TYPE II TENTATIVE LAND DIVISION,
PRE-SUBMITTAL CHECKLIST
Project Name: Tuan Bui Subdivision
. Project Proposal: 10 lot subdivi~ion of 5 existing lots
Case Number: PRE2006-00071
Project Address: 1226 1/2 Fairview Street
Assessors Map and Tax Lot Number(s): 17-03-27-31 TL #'s 900, lobo, 3600 & 3601
Zoning: LDR
Applicable Refinement Plan:
Refinement Plan Designation:
Pre-Submittal Meeting Date: August 1, 2006
Application Submittal Deadline: January 22, 2007
Associated Applications: None
CITY OF SPRINGFIELD DEVELOPMENT REVIEW TEAM
I POSITION
I Proiect Manaqer
I Transportation Planninq Enqineer
I Public Works Civil Enqineer
Public Works EIT
I Deputy Fire Marshall
I Community Services Manaqer
REVIEW OF
Planninq
Transportation
Utilities
Sanitary & Storm Sewer
I Fire and Life Safetv
Buildinq
NAME
David Reesor
Garv McKenney
Matt Stouder
Matt Stouder
Gilbert Gordon
Dave Puent
I PHONE
726-3783
726-4585
726-1035
736-1035
726-2293
726-3668
APPLICANT'S DEVELOPMENT REVIEW TEAM
Applicant
Tuan Bui
325 Goodpastl'Jre Island Rd.
Eugene, OR. 97401
Engineer
Michael J. Kaiser
Poage Engineering
PO Box 2527
Eugene, OR. 97402
8/1106
~
.{.
TENTATIVE LAND DIVISION APPLICATION
PRE-SUB,MITTAL CHECKLIST
PLANNING
o Application Fee discuss the applicable fees'
o One additional copy of the Land Division Plan reduced to 8 '12 "x 11"
Complete Incomplete See
Notes
[ill ~ ~.
8 '12" x 11" Copy of Land Division Plan.
o Copy ot'the deed and a preliminary title r~port issued within the past 60 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property owner is required.
Complete
Incomplete
See.
Notes
fiim1
li!!I
~
~'"
'$Q,
1=,.
.0 Tentative Land Division Plan
Complete Incomplete
See
Notes
~
~
.Iiliiiil
lEJ
~
~
~
~..
.~
~,
~
~
~
~
I0i1I
L:I
~
~
~
~,
~
m01
li!J
~..
,'0.2
,],i;
7/28/06
Deed and Preliminary Title Report
Prepared by" an Oregon Licensed Land Surveyor in
accordance with ORS 92 .
. AII.existing and proposed easements
Dimensions and size of each parcel and the
approximate dimensions of each building site
indicating the top and toe of cut and fill slopes to scale
Location, widths and names of all existing and'
proposed streets, alleys, dedications or other right-of-
ways within or adjacent to the propo?ed land division
Location of existing and required traffic control
devices, fire hydrants, power poles,. transformers,
neighborhood mailbox units and similar public facilities
Location and width of all existing and.proposed
sidewalks, sidewalk'ramps, pedestrian access ways
and bike trails
Locatio'n, size and type of plantings and street trees in
any required planter strip .
2
~
~"0.
,,-.-
,ceo,'
m01
L2J
Location and size of existing and proposed utilities on
and adjacent to the site including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV. Indicate
the proposed connection points
o Phased Development Plan required if redivision is proposed. The plan must include
the boundaries and sequencing of each proposed redivision. Any redivision must
progress in a sequence promoting street connectivity between the various phases of the
development and accommodating other required public improvements.
Complete
n,'
U
Notes:
Incomplete
~
See
Notes
F'l
Lt:d
Phased Development Plan
Additional comments not related to the completeness of the application:
The City of Springfield typically requires a 7 foot PUE along all lot frontages. This will
need to be shown in the Tentative Plan when submitted. Check with Public Works Dept.
for details.
7/28106
, ,
3
r",\dZ-DO C. - 0(' 67/ BU.z; -6~/VI5 / D AI
~//o~ i ~. ',4?Ke-N/l/~ . '"
TENTATIVE LAND DIVISION APPLICATION
'PRE-SUBMITTAL CHECKLIST
TRANSPORTATION,
, , ~i9ht-of-vita'y Approach Permit application must be pr~vided "where the property has
: frontage on an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete See
Notes
III Iii III Copy of ROW approach Permit Application
.\ . ~/ Traffic Impact Study-four copies of a study prepared by a Traffic Engineer in '
~y accordance with SDC Section 32.020(1)(c). Traffic)mpact Studies (TIA) allow the City to
analyze and evaluate the traffic impacts and mitigation of a developn:ent on the City's
transportation system. In general, a TIA must explain how the traffic from a given
development affects the tr'ansportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjo'inillg street systems. A TIA must also
address, if needed, City, metro plan and state land use and trahsportationpolicies and
objectives. . '
Complete Incomplete
See
Notes
Fim
~
Traffic impact Study
R ~
o Tentative Land Division Plan
Complete, Incomplete See
Notes
III
Jt;iiI
I2tiI
~.'"
!)>;';:
'''''~'
Location and type of existing and proposed street
lighting
I!iii1I
rasr.
Ii\1
f!J
1El:iI,"
.~
Location~ widths and names of. all existing and '
proposed streets, alleys, dedications or other right-of-
ways within or adjacent to the proposed land division
, '
1.1
~
~
~
Location of existing and required traffic control devices
Notes:
7/21104
4
pf!-E; Zoo(P - ()oo71 -rLNA./ .6/Ai (9 u : "1- cd f Sv,bl,v,j,~..))
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete
~
~
~
~
~
~
R?I
~
~
~
7128/06
Incomplete
See
Notes
R?I
E!tJ
EI
r;;wl
tJ!!!J
r;;;u
~
r;;;u
ctJ
~
r:;:'1
E.2::J
r;;;u
f..!Ej
r;;;u
u
Ii'Dl
~
r:J
~
~
~
r;;;u
l:L!J
fi'EIl
I1!J
~
r.:l
89
~
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location and dimensions of all existing site
'features including buildings, curb cuts, trees and
impervious surface areas, clearly indicating what is
remaining and what is being removed
Required setbacks to the proposed new property
lines for'existinQ structures to remain on site
The name, location, dimensions, direction of flow and
top of bank of all watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
The 100-yearfloodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA
Flood Insurance Rate Maps or FEMA approved Letter
of Map Amendment or Letter of Map Revision
The Time of Travel Zones, as specified in Article 17 of
the Springfield Development Code and delineated on
the Wellhead Protection Areas Map on file in the
Development Services Department
Physical features including, but not limited to trees 5"
in diameter or greater when measured 4 V2 feet
above the ground, significant clusters of trees and
shrubs, riparian areas, wetlands and rock
outcroppings
Soil types and water table information as mapped
and specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must
be submitted concurrently if the Soils Survey
indicates the proposed development area has
unstable soils and/or a high water table
5
o Stormwater Management System Study' provide four (4) copies of the stLJdy with
the completed Stormwater Scoping Sheet attached. (See attached for Stormwater
Scoping Sheet). The plan, calculations and documentation must be consistent with the
Engineering Design Standards and Procedures Manual. .
Complete Incomplete See
Notes
~ ~ ~,
Scoping Sheet and attached Storm water
Management System Study
Notes:
Additional comments not related to the completeness of the application:
The runoff from lots 1-8 is proposed to drain into the street and ,flow along the gutter to
the existing inlets located at the intersection of West Quinalt Ave and Tamarack St. This
system may be under Lane County jurisdiction and may require obtaining a Lane County
Facilities permit prior to discharge.
Calculations will need to be provided for the inlets located in Quinalt Ave (consistent with
Section 4.05 of the City's EDSPM) to verify the inlets can accommodate the increased
flow from the subdivision. This can occur with the Public Improvement Plans.
Revise note 6 on the grading and paving plan to eliminate the possible use of drywells in
this area unless a percolation rate test is to be performed.
Provide the existing flowline information for,the existing catch basins in West Quinalt Ave
and for the existing public sanitary sewer line.,
7/28/06
'7
J
G/~(b~-f Go..-k... ' Pt<.E:Zoo~ -qco,7rTUe..~ 6,,;
[j 1 it..- I ( /0-(,' '5ukaJ'v'MOh.,
" e~ IA 7 h'v-<. V l"""S!riG<., ('.2:2....2- h:-'~t/I~ JJv'-c.e.
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
FIRE
o Tentative Land Division Plan
Complete Incomplete
See
Notes
i:0iJ
~
Location, widths and names of all existing and
proposed streets, alleys, dedications or other right-of-
ways within or. adjacent to the proposed land division
,~' ~
~,
~
~
Iiji\J,I
~
Location of existing and required fire hydrants
Notes:
Additional Comments not related to the completeness of the application:
M~J> ~t-jJRC~ : " '
Lor!- c; wr11 ~ 0. rIJ k- , ,', 11, /;'/1 J)~ r
. ,~) 1Vt?'~, '-r-.-<...,~ Ie '
',~ - bc>fk7(~' ,AJtJie-L~' x..'LJL-r,,"~ ...<..t? "";};/
/ ' ff " , ' ! , ,I ' 7': "1) =- 75'q (;rZJ Ih ~.
, OV"
, ,~~~ ffpJ~d-fr'~-#; ~ ~
/50 fA- c{ "~N~ ~ -@?F~~.
<9.,..-
~~,~jM
Stz:C:5- 'II...." /
, 03., I e:;<..,~;f"'<;;""" 1.
4/6/04 '
9
ANY REQUIRED'ADDITIONAl MATERIALS, APPLICATIONS OR
. PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL
STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT
SHOULD CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable Not
Applicable
~
~
Proposed deed restrictions and a draft of any, Homeowner's
Association Agreement
Additional plans and documentation for submittal of a Cluster
Subdivision proposal as specified in SDc'Section 16.100(3)
, Riparian Area Protection Report For properties located within 150
feet of the top of bank of any Water Quality Limited
Watercourses (WQLW) or within 100 feet of the top of bank of
any direct tributaries of WQLW
A Geotechnical Report prepared by an engineer must be
submitted concurrently if there are unstable soils and/or a high
water table present '
Where the development area is within an overlay district
applicable, address the additional standards of the overlay
district
I0i1I
LZ:BJ
~
m01
U!l'J
~
, ~
,I0i1I,'ID
~
~
~
1'0'1' ,
~.'
~
,~
~
~
m01,"', '
@J
,~
~','
~
- '
Where any grading, filling or excavating is proposed with the
, development, a Land and Drainage Alteration permit must be
submitted with the land use application
Where applicable, any Discretionary Use, Variance or
Modification of Provisions as specified in SDC Article 10 or 11
~
m01,""
l2tiLI
7/28/06
10
THIS APPLICATION IS:
o COMPLETE FOR PROCESSING
!Xl INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
CV~--"
City Planner
~'~ /
CJt
Date
This is not a decision on.yourapp/icatiQn. Springfield Development Code Sections
3.050(3H6) and Oregon Revised Statutes 227.178 require the City take final action on a
limited land use decision within 120 days after the application is deemed complete. The 120-
day processing period for this application begins when all the missing information is
submitted or when you request that the City proceed without the information. You must
indicate by either signing this form or by submitting a written response to the City within
seven days of the date of this form asserting your intentions regarding the provision of the
missing information. If you indicate herein or in your written response that the missing
information will be submitted, then you have 180 days from the date th~ application was
,submitted for Pre-Submittal Review to provide the City with the missing :information. If you
refuse to submit the missing information, then upon receipt of the full application packet and
processing fee, the City will deem the application complete for purposes,ofstarting the 120-
day clock and begin processing the application. No new information may be submitted after
the start of the 120-day' period unless accompanied by a request for an extension of the
120-day processing time. Upon receipt of a request for extension, the City may extend the
120-day period for a reasonable period of time. The City may also require additional fees if
the new information is submitted after the Notification to Surrounding Property Owners is
sent out and a second notification is required or if the new information substantially affects
the application proposal and additional review is required.
I, the owner/applicant, intend to submit all missing items indicat.ed herein to the
City within the ISO-day timelirie. '
,'~'
--........
Owner/Applicant's Signature
7/28/06