HomeMy WebLinkAboutComments PWT 12/23/2005
P'I:z,~~-; - 000 €!:> 4- /fd,te7Z)#
t!1. //l~E,vIVGY /z-./?..y63
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
TRANSPORTATION
o Right-ot-Way Approach Permit application must be provided where the property has
frontage on an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete
See
Notes
'iF'
~
Copy of ROW approach Permit Application
. ill
o Traffic Impact Study-four copies of a study prepared by a Traffic Engineer in
accordance with SDC Section 32.020(1)(c). Traffic Impact Studies (TIA) allow the City to
analyze and evaluate the traffic impacts and mitigation of a development on the Cityfs
transportation system. In general, a TIA must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIA must also
address, if needed, City, metro plan and state land use and transportation policies and
objectives. .
Complete Incomplete
See
Notes
111<",',
i:ll'''.'
''''.'''0
'.
Iiii'JiiI l1iif!,
~ .1:11iliI
Traffic impact Study
o Tentative land Division Plan
Complete Incomplete
See
Notes
II(D
Location and type of existing and proposed street
Ughting , .
B I]l
IS
t;;;ii:l.,-"
~
Iiml,
Li[I]
Location, widths and names of all existing and
proposed streets, alleys, dedications or other right-of.
ways within or adjacent to the proposed land' division
R
~'"
~"'''.
",,,.
fI
Location of existing and required traffic control devices
Notes:
l():h1t.ter t.lq/lrtN '1 fA.Ii(..~ 17~ l!6'fJOltU!O.
7/21104
4