HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-6-22 lrtlA~;J Information "'~.lTo Build On Engineering. Consulting . Testing DAILY FIELD REPORT Date Performed: June 22, 2007 Sycan Development Corpqration Mr. Tim Hovel 840 Beltlirie Road Ste.202 Springfield, OR 97477 . Report Number: 722-70091-75 Client: Project Name: Holiday Inn (Gateway) 919 Kruse Way Springfield. Oregon Project Location: ' P.O. No.: Type of Structure: Type of Inspection: Permit No,: Weather: COM'.2006'01505 Clear Epoxy .Field Observations and Comments Met on-site with contractor to observe placement of'#4 epoxied rebar dowels in the following locations: 3 (three) #4 verticals at each end of north radius stem wall, Prior to installation tlie predrilled'holes were cleaned using a nylon brush and compressed air: Verified minimum embedment depth of 9 inches. the above listed epoxy anchors were installed using Simpson Set 22 epoxy: The epoxy anchors were installed in 'accordance with the contractor,' Contractor was asked to notifv our office when additional services are needed, ' Inspector: David Smith If you have any questions regarding this report, please feel free to contact us at 541-746-9649. Respectfully Submitted, Professional Service 'ndustries, Inc. ~~ . Project Manager c: City of Springfield-Denny Wright ,Mega Pacific-Ron Miller AAI Engineering-Harrid Afghan AAI Engineering-Steve, Young RECE\\lEO jUN 2 8 1007 THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT aNL Y. THE REPRODuC"nON 01= THIS REPORT, BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. Professional Service Ind,ustries, Inc. -1040-A Shelley Stre.et. Springfield, OR97477. Phone 541/746-9649. Fax 541n46-7163 l...~ ;llnjormation ,.,~. .To Build On Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed: June 22, 2007 Report Number: 722-70091-76 Client: Sycan Development Corporation Project Name: Holiday Inn Mr, Tim Hovet 840 Beltline Road Ste. 202 Project Location: 919 Kruse Way. Springfield, OR 97477 Springfield, Oregon P,O, No.: Permit No.: COM 2006-01505 Type of Structure: Weather: Partly Cloudy Type of Inspection: Reinforcing Steel field Observations and Comments Performed visual inspection of reinforcing,steel at the following locations: North radius stem wall between lines K and R. Reinforcing steel was. checked for grade, size, lap, placement and clearances where appticable. Reinforcing steel was secured using tie wire and supported on concrete dobie blocks. Reinforcing steel.was placed in accordance with approved design drawings and speCifications. Note: At noted radius brace frame bolts at M and. Q .call out for 1" anchors, 3/4" installed, Need engineering approval for as~built condition, Contractor was asked to notify our office . when additional services are needed. To the best of our knowledge, the work inspected above was in accordance with the building department approved design drawings, specifications and applicable workmanship provisions of the International Buildinp_ Code. Inspector: David Smith, ICC #0877340-85 CCB #176269 If you have any questions regarding this report, please feel free to contact us at 541-746-9649. Respectfully Submitted, P :ofessional Service Industries, Inc. ~ Joseph Vardner, E.I.T. Department Manager c: City of Springfield- Denny Wright Mega Pacific- Ron Miller n_, . AAI Engineering- Harrid Afghan THIS REPORT IS PROVIDED FOR THE INFORMATION at: THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT-THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. Professional Service Industries~ Inc:. 1 04-0-A Shelley Street. Springfield, OR 97477 . Phone.S41/746-9649 . Fax 541/746-7163 l~ ~~;J Information "'~.l1b Build On Engineeri'!g . Consulting. Testing DAILY FIELD REPORT Date Performed: June 18, 2007 Report Number: 722-70091-74 Client: Sycan Development Corporation Project Name: Holiday Inn Mr. Tim Hovet 840 Beltline Road Ste. 202 Project Location: 919 Kruse Way Springfield, OR 97477 Springfield, Oregon P.O. No,: Permit No,: COM 2006-01505 Type of Structure: 'Weather: Partly Cloudy Type of Inspection: Reinforcing Steel Field Observations and Comments Performed visual inspection of reinforcing steel at the following locations: 1 st floor, southwest elevator walls, (3) total; and columns at gridlines AA-11 " AA-2, 8-3.6 and D-2, Reinforcing steel was checked for grade, size, iap, placement and clearances where applicable. Reinforcing steel was secured using tie wire and supported on concrete dobie blocks. Reinforcing'steel was placed in accordance with approved design drawings, specifications and Farwest Steel drawings and RFI #4, Item 5, Contractor was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected above was in accordance with the building department approved design drawings, specifications and applicable workmanshie erovisions of the International Buildinq Code. Inspector: David Smith, ICC #0877340-85 If you have any questions regarding this report, please feel free to contact us at 541-746~9649, Respectfully Submitted, Pro'essiona' Service 'ndustries, 'nc. g~ seph Vardner, E.IT. Department Manager c: City of Springfield- Denny Wright Mega Pacjfjc- Ron MjJJer AAI Engineering- Harrid Afghan THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT GNL V. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. Professional Service Industries, Inc.. 1040~A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649. Fax 541/746~7163 l rVl'~illnlormali{)n fh~~_'L .ToBuild On FIELD DENSITY REPORT SOil AND SOil-AGGREGATE 1040 - A Shelley Street Springfield, Orego~ 97477 (541)746.9649 - (541)746-7163 tax CCB #176269 I!nglrNterlng . ConauItIng . ~i,;.""",.".ar Client:.. Sycan Development Corporation . Address: Mr. Tim Hovet 840 Beltline Road Ste.202 Springfield, OR, 97477 Project No.: Project: Project Location: Equipme'nt: 722-70091.82 Holiday Inn 919 Kruse Way. Springfield, Oregon Troxler: 3430 SN: 30203 OatePeriormed: P.O. No.: B.P. No.: Technician: June 25, 2007 COM 2006-01505 Anthony Deluc.a Laboratory Soil / Aggregate Data: Moistu'" Density Relationship of 133.0 Ibs.lcuJi., at 9,0% moisture, is from our report number 722-70091-2, dated April 4, 2007 for Egge Sand and Gravel (3/4",0). . , Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS577 OS 2214), 1 2 Q a114.7 N at 15 FRG FRG Probe Wet Density Dry Density Percent Percent Required Co~ments Depth LBSICU.FT. LBSICU.FT. Moisture Compaction Compaction 8" 135.8 127 6.9 95.5 95% 6" 141.1 131.7 7.1 99.0 95% 6" 135,9 129,2 5.2 97.1 95% Test No. Approximate Test Location Appro.ximate Test Elev. I I I 3 K.5 at 14.7 FRG Tests performed at finished grade of base rock at the locations listed above. Tests were reported to Jerry with Mega Pacific. Respectfully Submitted Professiona' Service Industries, 'nc. c: City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Ct7, --- oseph Vardner, EIT Department Manager THIS REPORT IS PROVIDED FOR THE INFORr..JA nON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD PARTY BY ANY MEANS EXC{:PT IN FULL IS PROHIBITED WITHOUT THE WRITTEN PERMISSION . OF PROFESSIONAL SERVICE INDUSTRIES. THESE RESUL TS APPL Y ONL Y TO THE SAMPLES TESTED ' rs~'~;ll!1jomWli()11 <<I.~~l! .To Build On I!nglrteerlng . eon.unJng . re.tJng FIELD DENSITY REPORT SOIL AND SOIL-AGGREGATE 1040. A Shelley Street Springfield, Oregon 97477 (541)746.9649 - (541)746-7163 fax CCB #176269 Client: Address: Sycan Development Corporation Mr. Tim Hovet 840 Beltline Road Sle.202 Springfield, OR 97477 Project .No.: Project: Project Location: Equipment: 722-70091-78 Holiday Inn 919 Kruse Way Springfield, Oregon Troxler: 3430 SN: Date Performed: P.O, No.: B.P. No.: Technician: June 21, 2007 COM 2006-01505 Chris McDonald 28693 Laboratory Soil / Aggregate Data: Moisture Density Relationship of 133.0 IbsJcu.fI., at 9.0% moisture, is from our report number 722-70091-2, dated April 4, 2007 for E9ge Sand and Gravel (3/4"-0). Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 673 OS 2751), TestNo. Approximate Test Location Approximate Test Elev. I I I I 4 IMa18.1 I FG Tests performed at finished grade of fill material at the locations listed above, Tests were reported to Jerry wilh Mega Pacific. 1 2 3 0.8 at 13 0.8 at 9.5 ,"P a18.1 FG FG FG Probe Wet Density Dry Density Percent Percent Required Comments Depth LBSICU.FT. LBSICU.FT. Moisture Compaction Compaction 6" 136.1 127.9 6.4 96.2 95% , 6" 141.6 132,2 7.1 99.4 95% j' 6" 135.8 124.8 8.8 93.8 95% 6" 127 119.1 6.7 89.5 95% C: City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Respectfully Submitted Professiona' Service 'ndustries, 'nc. ~dn:I:/ ~ Department Manager . THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLlENTONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMIITAL TOA THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED WITHOUT THE WRIITEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. THESE RESUL TS APPL Y ONL Y TO THE SAMPLES TESTED l'~.;;;~;lfnfonl1ation A~~~ .ToBuildOn 1I!!ng: , ,':,_ . ConauItiRfl . n..rtlRfl Client: Address: Sycan Development Corporation Mr: Tim Hovet 840 Beltline Road Ste.202 Springfield, OR 97477 COMPRESSION REPORT Project No.: 722-70091-79 Proj. Name: Holiday Inn Express location: 919 Kruse Way Springfield, Oregon Placement Data: Shear walls in Ihe elevator shaft. Set #1. Material: Concrete Location Sampled At: Grid 3.4 to 6/C to 0 Date Cast, 06/18/07 Ticket No.: I Mix N204' '89 322459 Date Rec'd: Weather: 06/19/07 Clear Design Strength (psi): required 6,000 Cylinder No. Test Date Age (days) Field Cure Lab Cure (days) (days) 07-2019 6/25/2007 7 6 07 -2020 7/16/2007 28 . 27 07-2021 7/16/2007 28 27 07-2022 Hold Hold Hold koad' Total: Supplier: Eugene Sand & Gravel Yardage Slump'(inl ASTM C143 Max. Aggr. Size: Air Content: ASTM C231 Air Temperature (F): Material Temp. (F): ASTM Cl064 MaxTemp (F): Min Temp (F): Specimen Size: Unit Weight (pet): ASTM C138 Time Cast: 2:20 PM Additives: Super P Results Reported To: Compressive Strength Data ASTM C39 placed 6,000 Date: B.P. No,: P.O, No,: Cast By: Field Test Data 7" 3/4"-0 730 80.60 4x8 Curing Conditions: Contractor SPRINGFIELD OFFICE 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 fax June 25, 2007 COM 2006-01505 Chris McDonald 1 day FC remainder ASTM Diameter or Cross Sect. Area Cylinder WT. Compo Strength Capping Method Dimensions Max. Load (Ibs.) Fracture Type U Test Time . (inches) (5.1.) (Ibs.) (psi) C617-03 C1231-03 4.00 12,57 8.8 68,590 5,460 3 9:50 AM X .. 1 - Cone (both ends) 2 - ConeNeriical Cracks (one end) .; - Columnar 4 - Diagonal wino craking at ends 5 - Side fraclur€.3 (at top of bottom) Remarks: c: City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sand & Gravel . , 6 - Top fractures (same as #5 Jut end of cylinder is pointed) R~CtfUIlY Submitted, Pr ss?~es, Inc. Seven E. Wilder laboratory Supervisor THIS REPORT IS PROVIDED FOR THE INFOR^,fA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED WITHOUT"THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. THESE RESUL TS APPL Y ONLY TO THE SAMPLES TESTED. ~n~'j;l. Infonnation i/,~~~~ .To Build On I!!!ng, ,." .,' . ~ng . ThaUng Client: Address: Placement Data: Columns. Set #3, SPRINGFIELD OFFICE COMPRESSION REPORT 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 fax June 25, 2007 COM 2006-01505 Sycan Development Corporation Mr. Tim Hovel 840 Beltline Road Sle.202 Springfield, OR 97477 Location Sampled At: AA at 10.5 Dale Cast: Ticket No.: 322477 06/18/07 IMiX N20~~6 DesiQn StrenQth (psi): Cylinder No. 07-2027 07-2028 07-2029 07-2030 Test Date 6/25/2007 7/16/2007 7/16/2007 Hold Project No.: 722-70091-81 Proj. Name: Holiday Inn Express Location: 919 Kruse Way Springfield, Oregon Date: B.P. No.: P.O. No.: Cast By: Chris McDonald Field Test Data Material: Goricrete Sfump (in:): ASTM C143 Max. Aggr. Size: Air Content: A$TM C231 Air Temperature (F): Material Temp. (F): A$TM C1064 Max Temp (F): Min Temp (F): Specimen Size: Unit Weight (pet): ASTM C138 Time Cast: 4:30 PM Additives: Results Reported To: T' 3/4"-0 76.10 78.20 Dale Rec'd: 06/19/07 Weather: koad: Total: Supplier: Eugene Sand & Gravel 4x8 Yardage 4 10 Curing Conditions: 1 day Fe remainder ASTM Clear Contractor required 4,000 Compressive Strength Data ASTM C39 placed 4,000 Age (days) Field Cure (days) Lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Strength Capping Method Dimensions Max. Load (Ibs.) Fracture Type .. Test Time (days) (inches) (s.L) (lbs.) (psi) C617-QJ C1231-o3 6 4.00 12.57 8.8 43,665 3,470 3 10:10AM X 27 7 28 28 Hold 27 Hold ~ --Columnar 4' - Diagonal wfnocraking at ends 5 ~ Side fractures (at top of bottom) 6 - Top fractures (same as #5 Jut end of cylinder is poinle i) R1~::~~fUIlY bmitted, P]'M(Fit (Vices Industries, Inc. Steven E. Wilder Laboratory Supervisor .. 1 ~ Cone (both ends) 2 - ConeNertical Cracks (one end) Remarks: c: City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sand & Gravei THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES_ THESE RESUL TS APPL Y ONL Y TO THE SAMPLES TESTED. r::-~-~";lll1fonnation flA~~f!!. .To Build On /1!!nfItneerlng . ConauIiJng. n-t#ng Client: Address: Sycan Development Corporation .Mr. Tim Hovet 840 Bettline Road Ste.202 Springfield, OR 97477 Placement Data: Columns. Set #2. Location'Sampled At: Column F at 2,5 Date Casl:06/18/07 Ticket No.: IMiX No.: 322469 2486 Date Rec'd: 06/19/07 Weather: Clear Design Strength (psi): Cylinder No. . 07 -2023 07-2024 97-2025 07-2026 required 5,000 Test Date Field Cure (days) COMPRESSION REPORT Project No.: 722-70091,80 ' Proj. Name: Holiday Inn Express Location: 919 Kruse Way Springfield, Oregon Material: Concrete - Lab Cure (days) 6 27 27 Hold koad: Total: ~upplier: Eu~ene Sand & Gravel Yardage 3 10 Slump(in~): ASTM C143 Max. Aggr. Size: Air Content: ASTM C231 Air Temperature (F): Material Temp. (F): ASTM C1064 Max Temp (F): Min Temp (F): Specimen Size: Unit Weight (pet): ASTM C138 Time Cast: 3:30 PM Additives: Results Reported To: Compressive Strength Data ASTM C39 placed 5,000 Diameter or Dimensions (inches) Cross Sect. Area Cylinder WT. (s.L) (Ibs.) Max; Load (Ibs.) Camp. Strength Fracture Type *. Test Time (psi) C1231-03 4m 12,63 .8.8 . 60,880 Age (days) 6/25/2007 7/16/2007 7/16/2007 Hold 7 28 28 Hold '~'-1-- t'orie (bothen'ds') --2 ~Cori'eNertj6aj'Crack's--(one e~). 3 - Columnar . 4 - Diagonal wIno craking at ends Remarks: c: City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sana & Gravel Date: B:P, No,: P.O. No.: Cast By: Field Test Data 61/2" 3/4"-0 75.r 78.90 '4x8 Curiil-g Conditions: Contractor 4,8fO 3 . SPRINGFIELD OFFICE 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 fax June 25, 2007 COM 2006-01505 Chris McDonald 1 day FCremainderASTM Capping Method C617-03 10:00 AM 'x 5 - Side fractures (at top of bOllom) 6 - Top fractures (sam.a as #5 but end of cylinder is pointech Re1J;CCtfUIIY S bmitted, . Pr) ssional rvices Industnes, Inc. I 'f . . I . . Steven E. Wilder . Laboratory Supervisor THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL y, THE REPRODUCTfON OF'THIS REPORT BY ANY METHOD. AND ITS TRANSMfTTAI. TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS PROHIBITED WITHDUTTHE WRITTEN ~ PERMISSION OF PROFESSIONAL SERVICE'INDUSTRIES. TNESE RESUL TS APPI. Y ONL Y TO THE SAMPLES TESTED. fl:iI1~~."';lInfonnation &tf1rij,]f1S' rr. B 'ld 0 8....., .. ....' .10Ul ' n f!nglneerlng . ComJuItIng . n..ung FIELD DENSITY REPORT SOIL AND SOIL-AGGREGATE . 1040. A Shelley Street Springfield, Oregon 97477 . (541)746-9649. (541)746-7163 fax CCB #176269 Client: Address: Sycan Deveiopment Corporation Mr. Tim Hovet 840 Beltline Road Ste.202 . Springfield, OR 97477 . Project No.: Project: Project L'ocation: COM 2006-01505" Chris McDonald Laboratory Soil / Aggregate Data. Moisture Density Relationship of 133.0 Ibs.lcu.fL, at 9.0% moisture, is from our report number 722-70091.2, d,atedApril4, 2007 for Egge Sand and Gravel (3/4"-0). E.quipment: 722-70091-83 Holiday Inn 919 Kruse Way' . Springfield, Oregon Troxler. 3430 . SN: 30203 Date Performed: P.O. No.. B.P. No.: Technician: June 23, 2007 Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 577 OS 2214), Test No. Approximate Test Location Approximate Test Elev. Probe Wet Density Dry Density Percent Percent Required Comments I Depth LBSICU,FT. LBSICU.FT. . Moisture Compaction Compa~tjon 6" 144,4 131.6 9.7 98.9 95% I 6" 139.9 f 129,4 9.1 '97.3 95% I 6" 143.8 I 131..6 8,9 98,9 95% I 6" 143,9 f 131.4 9 98.8 95% J 1 IK at 14.2 2" BFG 2 Kat 12 2" BFG 3 P.5 at 8,1 '2" BFG I 4 L.5 at 8,1 2" BFG Tests performed at finished grade of fill material at the locations listed above. Tests were reported to the Contractor. c: City of Springfied- Denny Wright Mega f"acific- Ron Miller AAI Engineering~ Harrid Afghan Respectfully Submitted Professiona' Service 'ndustries, 'nc. ~LL. ~ePh Vardner, E.IT Department Manager RECEIVED JUN 2 8 7007 Tf-US REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPROOUCTlON OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROfIlS/TED WITHOUT THE WRITTEN PERMISSION OF PROFESSIO('JAL SERVICE INDUSTRIES. THESE RESULTS APPL Y ONLY TO THE SAMPLES TESTED . lif)~ili'!::::/:~; ~'"' , c ,:JIfI . ConsUltIng . l'esHng SPRINGFIELD OFFiCi::: COMPRESSION REPORT Client: Address: Sycan Development Corporalion Mr. Tim Hovel 840 Beltline Road. Ste.202 Springfield, OR 97477 Project No.: 722,70091-88 Proj. Name: 'Holiday Inn Express Location: 919 Kruse Way Springfield., Oregon 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 fax . June 28, 2007 CCB#176269 COM,2006-01505 Date: B.P. No,: P.O. No.: Cast By: Chris McDonald " . Date Cast: T!cket No.: 322721 06/21/07 I Mix N20~ ~A " koad' Yardage . Slump (in.): ASTM C143 Max. Aggr. Size: Air Content: ASTM C231 Air Temperature (F): Material Temp. (F):A$TM C1064 Max Temp (F): Min Temp (F): 'Specimen Size: Unit Weight (pef): ASTM C138 Field Test Data 5" 3/4"-0 'Placement Data: Stem wall onlhe north side Material: Concrete 80.6" 83.6" Location Sampled'At:- 14,8 at N 6x12 Clear Tolal: Supplier: . Eugene Sand & Gravel 1 6,5 Time Cast: , 'Additives: :Results Reported To: 2:30 PM Curing Conditions: 1 day Fe remainder ASTM Date Re'c'd: 06/22/07 Weather: Contractor . ~e~ign Str~ngth !~si): required 4,000 Compressive Strength Data ASTM C39 placed 4,000 Cylinder No. T~st Dale Age (days) Field Cure (days) 07-2089 6/28/2007 7 07-2090 7/19/2007 28 07-2091 7/19/2007 28 07-2092 . Hold Hold Lab Cure (days) Diameter or Dimensions (inches) Cross Sect. Area (s.i.) CYIi~der WT. (Ibs.) Compo Strength Max. Load(lbs~) (psi) Fracture Type *- Te,lTime I 1040 AM I I Capping Method C617-03 C123HlJ d1 -Cone (bqth end!:!) 2 - ConeNertical Cracl<s"(one end) Remarks: 6 27 1 27 .1 Hold 1 3 - Colum"ffar 4 - Diagonal wino ci-aking at ends .5 ~ Side fractures' (at top of ..bottom) 603 28.56 299 107,640 I 3,770 3 1 I I .x c: City of Springfied.- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sand. & Gravel '. , 6 - Top fractures (same as #5 buf end of CYlinder ;s pointed) . Rery,;"ctfuIIY Submitted, . Pre (SSionaljervices Induslries, Inc. ,),^,fvPl/\ '. Steven E. Wilder Laboratory Supervisor TtiIS REPORT IS PROVIDED FOR THE INFORMA TION OF THEeL/ENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL- TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROH",BITED WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES: Tf/ESE RESUL TSAPPLY ONL Y TO THE SAMPLEs TESTED. -- ~. '~ -- -, -- - l'n'e;lInjormation. ~:..=.~ .ToBuildOn Engh...e~ . Con.uittng . n-tlng Client: Address: Sycan Development Corporation Mr. Tim Hovet 840 Beltline Road Ste.202 Springfield, OR 97477 Placement Data: Shear walls and columns SPRINGFIELD OFFICE COMPRESSION REPORT 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 fax June 28. 2007 COM 2006:01505 Project No.: 722-70091-45 Proj. Name: Holiday Inn Express Location: 919 Kruse Way Springfield, Oregon Date: B.P, No.:.' P.O. No.: Cast By: Chris McDonald Yardage Slump (in.): ASTM C14] Max. Aggr. Size: Air Content: ASTM C231 Air Temperature (F): Material Temp. (F): A$TM C1064 Max Temp (F): Min Temp (F): Specimen Size: Field Test Data 6" 314"-0 Malerial: Concrete Location Sampled At: Shear wall (east end) Date Cast: 05131107 Date Rec'd: Ticket No.: IMiX N;~~9 Weather: 321:347 Clear Design Strength (psi): 'required 6,000 Cylinder No. Test Date Age (days) Field Cure lab Cure (days) (days) 07-1755 61712007 7 6 07-1756 612812007 28 27 07-1757 612812007 28 27 07.1758 Hold H!,ld Hold 6x12 Load: Total: 2 10114 Supplier: Eugene Sand & Gravel Unit Weight (pet): ASTM C138 Time Cast: 3:00 PM Curing Conditions: Additives: Super P Results ~eportedTo: Contractor 1 day Fe remainder ASTM Compressive Strength Data ASTM C39 placed 6,000 Diameter or 60ss Sect. Area Cylinder WT. Compo Strength Dimensions Max. Load (Ibs.) Fracture Type .. Test Time (inches) (s.i.) (Ibs.) (psi) 6.02 28.46 29.5 158,450 5.570 5 11:20AM 6.02 28.46 2g.s 204,115 7,170 3 10:10AM 6.02 28.46 29.5 206,705 7,260 3 10:20 AM Capping Method C617-oJ C1231-Q3 x X X .. 1 - Cone (both eridsr~'2 ~ Co'n-eNe.i1ical'Ciacks'(one end)" 3 c'Coluriiilar 4 ~ Diagonal wino ciaking alends Remarks: c: City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sand & Gravel , 5. Side-fractures (at top of bollom) 6 - Top fractures (same as #5 but end of cylinder is pointed) Res~eCtfUIlY Submitted, Pro triof:J~es Industries, Inc. S".j~. Wilder Laboratory Supervisor THIS HEPORT IS PROVIDED FOR mE INFORMATION OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT BY ANY MEr/IQD. AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED WITf-iOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, THESE RESULTS APPL Y ONL Y TO THE SAMPLES TESTED, ,'~ ... lrtA~;J Infonnation "'~.lTo Build On Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed: June 5, 2007 Sycan Development Corporation Mr. Tim Hovel 840 Beltline Roaa Ste. 202 Springfield, OR 97477 Report Number: 722-70091-48 Client: Project Name: Holiday Inn 919 Kruse Way Springfield, Oregon Project Location: P,O. No,: . Type of Structure: Type of Inspection: Permit No,: Weather: ..-- "'.'> '. '-,,' . CQM.2006~01505- Rain Reinforced Concrete Field Observations and Comments Reinforcing steel was previously inspected on June 4, 2007. Performed visual inspection during placement of concrete in the following locations: Shear wall 7/M-Q.5 and Columns R/4, M/4, P/4, H/2, K/3 and M/3. Concrete was placed by pump truck and mechanically consolidated. Cast one set of four (4x8) concrete test cylinders. To the best of our knowledge, the work inspected above was in accordance with the building department approved design drawings, specifications and applicable workmanship provisions, of the International Building Code, The Contractor was asked to notify our office when additional services are needed, Tvoe of Material ' Concrete Supplier ES&G Mix # 2489 Slump 7" Air Content Ambient Temperature Material Temperature Time Placed Design Strength (psi) Number of Samples Total Yardage Placed Inspector: Chris McDonald, Ice #01102446 640 760 2:00 PM 6000 4 11 If you have any questions regarding this report, please feel free to contact us at 541'-746-9649, Respectfully Submitted, Pro'essional Service 'ndus'ries~ 'nc, ~ C/../ ~ePh'Vardner, E.IT Department Manager c: City of Springfield- Denny Wright Mega Pacific- Ron Miller . AAI Engineering- Harrid Afghan RECEIVED JUN 1 4 Z007 THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPROqUCTlON OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY.BY ANY MEANS, EXCEPT IN FULL WITHOUT THE WRITTEN PERMIS!510N OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. Professional Service Industries, Inc," 1 040-A Shelley Street .. Springfield, OR 97477 .. Phone' 541 n 46-9649 .. Fax 541/746-7163 l...~., Infonnation "'''''.lTo Build On Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed: June 11, 2007 Report Number: 722-70091-56 Client: Sycan Development Corporation Project Name: Holiday Inn Mr. Tim Hovet 840 Beltline Road Ste. 202 Project Location: 919 Kruse Way Springfield, OR 97477 Springfield, Oregon P.O. No.: Permit No,: COM 2006-01505 Type of Structure: Weather: Overcast Type of Inspection: Reinforcing Steel Field Observations and Comments Performed visual inspection of reinforcing steel at the following locations: Columns gridlines B-11, B-O, AA-3.7 and 9.1; shear walls lines C and 0 from 7to 9.6; and stem walls at line K and R from 11 to 14.6; west wall line 2 to 11 and south wall from AA to F. Reinforcing steel was checked for grade, size, lap, placement and clearances where applicable. Reinforcing steel was secured using tie wire and supported on concrete dobie blocks. Reinforcing steel was placed in accordance with approved design drawings, specifications and Farwest Steel drawing with Engineers stamp dated May 17,2007. Note: Will perform final inspection at stem wall prior to concrete placement. At shear wall bottom (3) horizontal steel placed at inside of vertical steel. Contractor was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected above was in accordance with the building department aoproved desiqn drawings, specifications and aPQlicable workmanshio provisions of the International Buildino Code. Inspector: David Smith, ICC #0877340-88, DaDA #442 'If you have any questions regarding this report, please feel free to contact us at 541-746-9649, Respectfully Submitted, Professiona' Service 'ndustries, Inc. a/ L--L---. ~p;;:'ardner, E.IT Department Manager c: City of Springfield- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan THIS REPORT 1$ PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. . RECEIVED JUN 1 5 1007 Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 5411746-9649. Fax 541/746-7163 Jf'iii,'~';'I Infonnation "A~."!:...?:~.f.To Build On I!!ngln ,. '.. ::,'...- .~ng . n..tIng Client: Address: Sycan Development Corporation Mr. Tim Hovel 840 Bellline Road Ste.202 Springfield, OR 97477 Placement Data: , Shear wall and columns Location Samopled At: Shear wall (east end) Date Cast: 06/05/07 Ticket No.: IMiX No.: 321588 2489 Oo:te Rec'd: Weather: Design Strength (psi): Cylinder No. 07,1803 07-1804 07-1Ci05 . 07-1Ci06 Test Dale Age (days) Clear required 6,000 Field Cure (days) 1 COMPRESSION REPORT Project No.: 722,70091-57 Proj. Name: Holiday Inn Express location: 919'Kruse Way Springfield, Oregon Material: Concrete Lab Cure (days) koad: Total: Supplier: Eugene Sand & Gravel Yardage 2 11 Compressive Strength Data ASTM C39 placed 6,000 Diameter or Dimensions (inches) Cross Sect. Area Cylinder WT. (s.i.) (Ibs.) Compo Strength Max. Load (Itis.) Fracture Type *' Test Time (psi) C12J103 6 27 27 4.00 12.57 8.8 .84,440 .~ 1 - Cone (both ends), i~~ConelVerlical Cracks'(one"end) Remarks: Hold 3- Columnar 4 - Diagonalwfrio craking at ends 5 - Side fractures (at top of bottom) c: 6/12/2007 7 City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sand & Gravel Date: B.P. No.: P,O, No.: Cast By: Field Test Data T' 3/4"-0 6,720 3 SPRINGFIELD OFFJCE 1040 - A Shelley Stl eet Springfield, Oregon 97177 (541)746-9649 - (541)746-7163 ~ax June 11, 2007 COM 2006-01505 Chris McDonald 1 day Fe remainder ASTM Capping.Metho< C617.{)3 11:00AM x 7/3/2007 I. 28 7/3/2007 Hold 28 Hold 6 - Top fractures (S~ eas #5 but end of cylinder is pointed) Re j lctfully S bmilted, Pc<' € ;sional !Vices Industries, Inc. sIeV!jti~ilder Laboratory Supervisor THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT DNL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FliLL, IS PROHIBITED WITHOUT THE WRIT] ~N PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. l'ri'~.J lrifonllation ~~I/i_lToBuild On eng'" .. ,-,rJU . eon.uJtIng . Th<rtIng Client: Address: Sycan Development Corporation Mr. Tim Hovel 840 BelUine Road Ste.202 Springfield, OR 97477 Placement Data: Foolings for shear walls at Southwest corner of the pool. Location Sampled At: Northwest corner Date Cast: 05/14/07 Ticket tJo.: IMiX No.: 320125 2146 Date Rec'd: 05/15/07 Weather: Clear Design Strength (psi): required 4,000 Cylinde:r No. Test Date Field Cure (days) Age (days) 07-1544 5/21/2007 6/11/2007 6/11/2007 Hold 7 28 28 07-1~)45 07-1546 07-1547 Hold COMPRESSION REPORT ' SPRINGFIELD OFFICE i 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 fax June 11,2007 COM 2006-01505 Project No.: ,722-70091-31 Proj, Name: Holiday Inn Location: 9,19 Kruse Way Springfield, Oregon Date: B,P, No,: P,O, No,: Cast By: Verlyn Bearden koad: Slump (in.): ASTM CI43 Max. Aggr. Size: Air Content: A$TM C231 Air Temperature (F): Material Temp. (F): ASTM C1'064 Max Temp (F): Min Terno lFl: Specimen Size: Unit Weight (pet): A$TM C138 Time Cast: 2: 15 PM Additives: Results Report~d To: Field Test Data 51/2 3/4" Material: Concrete 65 71 Yardage 4x8 Lab Cure (days) Hold 1 11 Curing Conditions: 1 day F.G. ASTM G31 Total: Supplier: Eugene Sand & Gravel Contractor 6 27 27 Compressive Strength Data ASTM 039 placed 4,000 Diameter or Cross Sect. Area Cylinder WT. Compo Strength Dimensions Max. load (Ibs.) Fracture Type U Test Time (inches) (s.L) (lbs.) (psi) 4.01 12.63 8.7 46,690 3,700 3 8:52 AM 4.02 12.69. 8.6 69,965 5.280 3 9:50AM 4.01 12.63 8.6 67,520 5.350 3 10:00 AM x X X Capping Method C617-QJ C1231-()3 .~ 1 - Cane (bo.h a-iids) 2 -ConeNeitical' Cracks (one end) ,). Columnar 4 - Diagonal wIno craking at ends Remarks: Set# 1 c: City of Springfied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sand & Gravel , 5 - Side fractures (at top of bottom) 6 - Top fractures (saJl e 8s#5 but end of cylinder is pointed) . Re~ ctfully S'ubmitted, , Pn r. sional !Ae~es Indus~ries, Inc. ~ ~(!V . '--" Sfeven E. Wilder Laboratory Supervisor THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE <;UENT ONt Y. THE REPRODUCTION OF THIS REPoRT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. Iri~";llnfohl1ation "Jf'~!P~!,!. .To Build On /l!!ngJ < , _ ,ng . c--.ItIng . Te.Ung Client: Address: Sycan Development Corporation Mr. Tim Hovet ' 840 Beltline Road Ste.202 Springfield, OR 97477 SPRINGFIELD OFFICE COMPRESSION REPORT 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-96'19 - (541)746-7163 fax June 11, 2007 COM 2006-01505 Project No.: 722-70091.32 Proj. Name: Holiday Inn 'Location: 919 Kruse Way Springfield, Oregon Date: B.P. No,: P,O. No.: Cast By: Verlyn Bearden Field Test Data Placenie'nt Data: 'Material: Co-ncrele Footings for shear walts at Southwest corner of tot by pool. ,Location Sampled At: .Center of footing Oate Cast: 05/14/07 :Ticket l>Jo.: IMiX No.: . 320141 . 2146 Desi!'Jn Strength (psi): Cylinder No. 07-1548 07-1549 07-1!;50 07-1551 Test Date 5/21/2007 6/11/2007 6/11/2007 Hold Dale Rec'd: 05/15/07 Weather: Clear required 4,000 Age (days) Field Cure (days) Lab Cure (days) 7 28 28 6 27 , 27 Hold Yardage 12 11 Slump (in} ASTM C143 Max. Aggr. Size: Air Content: ASTM C231 Air Temperature (F): 68 Material Temp. (F): ASTM C1064 72 Max Temp (F): Min Temp (F): Specimen Size: 4x8 Unit Weight (pet): ASTM C13B Time Cast: 3:35 PM Curing Conditions: 1 day F.e. ASTM C31 5" 3/4" Load: Total: Supplier: Eugene Sand & Gravel Additives: Results Reported To: Contractor Compressive Strength Data ASTM C39 placed 4,000 Diameter or Cross Sect. Area Cylinder WT. Camp. Strength Dimensions Max. Load (Ibs.) Fracture Type .. Test Time (inches) (s.L) (Ibs.) (psi) 4.03 12.76 8.70 47,830 3,750 3 9:36 AM 4,02 12.69 8.8 71,430 5,630 3 9:30 AM 4.02 12.69 8.8 72,300 5,700 2 9:40 'AM Capping Method C617.03 C1231-03 x x X Hold 3 - Co"lumnar . 4 -' Diagonal wino craking at ends 5 - Side fractures (at top of Dottom) 6 - Top fractures (s~e as #S but end of ~ylinder is PO._ inted) Re. 1CtfUllY Su itted, Pre . siona' ice ustries, Inc. .. 1 ~ Cene (both ends) 2 ."ConeNerticaICraCks (one erid) Remarks: Set# 2 c: City of Springtied- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan Eugene Sand & Gravel sle!en E. ilder Laboratory Supervisor THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y: THE REPRODUCTION OF THIS REPORT BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED WITHOUT THE WRITTEN . PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. l",~., Information ,.,..,. .To Build On , Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed: June 6, 2007 Sycan Development Corporation Mr, Tim Hovet 840' Beltline Road Ste..202 Springfield, OR 97477 . Report Number: 722-70091-49 Client: Project Location: Holiday Inn 919 Kruse Way Springfield, Oregon 'COM 2006-01505 Overcast. Project Name: P.O. No.: Type of Structure: Type of Inspection: Permit No.: Weather: Reinforced Concrete Reinforcing Steel Field Observations and Comments Performed visual inspection of reinforcing steel and anchor bolts at the following locations: Strip and pier footings at vestibule between lines D and E; line K from 11 to 14.8; line R from 11 to 14.7; pier footings at lines Rand L4-14.2, 13, and 14; concrete pier footing at 4crane foundations. Rebar only at shearwallline 6 from E.5 to F, Reinforcing steel was checked for grade, size, lap placement and clearances where applicable. Reinforcing steel was secured using tie wire and supported on concrete dobie blocks. Reinforcing steel was placed in accordance with approved design drawings, specifications and directive from AAI changing F4 footings to F6. See Attached. Performed visual inspection during placement of concrete in the locations listed above. Concrete was placed by pump and mechanically consolidated, Cast two sets of four (J set of 6000, 1 set of 4000) (4x8) concrete test cylinders, Note: Shear wall will be poured at a later date, discontinued wall at 2nd floor; need floor dowels. Crane footing foundation per Morrow Equipment Co, detail dated May 8, 2007, See attached. To the best of our knowled~e, the work inspected above was in accordance with the building department approved design drawings, specifications and applicable workmanship provisions of the International Building Code. The Contractor was asked to notify our office when additional services are needed. Tvoe of Material Supplier Mix# Slump Air.Content Ambient Temperature 71,2' 71.4' Material Temperature 75.5' 75.7' Time Placed 2:00PM 2:40 PM Design Strength (psi) 6000 12:00 AM Number of Samples 4 12:00 AM Total Yardafle Placed 8 12:00 AM Inspector: David Smith, Certification #0877540-88 OBOA #442 Chris McDonald, Certification #5298238-51 ACI 01102446 If you have any questions regarding this report, please feel free to contact us at 541-746-9649. Set#1 ES&G 2489 7" Set #2 ES&G 2146 51/2" Respectfully Submitted, Professioria' Service 'ndustries, 'nc, .0 ~ ~ Vardner, E.I.T, Department Manager c City of Springfield- Denny Wright Mega Pacific- Ron Miller AAI Engineering- Harrid Afghan THIS REPORT IS PROVIDED FOR THE INFORMATION OF"THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANv"METHOD, AND ITS TRANSMITTAL TO A THIRD EARTY, BY AN't. MEA..NSf EXCEP.T IN FULL, WITt/QUr THt. WRITTEN PtRMI~~/ON Of- PROF-t:::;::;IUNAL :it:KVIGE INDUSTRIES, IS PROHIt;J1 leU I-'rblesslonal ::>erVlce ndustrl8S, Inc. .1040-A Shelley Street- Springfield, OR 97477. Phone 541/74,6-9649. Fax 541/746-7163 . l.. ~;, lrifol7111ltion "''''.lTo Build On Engineering' Consulting' Testing DAILY FIELD REPORT Date Performed: June 7, 2007 Report Number: 722-70091-51 Client: Sycan Development Corporation' Project Name: Holiday Inn Mr. Tim Hovet 840 Beltline Road Ste. 202 Project Location: 919 Kruse Way Springfield, OR 97477 Springfield, Oregon P.O. No.: Permit No,: COM 2006-01505 Type of Structure: Weather: Overcast Type of Inspection: Reinforcing Steel field Observations and Comments Performed visual inspection of reinforcing steel at the following locations: Shear wall line 7 from K to M; columns at gridlines 9-H, K, M, P, and P-10; elevator pit wall between Rand S; south side and strip footing line S from 1 to 2. Reinforcing steel was checked for grade, size, lap placement and clearances where applicable. Reinforcing steel was secured using tie wire and supported on concrete dobie blocks. Reinforcing steel was placed in accordance with approved design drawings, specifications, Farwest Steel Drawings dated April .12, 2007 and RFI #3. Note: At shear wall #7's to be added at 2nd floor elevator, To the best of our knowledge, the work inspected above was in accordance with the building department approved design drawings, specifications and applicable workmanship provisions of the International Building Code. Contractor was asked to notify our office when additional services are needed. Inspector: David Smith, Certification #0877540-88 OBOA #442 If you have any questions regarding this report, please feel free to contact us at 541-746-9649. Respectfully Subm itted, Professiona' Service 'ndustries, Inc, QL~ ~Ph ;ardner, E.I.T. Department Manager c: City of Springfield- Denny Wright Mega Pacific- Ron Miller. AAI Engineering- Harrid Afghan THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y.' THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. Professional Service Industries, Inc.. 1 040-A Shelley Street. Springfield, OR 97477 . Phone 541n46-9649 . Fax 541/746-7163 l"~;1 Information ,.,~. .To Build On Engineering . Consulting . Testing DAILY,FIELD REPORT Date Performed: June 7, 2007 Report Number: 722-70091-52 Client: Sycan Development Corporation Mr. Tim Hovet 840 Beltline Road Ste.202 Springfield, OR 97477 Project Name: Holiday Inn (Gateway) 919 Kruse Way Springfield, Oregon Project Location: P.O. No,: Type of Structure: Type of Inspection:. Permit No,: Weather: . Overcast Epoxy , Field Observations and Comments Met on'site with contractor to observe installation of (4) #4, (3) #8 and (1) #10 rebar dowls in the following locations: (4) #4 bar at gridS at10'(shear wall to strip footing), (3) #8 rebar dowels at grid D at 2 (column footing) and (1) #10 rebar dowel at shear wall footing grid 7.5 at, (13.5" west of L.5). Prior. to installation the predrilled holes were cieaned using a nylon brush and compressed air, Verified minimum embedment depth of 36" for.the#10 bar, 12" for the #8 bar, and 7" for the #4 bar. The above listed epoxy anchors were installed using Simpson Set 22 epoxy with ICC# 1772. The epoxy anchors were installed in accordance with the latest revisions ,dated May 31,2007. Note: (4) #4 bar at grid 5 at 10 is an "as built condition". Needs engineering approval for 7" embed depth. To the best of our knowledge, the work inspected above was in accordance with the building dep~rtment approved design drawings, specifications, and applicable workmanship provisions of the International Building Code, Contractor was asked to notify our office when additional services are needed. Inspector: Chris McDonald, ICC #5298238-51 If you have any questions regarding thiS report,'please feel free to contact us at 541-746-9649. Respectfully Submilte9, , Professiona' Service 'ndustries, 'nc, 2;~IT Project Manager c: City of Eugene THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y_ THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED. Professional Service Industries, Inc. . 1 040-AShelley Street. Springfield, OR 97477 . Phone 541/746-9649 . Fax 541/746.7163