Loading...
HomeMy WebLinkAboutComments SUB 9/12/2006 SEP-12-2005 12:35 P.02/03 s r 11. I N C r I E L DU T I LIT Y B 0 ,\ lZ LJ W..\II:I~ .'I:!{\'II,'I' CF:,n'I:I/ 1'02 South 18th Street Springfield, OR 97477.5240 T~I 541./'26.2396 F.':!x 541 '47.7346 www.$ul.Hllil.r.r;m September 12, 2006 Dave Ree,;or Cityof Springfield 225 N. 5th Street Springfield, OR 97477 Dear Dave: SUBJECT: SUBDIVISION TENTATNE #SOO2006-00055 Bill . Tax Map 17-03-27-31 Tax Lots 900,.1000, 3600, & 3601 QUINALT SunI [VISiON Lioled bdaw are our comments for thcabove referenced development proposal: 1. The proposed development is currently pal1ially within the service territory of the Ra nbow Water District and partially within our service terrilory. The service territory of the Rainbo' 'Water District will be served by RWD until July 1, 2007, at which time SUB will become t e water service provider. TIle water line has already been installed in our service territory, s( no furthcr constmction is required in SUB's service territory, 2. ^ 11 new water system facilities and modifications to water systcm facilities both insic ~ and adjacent to the proposed development shall be placed in streel right-of-way at a locat )n and depth of bury that meets lhc'standards ofthe Still Water Divioion. . 3. All water facility materials shall be to a slandard that must meet SUB Water Divisior. specifications, 4. All workmanship shall bc performed to meet or exceed SUB Water Division constrUl lion 8tandilfdo. 5. Size of walerline and other facilities. including water mcters, must meet the need" of he SUB Water Division and the long-range need., of the City. These needs inclode, but are n' t limited to, meter location and access, sizes ofw3leT distribution and transmission lines, pumpinl facilitics, and communication lines. 6, Pleaoe ask the developer to contact the SUB Water Division for detailed information ,n the materials and construction standards, detli1ed costs for inslalling SUB water facilitic! and a schedule of conslruction, Construction expenses may be reduced with good plannin. of required water facilitics, good timing of facilities installation, and joint trench opportunities. 7. All water meters will be placed in public right.of~way at a location identificdby the ( ,veloper. . Each lot or parcel must have its own wal<:r service. R E C E , V ED 1)(<.(;, . (oY%~ -", .... By: ~-', d- - 0(0 S:\SlTEPLAN\Quinalt Subdiv;!':inn.dClC SEP-12-2005 12:35 P,03/03 8. Water service facilities will be installed upon collection of development charges. Dc 'elopment policies and charges identified in this letter are subject to change. Actual charges wi . be those in effect at the time water servicc is requested. 9. Spril1gfi~ld has several wellhead protection areas. Ninety percetit of Springfield's dri Iking water comes from wells. Tn every instance, care shall be taken to prevent groundwater con! ,mination. Contractors/developers/owners shall be responsible for the safe handling and storage ,f chemicals, petrolcum products, fertili~ero, and the prevention of groundwater and stonn water n IOff contamination. Special requircments may be necessary for groundwater protection at this developme l. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. PU:ASE NOTE: SUB devclopment charges are paid directly to SUB Water r: vision and SUB Electric Division. Sincerc1y, Ztr~ .~ Rebecca TemplIn, P.E. Civil Enb.Jneer - Water Division RAT:mkm cc: Tnan Bni, Emerald City Real Estate, 325 Goodpasture Island Rd., Eugenc, Oregon 9' 401 Michael J. Kaiser, Poage Engineering, P.O. Box 2527, Eugene, Oregon 97402 " RECEIVED By: '." .....- q-'l1-D~ S:\SITEPLAN\Quinult Subdivision.doc TOTAL P.03