HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-1-6 &1EI ~. .m & Construclion SeNices Compressive Strength of Concrete (ASTM C 39) 11a.'lliICW;.t~,,"ili'IIIJl'.m.1I!I CLIENT Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97403 PROJECT L TD Gateway Mall Station 3000 Gateway Street Springfield, Oregon DATE PROJECT NO. REPORT NO. 01-06-09 2087170 .6136. B.P.NO. COM2008-00440 DATE CAST 12-09-08 CAST BY A. Fenstermacher DATE RECEIVED. 12-10-08 . STRENGTH REQUIRED 3000 psi SPECIMEN SIZE 4" x 8" STRENGTH PLACED 3000 psi .SACKS SUPPLIER ESi' PRODUCT CODE 313065 CEMENT MAX SIZE AGG. 3/4" ADDITIVES AEA; Hot water AIR CONTENT LOAD NO. 1 TICKET NO. 58006480 SLUMP 41/4" CONCRETE TEMP 62" F YARDAGE 3.5 OF 3.5 TIME 9:00 AM AIR TEMP 38" F WEATHER F09 SPECIMEN STORAGE ASTM C31 POUR LOCATION North down spout site wall. AVERAGE TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYSl (IN.') (LBSl LOAD (LBS) STRENGTH (PSIl (PSIl TEST FRACTURE- 12-16-08 7 12.62 8.2 24000 I 1900 12:20 PM 5 01-06-09 28 12.56 8.2 38200 I 3040 10:00 AM 5 01-06-09 28 12.56 8.2 36400. 3060 3050 10:05 AM 5 Hold U1 -End Cones 2 - ConefSplit 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: Adam HU9hes (Brown Contracting) was advised of on-site test results. Reviewed By: /h.Y'~ Michaei L MeyJ.} Technical Manager c: Rowell Brokaw- Mark Young (em ail) Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (emaii) Brown Contracting- Adam Hughes (em ail) City of Springfield- Denny Wright (email) MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specifIC process and/or material evaluated. As such, infonnation contained herein shall not be reproduced in part or full andlor any part . thereof be disclosed without FEI Testing & Inspection, Jnc.'s written authorization. 700 NN CanelAverue' Cavaliis, 0reg:x1 97330, rtme(541) 757-4698, fax (541) 757-2991 29540 BAirpat Road . Eugene, 0reg:x197402 . rtme (541)684J849 . fax (541) 684-3851 63050 Co<porate Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844' fax (541)382-4846 ~rP~. ~._l Page 1 of 1 11:"II~lrw;<lI~..'iI;III'Jj.liL. c;"",w. ~ & Construcfun Services Daily Field Report Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon Project: L TD Gateway Mall Station 3000 Gateway Street Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.: 01-06-09 2087.170 E-22109 A Fenstermacher 5258882-49 ICC Inspection of: Reinforced Concrete Contractor: Brown Contracting - Weather:_o.vercast BP No.: COM2008-00440 Continuous Inspection: 0 Periodic Inspection: 0 Performed inspection on the reinforcing steel for south site wall. Reinforcirig steel was checked for grade, size, laps, quantities, locations, ties, clearance and supports. Observed the placement of 9.5 yards of Eugene Sand and Gravel 3000 psi concrete (mix 313065) into areas noted above.. Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" compressive strength cylinders. Notified Adam Hughes (Brown Contracting) of on-site results. Concrete temperature- 66F; air temperature- 49F; slump- 5 1/2". Mr. Hughes was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance with Ang Engineering drawings dated 08-11-08, plans dated 03-12-08 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: A.x.~ Michael L Miler Technicai Manager c; Rowell Brokaw- Mark Young (email) Ang Engineering- Jok Ang (em ail) Balzhiser Hubbard- Tina Guard (em ail> Brown Contracting- Adam Hughes (emaill City of Springfield- Denny Wright (em ail) MLM:sc This report and/or enclosed test data is the confidential property of the client to 'Nhom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced inpart or full and/or any part thereof be disclosed without FEI Testing & Inspection. Jnc.'s written authorization. 750 I'#J Cane! AVff1ue' Cavailis, Clre(pl 97330. phcne (541) 757-4698, fax (541) 757-2991 29540 B I\irjxrt Road, ELgane, Clre(pl97402 . phcne (541) 684384g. fax (541 )684J851 63050 Corporate Place, Su~e 2. Bend. Oregon 97701 . phone (541) 382-4844. fax (541) 382-4846 {ifEl 11.'llilrt;.I,~'~;'IIII~.Jri" - CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE'TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED TEST DATE 12-30-08 01-20-09 01-20-09 Hold . AGE (DAYS) 7 28 28 Gc....~ . ~ & Construclion SerIIicss Compressive Strength of Concrete (ASTM C 39) PROJECT L TD Gateway Mall Station 3000 Gateway Street Springfield, Oregon DATE PROJECT NO. REPORT NO. Me. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97403 B.P.NO. COM200B-oQ440 12-23-08 CAST BY M. Meyer 3000 psi 3000 psi SACKS 313065 CEMENT AEA, Hot water, WRA 1 TICKET NO. 58006583 66" F YARDAGE 10.0 OF 21.0 33" F WEATHER Cloudy Site walis between lines 3 and 6 and 7 and 10.(ftg. to top). DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG. AIR CONTENT SLUMP TIME SPECIMEN STORAGE Near line 4. AREA (IN.'l 12.50 WEIGHT (LBS) 8.3 TOTAL LOAD (LBS' 25200 COMPRESSIVE STRENGTH (PSI' 2020 AVERAGE STRENGTH (PSIl TIME OF TEST 7:35 AM 12-30-08 2087170 6152 12-24-08 4' x8' ESG 3/4" 33/4" 10:25AM ASTM C31 TYPE OF FRACTURE- 5 ...., - End Cones 2 - ConefSplit 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: Adam Hughes (Brown Contracting) was advised of on-site test results.. Reviewed By: (h. ;t{,~ Michael L. ~eye(/ , Technical Manager c: Roweli Brokaw- Mark Young (email) Ang Engineering- Jok Ang (em ail) Balzhiser Hubbard- Tina Guard (email) Brown Contracting- Adam Hughes (emaii) City of Springfieid- Denny Wright (emaii) MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed wTt~out FEI Testing & Inspection, lnc.'s written authorization. 7fIJ NoN CaneII A;mue' CavaIIis, 0re;p197330 . ph:::re (541) 757-4698 . fax (541) 757-2991 29540 B Airpat Road . Eugene, 0re;p197402 . ph:::re (541) 684J84g . fax(541) 684-3851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~ Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97403 ~Ffl 11~'ll!ltI;1IIIf,.'liI;'lIIJ~.IiL_ CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED Geotechnical & Construclion SeNices Compressive Strength of Concrete (ASTM C 39) PROJECT L TD Gateway Mall Station 3000 Gateway Street Springfield, Ore90n DATE PROJECT NO. REPORT NO. 12-31-08 2087170 6131. ---- '. B.P. ':'I(): . -fQ~2QQ8-00440 0 CAST BY A. Fenstennacher DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG. AIR CONTENT SLUMP TIME SPECIMEN STORAGE 3112- 10:00 AM ASTM C31 SACKS CEMENT 12-04-08 4>e- ESG 3/4" 12-03-08 3000 psi 3000'psi 313065 AEA, WRA 1 TICKET NO. 61" F YARDAGE 48"F VVEATHER Platform site wall footings. 58006402 10.0 OF 15.0 Showers From north end. AVERAGE TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYS) (IN.') (LBS) LOAD (LBS) STRENGTH {PSIl (PSI) TEST FRACTURE- 12-10-08 7 12.56 8.2 29300 2330 7:50 AM 5 I 12-31-08 28 12.56 8.2 47600 3790 7:30 AM 5 I 12-31-08 28 12.56 8.3 49200 3920 3855 7:35 AM I '5 I Hold I I -1 - End Cones 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: Adam Hughes (Brown Contracting) was advised of on-site test results. Reviewed By: /l1.~~--- Michael L. Mey~ .' Technical Manager c: Rowell Brokaw- Mark Young (email) Ang Engineering- Jok Ang (email) . Balzhiser Hubbard- Tina Guard (em ail) Brown Contracting- Adam Hughes (em ail) City of Springfield- Denny Wright (email) MLM:sc This report and/or encl9sed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization. . 7fiJ NVV Camel Avenue' CavaIIis, 0regJn97330' rhre(541)757-4698' fax (541) 757-2991 29540 B AirpJt Road . Et.gene, 0regJn 97402 . rhre (541)6!l4-3849 . fax (541) 684;)851 63050 Corporate Place, Sutte 2' Bend, Oregon 97701 . phone (541) 382-4844, fax (541) 3824846 SFEl 11;.,'llltfl-;.IIIo':.'aIIIIJI1W1~l" Page 1 of 1 GeoIed1nical & Construclion SeNices Daily Field Report Client: Mr. Joe McCormack Lane Transit District. PO Box 7070 Eugene, Oregon Project: L TD Gateway Mail Station 3000 Gateway Street Springfieid, Qregon Date: Project No.: Report No.: Inspector: IDNo.: 12-23-08 2087170 E-22068 M. Meyer 0877905-88 ICC Inspection of: Reinforced Concrete Contractor: Brown Contracting , -Weather:-Cloudy _ BP No.: C~flA2008-00440 J Continuous Inspection; 0 Periodic Inspection: . 0 Performed inspection on the reinforcing steel in site walls between lines 3 & 6 and 7 & 10 (ftg. to top). Reinforcing steel was checked for size, grade, laps, quantities, locations, ties, clearance and supports. Observed the placement of 21.0 yards of Eugene Sand and Gravel 3000 psi concrete (mix 313065) into area noted above. Concrete was placed directly from truck and was mechanically consoiidated. Cast one (1) set of four (4) 4" x 8" concrete test cylinders from load 1. Notified Adam Hughes (Brown Contracting) of on-site results: slump- 3 3/4"; concrete temperature- 66F; air tempe;ature- 33F. Mr. Hughes was asked to notify.our office when additional services are needed and was advised to protect concrete from exposure to inclement weather conditions. To the best of our knowledge, the work inspected was in accordance with ANG Engineerin9 drawings dated 08-11-08, plans dated 03-12-08 and applicable workmanship provisions of the LB.C., except if noted above. . Reviewed By: !!1~e~'~ Technical Manager c: Roweil Brokaw- Mark Young (email> Ang Engineering- Jok Ang (em ail) Balzhiser Hubbard- Tina Guard (email) Brown Contracting- Adam Hughes (email) . City of Springfieid- Denny Wright (email> MLM:sc This report and/or enclosed test data is the confidential property of the c1lent to whom it is addressed and pertains to the specific process and/or material evaluated. As such, infonnstion contained herein shall not be reproduced in part or full and/of any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 NoN Cane! Avenue' Cavaffis, C\'eg:Jn 97330. p/me (541) 757-4698 . fax (541) 757-2991 29540 B Ai1pat Road . Eugene, C\'eg:Jn 97402 . p/me (541) 684-J849 . fax (541) 684;3851 63050 Corporate 'Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844. fax (541) 382-4846 ~"''''I LYrt Geok.G: . .;.,.,J & CalsIruc:OCin Setvices Compressive Strength of Concrete (ASTM C 39) 11:r.'1llllrt;.ltlI,'~~IIIIJ~.I1{. CLIENT Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97403 PROJECT L TD Gateway Mall. 3000 Gateway Street Springfield, Oregon DATE PROJECT NO. REPORT NO. 12-16-08 2087170 6136 B.P. NO. COM2008-00440 ~ , DATE CAST 12-09-08 CAST BY A. Fenstermacher DATE RECEIVED 12-10-08 STRENGTH REQUIRED 3000 psi SPECIMEN SIZE 4" x 8" STRENGTH PLACED . 3000 psi SACKS SUPPLII;R ESG PRODUCT CODE 313065 CEMENT MAX SIZE AGG. 3/4" ADDITIVES AEA; Hot water AIR CONTENT LOAD NO. 1 TICKET NO. 58006480 SLUMP 41/4~ CONCRETE TEMP 62" F YARDAGE 3.5 OF 3.5 TIME 9:00 AM AIR TEMP 38" F WEATHER Fog SPECIMEN STORAGE ASTM C31 POUR LOCATION "- North down spout site wall. TEST DATE 12-16-08 01-06-09 01-06-09 Hold AGE (DAYS) 7 28 28 AREA (IN.'! 12.62 WEIGHT (LBSl 8.2 TOTAL LOAD (LBSl 24000 COMPRESSIVE STRENGTH1PSIl 1900 AVERAGE STRENGTH lPSIl TIME OF TEST 12:20 PM TYPE OF FRACTURE- 5 "1 - End Cones 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: Adam Hughes (Brown Contracting).was advised of on-site test results. Reviewed By: Ih.<;(,~ Michaei L~ Melr . Technical Manager c: Rowell Brokaw- Mark Youn9 <emaill Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (em ail) Brown Contracting- Adam Hughes (email) City of Springfield- Denny Wright (email) MLM:sc This report and/or enclosed test data is the confidential property of the client. to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI ~estjng & Inspection, Inc.'s written authorization. 700 NoN CaneIIAvenue' CavaDis, ()eg:n 97330. phcre(541) 701~' fax (541) 701-2991 29540 BAirpat Road . Eugene, ()eg:n 97402' phcre (541)6843849' fax (541) 684J851 63050 Corporate Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844' fax (541) 382-4846 SfEl 11."",,,,,"""""11'."'. . Geolechnical & Cons1ruclion SeNires Page 1 of 1 Field Density Test Results - ASTM D 2922 Client: Me. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97403 Project: . L TD Gateway Mall Station 3000 Gateway Street Springfield, Oregon Date: Project No.: Report No.: , - - L :,.P. ~~.:___ 01-07-09 2087170 E-22121 COM2008-o0440 *MOISTURE/DENSITY DATA: ASTM D698 - Maximum Dry Density of 116.4 pcf, at 9.6% moisture furnished by Brown Contracting for 3/4"-0 crushed aggregate (Wiidish). -MOISTURE/DENSITY DATA: ASTM D698 -. Maximum Dry Density of 132.9 pcf, at 7.8% moisture furnished by Brown Contracting for 11/2"-0 crushed aggregate (Wiidish). - -- Wet Test Approximate Location Approx. . Density Percent Dry Density . Percent Compaction No. Elev. (pcfl Moisture (pcfl Compaction Requirement AM 1 Near center of east side 1.5' BFG- 145.0 5.5 137.5 100+ 95.0 2 Near center of west side 1.5' BFG- 140.4 5.2 133.4 100+ 95.0 PM 3 Near center of east side FG+ 139.1 6.2 130.9 100+ 95.0 4 Near center of west side FG* 142.7 5.3 135.5 100+ 95.0 --_._.-_.._~ --~- Tests performed below finished grade and finished grade of base rock under new concrete paving at west end of pedestrian walkway. Remarks: Adam Hughes (Brown Contracting) was ,advised of test results. Reviewed By: ~.'7(,~ Michaei L. Me er Technical Manager c: Rowell Brokaw- Mark Young (email) Ang Engineering- Jok Ang (emaill Balzhiser Hubbard- Tina Guard (email) Brown Contracting- Adam Hughes (em ail) City of Springfield- Denny Wright (email) MLM:sc This report andlorenclosed test data is the confidential property of the client 10 whom it is addressed and pertains to the specific process andlor material evaluated As such, infonnatioD contained herein shall not be reproduced in part of full andlor 1I0Y part thereofbe disclosed without FEI Testing & Inspection, Inc,'s wrinen authorization. 750 NW Caneli AWlue' CcrwIIis, 0I<gm 97330' phooe(541) 757-4698, fux (54 t) 757-'0)1' 29540 BAirpcrtRood . Eugme, Oregm 97402' phrne(54I)684-3849' fux (541)684-3851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~......~ ~yrtJ """'''";.''''~''""'.'''. c;,.,.,"'-A . oM,I & Construclion SeNiCES Page 1 of 1 Report of Inspection Services Welding/High-Strength Bolting Client: Me. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon Project: L TD Gateway Mall Station 3000 Gateway Street Springfield, Oregon L TD Gateway Mall Station Date: Project No.: Report No.: Inspector: IDNo.: 12-31-08 2087170 E-22096 K. Green 8003776 ICC . Field: 0 Inside. _ _._ COM2008-00440:::' Inspection of: Fabricator or Erector: Contractor: Welding Gibson Steel Brown Contracting Shop: I;>! ~Weather:--- / .~. I:I!" NQ..:.. , Performed visual inspection of the fabricated structural steel walkway canopy structure components- (6) 6- A, (5) 7-A, (4) 8-A, 8-b, and (2) 8-C. Completed welds were checked for size, length, profile and location. Gentry (Gibson Steel) was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked is in conformance with shop drawings dated 06-07-08 and appiicable AWS D1.1 code, except if noted above. Reviewed By: ;1. '-/./ku,~ Michael L. Me(e,r. Technical Manager c: Roweil Brokaw- Mark Young (email) Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (email) Brown Contracting- Adam Hughes (email) City of Springfield- Denny Wright (emaii) MLM:sc This report andlor enclosed test data is the confidential property of the dient to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall nol be reproduced in part or full and/or any part thereof be disclosed without FE! Testing & Inspection, lnc.'s written authorization. 750 NW ComeU Avenue' Corvailis, Oregon 97330, phone (541) 757-4698. fax (541) 757-2991 29540 B Airport Road' Eugene, Oregon 97402. phone (541) 684-3849, fax (541) 684-3851 63050 CoIporate Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844. fax (541) 382-4846 ,'. &fEJ II.'''''''''''''''''''''.I''!! Gcv~ " .m & Construclion Servires Page 1 of 1 Report of Inspection Services Weldin~/HiQh-StrenQth BoltinQ Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon Project: L TD Gateway Mall Station 3000 Gateway Street Springfield, Oregon L TD Gateway Mall Station Inspection of: . Fabricator or Erector: Contractor: Welding Gibson Steel Brown Contracting Date: Project No.: Report No.: Inspector: 10 No.: Shop: 0 Weather:. BPNo.: 01-06-09 2087170 E-22113 C. Walpole 0104013.1 AWS CWI Field: 0 . -,Inside, COM2008-00440 Performed visual inspection on the following fabricated structural walkway gutter frames- 13-A (14) 14-A, (5) 15-A and 16-A. Completed welds were checked for size, length, profiie and location. Fabricator was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked isin conformance with shop drawings dated 07-07-08 and applicable AWS D1.1 code, except if noted above. . Reviewed By: A. '1(.~)J Michael L. MJ/er Technical Manager :----' c: Rowell Brokaw, Mark Young (email) Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (em ail) Brown Contracting' Adam Hughes (emaii) City of Springfield- Denny Wright (emaii) MLM:sc '. This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s wntten authorization. 750.NW Cometl Avenue' Corvallis, Oregon 97330. phone (541) 7574698 . fax (541)757-2991 29540 BAirport Road' Eugene, Oregon 97402. phone (541) 684-3849, fax (541) 684-3851 63050 Coiporate Place, Suite 2' Bend, Oregon 97701 . phone (541) 382-4&\4. fax (541) 382-4846