Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-6-25 " I '.. JOHiY. . 'II"';'}E::' ,;:, ~ ,- ....-.'._ . .:.l . ,_-V' ~. .'-- -'_,C.._ -'.,-~) ~"~~ :'.->-.;~:'~~.~~. . -..',-,'.. ,." TRANSMITTAL June 25, 2007 I TO: I BUILDING INSPECTOR CITY OF SPRINGFIELD . FROM: Jeffrey D~rmaj . Project Manager Phone 541- 501-8621 '\ Fax-541-743-4701 E:,Peace Health RiverBend Annex- Sector E HID . ~E~I\II~T#.C9M2007.,D0111 ,. - --' .,,;,~ ""' ,lDei'Of sheets transmitted including this cover sheet is 1'1 . Final Air and Testing Report for COM2007-00111. " . ( P,O, BOX 7867' EUGENE, OREGON 97401-0033 '\ (541) 726-8081 . FAX (541) 741-0896 ) CCB#46071 ~OOITOO ~ (> > / xv~ RC:TO LOOZ/SZ/90 Air Introduction & Regulation of Eugene, Ine, (AIR, Ine,) 90710 HuntleyCt., Coburg, OR 97408 Phone: (541) 484-1928 Fax: (541) 343-6704 OF EUGENE!, INC. I ." I. AIR JBAJUlNClNG AND TESTING REPORT FOR: RIVERBEND ANNEX SECTOR E HID OFFICE BUILD-OUT ARCHITECT: ANDERSON DABROWSKI ARCHITECTS ENGINEER: CARMICHAEAL GROUP CONTRACTOR: FM SHEET METAL, INC, I DATE: MAY 29, 2007 *1. JOB NUMBER: 07-42 Certification No. 2983 toonoo ~ xv~ 8C:10 LOOZ/SZ/90 *1.. L.D...J OF EUClENE. 1Ne. Certification No, 2983 CERTIFICATION PROJECT: . RIVERBEND ANNEX SECTOR E - HID OFFICE BUILD-OUT ADDRESS: SPRINGFIELD, OREGON THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORT. THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED AND BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS. NEBS TAB FIRM: Air Introduction & Regulation of Eugene, Inc. (AIR,lnc,) REG. NO. 2983 CERTIFIED BY Tommy W, Hooker, Jr, DATE 5/29/07 THE HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS. NEBS TAB FIRM: REG. NO. CERTIFIED BY DATE SUBMITTED & CERTIFIED BY: REG NO. 2983 SIGNATURE/"\~fi4J.... --< . ~, ". ", NEBS TAB FIRM AIR, Inc. TAB SUPERVISOR Tommy W, Hooker, Jr, DATE' 5/29/07 CERTIFICATION EXPIRATiON DATE 12-31-07 ~OO/COO ~ XVd 6C:I0 LOOZ/SZ/90 5I2912007 OF EU()ENE,INC. Air Introduction & Regulation of Eugene, fne, (AIR, Inc.) 90710 Huntley Court, Coburg, Oregon 97408 Phone: (541) 484-1928 Fax: (541) 343-6704 jeff@aireugene,com Air Balance Summary & Procedures *1. Certification No. 2983 On existing AHU-8 fan system all of the terminal units in sector E HID remodel odjusted out to the design criteria, The return outlets were adjusted with all of the terminal units in the remodel on 100% cooling and the osa damper commanded to minimum position of 10 psi as set in the control program: At this condition all of the terminal units were at the design cfm flow however we noted the outside and return dampers were both approximately 75% open and appear to be tracking by separate control signals, INSTRUMENTS CAUBRATION DATE 1, Shortridge Diffuser Hood 2. Shortridge AirData Multimeter 3. Vane Anemometer 4, Digital Tachometer . 5, Water Flow Meter tOOItOO ~ 07-25-06 07-26-06 11-15-06 11-15-06 06-15-06 XV~ 6&:10 LOO~/S~/90