Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2008-12-23 lpsil;;ff;::;:~n 1!!!IIg:.,.. ,,' ,~;:.,.", . C"" . ., I '.",."""" . n .1."" j ',II COMPRESSION REPORT CB \~\/J SPRINGFIELD OFFICE Client: Address: Ms. Lauretta Davies Jerry's Home Improvement P.O. Box 2611 Eugene, Oregon 97402 Project No.: 722-80276-12 Proj. Name: Jerry's-McKenzie Field Improvments Location: 2525 Olympic Street, Springfield, Oregon 1040 - A Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 fax December 23, 2008 CCB#176269 Dale: B.P. No.: P.O. No.: Cast By: Gienn Meek Jr. Yardage _ Load: 1 ITotal: 10 Supplier: Knife River Slump (in.): ASTM C143 Max. Aggr. Size: ,Air Content: ASTM C231 A.ir Temperature (F): :Material Temp. (F): A5TM C1064 Max Temp (F): Min Temp (F): Specimen Size: Unit Weight (pet): ASTM C138 Time Cast: 1 :15 PM Curing Condltions: Additives: :Results Reported To: Contractor Field Test Data 3" 3/4" ,Placement Data: - Material: 'Concrete Column footings on lines 1, 4, 7 and 9 from lines A to J 45" 55" Location Sampled At: A al8 Date Cast: 12/11/08 Date Rec'd: 12/12/08 Ticket No.: 1~~;~O~:E5200 Weather: 3160559 Overcast Design Strength (psi): required Cylinder No. Test Date Age (days) Field Cure (days) 08-3896 12/18/2008 7 08-3897 1/8/2008 28 08-3898 1/8/2008 28 08-3899 H H Ax8 ASTM Compressive Strength Data ASTM C39 3,000 placed 3,000 Lab Cure (days) Diameter or Dimensions (inches) Cross Sect. Area Cylinder WT. (s;i.) (Ibs.) Compo Strength Fracture Type Max. Load (Ibs.) (psi) ** Test Time Capping Meth.od C617-0J C1231-0J 6 27 27 4.00 12.57 I 8.5 33,065 2,630 I I I 2 11:20AM x ** 1 ~ Cone (both ends) 2 - ConeNertical Cracks (one end) 3 - Columnar 4 - Diagona(w/no cracking at ends 5 _ Side fractures (at top ofbollom) Remarks: c: City of Springfield Cllambers Construction - David Bakke Robertson Sherwood Architects - Scott Stolarczyk Metzler Engineering - Scott Metzler . 6 - Top fractures (sam~ as #5 but end of cylinder is pointed) Respectfully Submitted, peSSiona/{J~ustries, Inc. Raym~. Aiiperti R E eEl V E 0 Project Manager .. JAN 0 8 Z008 THIS REPORT 1$ PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED WITHOUT THE WRITTEN . PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. l,.~ ;ZInjormation ",~. .To Build On Engineering. Consulting. Testing l~J)YYj LInD - D I Lj(.Q.5 DAILY FIELD REPORT Date Performed: December 11, 2008 Report Number: 722-80276-10 Client: Ms. Lauretta DaVies Project Name: Jerry's-McKenzie Field Jerry's Home Improvement Improvements P.O Box 2611 Project Location: 2525 Olympic Street Eugene, Oregon 97402 Springfield, Oregon P.O. No.: Z4175LD Permit No.: Contractor: Chambers Construction Weather; Overcast Type of Inspection: Reinforced Concrete Field Observations and Comments Performed visuai inspection of reinforcing steel and anchor bolts at the following locations: Column footings on gridlines 1,4, 7, 9 from A to J. Also performed continuous ,inspection during the placement of concrete. Concrete was placed by truck and mechanically consolidated. Cast one (1) set of four (4) (4x8) concrete test cylinders. To the best of our knowledge, the work inspected above was in accordance with the building department approved design drawings, specifications, and applicabie workmanship provisions of the International Building Code. Tv"" of Matlilla! Supplier Mix# Slump Air Content Ambient Temperature Material Temperature Time Placed Design Strength (psi) Number of Samples Total Yardaqe Placed Inspector; Steve Wilder/Pete Furlong CCB# 176269 Set #1 Knife River 2430NE5200 3" 45' 55' 1:15 pM 3000 4 100 If you have any questions regarding this report, please feel free to contact us at 541-746-9649. """"'''' S"br~ rofessio 5e ice J~stries, Inc. l -~\ IJ.. David Smith Branch Manager c: City of Springfield Chambers Construction - David Bakke Robertson Sherwood Architects - Scott Stolarczyk Metzler Engineering - Scott Metzler THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PApfof.!liSilI'r\.I~~Hilcg1fia6sflM~\ltc~WI4~T",!!h""II!ISlNM~'$'~lill/l!llilij,Potliw,ffllV'j>tf6i\\\"fi,fflfflii9gl@.'Fa">fflti'1i'46O,163 l... ~ ;ZInjormation fI~. .To Build On Engineering . Consulting . Testing 0J)Yn?JJDO' OIl/loS DAll Y FiELD REPORT Date Performed: Client: December 2, 2008 Ms. Lauretta Davies Jerry's Home Improvement P.O. Box 2611 Eugene, Oregon 97402 Report Number: 722-80276-9 Project Name: Jerry's-McKenzie Field Improvements 2525 Olympic Street Springfield, Oregon Project Location: P.O. No.: Type of Inspection: Z4175LD Soils Observation Weather: Cloudy . Field Observations and Comments Met on site with Chambers Construction and Egge Sand and Gravel representatives to observe excavations at the following locations: Pad Footings at A at 3(11 ')" B at 3 (11 '), B at 6(7'), C at 3(11 '), C at 6(8'); continuous footings at gridlines A from 2 to 5(10 1/2'). Ail measurements are from finished rock grade. Exposed subgrade soils visually appeared to be native dense sandy (bar run) gravel. All excavations were clean and free of loose debris and were filled in with imported Controlled Density Fill. To the best of our knowledge, the work inspected was in accordance with the building department approved design drawings, specifications and applicable workmanship provisions of the International Building Code. Inspector: Raymond A/iperti CCB #176269 If you have any questions regarding this report, pl,ease feel free to contact us at 541-746-9649. Respectfully Submitted, Professional S,fVice Industries, Inc. ~,~ ti David Smith Branch Manager c; City of Springfield Chambers Construction - David Bakke Robertson Sherwood Architects - Scott Stolarczyk Metzler Engineering - Scott Metzler THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED Professional Service.lndustries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541n46-7163