Loading...
HomeMy WebLinkAboutComments PWT 12/23/2005 P'I:z,~~-; - 000 €!:> 4- /fd,te7Z)# t!1. //l~E,vIVGY /z-./?..y63 TENTATIVE LAND DIVISION APPLICATION PRE-SUBMITTAL CHECKLIST TRANSPORTATION o Right-ot-Way Approach Permit application must be provided where the property has frontage on an Oregon Department of Transportation (ODOT) facility. Complete Incomplete See Notes 'iF' ~ Copy of ROW approach Permit Application . ill o Traffic Impact Study-four copies of a study prepared by a Traffic Engineer in accordance with SDC Section 32.020(1)(c). Traffic Impact Studies (TIA) allow the City to analyze and evaluate the traffic impacts and mitigation of a development on the Cityfs transportation system. In general, a TIA must explain how the traffic from a given development affects the transportation system in terms of safety, traffic operations, access and mobility, and immediate and adjoining street systems. A TIA must also address, if needed, City, metro plan and state land use and transportation policies and objectives. . Complete Incomplete See Notes 111<",', i:ll'''.' ''''.'''0 '. Iiii'JiiI l1iif!, ~ .1:11iliI Traffic impact Study o Tentative land Division Plan Complete Incomplete See Notes II(D Location and type of existing and proposed street Ughting , . B I]l IS t;;;ii:l.,-" ~ Iiml, Li[I] Location, widths and names of all existing and proposed streets, alleys, dedications or other right-of. ways within or adjacent to the proposed land' division R ~'" ~"'''. ",,,. fI Location of existing and required traffic control devices Notes: l():h1t.ter t.lq/lrtN '1 fA.Ii(..~ 17~ l!6'fJOltU!O. 7/21104 4