Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-1-28 ~....... ~yrtl Page 1 of 1 Report of Inspection Services Welding/High-Strength Bolting 11~'lItl~;"II~'~;lIImah'l" Geotechnical & Construction Services Client: Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 Project: LCAFRC Complex Phase II 3110 Pierce Parkway Springfield, Oregon Date: Project No.: Report No,: Inspector: 10 No,: Inspection of: Welding Fabricator or Erector: Contractor: Wildish Building Co. Shop: 0 Weather: BP No,: 01-28-09 2077102 E-22284 K. Green 8003776 ICC Field: 0 Overcast COM2007 -00828 Performed visual inspection of riffle range baffle 10 L3" x 3" x 1/4" angle connecllons (per delail 1 on S2). Completed welds were. checked for size, length, profile and localion. Note: the upper end of the diagonal angle to baffle connections along lines C and E are missing one weld at each location, twelve (12) locations total, Tony Dean (WBC) was advised and was asked to notify our office when welding Is completed. To the best of our knowledge, the work checked is in conformance with drawings daled 10-24-08 and applicable AWS 01.1 code, except if noted above. . Reviewed By: M~~~ Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Mililary Dept. - (e-mail) Wildish- TonyDean (email) City of Springfield MLM:sc RECEiVe- ~D FEB 0 f! lOUg This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed withoutFEI Testing & Inspection, Inc.'s written authorization. 750 NW Comell Avenue' Corvallis. Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BAirportRoad' Eugene, Oregon 97402. phone (541) 684-3849 . fax (541) 684-3851 63050 CorporalePlace. Suite 2,' Bend. Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846