TRANSMITTAL
June 25, 2007
I TO:
I BUILDING INSPECTOR
CITY OF SPRINGFIELD .
FROM:
Jeffrey D~rmaj .
Project Manager
Phone 541- 501-8621
'\
Fax-541-743-4701
E:,Peace Health RiverBend Annex- Sector E HID
. ~E~I\II~T#.C9M2007.,D0111 ,.
- --'
.,,;,~ ""' ,lDei'Of sheets transmitted including this cover sheet is 1'1
.
Final Air and Testing Report for COM2007-00111.
"
. ( P,O, BOX 7867' EUGENE, OREGON 97401-0033 '\
(541) 726-8081 . FAX (541) 741-0896 )
CCB#46071
~OOITOO ~
(> >
/
xv~ RC:TO LOOZ/SZ/90
Air Introduction & Regulation of Eugene, Ine, (AIR, Ine,)
90710 HuntleyCt., Coburg, OR 97408
Phone: (541) 484-1928 Fax: (541) 343-6704
OF EUGENE!, INC.
I ."
I. AIR JBAJUlNClNG
AND
TESTING REPORT
FOR:
RIVERBEND ANNEX
SECTOR E
HID OFFICE BUILD-OUT
ARCHITECT:
ANDERSON DABROWSKI ARCHITECTS
ENGINEER:
CARMICHAEAL GROUP
CONTRACTOR: FM SHEET METAL, INC,
I
DATE:
MAY 29, 2007
*1.
JOB NUMBER: 07-42
Certification No. 2983
toonoo ~
xv~ 8C:10 LOOZ/SZ/90
*1..
L.D...J
OF EUClENE. 1Ne.
Certification No, 2983
CERTIFICATION
PROJECT: . RIVERBEND ANNEX SECTOR E - HID OFFICE BUILD-OUT
ADDRESS: SPRINGFIELD, OREGON
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM
PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD
PROCEDURES. ANY VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB
TOLERANCES ARE NOTED THROUGHOUT THIS REPORT.
THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED AND BALANCED AND FINAL
ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL
STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS"
AND THE PROJECT SPECIFICATIONS.
NEBS TAB FIRM: Air Introduction & Regulation of Eugene, Inc. (AIR,lnc,)
REG. NO.
2983
CERTIFIED BY Tommy W, Hooker, Jr, DATE
5/29/07
THE HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL
ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL
STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS"
AND THE PROJECT SPECIFICATIONS.
NEBS TAB FIRM:
REG. NO.
CERTIFIED BY
DATE
SUBMITTED & CERTIFIED BY:
REG NO. 2983
SIGNATURE/"\~fi4J.... --<
. ~, ". ",
NEBS TAB FIRM AIR, Inc.
TAB SUPERVISOR Tommy W, Hooker, Jr,
DATE' 5/29/07
CERTIFICATION EXPIRATiON DATE 12-31-07
~OO/COO ~
XVd 6C:I0 LOOZ/SZ/90
5I2912007
OF EU()ENE,INC.
Air Introduction & Regulation of Eugene, fne, (AIR, Inc.)
90710 Huntley Court, Coburg, Oregon 97408
Phone: (541) 484-1928 Fax: (541) 343-6704
jeff@aireugene,com
Air Balance Summary & Procedures
*1.
Certification No. 2983
On existing AHU-8 fan system all of the terminal units in sector E HID remodel
odjusted out to the design criteria, The return outlets were adjusted with all
of the terminal units in the remodel on 100% cooling and the osa damper
commanded to minimum position of 10 psi as set in the control program: At this
condition all of the terminal units were at the design cfm flow however we noted
the outside and return dampers were both approximately 75% open and appear
to be tracking by separate control signals,
INSTRUMENTS
CAUBRATION DATE
1, Shortridge Diffuser Hood
2. Shortridge AirData Multimeter
3. Vane Anemometer
4, Digital Tachometer
. 5, Water Flow Meter