Geotechnical & Construction Servires
Daily Field Report
Client:
EWEB
500E. 4th Ave.
Eugene, Oregon
Project:
Hayden Bridge Water Filtration
Plant Expansion
Springfield, Oregon
Date:
Project No,:
Report No.:
Inspector:
ID No.:'
01-16-09
2087168
E-22207
A. Fenstermacher
5258882-49
ICC
Inspection of: Reinforced Steel
Contractor: Wildish Building Co.
Weather: .~F9g... .
BP No.:.': .:. 200JI:99225
Continuous Inspection: 0
Periodic Inspection: 0
Performed final inspection on the reinforcing steel for wall #20. A preliminary
inspection was performed on 01-07-09 (reference FEI report E22123).
Observed the placement of 28 yards of Knife River 4000 psi concrete (mix 40-SE7) into
areas noted above. Concrete was placed by pump and was mechanically
consolidated. Tested load 1 for mix design compliance: concrete temperature-54F; air
temperature- 31 F; slump- 6 1/2"; air content- 5.4%. Cast one (1) set of four (4) 4" x 8"
concrete test cylinders from load 2. Notified Jake Stucky (Wild ish) of on-site results:
concrete temperature- 62F; air temperature- 38F; slump- 61/4"; air content- 3.8%.
Mr. Stucky was asked to notify our office when additional services are needed.
To the best of our knowledge, the work inspected was in accordance with plans dated
02/2008 and applicable workmanship provisions of the I.B.C., except if noted above.
RP=r~
Michael L. Meyer ;;;;e
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCulloU9h (email)
OBEC- Pete Slocum (em ail)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
MlM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
7fJJ tWV CcmeIIAvenue' CavaDis, Qegm 97330, phcre(541) 757-4698, fax (541) 757-2991
29540 B Airpcrt Road . Eugene, Qegm 97402, pha1e (541)684-J849' fax (541) 684-3851
63050 Corporate Place, Suite 2 . Bend. Oregon 97701 . phone (541) 382-4844 . fax (541) 3824846
~""I
~.t!:
Page 1 of 1
1I:It.'llUrI;'I~~'~;'llll~_
Gc.v~~ " ,;CaJ & Construction Services
Daily Field Report
Client:
EWEB
500E. 4th Ave.
Eugene, Oregon
Project:
Hayden Bridge Water Filtration
Plant Expansion
Springfield, Oregon
Date:
Project No.:
Report No.:
Inspector:
10 No.:
01-14-09
2087168
E-22187
A. Fenstermacher
5258882-49
ICC
Inspection of: Reinforced Concrete
Contractor: Wildish Building Co.
Weather: Fog
'BPNo::'-'2008-00225
Continuous Inspection: 0
Periodic Inspection: Iil
Performed final inspection on the reinforcing steel for coagulant building slab on grade,
elevated slabs for raw water channel above walls #24 and #30, walls on east and. west
side for raw water channel above wall #25. Preliminary inspections were performed on
12-23-08,01-05-09 and 01"09-09 (reference FEI report numbers E22072, E22107 and
E22151).
Observed the placement of 88 yards of Knife River 3000 psi concrete (mix 30-1 K) into
coagulant slab and 18 yards of Knife River 4000 psi concrete (mix 40-SE7) into walls
and elevated slabs. Concrete was placed by pump and was mechanically
consolidated. Performed field tests to verify mix design compliance. load 1 was
tested initially to an air content of 7.7%. load 1 was set aside and load 2 was tested:
slump~ 5"; concrete temperature- 63F; air temperature- 38F; air content- 6.5%. Upon
completion of load 2, load 1 was retested: slump- 5 1/2"; concrete temperature- 62F; air
temperature- 37F; air content- 6.7%. EWEB approved the use of load 1 in the
thickened slab area. No test cylinders were cast from load 1 or 2 of 3000 psi concrete
(mix 30-1 K). Cast three (3) sets of four (4) 4" x 8" compressive strength cylinders.
Notified Jake Stucky (Wildish) and Mike Stickling (EWEB) of on-site results.
I Load 3 (mix 30-1K) I Load 8 (mix 30-1K) Load 1 (mix 40-SE7l
I CT- 64F I CT- 62F CT- 59F
I AT- 39F I AT- 43F AT- 42F
I S- 6" I S- 6" S- 7"
I AE-7.3% I AE-6.1% AE-5.3%
CT - concrete temperature; AT-air temperature; S- slump; AE- air content
Mr. Stucky was asked to notify our office when additional services are needed.
To the best of our knowledge, the work inspected was in accordance with plans dated
02/2008 and applicable' workmanship provisions of the I.B.C.. except if noted above.
;;1nh-
Michael L. Meyer for
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
"" OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake' Stucky (email)
City of Springfield MlM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
750 rw Cornell Avenue' Corvanis, Qegxi 97330 . phone (541) 757-4698 . fax (541) 757-2991
29540 8 Airport Road, Eugene, Oegon 97402 . phone (541) 6IJ4.J849 . fax (541) 684J851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846
SF;l
11~'II~lrt;41I~~'W~IIIIIIIIIHII
CLIENT
EWEB
500E. 4th Ave.
Eugene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 2 SAMPLED
TEST
DATE
01-15-09
02-05-09
02-05-09
Hold
AGE
(DAYS)
7
28
28
Geob.; " ~I & Construdion Services
Compressive Strength of Concrete
(ASTM C 39)
PROJECT
DATE
PROJECT NO.
REPORT NO.
01-15-09'
2087168
6162
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
B.P. NO.
2008-00225
01-08-09 CAST BY A. Fenstermacher DATE RECEIVED
4000 psi SPECIMEN SIZE
4000 psi SACKS SUPPLIER
40-SE7 CEMENT MAX SIZE AGG.
Super; Eclipse; AEA; Hot water AIR CONTENT
2 TICKET NO. 3160663 SLUMP
64" F YARDAGE.' 10.0 OF 40.0 TIME
52" F WEATHER Showers SPECIMEN STORAGE
Baffle wall north of wall #29; wall #21; remaining ramp walls (except west end).
From 1't lift in number 21.
AREA
(IN.'!
12.56
WEIGHT
(LBS!
8.3
TOTAL
LOAD (LBSI
47800
COMPRESSIVE
STRENGTH (PSIl
3810
AVERAGE
STRENGTH
(PSIl
TIME OF
TEST
8:30 AM
01-09-09
4" x8"
Knife River
3/4"
4.6%
6"
1:10 PM
ASTM C31
TYPE OF
FRACTURE-
5
**1 - End Cones . 2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 - Side (tcp or bottom)
REMARKS: Jake Stucky (Wildish) and Mike Stickling (EWEB) was advised of on-site test results.
Reviewed By: Ie:
UNmlt -'~
Michaell. Meyer mr
Technical Manager
~
c:
EWEB- Mike Stickling (email)
EWEB~ Wally McCullough.(email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
Knife- River
MLM:sc
RECEIVED
J4N.2 0 2008
This report and/or enclosed. test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
7fIJ NN Cornell Avenue' Cavallis. Oregon 97330. phone (541) 757-4698' fax(541) 757-2991
29540 8 Airport Rood . Eugene, Oregon 97402 . r;V1me (541)684-3849 . fax (541) 684-3851
630fIJ Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 3824846
~ftl
Geotechnical & Construdion Services
Compressive Strength of Concrete
(ASTM C 39)
, 11;"II~lct;"'I~..,~;,.nth\.I~l"
CLIENT
EWEB
500E. 4th Ave.
Eugene, Oregon
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
01-16-09
2087168
6164
B.P. Nef
2008-00225
DATE CAST 01-09-09 CASt BY J. Keller DATE RECEIVED 01-10-09
STRENGTH REQUIRED 4000 psi SPECIMEN SIZE 4" x8"
STRENGTH PLACED 4000 psi SACKS SUPPLIER Knife River
PRODUCT CODE 2440K1 UOKS CEMENT MAX SIZE AGG. 3/4"
ADDITIVES ~Super; Eclipse AIR CONTENT 6.0%
LOAD NO. 1 TICKET NO. 3160681 SLUMP 8"
CONCRETE TEMP 630 F YARDAGE 6.0 OF TIME 10:10AM
AIR TEMP 410 F WEATHER Overcast SPECIMEN STORAGE ASTM C31
POUR LOCATION Elevated walkway above wall #23.
TEST
DATE
01-16-09
02-06-09
02-06-09
Hold
AGE
(DAysl
7
28
28
AREA
(IN.')
12.50
WEIGHT
(LBsl
7.9
TOTAL
LOAD (LBsl
32800
COMPRESSIVE
STRENGTH (Psll
2620
AVERAGE
STRENGTH
(PSI)
" TIME OF
TEST
1:20 PM
TYPE OF
FRACTURE~
5
**1 - End Cones '. 2 - Cone/Split
3 - Columnar
~ -Diagonal
5 -:- Side (tcp and bottom)
6 - Side (top or bottom)
REMARKS: Mike Stickling (EWEB) was advised of on-site test results.
Re~::::.0r? _
. f//VVP-v,'7 .(;,r
Michael L. Meyer
Technical Manager
c:
EWEB- Mike Stickling (em ail)
EWEB, Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MlM:sc
This report and/or enclosed test oata is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part
thereof be disclosed wi!hout FEI Testing & Inspection, Inc.'s written authorization.
7fJJ N-N ComeII Ava1Ue' eavams, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 BAirpcxt Road, Eugene, Oregon 97402, phme (541) 684-3849 . fax (541) 684-J851
63050 Corporate Place, Surte 2 . Bend, Oregon 97701 . phone (541) 3824844 . fax (541) 382-4846
{~Ft'
11r..'II~lrf;<1II~~'ll;'lllltl.l~lti
G.:..,UoJ ,,1ical & ConStrudion Services
Compressive Strength of Concrete
(ASTM C 39)
CLIENT
EWEB
500E. 4th Ave.
Eugene, Oregon
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
DATE
PROJECT NO.
REPORT NO.
'01-16-09
2087168
6163
B.P. NO. . _ 1.008-00225
DATE CAST 01-09-09 CAST BY J. Kelier DATE RECEIVED 01"10-09
STRENGTH REQUIRED 4000 psi SPECIMEN SIZE 4" x8"
STRENGTH PLACED 4000 psi SACKS SUPPLIER Knife River
PRODUCT CODE 2440K1VOZF CEMENT MAX SIZE AGG. 3/4"
ADDITIVES Adva; Eclipse; Fiber; Hot water AIR CONTENT 4.9%
LOAD NO. 3 . TICKET NO. 3160677 SLUMP 71/2"
CONCRETE TEMP 65" F YARDAGE 7.00 OF TIME 9:30 'AM
AIR TEMP 34" F WEATHER Overcast SPECIMEN STORAGE ASTM C31
POUR lOCATION Slab #18.
LOAD 3 SAMPLED ,Near center
AVERAGE
TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF
DATE (DAYS) (IN', (LBSl LOAD (LBS) STRENGTH (PSn wsn TEST FRACTURE"
I 01-16-09 7 12.50 8.3 44200 3540 1:35 PM 5
I . 02-06-09 28
I 02-06-09 28 ,
.,
I Hold
"'''1- End Cones 2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 ~ Side (top or bottom)
REMARKS: Mike Stickling (EWEB) was advised of on-site test results.
,
R;;;4h
Michael L. Meyer ~
Technical Manager
,
c:
EWEB- Mike Stickling (email)
EWEB- Waliy McCullough (email)
OBEC- Pete Slocum (emall)
Wildish Building Co.- Kevin Fitzjarreli (email)
Wilciish Building Co.- Jake Stucky (email)
City of Springfield
, Knife' River
This report and/or enclosed test data is the confidential property of the client to whom.it is addressed and pertains to the specific
process and/or material evaluated. As,such; information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
R~e~IV~~
JAN 9! 'U~g
MLM:~~
700 NW Cornell Avenue' CoMlIIis, 0reg:Jl197330' phone (541) 757-4698. fax (541) 757-2991
29540 BAitpatRood . Eugene, Oegon 97402 . phone (541 )684J849. fax(541)684-J851
63050 Corporate Place, Surte2' Bend, Oregon 97701' phone (541) 382-4844 . fax (541) 3824846
RECEIVED
JAN 2 ~ ?nOB