineers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberger FlowMaster v6.a [614b] (203) 755-1666 Page 1 of 1 I I Project Description Worksheet Type Solve For G STREET GUTTER Gutter Section Spread I I Input Dala Slope 002800 fIIft Discharge 0.74 cfs Gutter Width 1.33 ft Gutter Cross 5101062500 fIIft Road Cross Slop 020000 fIIft Mannings eoeffic 0.016 I I I . Results Spread 7,79 ft Flow Area 0.6 ft2 Depth 0,21 ft Gutter Oepres~ 0.7 in Velocity 1.15 fils d" I , . I . 1<6 l'fj> ~ I I ,A As~1 :"] . "c"..- '.,~ ::C",;":;!,";" ".C" G St. Gutter - 25 Yr. Storm Worksheet for Gutter Section '... ~ (~ r T--lf I i MLo.......1lI.e. S"rtl>AD "- E./'<UlD""'''Il...r l "DSt' .~j I -i,b' I.\SA-llLE I LJrNE WZQfl1,) I ~ - I I I I I I I c:\...\civil\storm drain\gutter analysis.fm2 , 01110/07 09:19:13 AM a:l Haestad Methods, Inc. I I~. ~'.' If-S-A.!>LE NHvf LA-NI= (I'.~P-r"'I3t.f. FOTL c..o\..\..c.L-TO''a.'i>) .... 4.0S~)) ~ Balzhiser & Hubbard"Englneers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberge: FlowMaster v6.0"(614b] (203) 755-1666 Pagerof 1 I G-STREET GUJTERCROSS SECTION' Cro~s S~cti~i'I'fOI' Glitter Section " I I Pr.oject.Oescription Worksheet 'Type, . Solve For G STREET, GUTTER Gutter Section. . Spread I Section oat,a'-. Slope " . 002800, ftIft Dischar~e; 0.('4 cis Gutter Wialhc '133 ft Gutter Crass Sial 062500 . ftIft, Road ~~oss Slop O~OOO~. ftIft . Spread ,,", 7.79 ft Mannings Coeffic '0.016 I I I I I I 0,50' -, I ',,[ I 0.40 I I I [ 0,30 I. I I 1 ~I 0,20 -: I, I I - i -I I -..," ! l' 0,10 ~ I I I I I I I , '0,00 , 0+00 0,..01 0+02 0+03 '0+04 0+05 0+06' 0+07 0+08 0+09 v:5,oL H:1 .., NTS I I I I I I I I I " c::\...\civjl\st~rm drain\g'utter analysis~fm2_ . -:;".01/.10107 09:21 :53AM @-Haestad Methods, Inc. . ',y..,- -.. . :"," " ,. 'saIZh'iser.;& t;tubbardEngirie~rs 37 Brookside:Hoad:' Waterbury, CT0670B USA . .:~ . . p,r~ject Engjn~e'r: John .Hornberger FlowMaster VS.O'[61'4b}.. (203)755~1666 Page ~ of l' I I Project Description Worksheet Type SONe For F STREET GUTTER Gutter Section Spread I I Input Data Slope O.D02800 ftlft Discharge 0.22 efs Gutter Width 1.33 ft Gutter Cross SIOI 062500 ftlft Road Cross Slop 020000 ftlft Mannings Coeffic 0.016 I I Results I Spread 4.54 ft Flow Area 0.2 ft2 Depth 0.15 ft Gutter Depres~ Q.7 in Velocity 0.90 ftls I I I I I I I I I I I I C:\...\civil\storm drain\gutter analysis;fm2 01/10/07 09:21:14 AM @Haestad Methods, Inc. F St. Gutter - 25 Yr, Storm Worksheet for Gutter Section Balzhiser & Hubbard Engineers 37 Brookside Road Waterbury, CT 06708 USA Project Engineer: John Hornberger FlowMaster v6.0 [614b] (203) 755-1666 Page 1 of 1 I F-STREET GUTTER CROSS SECTION Cross Section for Gutter Section I Project Description Worksheet Type Solve For F STREET GUTTER Gutter Section Spread I I Section Data I Slope C),002800 ftlft Discharge 0.22 cfs Gutter Width 1.33 ft Gutter Cross Sial 062500 ftlft Road Cross Slop 020000 ftlft Spread 4.54 ft Mannings Coeffic 0.016 I I I I O,50-=~--I-'-n-- ~:~ _m__~____m__ I i 0,35 -------r------I 0.30 -- ---- --- I 0.25 _n___..____ I 0.20 ~_____....u.____ -.--.-~-.----- 0.15 .,_..,_._____...._ . ___'0' i 0,10 -'n----r--- I 0,05 0,00 0+00,0 _I I --j-- ---!----- -nul I 0+01.0 , I 1--.------. .,-,- __..l_ 0+02.0 0+03,0 0+04.0 . i --~---- I ---i- I ] 0+05.0 _.-_, . _u.__.._ ~ , i -------1 I I ---- --I ...-1 I -.] , I I I I 0+06,0 I v:5,01 H:1 NTS I I I I I Project Engineer: John Hornberger c:\._.\civil\stormdrain\gutter analysis.fm2 Balzhiser & Hubbard Engineers FlowMaster v6.0 [614b] 01/10/07 09:21:36 AM @Haestad Methods. Inc. 37 SrooksideRoad Waterbury, CT 06708 USA (203) 755-1666 Page' of 1 I I I I I I I I I I I I I I I I I I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX D: DETAILS AND FLOW CALCULA nONS I I I I I I I I I I I I I I I I I I I SWALE A - Water Quality Analysis Input Abbreviation Channel Bottom Width = 4 fl w Side Slopes = 3 (!:!.:V) flIfl SS Longitudinal Slope = 0.005 flIft So Channel Flow =1 0,05 lets Q Manning's Roughness = 0,35 n Channel Length = 50 ft L Iterative Input, or Goal-Seak Normal Depth =1 0,14 1ft d 1,68 in Constants k= 1.49 ft Output Cross Sectional Flow Area = 0,62 ft2 A Wetted Perimeter = 4.44 ft Pw Hydraulic Radius = 0,14 ft RH Veiocity = 0,08 flIs v Channel Flow =1 0,05 lets Q Residence Time = 10 min T Hydraulic properties are calculated using Manning's Equation for open channel flow. For swale sizing, sheet flow must occur, therefore, flow depth is limited, and mannings roughness values for sheet flow are used. I I I I I I I I I I I I I I I I I I I SWALE B-1 - Water Quality Analysis Input Abbreviation Channel Bottom Width = 3 ft w Side Slopes = 3 (.!:!:V) ftlft SS Longitudinal Slope = 0,005 ft/ft So Channel Flow =1 0.01 leIs Q Manning's Roughness = 0,35 n Channel Length = 25 ft L Iterative Input, or Goal-Seak Normal Depth =1 0,06 1ft d 0,78 in Constants k= 1.49 ft Output Cross Sectional Flow Area = 0,21 Ie A Wetted Perimeter = 3,21 ft Pw Hydraulic Radius = 0,06 ft RH Velocity = 0,05 ftls v Channel Flow =1 0,01 leIs Q Residence Time = 9 min T Hydraulic properties are calculated using Manning's Equation for open channel flow, For swale sizing, sheet flow must occur, therefore, flow depth is limited, and mannings roughness values for sheet flow are used, I I I I I I I I I I I I I I I I I I I SWALE B-2 - Water Quality Analysis Input Abbreviation Channel Bottom Width = 3 ft w Side Slopes = 3 (!:!:V) ftlft SS Longitudinal Slope = 0,005 ftlft So Channel Flow =1 0,01 lets Q Manning's Roughness = 0,35 n Channel Length = 25 ft L Iterative Input, or Goal-Seak Normal Depth =1 0,06 1ft d 0,78 in Constants k= 1.49 ft Output Cross Sectional Flow Area = 0,21 ft2 A Wetted Perimeter = 3,21 ft Pw Hydraulic Radius = 0.06 ft RH Velocity = 0,05 ftls v Channel Flow =1 0,01 Icfs Q Residence Time = 9 min T Hydraulic properties are calculated using Manning's Equation for open channel flow, For swale sizing, sheet flow must occur, therefore, flow depth is limited, and mannings roughness values for sheet flow are used. I I I I I I I I I I I I I I I I I I I ~ <i a; VARIES SWALE BOTTOM WIOTH VARIES (ZERO LATERAL SLOPE) VARIES EROSION CONTROL BLANKET PLACED OVER SEED MIX. ~ c "- c ~ ,\Ir/,~, :~i'V'\W ....'-.- EXTEND ,CLAY LINING TO TOP OF BANK -~. ' <,<<(,<<('<<:<<<,,<,, ~,/ " . UNDISTURBED , EARTH 6" THICK CLAY LINER, OR NATIVE SOIL WITH MIN 35% CLAY CONTENT -0 VEGETATED CLAY-LINED SWALE SECTION NO SCALE I I I I FLEX- TRANSITION SOLID STEEL MANUFACTURED L E LID I I FINISHED GRADE FITTING _.. _' _ _ PAT __ .__. _____ -{'////////// //////~ / Ar I . - '- - . - - HINGED ACCESS ~ 4 tCOVER 45' PVC BEND OUTLET PIPE '" ----r--~~~ PE X PE EXTENSION ::-- - ~ - 'Iii NOTE No.4 v ~, LENGHT AS REQ'D III '" ~ OIL AND GREASE FIL TRA TIQN SYSTEM WITH FILTER INSERT STRUCTURE GRATE ~EFER TO NOTE3 RIM SET TO / r INI::iH1cU GKAUt crT' ""~~l GREASE TRAP \~ I I " ", I III IIi I I I PVC PIPE DUCTILE IRON, SCHEDULE 40, OR C900 PVC PIPE AND FITTINGS I I I I -0 'FILTRATION SYSTEM & DOUBLE CHAMBER CATCH BASIN NO SCALE I I I I I I I I I I I I I I I I I I I I I I I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX E: WELLHEAD PROTECTION AREAS- CONTAMINANT SOURCE INVENTORY I I I I I ~ I I I I I I I I I I I Not to Scale I I I Drinking Water Protection Overlay Oregon Urology 2100-071-06 Or gon Urology Development 5 year TOTZ 10 year TOTZ Zone of Concentration 20 year TOTZ Wellhead Protection Area Map Detail G Street Time of Travel Zones Source: City of Springfield I I I I I I I I. I I I ~ I I I I I I, I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX F: TAX MAp I I', I , I I I , 6'7 I~ 7700 14800 I 1\1'" "' 1\l"i/'"'T ...........;;...... . ..... .,h .....- LANE COUNTY l' D~~' ~ 2. 1"=100 See Map 17 03 2:5 33 /~ /"".11' S4...r,.-W ~,II ....$- 2 300' , 100"'1. -eoo- 1 ',I , 'I 31 ~ 41 , I -400- 1 ~,8;">J"";' 2,~, ',~ 7,~ 5, ~ 6,' i).. \'1 'I 'I ~I : ~ ~(')y( ~ O~ ~ ~ ~ ~ ~ . ~4~;~~ '--'01' k ~_'_ I - . ~. /.; ~/;--- I ,~p; 1"'"<j8- -, 0r;i~ . ":"~};:I I ~~01 I I \5) ,4603 I , </' - ~ - -.&. >Os' 9' '9, " p; ; I ,\ - _.:!.L .!'"~"--L "'~.J'....lfI .~, ,l-J .s"'~'J"'.",,":i--..L ~_I~ 118..17'1',\1 (VACATEDI U...' -- - STREET; . II .. 12 .. 13 .,...'....14 2200 2100 2000 1900 .....s"IS .. 16 - 17 .. 18 .. 19 "20 -'171"': 1800 1700 1600 1500 1400 1300 1200, ~::i ,!... = ~?.j ,~\ ' , Qit .., , ,.. 'l- G4S ~ 1 600 3300 34Cll\,\ j!5OO 3600 3700 '800:; ~ I ,~O . " p' ',I ~ ~ &} ~I . ~..." ~ '''~ 36 37 38. 39 ......r40 ....". 4i" ~.. .~...' .rl" 6! ......r t I 1 I 14'- 71 I I 26 25 I + 35 36 '. MODOC I . ,- ",r 8 ~ - 9 . '0 l!.500 400 2300 I, 1-:- 2600 j700 2800 2900 3 3000 3100 3200 , I . I I~ . ... ..s2~1 . ~~ . ,'~L.. 32 ~ I I I I I I I I I I I 7300 I .\,0''' +----------------:-. - I ~~~ l I I I I I I I I N>"'" 33 34 35 __u....~:" '[ ~ ....s.... 9"10 7200 Taa lolled on Mop 7 " " . , 17 03 35 I I ;' 1 . A >~~7-~..!- - _ -- "'""""'~~~tr~#./#',~~..J_LLLJ_J.L_<L_Ll..U.--.L~~ N~"""~ ------------N:E."c~."Yl BRATTAIN .. . _ O.L.e. No.63 I '.: ',:: " ~(. I \) I I I I I I d_ _ "Olt..!:',. . - / f > . ! .~ /;,,"". .f iff g ('''' ".~',?i ,..r:,; ..1..' ~ - V"~"'I"D' ~~~ - : --= ": .....,..: G . _ , ~. ~~^520'i=' ~~;: ~,. 's". 5100 I~ ~ 500' ': ~OO ; 15300.....<< ~ If) ~~ :t 5400 J ,~' ----., ,< l>-\0 " \ <:\l>- '9{ 490& I ! 1 I 16000' L. -'-~ O.56llCo1 I ;. . .~5700 5600 I I ; O~:"'" I I l\-~ 1, II I d1\'-~"''' .. J,\)'9 Y". - u'! - . - - L -+.... - \1CO.lO~E.si.r I ~HI::':';:, F ~."t l.._J/Ollu/: I' ~~...~ ....Il......~, 5500 I I I' I' I I ',\ e'9?~J"" ,.,."., ._'~o. - I .- I Ig.#K' ~IOO e' :.00 . ;:'<f 'I . . , ______. r 6300 J ...... '''1_- I;;" _~ 6400 ....,- 1'6500 6700 ~". p." I 'l ~ I~ ~ I- I ~ ~"':!.. 1_$"_1 .......A.r. $."1..,,,,, --. ---------- :F ........<,...<,. _. .....-{o,-.. ..........- ......-....,,-_.... i .$1...$4.... ,r", STREET ,,,S:I. tle9UI1"e 2""_&Z. 6800 ,- ~"".. i ~~ , .0 I ~ ~cr-S":b'" 1'5"'.lQ' If.."t11I1JO"E r' .-.5_' M..~.1':N"w 'MU" ~.......' .J. STREEn SOl Mop 17 03 36 2 3 I I n ,~ i ,~'{j\ ., I\Jh I l' I I 8, _ 9, 101 STR S~'"S"'"r ..........SI" ::~.z-~ .1 .~: -c, ,v".S"':'I~ I7IOO~ Z.HAC .....1".~...'" I .1 ft~ ~I ftI:>:-.to> _ N.#t:c.o.... j ...!r' "-,,,-"'T lUC.Nc>.T~ /~,."~..w r.". I I I , I I _I I I I I, I I I I I I I I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX G: FLOOD PLAIN DATA - - ii 35 ~ STREET F ~1Ih<b1' STREET STREET STREET .~.-::...,,,. ','.'". .. '.. STREET ,,::,:.. "'''' _, t_ ..,~ 63 ZONE X - - - - 'i"I"."".......f"":,'h?"n~,y..,., '..."."..'.,..,.... - 25 / j ~ . ~ \IJ ,. .. t _I -, I ~ - - -- - - - ,- '. -,.. - ",,'" IVV-)".., "V~"". OTHER AREAS ZONE )( Neas detemlined to be outside S()()..year floodplain. A .~ lONE 0 ^rea$ in which flood hazards are undetermined. UNDEVELOPED COASTAL BARRIERS "'''''' "'" ~ ['," ,-.) ~ ....~"'t.. 8d~,..ot to SPeCiel Identified 1983 Coastal barner areas Flood Hazard Areas. ." ~:,' ',,1 Identified "90 normally located within or FloodplaIn Bo~""'ry floodwa't' .IOund81)' Zone" Boundary ~1::7:~:.~J .doundal)' DMding Special Flood Hazard Zones. and Boundary Divlding Areas of DiHerent Coastal ges8 Flood ElevatiOns Within Special Flood Hllzard Zones. Base Flood Elevation Una: Elevation in FeeL Se8 Map Inde".. lor Elevation Datum. Cross Section Line Base Flood Elevation in Where Uniform Within See Map Indell: for Elevetion Elevation Reference Mark. 513 @ @ Feet Zone. Datl.lm. . IEL 987} RM7X . M2 River Mile Horizontal Coordlnatas Based on North Af11erican Datum 01 1927 (NAO 271 PrQjection. 91007'30".32022'30" NOTES This map 15 lor use in administering the National Flood InsunllnC8 Program; it ooes not necessarily identify allar8&s subject to flooding, particularly from 'Iocil drainage 10urcBS of small size, or all planimetric features outside Spteial Flood Hazard Areas. The community map repository should be eo.sul1ed for more detailed data on BFE'a, and for any information on 1I0odway delineations. prior to use of this map for property purchase or cOlstruction purposes. Ar.s of Special Flood Hazard \lQO-year lloodl Include Zones A, AS, A1- AJO. AH, AO, MS, V, VE and Vl-V3Q, Celtain areas not In Special Flood Hazard Areas may be protected by flood conuol structures. Boundaries of tha floodways were computed at cross sections and int.rpolated between cross sections. The ffoodw"ays went based on hydraulic considerations with regerd to' requirements of the Federel Emergency Management Agency. Floodway wld1hs in some areas may be too narrow to show to scate. Aeler to Floodway Dew Table where f1oodW8Y width is shown 8t Y.20 inch. Coestal base flOOd elevations apply onlv landward of 0.0 NGVD. ..--f Include the eff&C1S 01 wllva action: these elevBtions may also diff, ',cantly I ~~~~::~~-~"~:'r~'~~~~~~~~~~~~. r:.v ~ ~~_":-;""~~::'~S:T_~'_~_ ~~ 1':~~!t~B~)~~0~~7~lvi1K~'/~;;-'?~~'T"-:-'7Ji?_~1;'i~ij-i?~ ~I ~ ,NATIONAL FLOOD INSURANCE PROGRAM" .)' .' ..... "- !IIII~ ~ I I ~ I I! I! I J "I " ,! I PANEL 1142 OF 2975 ;' I I: I I I I I I I I I I I -".< !l :] .~ , 1 II I;,: 1!_~-,!j!IA,.~j,lilj~lIi!!i:-.._ b 9L) FIRM I flOOD INSURANCE RATE MAP LANE COUNTY, OREGON AND INCORPORATED AREAS (SEE MAP INDEX FOA PANELS NOT PAINTED) I CONTAINS: COMMUNITY I EUGENE, CrTY OF . SPRINGFIELD. CITY OF lANE COUNTY, lJNINCORPORA TED AREAS "'I ~ : NUMBER PANEL SUFFIX 4J0122 1142 415592 1142 ._ 1142 F II) [] F_ __ "'........._j MAP NUMBER 41039C1142 F EFFECTIVE DATE: JUNE 2, 1999 1 "[0"",' -. I J J 1 . ; I '; , " " ~ 1 i I I ! , i il i ! I ! I I I I '" I I I I I I I I I I I I I I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX H: SOIL PROPERTIES DATA - - - - - - - - - - - - - - - - - - - SOIL SURVEY OF LANE COUNTY AREA, OREGON Oregon Urology --4-. o 30 60 Meters 120 Feet o 50 100 200 300 400 !JSQ~ .'llIuml Hl"uLlrn'''' ~I' uliull."erliu' W.:b Soil SlIlT.:\' I.] :\alional Cl)U] ',,: Soil Sun-..:y 12/2W:!fl06 P.' If) I I I I I I I I I I I I I I I I I J I I Soi I Survey of Lane Counly Area, Oregon Map Unit Legend Summary Lane County Area, Oregon Map Unit Symbol Map Unit Name Acres in AOl "'-'-' ''32': .' '., ,. '09 , " USDA NlIh...1 H........rrn "'c.--= r"l\lirrndl..n Sdl!rr Wen Soil Surn:\" 1.1 N.1lional Coupcr;lli,c Soil Surn:y Percent of AOJ Oregon Urology 12i29/2006 Page:- ()f~ II I 50 I I lower part to a depth of 60 inches or more is multicolored sand, Permeability 01 this Cloquato soil is moderate, Available water capacity is 9 to 14 inches. Water supplying capacity is 19 to 26 inches, Effective rooting depth is 40 to 60 inches or more. It is limited by the sandy substratum, Runoff is slow. and the hazard of water erosion is moderate. This soil is subject to occasional. very brief periods of flooding from November to March. The disturbed Cloquato soil has been covered by as much as 40 inches of fill material or has had as much as 30 inches of the original prolile removed by cutting or grading, The fill material is commonly from adjacent areas of Cloquato, Chehalis. Chapman, Newberg, or McBee soils that have been cut or graded, The characteristics 01 the disturbed areas are highly variable. Urban land consists of areas where the soils are largely covered by concrete, asphalt, buildings, or other impeNious surfaces that obscure or alter the soils so that identification is not feasible, This unit is used mainly for urban development. It is also used for yards and as open areas around and between buildings, If this unit is used for urban development, the main limitation is the hazard of flooding, Roads and streets should be located above the expected flood level. In summer, irrigation is required for lawn grasses, shrubs, vines. shade trees, and ornamental trees. Plants that tolerate flooding and droughtiness should be selected il irrigation is not provided, This map unit is not assigned a capability classification, I I I I I I I I I I I 31-Coburg silty clay loam. This deep, moderately well drained soil is on low stream terraces. It formed in silty and clayey mixed alluvium. Slope is 0 to 3 percent. Areas are irregular in shape and are 5 to 100 acres in size. The vegetation in areas not cultivated is mainly Oregon ash, Douglas-lir, Oregon white oak, and poison- oak, Elevation is 300 to 800 feet. The average annual precipitation is 40 to 60 inches, the average annual air temperature is 52 to 54 degrees F, and the average frost-free period is 165 to 210 days. Typically, the surface layer is very dark grayish brown silty clay loam about 18 inches thick. The subsoil is dark brown, mottled silty clay loam and silty clay about 35 inches thick, The substratum to a depth of 65 inches is dark brown, mottled fine sandy loam.. Included in this unit are small areas of Conser, Malabon, Oxley, and Salem soils. Included areas make up about 15 percent of the total acreage, Permeability of this Coburg soil is moderately slow. Available water capacity is about 10 to 12 inches, Water supplying capacity is 20 to 26 inches, Effective rooting depth is more than 60 inches, Runoff is slow. and the I I I I Soil SUN' ~ \: g ~ ~ hazard of water erosion is slight. A high water table is a a depth of 1.5 to 2,5 feet from November to May, This unit is used for small grain, grass seed. pasture. orchards, irrigated vegetable crops, recreation, and urban development. This unit is suited to many kinds of crops. In summer irrigation is required for maximum production of most crops. Sprinkler irrigation can be used, but water needs to be applied slowly to minimize runoff, Grain and grasses respond to nitrogen; legumes respond to phosphorus, boron, sulfur. and lime; and vegetables and berries respond to nitrogen, phosphoru and potassium. Crop residue left on or near the surfac, helps to conseNe moisture, maintain tilth, and control erosion. Orchards and vegetable crops should have cover crops to help protect the soil. Restricting use of machinery when this unit is wet minimizes compaction, This unit is suited to pasture, Proper stocking rates, pasture rotation. and restricted grazing during wet periods help to keep the pasture in good condition anc to protect the soil from erosion and compaction. If this unit is used for recreational development, the main limitations are the high content of clay and moderately slow permeability. If this unit is used for urban development, the main limitations are the seasonal high water table, moderat, slow permeability, and low soil strength. If buildings an constructed on this unit, properly designing foundation and footings and diverting runoff away from buildings help to prevent structural damage as a result of shrink and swelling, Roads and streets can be built if they ar, designed to compensate for the instability of the subs! and if a maximum amount of base rock is used. landscaping plants that tolerate a seasonal high wate table and droughtiness should be selected if drainage and irrigation are not provided, This unit is in capability subclass IIw. This map unit is on ow stream terraces. ope IS 0 to 3 percent. Areas are irregular in shape and are 5 to 100 acres in size, . native vegetation is mainly Douglas-fir, Oregon white oak, and poison-oak. Elevation is 300 to 800 feet. Th, average annual precipitation is 40 to 60 inches, the average annual air temperature is 52 to 54 degrees F and the average frost-free period is 165 to 210 days, This unit ;s 45 percent relatively undisturbed Coburf silty clay loam, 10 percent disturbed Coburg silty clay loam, and 30 percent Urban land, The components 01 this unit are so intricately intermingled that it was not practical to map them separately at the scale used. Included in this unit are small areas of Conser, Malabon, Oxley, and Salem soils. Included areas ma~ up about 15 percent of the total acreage. The relatively undisturbed Coburg soil is deep and moderately well drained, It formed in silty and clayey mixed alluvium. Typically, the surface layer is very da, I I I C;:brown silty clay loam about 18 inches thick, The , ' Is dark brown, mottled silty clay loam and silty ut 35 inches thick. The substratum to a depth of es or more is dark brown, mottled fine sandy I a e IS at , !o 2,5 feet rom vember to May. , The disturbed Cobur~ soil has been covered by as "' uch as 40 inches of fill matenal or has had as much as c~ Inches of the original profile removed by cutting or 'giading, The fill material is commonly from adjacent areas of Coburg, Malabon, Salem, Conser, and Oxley soils that have been cut or graded. The characteristics of the disturbed areas are highly variable. Urban land consists of areas where the soils are largely covered by concrete, asphalt, buildings, or other impervious surfaces that obscure or alter the soils so that identification is not feasible, This unit is used mainly for urban development. It is also used lor yards, parks, and open areas around and between buildings. If this unit is used for urban development, the main limitations are the seasonal high water table, moderately slow permeability, and low soil strength. If buildings are constructed on the unit, properly designing foundations and footings and diverting runoff away from buildings help to prevent structural damage as a result of shrinking and swelling. Roads and streets can be built if they are designed to compensate for the instability of the subsoil and if a maximum of base rock is used, Landscaping plants that tolerate a seasonal high water table and droughtiness should be selected if drainage and irrigation are not provided. This map unit is not assigned a capability classification. I I I I I I I I I I I 33-Conser silty clay loam. This deep, poorly drained soil is in depressional areas along drainageways. It formed in silty and clayey mixed alluvium. Slopes are 0 to 2 percent. Areas are irregular in shape and are 5 to 100 acres in size, The vegelation in areas not cultivated is mainly Oregon ash, Oregon white oak, hawthorn, rose, sedges, rushes, and grasses. Elevation is 300 to 500 feet. The average annual precipitation is 40 to 60 inches, the average annual air temperature is 52 to 54 degrees F, and the average frost-free period is 165 to 210 days, Typically, the surface layer is very dark brown silty clay loam about 9 inches thick. The upper 5 inches of the subsoil is very dark grayish brown silty clay, and the lower 27 inches is very dark gray and brown, mottled clay and silty clay. The substratum to a depth of 60 inches or more is dark grayish brown, mottled loam and I I I I ~l sandy loam. In some areas coarse sand and gravel are below a depth of 40 inches. Included in this unit are small areas of Awbrig, Bashaw, and Coburg soils. Included areas make up about 15 percent of the total acreage. Permeability of this Conser soil is slow, Available water capacity is about 9 to 12 inches. Water supplying capacity is 15 to 20 inches. Effective rooting depth is limited by a high water table that is at a depth of 0 to 1,5 feet from November to May. Runoff is slow, and the hazard of water erosion is slight. The soil is subject to rare periods of flooding. This unit is used mainly for hay, pasture, and grass seed. Where drainage is provided, it is also used for corn and other cultivated crops. This unit is suited to water-tolerant or shallow-rooted crops, Deep-rooted crops are suited to areas where an adequate drainage system has been installed. In summer. irrigation is required for maximum production of most crops, Sprinkler irrigation can be used, but water needs to be applied slowly to minimize runoff, Returning all crop residue to the soil and using a cropping system that includes grasses, legumes, or grass-legume mixtures help to maintain fertility and tilth, Crops respond to nitrogen and phosphorus, Grazing when this unit is wet results in compaction of the surface layer, poor tilth, and excessive runoff, A tillage pan forms easily if the soil is tilled when wet. Chiseling or subsoiling can be used to break up the tillage pan. If this unit is used for recreational development, the main limitations are wetness, slow permeability, and the content of clay in the surface layer and subsoil. If this unit is used for homesite development, the main limitations are slow permeability, wetness, the content of clay in the surface layer and subsoil, high shrink-swell potential. and low soil strength when wet. Perimeter drains and properly designed footings and loundations help to reduce wetness and prevent structural damage from shrinking and swelling. Roads for year-round use need heavy base rock. Landscaping plants that tolerate a seasonal high water table and droughtiness should be selected if drainage and irrigation are not provided, This map unit is in capability subclass IIlw. 34-Courtney gravelly silty clay loam. This deep, poorly drained soil is in drainageways and other depressional areas of valley terraces. It formed in gravelly and clayey mixed alluvium, Slopes are 0 to 3 percent. Areas are elongated or irregular in shape and are 3 to 100 acres in size. The vegetation in areas not cultivated is mainly grasses, sedges, rose, hawthorn, and Oregon ash, Elevation is 300 to 800 feet. The average annual precipitation is 40 to 60 inches, the average annual air temperature is 52 to 54 degrees F, and the average frost-free period is 165 to 210 days. - - - - - - - - - - - - - - - - - - - Physical Soil Properties Lane County Area, Oregon Erosion factors Wind Wind Map symbol Moist bulk Saturated Available Linear Organic erodi- erodi- and soil name Depth Sand Silt Clay density hydraulic water extensi- matter bility bility conductivity capacity bility Kw T group index Kt In Pet Pet Pet gfee micro m/sec InIIn Pel Pel 32: Co burg 0-18 27-35 1.20-1.40 4,00-14.00 0,18-0,20 3.0-5,9 2,0-6,0 ,28 .28 5 7 38 18-53 35-45 1,20-1.40 1.40-4.00 0,18-0,20 3,0-5.9 0.5-2.0 .37 ,37 53-65 15-30 1,20-1,40 14,00-42.00 0,13-0,15 0.0-2.9 0,0-0.5 ,24 .24 Urban land USDA ~ Natural Resources Conservation Service This report shows only the major soils in each map unit Others may exist Tabular Dala Version: 5 Tabular Data Version Date: 12/22/2006 Page 1 of 3 - - - - - - - - - - - - - - - - - - - Physical Soil Properties This table shows estimates of some physical characteristics and features that affect soil behavior. These estimates are given for the layers of each soil in the survey area. The estimates are based on field observations and on test data for these and similar soils. "Depth" to the upper and lower boundaries of each layer is indicated. Particle size is the effective diameter of a soil particle as measured by sedimentation, sieving, or rnicrometric methods. Particle sizes are expressed as classes with specific effective diameter class limits. The broad classes are sand, silt, and clay, ranging from the larger to the smaller. "Sand" as a soil separate consists of mineral soil particles that are 0.05 millimeter to 2 millimeters in diameter. In this table, the,estimated sand content of each soil layer is given as a percentage, by weight. of the soil material, that is less than 2 millimeters in diameter. "Silt" as a soil separate consists of mineral soil particles that are 0.002 to 0.05 millimeter in diameter. In this table, the estimated silt content of each soil layer is given as a percentage, by weight, of the soil material that is less than 2 millimeters in diameter. "Clay" as a soil separate consists of mineral soil particles that are less than 0.002 millimeter in diameter. In this table, the estimated clay content of each soil layer is given as a percentage, by weight, of the soil material that is less than 2 millimeters in diameter. The content of sand, silt, and clay affects the physical behavior of a soil. Particle size is important for engineering and agronomic interpretations, for determination of soil hydrologic qualities, and for soil classification. The amount and kind of clay affect the fertility and physical condition of the soil and the ability of the. soil to adsorb cations and to retain moisture. They influence shrink-swell potential, saturated hydraulic conductivity (Ksat), plasticity, the ease of soil dispersion, and other soil properties. The amount and kind of clay in a soil also affect tillage and earthmoving operations. "Moist bulk density" is the weight of soil (ovendry) per unit volume. Volume is measured when the soil is at field moisture capacity, that is, the moisture content at 113- or l/1D-bar (33kPa or 10kPa) moisture tension. Weight is determined after the soil is dried at 105 degrees C. In the table, the estimated moist bulk density of each soil horizon is expressed in grams per cubic centimeter of soil material that is less than 2 millimeters in diameter. B':JJk density data are used to compute linear extensibility, shrink-swell potential, available water capacity, total pore space, and other soil properties. The moist bulk density of a soil indicates the pore space available for water and roots. Depending on soil texture, a bulk density of more than 1.4 can restrict water storage and root penetration. Moist bulk density is influenced by texture, kind of clay, content of organic matter, and soil structure. "Saturated hydraulic conductivity (Ksat)" refers to the eaSEl with which pores in a saturated soil transmit water. The estimates in the table are expressed in terms of micrometers per second. They are based on soil characteristics observed in the field, particularly structure, porosity, and texture. Saturated hydraulic conductivity (Ksat) is considered in the design of soil drainage systems and septic tank absorption fields. "Available water capacity" refers to the quantity of water that the soil is capable of storing for use by plants. The capacity for water storage is given in inches of water per inch of soil for each soil layer. The capacity varies, depending on soil properties that affect retention of water. The most important properties are the content of organic matter, soil texture, bulk density, and soil structure. Available water capacity is an important factor in the choice of plants or crops to be grown and in the design and management of irrigation systems. Available water capacity is not an estimate of the quantity of water actually available to plants at any given time. "Linear extensibility" refers to the change in length of an unconfined clod as moisture content is decreased from a moist to a dry state. It is an expression of the volume change between the water content of the clod at 1/3- or 1/10-bar tension (33kPa or 10kPa tension) and oven dryness. The volume change is reported in the table as percent change for the whole soil. The amount and type of clay minerals,in the soil influence volume change. Linear extensibility is used to determine the shrink-swell potential of soils. The shrink-swell potential is low if the soil has a linear extensibility of less than 3 percent; moderate if 3 to 6 percent; high if 6 to 9 percent; and very high if more than 9 percent. If the linear extensibility is more than 3, shrinking and swelling can cause damage to buildings, roads, and other structures and to plant roots. Special design commonly is needed. "Organic matter" is the plant and animal residue in the soil at various stages of decomposition. In this table, the estimated content of organic matter is expressed as a percentage, by weight, of the soil material that is less than 2 millimeters in diameter. The content of organic matter in a soil can be maintained by returning crop residue to the soil. Organic matter has a positive effect on available water capacity, water infiltration, soil organism activity, and tilth. It is a source of nitrogen and other nutrients for crops and soil organisms. USDA ~ Natural Resources Conservation Service This report shOWS only the major soils in each map unit Othels mayexkst Tabular Data Version: 5 Tabular Data Version Date: 12/22/2006 Page 2 of 3 - - - - - - - - - - - - - - - - - - - Physical Soil Properties "Erosion factors" are shown in the table as the K factor (Kw and Kf) and the T factor. Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Lass Equation (USLE) and the Revised Universal Soil Loss Equation (RUBLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt, sand, and organic matter and on soil structure and Ksa\. Values of K range from 0.02 to 0.69. Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. "Erosion factor Kw" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. "Erosion factor Kf' indicates the erodibility of the fine-earth fraction, or the material less than 2 millimeters in size. "Erosion factor T' is an estimate of the maximum average annual rate of soil erosion by wind and/or water that can occur without affecting crop productivity over a sustained period. The rate is in tons per acre per year. 'Wind erodibility groups" are made up of soils that have similar properties affecting their susceptibility to wind erosion in cultivated areas. The soils assigned to group 1 are the most susceptible to wind erosion, and those assigned to group 8 are the least susceptible. The groups are described in the "National Soil Survey Handbook." 'Wind erodibility index" is a numerical value indicating the susceptibility of soil to wind erosion, or the tons per acre per year that can be expected to be lost to wind erosion. There is a close correlation between wind erosion and the texture of the surface layer, the size and durability ofsurface clods, rock fragments, organic marter, and a calcareous reaction. Soil moisture and frozen soil layers also influence wind erosion. Reference: United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. (http://www.soils.usda.~ov) USDA Natural Resources 7'- COlIserVlltion Service This report shows only the major 50115 in each map unit Others may exist Tabular Data Version: 5 Tabular Data Version Date: 12122/2006 Page30f 3 - - - - - - - - - - - - - - - - - - - Engineering Properties Lane County Area, Oregon Classification Fragments Percent passing sieve number.. Map symbol Depth USDA texture I Liquid Plasticity and soil name >10 3-10 limit index Unified AA8HTO Inches Inches 4 10 40 200 In Pet Pet Pet 32: Coburg 0-18 Silty clay loam CL A-6 0 0 95-100 90-100 85-100 80-95 30-40 10-15 18-53 Silty clay, Silty clay loam CL A-7 0 0 95-100 90-100 85-100 80-95 40-50 15-25 53-65 Clay loam, Fine sandy lo'am, ML. A-4 0 0 90-100 85-100 70-90 40-65 25-35 NP~10 Loam 8M Urban land USDA Natural Resonrces ~ Conservation Service This report shows on~ the major soils in each map umt Others may eXist Tabular Data Version: 5 Tabular Data Version Dale: 12/22/2006 Page 1 of 2 - - - - - - - - - - - - - - - - - - - Engineering Properties This table gives the engineering classifications and the range of engineering properties for the layers of each soil in the turvey area. "Depth" to the upper and lower boundaries of each layer is indicated. "Texture" is given in the standard terms used by the U.S. Department of Agriculture. These terms are defined according to percentages afsand, silt, and clay in the fraction ofthe soil that is less than 2 millimeters in diameter. "Loam," for example, is soil that is 7 to 27 percent clay, 28 to 50 percent silt, and less than 52 percent sand. If the content of particles coarser than sand is 15 percent or more, an appropriate modifier is added, for example, "gravelly," . "Classification" of the soils is determined according to the Unified soil classification system (ASTM, 2005) and the system adopted by the American Association of State Highway and Transportation Officials (AASHTO, 2004). The Unified system classifies soils according to properties that affect their use as construction material. Soils are classified according to particle-size distribution of the fraction less than 3 inches in diameter and according to plasticity index, liquid limit, and organic matter content. Sandy and gravelly soils are identified as GW, GP, GM, Ge, SW, SP, SM, and SC; silty and clayey soils as ML, CL, OL, MH, CH, and OH; and highly organic soils as PT. Soils exhibiting engineering properties of two groups can have a dual classification, for example, CL-ML. The AASHTO system classifies soils according to those properties that affect roadway construction and maintenance. In this system, the fraction ofa mineral soil that is less than 3 inches in diameter is classified in one of seven groups from A-1 through A-7 on the basis of particle-size distribution, liquid limit, and plasticity index. Soils in group A-1 are coarse grained and low in content of fines (silt and clay). At the other extreme, soils in group A-7 are fine grained. Highly organic soils are classified in group A-B on the basis of visual inspection. If laboratory data are available, the A-1, A-2, and A-7 groups are further classified as A-1..a, A-1-b, A-2-4, A-2-5, A-2-6, A-2-7, A-7-5, or A-7-6. As an additional refinement, the suitability of a soil as subgradem~terial can be indicated by a group index number. Group index numbers range from 0 for the bestsubgrade material to 20 or higher for the poorest. "Rock fragments" larger than 10 inches in diameter and 3 to 10 inches in diameter are indicated as a percentage of the total soil on a dry-weight basis. The percentages are estimates determined mainly by converting volume percentage in the field to weight percentage. "Percentage (of soil particles) passing designated sievesll is the percentage of the soH fraction less than 3 inches in diameter based on an ovendry weight. The sieves, numbers 4, 10, 40, and 200 (USA Standard Series), have openings of 4.76,2.00,0.420, and 0.074 millimeters, respectively. Estimates are based on laboratory tests of 50ils sampled in the survey area and in nearby areas and on estimates made in the field. "Liquid limit" and "plasticity index" (Atterberg limits) indicate the plasticity characteristics of a soil. The estimates are based on test data from the survey area or from nearby areas and on field examination. References: American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard 02487-00. USDA Natural Resources ~ Conservation Service This report shows only the major soils in eacn map unit Others may e~lst Tabular Data Version: 5 Tabular Data Version Date: 12/22/2006 Page 2 of 2 - - 32: Coburg Urban land USDA ~- - Map symbol and soil name - - Hydrologic group c D Natural Resources C:ollservation Service - Suriace runoff - Month January February March April May November December Jan-Dec - - - - Water Features Lane County Area, Oregon Water table Upper limit Lower limit Ft Ft 1,5-2,5 1,5-2.5 1,5-2.5 1.5-2.5 1,5-2,5 1.5-2.5 1.5-2.5 >6.0 >6.0 >6.0 >6.0 >6.0 >6.0 >6.0 Tabular Data Version: 5 Tabular Data VersionDate: 12/22/2006 - Surface depth Ft - - Pending Duration - - - - - Flooding Frequency Duration Frequency None None None None None None None None None None None None None None None None ThiS report shows only the mOljor sOils in each map unit OIhers may eXist Page 1 of 3 - - - - - - - - - - - - - - - - - - - Water Features This table gives estimates of various soil water features. The estimates are used in land use planning that involves engineering considerations. "Hydrologic soil groups" are.based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The four hydrologic soil groups are: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to eXgessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture, These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink.swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (AID, B/O, or C/O), the first letter is for drained areas and the second is for undrained areas. "Surface runoff' refers to the loss of water from an area by flow over the land surface. Surface runoff classes are based on slope, climate, and vegetative cover. The concept indicates relative runoff for very specific conditions. It is assumed that the surface of the soil is bare and that the retention of surface water resulting from irregularities in the ground surface is minimal. The classes are negligible, very tow, low, medium, high, and very high. The "months" in the table indicate the portion of the year in which a water table, ponding, and/or flooding is most likely to be a concern. "Water table" refers to a saturated zone in the soil. The water features table indicates, by month, depth to the top ("upper limit") and base. ("lower limit") of the saturated zone in most years. Estimates of. the upper and lower limits are based mainly on observations of the water table at selected sites and on evidence of a saturated zone, namely grayish colors or mottles (redoximorphic features) in the soil. A saturated zone that lasts for less than a month is not considered a water table. "Ponding" is standing water in a closed depression. Unless a drainage system is installed, the water is removed only by percolation, transpiration, or evaporation. The table indicates "surface water depth" and the "duration" and "frequency" of ponding. Duration is expressed as ''very brief' if less than 2 days; "brief' if 2 to 7 days, "long" if 7 to 30 days, and "very long" if more than 30 days. Frequency is expressed as none, rare, occasional, and frequent. "None" means that ponding is not probable; "rare" that it is unlikely but possible under unusual weather conditions (the chance of ponding is nearly 0 percent to 5 percent in any year); "occasional" that it occurs, on the average, once or less in 2 years (the chance of ponding is 5 to 50 percent in any year); and "frequent" that it occurs, on the average, more than once in 2 years (the chance of ponding is more than 50 percent in any year). "Flooding" is the temporary inundation of an area caused by overflowing streams, by runoff from adjacent slopes, or by tides. Water standing for short periods after rainfall or snowmelt is not considered flooding, and water standing in swamps and marshes is considered ponding rather than flooding. "Duration" and "frequency" are estimated. Duration is expressed as "extremely brief' if 0.1 hour to 4 hours, "very brief' if4 hours to 2 days, "brief' if 2 to 7 days, "long" if 7 to 30 days, and "very long" if more than 30 days. Frequency is expressed as none, very rare, rare, occasional, frequent, and very frequent. "None" means that flooding is not probable; ''very rare" that iUs very unlikely but possible under extremely unusual weather conditions (the chance of flooding is less than 1 percent in any year); "rare" that it is unlikely but possible under unusual weather conditions (the chance of flooding is 1 to 5 percent in any year); "occasional" that it occurs infrequently under normal weather conditions (the chance of flooding is 5 to 50 percent in any year); "frequenf' that it is likely to occur often under normal weather conditions (the chance of flooding is more than 50 percent in any year but is less than 50 percent in all months in any year); and "very frequent" that it is likely to occur very often under normal weather conditions (the chance of flooding is more than 50 percent in all months of any year). The information is based on evidence in the soil profile, namely thin strata of gravel, sand, silt, or clay deposited by floodwater; irregular decrease in organic matter content with increasing depth; and little or no horizon development. Also considered are local information about the extent and levels of flooding and the retation of each soil on the landscape to historic floods. Information on the extent of flooding based on soil data is less specific than that provided bv detailed. engineering sUlVeys that delineate flood-prone areas at specific flood freQuency levels. USDA Natural Resources C;onservation Service This report shoWS only the major soils In each map unit Clthers may exist. Tabular Data Version: 5 Tabular Data Version Date: 12/22/2006 Page 2 of 3 I I I I I I I I I I I I I I I I I I I - BALZHISER & HUBBARD ENGINEERS ApPENDIX I: NATIONAL WETLANDS INVENTORY MAp I I I I I I I I I I I I I I I A I N 0 R T I H I Not to Scale I National Wetlands Inventory Map Oregon Urology 2100-071-06 Oregon Urology Development - No identified Wetlands National Wetlands inventory Map Detail Source: City of Springfield I I I I I I I I I I I I I I I I I I I -a K & A Engineering, Inc. 3327 Roanoke Ave., Eugene, OR 97408 (541) 684-9399 Voice (541) 684-9358 FAX engineering January 15, 2007 Mr. Terry Fitzpatrick, Administrator Uroiogy Healthcare, P.C. 2400 Hartman Lane, Suite 200 Springfield, OR 97477 Project: 180:06 Subject Geotechnical site investigation 1457 G St., Tax map17033622, Tax lot 6800 Springfield, Oregon PURPOSE AND SCOPE . As requested, K & A Engineering, Inc. has completed a geotechnical site investigation of the subject project site. The purpose of this investigation was to characterize the nature and extend of subsurface soil cOnditions and make recommendations for foundation design criteria. Our understanding is that a new medical facility is proposed for cOnstruction at this site. The structures will include a large cOncrete vault with foundation loads ranging from 6 to 1 O-kips per lineal foot and other cOnventional structures with foundation loads ranging from 1 to 3-kips per foot. The scope of our services included making geotechnical borings, engineering analysis, and this written report. SITE INVESTIGATION AND FINDINGS General Site Characteristics The project site is located in the south-central area of town, south of the existing McKenzie-Willamette Medical . Center and approximately 1.8-miles soulh of the McKenzie River. The site is currently the location of a wood- framed single-story medical office building surrounded with a paved parking lot. The existing ground surface is essentially flat wifh no remarkable topographical relief. . It is importanl to note that there appears to be a large underground.fuel storage tank located along the south side of the existing building foundation. Control valves and piping appear to be routed to what may have been a generator located in the building. We also noted that sanitary sewer and electrical service are currently located underground running from the south property boundary to the south foundation of the existing building. The geology of the project site consists of quaternary delta deposits that include silts, sands, and gravels having a variable depth over weak sedimentary sandstones and siltstones of the Eugene formation' This is consistent with the findings in our geotechnicai borings (see below). Groundwater can Characteristically be moderately high (within 1 O-feet of the ground surface). I Ian P. Madin and Robert B. Murray, PreliminaJY Geologic Map of the Eugene East and Eugene West Quadrangles, Lane County, Qregon, Open-File Report OFR 0-03-11, Oregon Department at Geology and Mineral Industries. 2004. I I I I I I I I I I I I I I I I I I I K & A Engineering, Inc. Subsurface Soil Conditions Two borings were made at the site. Our proposal was for four shallow borings with the assumption that we would possibly encounter bedrock within 20-feet. Bedrock was not encountered and the decision was made to attempt to extend two borings to depths greater than 20-teet. See the attached Geotechnical Site Plan for locations' of these borings. Graphic logs of the borings are attached to this report. The soils and groundwater in each boring were remarkably consistent and included approximately 1-foot of asphalt pavement and crushed rock base over 8-feet of brown stiff moderately plastic silt over very dense poorly graded sandy gravels and poony graded gravelly sands. Groundwater was at approximately 12-feet below the existing ground surface. . Boring DH1 was successfully extended to a depth of 31.5-feet. Boring DH2 was extended to a depth of 20-feet before sands welling into the auger casing prevented further sampling and testing. The borings were sealed with. bentonite and capped with cOncrete.after completion of the borings. SUMMARY AND RECOMMENDATIONS General Suitability The site is suitable, or.can be made suitabl~, to support the proposed foundations. Heavy foundation loads sh6uid be supported on the underlying We recommend that the site is suitable for the proposed construction, It is our' understanding that the proposed construction includes a vault for medical laboratory testing cOnstructed of very thick cOncrete that will have extremely high dead loads. The very dense gravelly.sands and sandy gravels found at a depth of approximately 9-feet below the 'existing ground surface will provide an extremely high bearing capacity. For extremely high loads we would not recommend supporting foundations On or in the upper layer of broWn silt. Recommended Foundation Type . Depending on the grades and size of the structure, suitable foundation types could include spread footings supported by a controlled granular fill that extends from footing grade to the dense gravelly sands or sandy gravels. Alternatively the structure could be supported by a grade beam system supported by piles, piers, or rock columns that extend into the dense gravelly sands or sandy gravels. Geologic Hazards Slope Stability There are no significant slopes On, or near, the project site. There is no hazard associated with slope movement. Expansive Sdils The moderately plastic silts are moderately expansive. There is a moderate hazard associated with expansive soils. Our recommendations for foundations and concrete slabs-on-grade will mitigate this hazard. Project. 180.06 Client: Urology Healthcare, P.C. . '1457G. St., Springfield, OR Page 2 of 11' August 9, 2006 I I I I I I I I I I I I I I I I I I I . K & A Engineering, Inc. Earthquake Ground Motion - Liqueiaction .. There is a low hazard associated with Iiquefactio'n from earthquake ground motion. The low-hazard determination was made because of the highly over-consolidated (stitt) silts and the absence of. loose, poorly graded granular soil. Earthquake Ground Motion - Design Criteria There are no unusual hazards associated with earthquakes other than those hazards known for the greater area . of east Lane County. . We recommend a site class of "C" for determination of design earfhquake loading, as defined in Table 1615. U of the 2004 State of Oregon Structural Specialty Code. Site Development Clearing and Site Preparation Clearing at this site will consist mainly of removing existing, to-be-abandoned footings, concrete or asphalt pavements, and abandoned underground utilities. To our knowledge there are no significant areas of soil having roots and other organic matter. However we should inspect the site during clearing operations to identify any . other unsuitable materials and make recommendations for removal or mitigation. Based On past experience with sites similar to this we expect that there may be underground structures that are presently unknown, such as septic tanks, drain tields, and drywells. These may have to be removed. All existing to-be-abandoned structural foundations and utilities should be removed from the site, including loose or unconsolidated fills, nOn-native or disturbed soils, cOnstruction debris, and organics. We recommend that any existing granular fills, drain rock, or other construction materials be excavated and removed from the site. Re-use of eXisting nOn-native or disturbed soils as fill presents a significant practical problem from ihe standpoint of quality cOntrol should be avoided. Excavation should extend to footing grade or native undisturbed soil below footing grade if footing grade is in eXisting unsuitable soils or materials to-be-removed. K & A Engineering, Inc. should be contacted to inspect the site during clearing operations to verify suitablesubgrade soils and minimum depth of clearing. ' . . . Fills necessari to bring the cleared area to the desired grades should cOnsist of select granular fill conforming to ttie materials and placement specifications below. . . Cut Embankments I; Based On our understating of the proposed project there may be significantly high temporary cuts to accommodate construction of underground features. Our understanding is that there will not be any permanent' cut slopes. . Temporary cuts up to 4-feet may be verfical for brief periods during clearing and' utility construction. Long- term temporary Guts (for periods more than 2-weeks) shouid have a slope not exceeding 0.75 horizontal to 1 . vertical. - Short-term cuts should be protected fromsurlace erosiOn. Fill Embankments We anticipate that low fills (riot exceeding 4-feetin height) will be made for landscaping of the site after construction. Based on our understanding of the proposed construction and of the site there is not planned nor Project: 180.06 Client: Urology Healthcare, P.C. 1457 G. St, Springfield, Of) Page 3 of 11 August 9, 2006 I I I I I I I I I I I I I I I I I I I K& A"Engineering, Inc. is there a need for permanent load-be.aring exposed fill slopes. Permanent exposed fill slopes should not exceed 3 horiZOntal to 1 vertical. Permanent fiiis shouid be vegetated or armored for erosion protection Pavements Design Assumptions We anticipate that traffic on the pav~d parking and loading areas that service the proposed building will consist of moderate delivery truck and passenger vehicle traffic. The native stiff brown silts have a low to moderate subgrade modulus, estimated to be 5,000-psi based On soil classification and soil consistency as determined by standard penetration testing. We estimated traffic aS,shown On Table 1. . Table 1 . Pavement Design - Traffic Estimate Vehicle I Light passenger vehicle I H20-44 loaded I H20-44 empty I HS 20-44 loaded I HS 20-44 empty I Vehicle/day 400 5 5 . 2 . 2 Days/wk 5 2 2 1 1 Analysis . Wk/y'r Period, Yr. 52 20 52 20 I 52 20 I I 20 20 20 20 I Total Estimated 18-kEAl 18kEAl I 830 I 129,300 I 1401 19,870 I 10 I 150,1801 Roadway Subgrade Alter clearing, grubbing, and grading, the subgrade for the roadway should be compacted so that the top 12-. inches has a dry density equal to or exceeding 95% of maximum as determined by ASTM D698. Alternatively, if wet weather precludes compaction, the graded undisturbed subgrade should be covered with pavement . geotextile prior to construction of the pavement structure. Pavement Construction We recommend a pavement structure consisting of 12-inches of aggregate base covered with a minimum of. 2.5-inches oi dense'grade'd bituminous hot mix asphalt concretepavemenl. 2 Ifconstnuction is made during' wet weather causing overly salt saturated subgrade soil, pavement geotextile should be placed On the subgfade prior to placement of the aggregate base. Wet Weather Construction Limited construction during wet weather is allowable provided that subgradesoils in the foundation pad areas are not overly saturated or disturbed and weakened by heavy traffic loads. Care should be taken during clearing and foundation pad preparation in wet weather to avoid depressions that could collect surface rUnoff. 2 Calculations based on AASHTO Guide for Design of Pavement Structures, 1993. Project: 180.06 Client: Urology Healthcare, P.C. 1457G. 5t., Springfield, OR Page 4 of 11 August 9, 2006 I I I I I I I I I I I I I I I I I I I , K & A Engineering, Inc. Underground Utility Construction There are no unusual hazards associated with weak or collapsing soils or high groundwater conditions. Hazards associated with. trench cave'ins for brief periods are low. Trench bracing should be made in accordance with state and federal guidelines. Foundation Support Valilt Foundation - Spread Footings , Our understanding is that a vault structure is to be constructed of heavy concrete construction, which will require support of large dead and associated transient loads. Conventional cast'ln-place cOncrete spread footings are recommended for foundation support of cOncrete vault structure. These spread footings should be supported On select granular fill that extends to dense sandy graveis that are approximately 9-feet below the current ground surface elevation. We recommend an allowable bearing capacity of 4-~ips per square foot for these footings. This allowable bearing capacity can be increased by 33% for transient load combination. The foundation pad for the vault should be prepared by excavation and removal of silts to the native sandy gravels. We recommend that the foundation pad for the vault extend at least 3-feet from the outside of the perimeter footings. K & A Engineering, Inc,should inspect the foundation pad excavation and approve of the sandy gravel subgrade prior to placement of select granular fill. After removal of silt, fhe sandy gravels should be graded and compacted to a minimum dry density of 95% of maximum as determined by ASTM 0698. Select granular fill should be layer placed and compacted according to the placement specifications below to footing grade. Footing grade should be a minimumof 1-foot below final grade around the perimeter foundation. Vault Foundation - Orilled Piers A suitable alternate foundation system consists of drilled cast'in-place concrete piers. Piers would be constructed in pre-drilled holes that extend'a minimum of 1-foot into the sandy gravel soil at a depth below the existing ground surtace of approximately 9~feet. The recommended allowable end-bearing capacity for drilled piers is 15-kips'per square foot. ' It is imperative that all loose soil at the base of the holes be compacted or removed prior to placement of reinforcement and concrete. We should inspect and approve of all pre-drilled holes prior to placement of steel or concrete. Steel reinforcement should bedesighed in accordance with sectiOn 1810 of the 2004 State of Oregon Structural Specialty Code. Concrete should be placed using a tremmie or the hose from a concrete pump in such a manner so that the concrete is placed from the bottom of the hole, advancing upward with the bottom of the tremmie pipe or pump hose always slightly below the surface of the cOncrete. COncrete should never be dropped through the reinforcing cage. Uplift resistance of drilled cast-in-place piers will.be a combination of concrete dead load of the piers and skin resistance. We recommend a maximum skin resistance of 10 kips per square foot (this recommendation Project: 180.06 Client: Urology Healthcare, P.C. 1457 G. St:, Springfield, OR Page 5 of 11 August 9, 2006 I I I I I I I I I I I' I I I I I I I I K.& A Engineering, Inc. . includes a 33% increase for transient loads). For a 24-inch diameter pier, this calculates to 6.3-kips per lineal foot. We recommend that a cOnservative rilaximum of 7-feet of pier be used to develop uplift skin resistance. Vault Foundation ~ Stone Columns Foundation support can also be achieved by construction .of stone columns or continuous stone walls (supporting continuous strip footings) extending from the foundation, through the silt, to end-bearing On the . dense sandy gravel. Typically stone columns are constructed by ramming stone into pre-drilled holes so that the sto.ne Slightly expands the hole diameter, engaging the stone into the silts at the'sides of the column and achieving good bearing contact on the bearing stratum (sandy gravels). . The recommended allowable end-bearing capacity for stone columns or stonewalls on the dense sandy gravel is 10-kips per square foot. . We recommend the. use 01 durable 6'inch open-graded shot Quarry stone for stone columns or stone walls. The columns should have a maXimum length to diameter ratio (LID) equal to or less than 3.0. Stone wails supporting continuous strip loads should eXtend a minimum of 12-inches on either side of the iooting. Care should betaken to ensure that the stones are interiocked by the use of a ram. Sione columns and stone walls should be placed in lifts not exceeding 12-inchesand rammed prior to placing the next lift u~less otherwise approved by the engineer. Proprietary systems of stone columns may use different materials and construction sequences and should be approved by K & A Engineering, Irk. prior to construction. It is anticipated that building loads will be transferred to the stone,columns or walls by shallow spread footings. We recommend that these footings bear on the top of the stone a minimum of 12-inches below final grade. The allowable bearing capacity of shallow spread footings supported by the stone columns or stone walls is 4-kips per square foot. . Anchors embedded at. the base of the column or wall can provide uplift resistance in stone columns or walls. Steel"plates connected to steel cables are typical.anchor assemblies. The recommended allowable uplift resistance, if anchor systems are employed, is 1 :O-kips per square foot of skin resistance at the interface of the stone. and native silts.. ' Framed Office Foundation We recommend shallow strip and spread fOoting support for the lighter office structure (assumed to be.a one- story conventionally framed structure with root loads). These foofings should be supported on undisturbed native Silty subgrade at a minimum depth of 2-feet below the final ground surface, or should be supported On select granular fill that extends to undisturbed native silty subgrade at a minimum depth of 2-feet below the final ground surface. . The maximum allowable bearing pressure for strip and isolated f.ootings is l.3-kips per square foot. The maximum footing widtQfor strip footings is 2-feet and the 'maximum width for isolated footings is 4-feet. The differential settlement for the composite foundation system is calculated to be 0.24-inches or less. , K & A Engineerin'g', Inc. should be cOnsuited to provide additional recommendatiOnS for loads that exceed the' maximum capacity constrained by the above recommendations. . ."'. . Project: 180.06 Client: Urology Healthcare,PC 1457:G St., Springfield, OR Page 6 of 11 August 9,2006 I I I I I I I I I I I I I I I I I I I K & A Engineering, Inc. Foundation Area Drainage We recommend that perimeter footing drains be constructed. These drains should cOnsist of perforated drainpipe placed at or near footing grade with perforatins facing downward covered with 12-inches minimum of drain rock that is completely enveloped with separation geotextile. Footing drains should be routed to a sump that pumps collected water to the city storm drain system. Final grading around the perimeter foundation should slope away from the foundation at a minimum grade of 2% for at least 10-feet. Backfill around the perimeter foundation should be graded and firmly compacted to reasonably minimize infiltration of surface runoff into the subgrade supporfing the footings. Slabs-an-Grade Interior slabs-on-grade in those portions of the foundation that are supported by shallow foundations On native silt subgrade should be constructed on a minimum of 18-inches of select granular fill that extends to the prepared native silt subgrade. We recommend a minimum slab thickness of 4-inches that is reinforced with #3 grade 40 rebar spaced at 24-inches o.c. each way. The rebar shouid be placed in the middle of the slab. Concrete slabs-on-grade should have either tooled or sawcut cOnstruction joints spaced at 12-feet o.c. max. each way. Interior slabs-on-grade in the vault should be constructed On 4-inches minimum of select granular fill that extends to the prepared subgrade in the sandy gravels. These recommendations are made considering the moderate hazard of expansive soils and will reduce the likelihood of heaving due to expansive soils. Retaining Walls Restrained retaining walls should be designed for an equivaient fluid density of 66-psl/ft and an additional Uniform lateral pressure of 83-psl/ft (influence of traffic loading). Cantilevered walls should be designed for and equivalent fluid density of 39-psf/ft plus an additional Uniform lateral pressure of 83-psf/ft (influence of traffic loading). We recommend a coefficient of sliding of 0.45 for footings supported On prepared native silt subgrade soils and a coefficient of sliding of 0.65 for footings supporfed on prepared sandy gravel subgrade soils. Note that these coefficients are NOT modified by a safety factor. Drywells or other Surface [Jrainage Features Soils at this site are NOT suitable for disposal of surface runoff, either by use of a cOnventional drywell or infiltration of surface water by swales or other surface features. The silts have a low permeability making on- site stormwater disposal impractical. Additionally collecting water in surface features near the foundations could'soften subgrade soils, reduce bearing capacity, cause high differential settlement, and cause heaving due to expansive soils. Due to the COnfined nature of the site we do not recommend swales or other "natural" methods of local stormwater disposal within 20-feet of the foundation. Project: 180.06 Client: Urology Heaithcare, P.C. 1457 G. St., Springfield, OR Page 7 of 11 August 9, 2006 I I I I I I I I I I I I I I I I I I I K & A Engineering, Inc. SPECIFICATIONS Materials Select Granular Fill Select granular fili may cOnsist entirely of fine select granular fill or a minimum of 9-inches of coarse select granular fill covered with a minimum of 3-inches of fine select granular fill. Fine Select Granular Fill Fine select granular fill should consist of ciean, durable, well-graded material with a maximum particle size of 3- inches and a maximum of 10% passing the nO. 200 sieve. Select granular fill shall be placed in layers not to exceed 12-inches (loose) and mechanically compacted to a dry density exceeding 95% of maximum as determined by ASTM 0698 (Std. Proctor). . Coarse Select Granular Fill Coarse select granular fill should cOnsist of clean, open-graded quarry stone having a maximum particle size of 3-inches. Quarry stone should be durable and have 100% fractured faces. Coarse select granular fill should be placed in 12-inch layers and seated with a backhoe bucket or by tamping with excavation equipment. Alternatively coarse seiect granular fill may cOnsist of well-graded "bar-rUn" gravels from a local alluvial source. "Bar-rUn" coarse select granular fill shall pass the 4-inch sieve and shall have no more than 10%, by weight, passing the nO. 200 sieve. Aggregate Base Aggregate base should cOnsist of clean, durable, well-graded material with a maximum particle size 011 1/2- inches and a maximum of 10% passing the no. 200 sieve. Aggregate base shall be placed in layers not to exceed 12-inches (loose) and mechanically compacted to a dry density exceeding 95% of maximum as determined by ASTM D1557 (modified proctor). Drain Rock Drain rock should consist of 1 'h to 3-inch clean, open-graded, and durable round river stone or angular quarry stone. Native Structural Fill No soils at this site are recommended for native structural fill. Sub grade Subgrade refers to compacted, graded native soils Underneath stripped and grubbed organic layers that will receive cOnstructed fills or embankments. Separation Geotextile Separation geotextile should cOnsist of a nOn-woven, needle-punched, polypropylene fabric meeting the following specifications: Project: 180.06 Client: Urology Healthcare, P.C. 1457 G. 51., Springfield, OR Page 8 of 11 August 9, 2006 I I I I I I I I I I I I I I I I I I I K & A Engineering, Inc. Table 2 - Separation Geotextile Specifications Property Test Specification Method Grab Strength ASTM > 1.4 kN 04632 . Tear Strength ASTM > 0.5 kN 04533 Puncture Stre'ngth ASTM > 0.5 kN 04833 Burst Strength 1 ASTM > 3,500 kPa 03786 Permittivity ,I ASTM > .02 sec" 04491 Apparent Opening Size (AOS) ASTM < 0.6 mm 04571 Ultraviolet Stability ASTM > 50% ret. After 500 hours 04355 exposure A manufacturer's printed certification is acceptable as proof of compliance in lieu of laboratory testing. Fabrics that meet this specification include ~moco Fabrics and Fibers Co. ProPex 4545. Separation geotextile should be placed free of wrinkles or other discontinuities. Torn, punctured, or damaged fabric should be replace. Separation geotextile should have a minimum lap at seams of 12-inches. Pavement Geotextile Pavement geotextile should cOnsist of a woven polypropylene fabric meeting the following specifications: Table 4 - Pavement Geotextile Specifications I Property Test Specification 1 Method I Grab Strength ASTM. > 1.4 kN I 04632 I Tear Strength ASTM > 0.5 kN I 04533 I Puncture Strength ASTM > 0.5 kN I 04833 I . Burst Strength ASTM > 3,500 kPa 1 03786 I Permittivity ASTM > .05 sec" I 04491 I Apparent Opening Size (AOS) ASTM < 0.43 mm I 04571 1 Ultraviolet Stability ASTM > 50% ret. After 500 hours I 04355 exposure Project: 18006 Client: Urology Heaithcare, P.C. 1457 G. St, Springfield, OR Page 9 of 11 . August 9, 2006 I I I I I I I I I I I I I I I I I I I K & A Engineering, Inc. A manufacturer's printed certification is acceptable as proof of compliance in lieu of laboratory testing. Fabrics that meet this specification include Amoco Fabrics and Fibers Co. ProPex 2006. Pavement geotextile should be placed free of wrinkles or other discontinuities. Torn, punctured, or damaged fabric should be replace. Separation geotextile should have aminimum lap at seams of 12-inches. Drain Pipe Drainpipe for foundation drain systems shall consist of rigid AOS3000 Triplewall pipe or schedule 40 PVC. Perforations should be either prefabricated by the pipe supplier, or constructed by drilling V,-inch diameter holes spaced at 8" into solid pipe. Perforations should be placed down. K & A Engineering, Inc. should be contacted to review and approve perforated drainpipe priorto installation. PJacemenlSpecification . General recommendations for placement of earthwork.and specified materials are as follows: . Strip and remove all construction debris and to-be abandoned structures, pavements, and fills. Remove any organic soils and organic matter that may be found in the subgrade. . Compact subgrade priorloplacing constructed fills, embankments, pavements, or foundations. The subgrade should be compacted to a minimum of 95%.of maximum as determined by ASTM 0698. Compaction may not be possible during wet weather or for soils having moisture contents exceeding optimum. . Fine selectgranular fill should be placed in 12-inch maximum lifts (loose) and compacted using a smooth drum vibratory roller to an in-place dry density exceeding 95% of maximum as determined by ASTM 0698. . Coarseselect granular fill consisting of open-graded quarry stone should be placed in 12-inch maximum lifts (loose) and seated using a backhoe bucket or tamping with excavation equipment. Coarse select granular fill consisting of "bar-run" sandy gravels should be placed in 12-inch maximum lifts and compacted using.a heavy vibratory drum roller having a minimum dynamic compaction of 35- kips until no visible deflection is observed in the fill. Adequate compaction should be determined in the fiel.d by a qualified geotechnical engineer. . Quality control of cOnstructed fills and embankments and compaction of subgrade should be provided by a qualified geotechnical engineer or a materials testing company approved by the geotechnical engineer. A quality control program should have a systematic plan for obtaining random samples of sufficient quantity to assure reasonable compliance with these specifications. LIMITATIONS OF THIS REPORT . This report has been prepared for the exclusive use of Urology Healthcare, P.C. and its design cOnsultants for the subject proposed structure. This geotechnical investigation, analysis, and recommendations meet the standards of care of competent geotechnical engin'eers providing similar services at the time these services were provided. We do not warrant or guarantee these recommendations, site surface, or subsurface cOnditions. Exploration tesl holes indicate soil conditions only at specifiC locations (i.e. the test hole locations) to the depths penetrated. They do not Project: 180.06 Client: Urology Healthcare, P.C. . 1457 G. St., Springfield, OR Page 10 of 11 ,August 9, 2006 I I I I I I I I I I I I I I I I I I I . K & A Engineering, Inc. necessarily reflect soil/rock materials 'or groundwater conditions ihat exist between or beyond exploration locations or limits. The scope of our services does not include construction safety precautions, 'techniques, sequences, or procedures, except as specifically recommended in this report. Our services should not be interpreted as an environmental assessment of site conditions. Thank you for the,opportunity to be of service. Please call us if you have questions or need further assistance. Sincerely, Project 180.06 Client Urology Healihcare, PC. . 1457"G..St:, Springfleld,:OR Page 11 of 11 August 9, 2006 ,r , , I I l' L.__.J. -, " , , I :1. 1: I I I I I I I I I I I I I "::1> "; Y...I. '\:'",A.. \)u--!5:~ lj!~~ VICINITY MAP 1457 G STREET SPRINGFIELD, OR PROJECT: 180.06 I I Datulll:1\'AI>27 I I I I I I I I I I I I I I I, I I ,. I I k-a geotechnical/l.r/viJ engineering Eugene, OR 97408 541 6849399 541 6849358 fax "roject: Client: Job No: 1457 G. St. Sorinafield. OR Uroloov Healthcare P.C. 18006 Date: 8/16/2006 Sheet: 1 > of 1 engineering ,I '\ G STREET ---r--- I 1 I i . i 1 . , PROPOSED STRUCTURE . I _ul 1 1 I. . I .1 ., LOCATION OF ORILL HOLES . . _ _ _ j i' 8/16/2006 "".\ 1 1 I , . 1 -l~J .1 I. I I 1 I ----------------------.-, I I I DH: I I I I ----------, : I' I : I. ~DHl I I I I 1 1 I _Joo I I ------- --I . ------ 1 . .1 I . 1 1 I I. 1 O\:!J f1\ GEOTECHNICAL SITE PLAN 1 1" = 40' EXPIRES / k K-'& A L )neeringj Inc. 3327 Roanoke Ave. Eugene, OR g7408 oa Telephone (541) 684-9399 ~noine~rino Fax: (541) 684-9399 Pm!ec': Urology Healthcare, P. C. Job No.: 180.06 Local;on: 1457 G Street, Springfield, Oregon I I I I I I I I I I I I ~ ~ I ~ 0 " 0; z w " I , .~ " ~ ~ m 0 I ~ ~ 0 r ~ ~ ~ 0 w I ~ u r ~ ~ r ~ I " 0 ~ 0 rr ~ " z ~ I 0 m " 0 " " I Coordinates: " ;; ~ 0; C .I' 0 ~ .I' -' Z ID C ID > U a ID a a ~ :c E a. u. ~ 'ii a. E ID . (( > ID . (f) . ID 0 <9 (f) '" UJ 0 -~ 67 - 5 2 87 3 93 - - i,:_7( -10- 'o.{Y'\ )o'.D - ,qC . '0 Do .:b:.D:( ,qC .o.[Y< -15-)o".D ,Oc -'oey, -b:D: .,Oc 0/':\0. _yU.( o".D -20-)O$.~ _ _~ 7 (I..,:: .t9 .0':.-, . .0 0...... 25,tQY} 8 ofy- - )~:.D~ -,OC 0/\0. . -yQ.( aD -30 - ~E$JR 9 - -~01 4 5 6 Top of Casing EJev.: Drilling Method: Sampling Method: MATERtAL DESCRIPTION Surface Elev.: ...:...Asohal! pavement --&rushed aaoreaate base r Brown, damp to moist, stiff, moderately plastic SILT. 50 Dark gray, moist to saturated,very dense, poorly graded SANDY GRAVEL . H.S. Auger Split Spoon ~~ -ID c~ gu . ().~ ~<b a ~ _ID !Da. LOG OF BORING DH1 Sheet 1 of WATER LEVELS While.Drilling' End of Drilling: 7..1 hrs After Drilling: STANDARD PENETRATION TEST DATA Ninblowslfl@ 5 5 6 4 4 4 " 53 53 80 Dark gray. saturated, dense, poorly graded GRAVELLY SAND .4 4 7 37 50 14 21 26 24 18 26 23 10 6 18 37 50 20 28 40 Completion Depth: 31.5 . Sample Types: -, Remarks: Date Boring Sta'rted: 8/16/06 ~ ~ 8/16/06 _' Auger Cutling " Shelby Tube. Date Boring Completed: " . Logged By: MOR ~ Vane Shear " Grab Orillinq Contractor: PNW Orillino v~ Split Spoon . Rock Core Thestratificaiion lines representappro~imate boundaries. The transition may be gradual. 93 Gray, saturated, very dense, poorly gradeq SANDY. GRAVEL 80 10 2030 5() BO 11' ::: ~ ::\::'. 41 a:' ~..... '.,..'.. ..0...... '..'.'..... ... .... . . ..... . , ,..... . , ..... . ,...... . ...... . ., ... ',' ."... ~.::: 0: : : : ;:;; '. '.. .........'...... . . ...... . d.:..: . . ...... . . ..... . . ....,. . ,...... . .. .d' . .. .... . .. .... . ,... ... . ..:0 12.0 WELL INSTALLATION DETAILS ..1 <&i K & A L )neering. Inc. 3327 Roanoke Ave. Eugene, OR 97408 Telephone: (541) 684-9399 enl1;nnrinQ Fax: (541) 684-9399 Proiect: Urol09Y Healthcare, P.C. Job No.: 180.06 Location: 1457 G Street, Springfie'ld, Oregon k(j Coordinates: '" ~ 0 " .!! '" 0 ~ .!! ~ z ~ .; ~ > u 0. ~ 0 .2 '" :c E 0. u ro 0. a. E ~ " '" > ~ " ~ " ~ 0 i5 ;!'. w <f) 0 :"'Il"~ 60 - 5 2 93 3 J'''': -1b.){~0:, d.D - . ,OC . ',J:\O ).!.;.J., . .o".D j(j( - . (\0 o'U -15-)~:'{{ . >qc 0/"\0 -b~D: .;9.r 0>:.<. _20.0D 4 .5 6 Top of Casing Elev.: Drilling Method: Sampling Method: MATERIAL DESCRIPTION Surface Elev.: --hsohall pavement ~rushed aaareaate base ------./ Brown, damp to mOIst, stiff. moderately plastic Sfl T. 100 Dark gray; moist to saturated, very dense, poorly graded SANDY GRAVEL 80 " 40 67 ASSUMED poorly graded SANDS or GRAVELLY SANDS. Sands welled into auger preventing.sampling or standard o.enetration testinci. LOG OF BORING DH2 H.S. Auger Split Spoon ~~ c~ o u Oc U.- ,<0 o ~. -~ tOo. Sheet 1 of 1 WATER LEVELS While Drilling: End of Drilling: ,'5l- 0,'3 hrs After Drilling: 12.0 STANDARD PENETRATION. -TEST DATA Ninblowslft @ 4 4' 7 4 4 6 4 4 3 28 3. 49 36 19 24 23 32 33 Completion Depth' 20.0 Sample 1ypes: Date Boring Started: 8/16/06 ~ AugerCutting ~ Shelby Tube Date Boring Completed: 8/16/06 rr LL Vane Shear '" Grab . Logged By:' MDR lv Dri\lin8 Contractor: PNW Drillinq to Split Spoon _ Rock Core The stratification lines represent approximatebounda'i"ies; The transition may be gradual. 10 20305080 ::::11 r 'u y :. JJ ....~.... Remarks: WELL I NST ALLA TION DETAILS