HomeMy WebLinkAboutPermit Field Test & Inspection Report 2008-1-26
C8- A 595
COMPRESSION REPORT
SPRINGFIELD OFFICE
l n~.lInformation
~~~ .ToBuildOn
/Il!ngln..rtng . ~ . n.etIng
Ms, Lauretta Davies
Jerry's Home Improvement
P,O. Box 2611
Eugene, Oregon 97402
Project No,: 722-80276-30
, Proj, Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26, 2009 CCB#176269
Client:
Address:
Date:
B.P. No.:
P.O, No;:
Cast By:
Pete Furlong
Fog
Total:
~~pplier:
Knife River
30
10
'Slump (in.): ASTM_C143 ,-
Max. Aggr. Size:
Air Content: A$TM C231
Air Temperature,(F):
Material Temp. (F): ASTM CI064
Max Temp (F):
Min Temp (F):
;Specimen Size:
Unit Weight (pet): ASTM C13B
Time Cast: 7:00 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
Field Test Data
6"
11/2"
5.0%
34
61
Placement Data: Material:' Concrete
Monolithic-Concrete Slab on Grade gridline A to E from 1 to 9
Location Sampled At:
D at 8
koad: '
Yardage
6 x 12
Date Cast:
Ticket No.:
3160772
,01/14/09 . Date Rec'd:
IMIX No . Weather:
2450~~2200
01/15109
ASTM
Design Strength (psi); required
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0153 1121/2009 7
09-0154 2/11/2009 28,
09-0155 2/11/2009 28
09-0156 H H
Compressive Strength Data ASTM C39
5,000 placed 5,000
Lab Cure
(days)
Diameter or Cross Sect. Area Cylinder WT. Compo Str,ength Fracture Type C<lpping Method
Dimensions Max. Load (Ibs.) Test Time
(inches) (s.i.) (Ibs.) (psi)
C617-03 C1231-03
5.99 28.21 28.0 118,915 ' 4,215 1:45 PM X
6
27
27
H
H 1 - Cone (bo'th'endS) 2 -ConelV~riicaICrackS (one end) -3= Columnar 4,~ Diagonal w no cracking at ends
Remarks: SET #4
c: 0 City of Springfield
Chambers Construction - David B.akke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
5. side fractures (at top of bottom) 6 - Top fractures (same as #S'but end (.' cyiinder is pointed)
Re~:t1s:~~IY Submitted, .
, Prc r ;::a?:J~ustries, Inc.
SIe~e Wilder
Lab'oratory Manager
THIS REPORT is PROViDED FOR THE INFORMATION OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPOR'rBY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBiTED
~VII HOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l ~1~;lInformation
p.... .To Build On
Il!nglneflWllng . c-.uHIng . 'RNrIIng
Client:
Address:
Ms. Laurett~ Davies
Jerry's Home Improvement
PO Box 2611
Eugene, Oregon 97402
~~ - \5l:\15
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26, 2009 CCB#176269
Project No,: 722-80276-26
Proj. Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Sprin9field,
Oregon
Date:
B.P. No,:
P,O, No.:
Cast By:
Pete Furlong
Field Test Data
6"
1 1/2"
4.5%
36
63'
Placem-ent Data: Materiai: Concrefe
Monolithic Concrete Slab on Grade gridlin" Eta J from 1 to 9
6
27
27,
H
u 1 -Cone (bo'th ends) 2 - Cone/Vertical Cr9cks (one ~nd) 3 - Columnar 4 - Diagonal w no cracking at ends
Remarks: SET #5' .
c: City of Springfield
Chambers Construction - David Bakke
Robertson, Sherwood Architect~- Scott Stolarczyk
Metzler Engineering - Scott Melzler
Location Sampled At:
Fat 8,5
Date Cast: 01112/09 Date Rec'd: 01113109
Ticket No.: I M;; 5NO~~2200 Weatlier:
3352301 Clear
Design Strength (psi): req u ired
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0081 '1/19/2009 7 '1
09,0082 2/912009. 28
09-0083 2/912009 28 ,'1
09-0084 H H 1.
Yardage
Slump (ine): ASTM C113
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
"Material Temp. (F): AS7M C1064
Max Temp (F):
'Min Temp (F);
Specil1}en Size:
Unit Weight (pef): ASTM C138
Time Cast: 8:15 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
ASTM
6 x 12.
Load:
39
10
Total:.
Supplier:
Knife River
Compressive Strength Data ASTM ,C39
5,000 placed 5,000
lab Cure
(days)
Diameter or
Dimensions
(inches)
C1231,03
Cross Sect. Area
(s.i.)
Compo Strength .Fracture Type
(psi)
Test Time
Capping Method
Cylinder WT.
(Ibs.)
Max. Load (Ibs.)
C617-03
5,95
1:'19 PM
x
27.82
112,290
4,040
27.9
3
5 - Sidefractures (at top of bottom) 6 - Top fra-clures (same as #5 but end 0 cylinder is pointed)
Ro/J,ectfuIIYS, mitted,
, p, ;: 'ssiona~ f rvices Induslries, fn~,
,I'^- 1JJ/ ,
Steve Wilder '
Laboratory Manager
~
Tl-iIS REPORT IS PROVIDED FOR THEINFORMATlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD; AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS
PROHIBITED t1/lrHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.,
"ft ~.J Information
1~~~.1ToBuild On
I1/!nfIlneel'lltfI . eon.uItIng . 11tsfIng
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
c''b - \595
COMPRESSION REPORT
SPRINGFIELD OFFICE
1 040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (54'1)746-7163 fax
January 26, 2009 CCB#176269
Project No.: 722-80276-25
Proj, Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Placement Data: Material: Concrete
Monolithic Concrete Stab on Grade gridline E to J from 1 to 9
Location Sampled At:
G al6
Dale Cast: 01/12/09 Dale Rec'd: 01/13/09
Ticket No.: IM~:5~~~2200 Weather:
3352295 Clear
-
Design Strength (psi): required
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0077 111 9/2009 7
09-0078 2/9/2009 28
09-0079 2/9/2009 28 r-
09-0080 H H
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 7:15 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
koad:
Yardage
29
10
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 placed 5,000
Field Test Data
5"
11/2"
5.0%
35
66
6 x 12
ASTM
Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type Crlpping Method
Dimensions Max. load (lbs.) TeslTime
(inches) (s.i.) (Ibs.) (psi)
C617-03 C1231-03
5.94 27.73 28.4 112,630 4,060 3 1:14 PM X
6
27
27
H
H 1 - Cone (bo'th ends) 2 - ConeNerlical Cracks (one end) 3 - Columnar 4: Diagonal w no cracking at ends
Remarks: SET #4
C City of Springfield
Chambers Construction - David Bakke
.Robertson Sherwood Architects - Scot! Stolarczyk
Metzler Engineering - Scott Metzler
Lab Cure
(days)
5 - Side fractures (at top of bottom) 6 - Top fractures (same as #5 but end of cylin-d"eris pointed)
R~CtfUIlY~U mitted,
P sional S C:S Industries, Inc.,
,S
S ve Wilder
Laboratory Manager
THIS REPOR r IS PROVIDED FOR THE INFORMATION OF THEeL/ENf QNL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A Hf/RD PARTY BY ANY MEANS EXCEPT IN FULL, 1$ PROHIBITED
wl/"I-four HIE WRIT/EN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
111~i .f::f:::a:1fnn
fi!!nsln....ri..g . c-uItIng . n..fIng
Client;
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
P.O, Box 2611
Eugene, Oregon 97402
t<6- \595
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (54'1)746-7163 fax
January 26, 2009 CCB#176269
Project No,; 722-80276-24
Proj, Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
'Placement Data: Material: Concrete
Monolithic Concrete Slab on Grade gridline E to J from 1 to 9
Location Sampled At:
Hat 6
Date Cast: 01/12/09 Date Rec'd: 01/13/09
Ticket No.: I M;:5NO~~2200 Weather:
3352291 Clear
Design Strength (psi): required
Cylinder No. Tesl Date Age (days) Field Cure
(days)
09-0073 11'19/2009 7
09-0074 2/9/2009 28
09-0075 2/9/2009 28
09-0076 H H
Lab Cure
(days)
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pct): ASTM C138
Time Cast: 6:00 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
koad:
. Yardage
21
10
Date:
B.P, No.:
P.Q, No.:
Cast By:
Pete Furlong
Field Test Data
51/2"
I 1/2"
5.0%
36
63
6 x 12
ASTM
Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type Capping Method
Dimensions Max. Load (Ibs.) Test Time
(Inches) (sJ.) (Ibs.) (pSi)
C617-03 C12Jl.0J
5.95 27.82 28.0 114,910 4,130 3 1:09 PM X
....II!ICIIlIl."...."".
6 - Top fractures (same as #5 but end 0 cylincler is pointed)
RehSktfUIlY Submitted,
PI; j s;onal ~7c.ndUSII;es, IIlC,
SW~e ~
Laboratory Manager
J
6
27
27
H
u 1 - Cone (bo'lh ends) 2 - ConelVer\ical Cracks (one end) 3 - Columnar 4 - Diagonal w no cracking at ends 5 - Side frac;ures (at top of bollom)
Remarks: SET #3
c: Cily of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 placed 5,000
THIS REPORT ISPRQVIOED FOR THEiNFORMATJON OF tHE CUENTONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
vvirllour THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES,
l"n'~;lInfonnation
~~~ .ToBuildOn
I/!ngm. " ,I .s . ~ . n..ctng
Client:
Address:
Ms. Laurella Davies
Jerry's Home Improvement
PO. Box 2611
Eugene, Oregon 97402
t~- \~5
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26, 2009 CCB#176269
Project No.: 722-80276-23
Proj. Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
Placement Data: Material: Concrete-.
Monolithic Concrete Slab on Grade gridline E to J from 1 to 9
Location Sampled At:
Fat 2
Date Cast: 01/12/09 Date Rec'd: 01/13/09
Ticket No.: IM~;;0~~2200 Weather:
3352286 Clear
Design Strength (psi): required
Cylinder No. Test Date Age (days) Field Cure
(davs)
09.0069 1/19/2009 7
09.0070 2/9/2009 28
09.0071 2/9/2009 28
09-0072 H H
Lab Cure
(days)
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM Cl0B4
Max Temp (F):
Min Temp (F):
,Spe"cimen Size:
Unit Weight (pet): A$TM C138
.Time Cast: 5:10 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
koad:
Yardage
10
10
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Field Test Data
5"
1 1/2"
5.0%
38
66
I
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 placed 5,000
6 x 12
ASTM
"
Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type C<lpping Method
Dimensions (5.1.) (Ibs.) Max. Load (Ibs.) (psi) .. Test Time
(inches) C617-03 C1231-03
5.95 27.82 27.7 105,885 3,810 3 1:04 PM X
6
27
27
H
H 1 ~ Cone (both ends) 2 ~ ConeNertical Cracks (one end) 3 - Columnar 4 - Diagonal w no cracking a(ends 5 - Side fractures (at toper bottom)
Remarks: SET #2
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
6 - Top fr ;ctures (same as #5 but end of cylinder is pointed)
Res~ectfullY Submitted,
pr:/tni:Jt-:dustries, Inc.
Steve Wilder
Laboratory Manager
TillS REPORT IS PROVIDED FOR THE INFORMATION OF THE. CLIENT ONt Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS
PROHIBITED WIT/lOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
tl1sil;;f%;:J:tnn
111!1'f1~" , """".. ContiIuIfIng . n".ttng
C8-ISQS
COMPRESSION REPORT
SPRINGFIELD OFFICE
Client:
Address:
Project No.: 722-80276-22
Proj. Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26,2009 CCB#176269
Ms. Lauretta Davies
Jerry's Home Improvement
P,O. Box 2611
Eugene, Oregon 97402
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Location Sampled At:
Hat 1.5
Date Cast 01/12/09 Date Rec'd: 01/13/09
Ticket No".: IM;;;oo~~2200 Weather:
3160693 Clear
Design.Strength (~sil: required
Cylinder No. Tesl Date Age (days) Field Cure
(days)
09-0065 1/19i2009 7
09-0066 2/9i2009 28
09-00'67 2/9/2009 28
Yardage
Load: 3
Total: 10
Supplie_r:
Knife River
Slump (in:): ASTM C143
'Max. Aggr. Size:
Air Content: ASTM G231
'Air Temperature (F):
Material Temp. (F): ASTM G1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pcf):.ASTM C138
Time Cast: 4:30 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
Field Test Data
. 51/4"
11/2"
5.5%
38
68
Pla'cement Data: Mal"erial:-Concrete-
Monolithic Concrete Stab on Grade gridline E .to J from 1 to 9
6 x,12
ASTM
Compressive Strength Data ASTM C39
5,000 placed 5,000
- r
Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type I Capping Method
DImensions (s.L) (Ibs.) Max. Load (Ibs.) (psi) '" Test Time
(inches) C617-03 C1231-0J
5.96 27.20 27.2 99,035 3,550 2 1,:00 PM X
Lab Cure
(days)
6
27
27
09-0068
H
H
H
I
, . ... .-
':'.1 - Cone'(~ottl ends) 2 - ConelVertical Cracks (one' end) 3 - Columnar 4 - Diagonal w no cracking at ef!dS
Remarks: SET #1
c City of Springfield
Cli'ambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
5 - Side fractures (at top of bottom)
6 - Top fractures (same as #5 bul end of cylinder is poinLed)
ReS!~ffUIIY Submitted,
pr~ j' . ionf;;;c :dllstries.II1C,
SteVe loer .
Laboratory Manager
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT aNL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. 15
PROHIBITED w/TI1Qur THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
lPsilfon:t;;::;:~n
1li!nfI1n..ring . ~ . n..ctng
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
P.O, Box 2611
Eugene, Oregon 97402
C<:6- \595
COMPRESSION REPORT
Project No.: 722-80276-27
Proj. Name: Jerry's-McKenzle Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26, 20U9 CCB#176269
Date:
B.P. No.:
P.O, No.:
Cast By:
Pete Furlong
Field Test Data
Placement Data: Material: Concrete
Monolilhic Concrete Slab on Grade gridline A to E from 1 to 9
Location Sampled At:
0.5 at1,5
Date Cast: 01/14/09 Date Rec'd: 01/15/09
Ticket No.: IM;;;oo~~2200 Weather:
3352373 Fog
Design Strength (psi): required
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0141 1/2'1/2009 7
09-0142 2/11/2009 28
09-0143 2/11/2009 28
09-0144 H H
Lab Cure
(days)
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pct): ASTM C138
Time Cast: 4:10 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
koad:
Yardage
6"
1 1/2"
4.5%
38
69
6 x 12
ASTM
Test Time
Capping Method
Total: 10
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 placed 5,000
Diameter or
Dimensions
(Inches)
Cross Sect. Area Cylinder WT. Compo Strength Fracture Type
(s.L) (Ibs.) 'Max. Lo~d (Ibs.) (psi)
C1231.0J
5.99
28,2
4,130
C617-0J
2
1:25 PM
x
6
27
27
H
.. 1 ~ Cone (both ends) 2 - ConelVerlical Cracks (one end) 3 - Columnar 4 - Diagonal w no cracking at ends
Remarks: SET #1
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Melzler Engine'ering - Scott Metzler
116,430
28,15
5 - Side fra( '.ures (at lop of bottom) 6 - Top fr ,clure (same as #5 bul end (. cylinder is pointed)
R ~ ectfully Submitted,
p r SSionfJ~/ndllSlries, Inc.
Sl~ve Wilder .
Laboratory Manager
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS
PROHIBITED lVlTfiOUT THE WRITrEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l" e.'IInfonnation
, ~"3-.~ToBuildOn
1I!nf11n..""g . c-.uHInfI . 11Nrttng
Client:
Address:
Ms, Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Q$- ISct5
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
JanuarY 26, 2009 CCB#176269
Project No.: 722-80276-28
Proj. Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furiong
Field Test Data .
'51'/2"-
1 1/2'"
4.9%
36
67
ILoad:
"Slum-p - (in.): "ASTM-C 143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (f): ASTM C106.4
Max Temp (F):
MinTemp (F):
:Specimen Size:
Unit Weight (pef): ASTM C138
Time Cast: 4:50 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
ASTM
Placement Data: Material: Concrete
Monolithic Concrete Slab on Gracie griclline A to E from 1 to 9
6
27
27
H
,H f -,Cone (bo'th-:endS)2 ~- ConelVertical Cracks (one'end) 3 - Columnar 4 - Diagonal w no cracking at ends
Remarks: SET #2
cCity of Springfield
, ,Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzier Engineering - Scott Metzler
"
Location Sampled At:
B at2
Date Cast:
Ticket No.:
3160761
01/14/09
I M;:5NOOO~2200
Fog
Date Rec'd: 01/15/09
Weather:
Design Strength (psi): required
Cylinder No. Test Date Age (days) Field.Cure
(days)
09-0145 1/21/2009 7
09-0146 2/11/2009 28
09-0147 2!.11/2009 28
09-'0148 H H
Lab Cure
(days)
Yardage
6 x'12
10
10,75
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 ,placed 5,000
Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type Capping Method
DimElnsions Max,Load (I~s.) Test Time
(inches) (5.1.) (Ibs,) (pSi)
C617-03 C1231-03
6.00 . 28,27 28.5 11.7 ,825 4,170 2 1:30 PM X
,
5 ~ Side fractures (aUop, of, bottom) 6 - Top "fr a:tures (same as #5 bu.t end 01 cylInder is "pointed)
Ren;el'tfullY Submitted, .
Pr /i~al Jf:::vdustlies, fnc,
SfJ" Wildf
Laboratory Manager
THIS'REPORT IS PROVIDED FOR THE INFORMATiON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS PROHIBITED
WITHOUT THE WRITTEN
. PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. - - .
l.,;J;r;;:-lInformation
~.~~ .ToBuildOn
Englneerlntl . ~ . no.ttng
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
PO Box 2611
Eugene, Oregon 97402
~'6 - ICJi5
COMPRESSION REPORT
SPRINGFIELD OFFICE
1040 - A Shettey Street'
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26, 2009 CCB#176269
Project No.: 722-80276-29
Proj. Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Field Test Data.
61/2" -
1 1/2"
5.5%
35
63
Yardage
Slump (in.): ASTMC143
Max..Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F):-ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight(pcf): ASTM'G138
Time Cast: 5:45 AM Curing Conditions:
Additives: AEA, Hot Water
Resl}!ts Reported To: Contractor
ASTM
'Placement Data: Material: Concrete
Monolithic Concrete Slab on Grade 9ridline A 10 E from 1 to 9
6
27
27
H
H 1 ~ Cone (bo\h ends) 2 ~ ConelVerlical Cracks (one end) 3 ~ Columnar 4 - Diagonal w no cracking at ends
Remarks: SET #3
c Cily of Springfield
Chambers Construction -,David Bakke'
Robertson Sherwood Architects - Sco\\ Stolarczyk
Metzler Engineering - Scott Metzler
Location Sampled ~t:
Cat 5
Date Cast: 01/14/09 Date Rec'd: 01/15/09
Ticket No.: \M~;;OQ~~2200 Weather:
3160766 Fo~
Design Strength (psi): required
Cylinder No. Test Date Age (days) Field Cure
(days)
09-0149 1/21/2009 7
09-0150 2/11/2009 28
09-0151 2/11/2009 28
09-0152 H H
Lab Cure
(days)
6x 12
Load:.
20
10.75
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39
5,000 placed 5,000
Diameter or
Dimensions
(inches)
Compo Strength Fracture Type
Max. Load (Ibs.) (psi)
Test Time
Cap[Jing Method
Cross Sect. Area Cylinder WT.
(s.l.) (Ibs,)
C617-03
C1231-03
5.99
28.4
4,220
1:40 PM
x
28,21
119,040
2
5 - Side fra( iures (at top of bottom) - 6 -'Top fra"ctu-res (sameiis--#5 but end c; cylinder isp"qint"ed)
Rest11~:~u'IY Submitted,-. .' '
prc; !:nq;;hndllslries, Inc.
S("~e Wilder '
Laboratory Manager
.
THIS REPORT /s PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMittAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WiTHOUr THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
it "~.lInfonnation
"r:!!.~.. .To Build On
1f!II/g1ne-.g . ~ . 111 ..",., '..
Ms. Lauretta Davies
Jerry's Home Improvement
P,O Box 2611
Eugene,Oregon,g7402
Client:.
Address:
ez~ l5C15
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26, 2009 CCB#176269
Project No.: 722-80276-31
Proj. Name: Jerry's-McKenzie Field Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Field Test Data
6" .
~ .
1 1/2"
4.5%
34
62
koad:
'~Iu~-P (in.)-: 'Asri.{C'143"
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
"Material Temp. (F): ASTM C 1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pet): ASTM C138"
,Time Cast: ' 7:55 AM Curing Conditions:
Additives: AEA, Hot Water
Results Reported To: Contractor
ASTM
Placement Data: Material: Concrete
Monolithic Concrete Slab on Grade'gridline A to E from 1 to 9
LocationSam'pled At:
Bat 8
Date Cast: 01/14/09
Ticket No.: IMIX No
3160778 2450~~2200
_.. ._. ..11._
Design Stren!lth (psil:
.... I _ .
Cylinder No.
Test Date
09-0157
09-0158
.09-0159
09-0160
1/21/2009
2/11/2009
2/"11/2009
H
Dale Rec'd: 01/15/09
Weather:
Fo~
required
Age (days)
Field Cure
(days)
Lab Cure
(days)
Yardage
6 x 12
7
28
28
H
6
27
27
H
39
10
Total:
Supplier:
Knife River
Compressive Strength Data ASTM C39 .
5,000 placed 5,000 .
Diameter or Cross Sect. Area Cylinder WT. Compo Strength Fracture Type Cilpping Method
Dimensions Max. Load (Ibs.) Test Time
(inches) (s.i.) (Ibs.) (psi)
C617-Q3 C1231-Q3
6.00 28.27 28.0 126,010 4,460 2 1:50 PM X
u 1 _ Cone (both ends) 2 _ Cbne/Vertical Cracks (one end) 3 -Columnar 4 - Diagonal w no cracking at ends 5 - Side fractures (at lOp of bohom)
Remarks: SET #5
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stoiarczyk
Metzler Engineering - Scott Metzler
6 - Top fractures (same as #5 but end o,cylinde-r is pain-ted)
Re1? ,ctfully Submitted,
Pr, fE 5sionawtes Industries, Inc, ,
JJl~~r .
Laboratory Manager
A
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTiON OF THIS REPORT BY ANY METHOd AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS PROH/BITEDWIn/OUT
THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES - .