Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2007-3-1 Mar, 2, 2007 4:30PM No 16~ p, 7/33 -a \Art ~ ZO\Jl- OI\3iS ~ , \ '\ I'nginl'!:'ring K & A Engineering, Inc. 3327 Roanoke Ave" Eugene, OR 97408 (541} 684.9399 Voice (541) 684-9358 FAX March 1, 2007 Project: 151.06 Hayden Enterprises, Inc. 2464 SW Glacier Drive #110 Redmond, OR 97756 Subject Jasper Meadows-lot #186 Springfield, Oregon Inspection of Foundation Fill At your request, we have inspected the in-place density of granular fills placed on the SUbject foundation pad, The fill consists of approximately 6to 3D-inches of a mix of 1 V,-inch minus and 'A-inch minus dense graded crushed aggregate, '7'115/ Af'Lte/ Y'n1J We inspected the placement and compaction of the dense graded crushed aggregate. Adequate compaction was determined in the field from test strips and visual estimation of optimum water content. This material was placed in 12-inch maximum lifts and compacted, Compaction was achieved by rolling the pad with a high capacity vibratory.steel drum roller until there was no significant deflection Of the granular material at the edge of the roller observed. We recommend approval of the foundation fill, as constructed, by the building oftlclal, . Thank you for the opportunity to be of service, Please call us it you have questions or need further assistance. Respectfully,