Loading...
HomeMy WebLinkAboutComments SUB 5/19/2008 , " ... SPRINGFIELD UTILITY BOARD WATER SERVICE Cr:!'\:TEI{ 202 South 18th Street Springfield, OR 97477-5240 Tel $41.726.2396 Fax 541.747.7348 www.subutil.com May 14,2008 . ed' rll'ilce Date Rece1v ...:;:2j..U-. Planner: MEM Molly Markarian City of Springfield 225 N, 5th Street Springfield, OR 97477 Dear Molly: SUBJECT: SITE REVIEW TENTATIVE #DRC2008-00029 CARVER 17-02-30-43 TL 6400, 6401 3654 KATHRYN A VENUE Listed below are our comments for the above referenced development proposal: I, The proposed development is within the Springfield city limits and currently receives water service from the Springfield Utility Board (SUB), If additional water service is required please ask the developer to contact the Springfield Utility Board Water Division, 2, The proposed washout area on the drawings is shown at the location of 3 water system valves, These valves cannot be covered with fabric and/or rock. All water system facilities must be visible and available for operation at all times. 3. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from wells. In every instance, care shall be taken to prevent groundwater contamination. Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. S:\SITEPLAN\3654 Kathryn Avenue site plan 5-14-08,doex . . . 4. Backflow prevention devices will be required for this service. Please contact Chuck Davis at 726-2396 prior to installing water service. Chuck can help in the selection of the most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. Sincerely, c:;] ov0I- '2:.. M G I Cae- Bart E. McKee, P.E. Senior Civil Engineer - Water Division BEM:mk S:\SITEPLAN\3654 Kathryn Avenue site plan 5-14-08.doex