Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
COMPRESSION REPORT
(j~- DDY3b
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 8, 2008 CC8#176269
Project No.: 722-80174-135
Proj. Name: Maple Elementary School
Location: 2109 J Street
Springfield, OR
Date:
B.P. No.:
P.O. No.:
Cast By:
P0271-255-0809
Dale Russeil
"Placement"Data: Material: .Concrete
Pour _bacl5s.t[il1s (North, Ea_sJ, VY,,-st.!'id.e_s of gym). Line 5 East.from.G.to E at 4..5 to:8 and
4,5t~.5.5.south:ofE line. E to H at8.line, 5 to.8 atHline.Northof D, 5.5 to"2.5, H to G5 at
. 2 to 5.-
Field Test Data
5114"
314"
.Location Sampled At:
G to E at 6.3 on line 5
Date Cast: 1'1/21/08 Date Rec'd:
"Ticket No.: /MiX No.: . Weather:
-3160339.~ -2440N:15200,
-
11122/08
Clear
Desifln Stren9th (osi): .
Cylinder No.
08-3719
08-3720
08-3721
08-3722
Remarks:
reouired 4000
Test Date
Age (days) Field Cure Lab Cure
(days) (days)
7 6
28 27
28 27
H
jLoad:
ITotal:
I Supplier:
Knife River
Slump (In.): ASTM C143
Max. Aggr. Size:
,Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
~Min Temp (F):
I Specimen Size:
Unit Weight (pd): ASTM C138
Time Cast: 7:30 AM Curing Conditions:
Additives: 1 % non chloride accelerator
Re.sults Reported To: Contractor
1 day F.C./ASTM
11/28/2008
12/19/2008
12/19/2008
H
34"
69"
Yardage
2
80
4.x 8
-
Compressive Strength Data ASTM C39
placed 4.000
Diameter or
Dimensions
(inches)
Cross Sect. Area Cylinder WT.
(s.L) (lbs.)
Max..Load (Ibs.) Compo Strength ~racture Type H Test Time
(psi)
Capping Method
C617-03
C1231-03
3.99
12.51
8.6
11:09AM I
47,160
3,770
2
x
Respectfully Submitted,
7t;\J7Ji;;ces Industries, Inc.
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahium - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CUENTONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WlfI-iOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l... ~;J lnfomw.tion
""'.l1b Build On
Engineering. Consulting. Testing
C~- q 3 'is'
DAILY FIELD REPORT
Date Performed: November 24, 2008 Report Number: 722-80174-131
Client: Springfield School District Project Name: Maple Elementary School
525 Mill Street
Springfield, OR 97477 Project Location: 2109 J Street
Springfield, OR
Contractor: John Hyiand P.O. No: P0271-255-0809
Fabricator: Metal-Some Shop/ Field: Shop
Type of Inspection: Welding Weather: Fog
Field Observations and Comments
Performed periodic visual inspection of the, ,foliowing items: piece marked 361A-M (7),:360B-M (6), 360A-M (8).
Weldments were inspected for size, length, profile and locations. To the best of our knowledge, the work inspected is in
confprmance with approved drawings, specifications and appiicabie 01.1 codes. Contractor was asked to notify our \
office when adaitional services are needed.
Inspector: DavidF. Smith, Certification# 0877340-85
eBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfuliy Submitted,
p~feSSio~J Service Industries, Inc.
J~-i AliP?k
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & AssoCiates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
Professional Service Industries, Inc.. 1040.A Shelley Street. Springfield, OR 97477 . Phone 541/746.9649 . Fax 541/746-7163
l...~ ;ZInjormation
,.,..,. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 17, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-124
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
HSS and Welding
P.O. No.:
Weather:
P0271-255-0809
Clear
Field Observations and Comments
Inspection was made on a work in-progress welding panel cord splice connection in the administration wing entry and
library, between gridiines L to J - 3 to 6. Also inspection was made on weldments being placed at beam clips to beams
connection in the kitchen ciassroom wing from grid lines 2 to 5 - A to D. Contractor was asked to notify our office when
additional services are needed. To the best of our knowledge, the work inspected above was in accordance with the
building department approved design drawings, specifications and applicable workmanship provisions of the
International Buildin9. Codes.
Inspector: Greg Boehland
CCB #176269
If you have any questions regarding this report, please feel free to contact us aI541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~i\J~
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield Schooi District - jsaracen@sps.iane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, 1$ PROHIBITED,
Professional Service Industries, Inc. . 1 040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 5411746-7163
l...~;l lnfonnation
,.,..,. .To Build On
Engineering . Consulting. 7l>sting
DAILY FIELD REPORT
Date Performed:
Client:
November 24, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-130
Project Name:
Maple Elementary School
2109 J Street
Springfieid, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
HSS and Welding
P.O. No.:
Weather:
P0271-255-0809
Cloudy
Field Observations and Comments
Performed continuous visual inspection of muitipass fillet and fiare-bevel weldments for chord splices and panel
connections in gymnasium. Also, performed periodic visual inspection of Nelson studs, seam weids, and puddie welds
for pan decking above kitchen. Weldments were inspected for size, length, profiie and locations. Contractor was asked
to notify our office when additional services are needed. To the best of our knowledge, the work inspected above was in
accordance with the building department approved design drawings, specifications and applicable workmanship
provisions of the International Building Codes.
Inspector: Chris McDonald, Certification# 5298238-S2
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~~~gr
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLlENTONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND {TS TRANSMITTAL TO A THiRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477 .'Phone 541/746-9649 . Fax 541(746.7163
L..~;lInformation
",~. .1b Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
December 1, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Contractor:
Fabricator:
Type of Inspection:
John Hyland
Axis Crane
Welding
Report Number:.
Project Name:
Project Location:
P.O. No:
Shop/ Field:
Weather:
722-80174-136
Maple Elementary School
2109 J Street
Springfieid, OR
P0271-255-0809
Field
Clear
Field Observations and Comments
Performed periodic visual inspection of the following items: Deck puddle and seam welds at roof iocation line B to D
from 2 to 5. Weldments were inspected for size, length, profile and locations. To the best of our knowledge, the work
inspected is in conformance with approved drawings, specifications and applicable Dl.1 codes. Contractor was asked
to notify our office when additional services are needed.
Inspector: David F. Smith, Certification# 0877340-85
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
WL)~
Raymond A~'
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconsLcom
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahium
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL 1. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT fHE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service ln~ustries, Inc. . 1040-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649 . Fax 541/746-7163
;.
I....~.' Information
"'~.lTo Build On
Engineering. Consulting . Testing
DAILY FIELD REPo.RT
Date Performed: .
Client:
November 19, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-126
Project Location:
Maple Elementary School
2109 J Street
Springfield, OR
Project Name:
B.P. No.:
Type of Inspection:
COM 2008-00438
Epoxy
P.O. No.:
Weather:
P0271-255-0809
Cloudy
Field Observations and Comments
Performed continuous inspection during the installation of #4 epoxied rebar dowels in the following location: (46) East
wall of gym; (32) South wall of storage; (7) East wall of storage. Prior to installation the predrilled holes were cieaned
using a nylon brush and compressed air. Verified minimum embedment depth of 5 inches. The above listed epoxy
anchors were installed using Hilti Hit-RE 500-SD epoxy with ICC# ES-ESR-2322 (expiration 07/2009). The epoxy
. .
anchors were installed in accordance with the approved job-site pians and manufacturer's directions. Contractor was
asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected above
was in accordance with the building department approved design drawings, specifications and applicable workmanship
~rovisions of the International Buildinq Codes.
Inspector: Devon Hovis
CCB #176269
If you have any questions regarding this report, piease feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~~.~
Raymond Aiiperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfeld School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT 1$ PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY RY ANY MEA.NS EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
l..~ ;ZInjormation
,.,~. .To Build On
Engineering . Consulting . ~sf;ng
DAILY FIELD REPORT
Date Performed:
November 26, 2008
Springfield Schooi District
525 Mill Street
Springfield, OR 97477
Report Number:
Client:
Project Name:
Project Location:
B.P. No.:
Type' of Inspection:
COM 2008-00438
Epoxy
P.O. No.:
Weather:
722-80174-128
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Overcast
Field Observations and Comments
Performed continuous inspection during the installation of #4 epoxied rebar dowels in the foliowing location: epoxy
rebar into bottom of panels in the gym classroom wing along H-iine from 5 to 6, and in the kitchen classroom wing along
D-Iine from 2.5 to 6. Prior to installation the predrilled holes were cleaned using a nyion brush and compressed air.
Verified minimum embedment depth of 5 inches. The above listed epoxy anchors were installed using Hit-RE 500-SD.
The epoxy anchors were installed in accordance with the approved job-site plans and manufacturer's directions.
Additional comments: welding continues to be monitored in the gym classroom wing on the panel cord splices and beam
clips from gridline 1 to 5 - E to G.5. Contractor was asked to notify our office when additional services are needed. To
the best of our knowledge, the work inspected above was in accordance with the building department approved design
drawings, specifications and applicable workmanship provisions of the International Building Codes.
Inspector: Greg Boehland, ICBO# 0884258-85
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~9\1~
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyiand Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yoianda.bird@sps.lane.edu
City of Springfield
THIS R~PORT /.<:; PRnVIr)r:'f) FOR THE INFORMATION OF THE CLIENT QNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
P~e!l'i'"i!1I_Ii:.._Ii\!ii.<Mo.WlmWl\T1lfiEll1'WSii'l!IP'S'p;,j16N.!ilf. '0l\',!fNjI~~1lHtiTFeVool'i~l5-'iJ&i9" Fi&~f!f46'7163
l",~., Information
,.,~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
December 1, 2008
Springfieid School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-138
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Epoxy
P.O. No.:
Weather:
P0271-255-0809
Clear
. Field Observations and Comments
Performed continuous inspection during the installation of #5 epoxied rebar dowels in the following location: vertical
dowels from slab on grade at stair location B to B.6 from 5.5 to 6. Prior to installation the predriiled holes were clea.ned
. using a nylon brush, compressed air, vacuum, and water. Verified minimum embedment depth of 9 inches. The above
listed epoxy anchors were installed using Hit 500. The epoxy anchors were installed in accordance with manufacturer's
directions and RFI #30. Contractor was asked to notify our office when additional services are needed. To the best of
our knowiedge, the work inspected above was in accordance with the building department approved design drawings,
. specifications and applicable workmanship provisions of the International Building Codes.
Inspector: David F. Smith
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~~~
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahium.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfieid School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT 1$ PROVIDED FOR THE IN,I"ORMATlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 104Q-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 5411746.7163
l...~ _lInformation
,.,~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 20, 2008
Springfield School District
525 Mill Street
Springfieid, OR. 97477
Report Number:
722-80174-127
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforcing Steel
P.O. No.:
Weather:
P0271-255-0809
Overcast
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: Inspection was made on reinforcing steei
along E-Iine from 4.5 to 5.5. interior perimeter of gym ciassroom wing from grid line - 5 to 8 - E to H, interior corridor from
2 to 5 - H to G.5, and along lines 5, 1, G.5 from 1 to 5 - E to G.5. Reinforcing steel was checked for grade, size, lap,
placement and clearances where applicable. Reinforcing steel was secured using tie wire and supported on concrete
dobie blocks. Reinforcing steel was piaced in accordance with approved design drawings and specifications. Additional
comments: welding of clips and panel cord splices is being monitored in 'the gym from gridlines 1 to 5 - E to G.5.
Contractor was asked to notify our office when additional services are needed. To the best of our knowledge, the work
inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Building Code.
Inspector: Greg Boehland
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541,746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~/\)~
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyiand Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.iane.edu
City of Springfieid
THIS REPORT IS PROVIDED FOR THE INFQRMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY. BY ANY MEANS. EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541rT46-9649. Fax 541/746-7163
l...~;lInformation
,.,..,. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 25, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-1 34
Project Name:
Maple Elementary School
2109 J Street
Springfieid, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforcing Steel
P.O. No.:
Weather:
P0271-255-0809
Overcast
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: Inspection was made on reinforcing steel for
grade beams along iines E and H from 11 to 13. Also inspection was made on second fioor decking, puddle welds,
seam welds and 3/4" Nelson studs in the kitchen classroom wing from gridline 2 to 5 - B to D. Reinforcing steel was
checked for grade, size, lap, placement and clearances where appiicable. Reinforcing steel was secured using tie wire'
and supported on concrete dobie blocks. Reinforcing steel was placed in accordance with approved design drawings
and specifications. Contractor was asked to notify our office when additional services are needed. To the best of our
knowledge, the work inspected above was in accordance with the building department approved design drawings,
soecifications and applicable workmanship provisions of the International Buildinq Code.
Inspector: Greg Boehland
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~IV' aJ~
Raymond Alipertl
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com.
Yoianda Bird - yolanda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum.com
City of Springfield
THIS REPORT /s PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, /S PROHIBITED
Professional Service Industries, Inc. ..1040-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649. Fax 5411746-7163
l. .-.r-;ZInjormation
",..,. .To Build On
Engineering' Consulting . Testing
. DAILY FIELD REPORT
Date Performed:
December 1, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-137
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforcing Steel
P.O. No.:
Weather:
P0271-255-0809
Clear
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: Pour back strip at administration area 3.
Reinforcing steel was checked for grade, size, iap, piacement and clearances where applicable. Reinforcing steel was
secured using tie wire and supported on concrete dobie blocks. Reinforcing steei was piaced in accordance with
approved design drawings and specifications. Contractor was asked to notify our office when additional services are
needed. To the best of our knowledge, the work inspected above was in accordance with the building department
approved design drawinqs, specifications and applicable workmanship provisions of the International Buildinq Code.
Inspector: David F. Smith, ICC# 0877340-88
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
t~"'lt~
Raymond Aliperti
Project Manager
c: Springfield Schooi District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yoianda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum.com
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
i
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERV'.cE INDUSTRIES, IS pROHIBITED.
Professional Service Industries, Inc.. lQ40-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649 . Fax 541/746-7163
l..~ ., Injonnation
",~. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
December 1, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-139
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforcing Steel.
P.O. No.:
Weather:
P0271-255-0809
Partly Cloudy
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: Inspected grade beam reinforcing at the
covered play area at gridiines G.5 at 11 to 13 and E at 11 to 13. Reinforcing steel was checked for grade, size, lap,
placement and clearances where applicable. Reinforcing steei was secured using tie wire and supported on concrete
dobie blocks. Reinforcing steel was placed in accordance with 1/S107, 6/S503 and 5/S503 and latest revisions dated 05
01-08. Contractor was asked to notify. our office when additional services are needed. To the best of our knowledge,
the work inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Buildinq Code.
Inspector: Glenn Meek Jr, ICC# 5071538-49
CCB #176269
/'
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~~~
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahium - rberndt@mahlum.com
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT GNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED.
Professional Service Industries, .Inc. . 104Q.A Shelley Street. Springfield, OR 97477 . Phone 5411746-9649 . Fax 541f746~7163
L ...~;J Information
""'.lTo Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed: November 21, 2008 Report Number: 722-80174-129
Client: Springfield School District Project Name: Maple Elementary School
525 Mill Street
Springfield, OR 97477 Project Location: 2109 J Street
Springfield, OR
P.O. No.: P0271-255-0809 Permit No.:
Type of Structure: Pour back strips Weather: Clear
Type of Inspection: Concrete
Field Observations and Comments
Performed visual inspection during piacement of concrete at the following iocations: Pour back strips placed at line 5
east from G to E, at 4.5 to 8, and 4.5 to 5.5 south of Eline. E to H at 8 line,S to 8 at H line, north of D, 5.5 to 2.5, H to
G.5 at 2-5. (North, East, West Sides of Gym). Concrete was placed by mix truck and pump truck and consolidated with
vibrators. Cast one (1) set of 4 (4" x 8"). Contractor was asked to notify our office when additional services are needed.
To the best of our knowledge, the work was inspected above was in accordance with the building department approved
design drawings, specifications and appiicable workmanship provisions of the Internationai Building Code.
Tvn.. nf Material Cnncrete#1
Supplier Knife River
Mix # 2440N 15200
Slump 5 1/4"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yarda!je Placed
Inspector: Dale Russell, ICC# 01140789
CCB# 176269
690
7:30 AM
4000
4
80
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
R;;;~al (if Industries, Inc.
Raymond Aliperti ~
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.iane.edu
Yolanda Bird - yoianda.bird@sps.lane.edu
Citl( of Sorinqfield
THIS REPORT IS Fffi>f.mll>n~F6'".m~~rlle\l,qna:l<Ej~etf( SNe~e{~~e\!f~lJilflj?6m\'iifffQ'fIh&ref!l41'ff46C~~4!Y'l'li1,s 511fm'il'7Wb TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, 1$ PROHIBITED.
l ~~;lInformation
fI~. .To Build On .
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
November 14, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-121
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfieid, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforced Concrete
P.O. No.:
Weather:
P0271-255-0809
Foggy
Field Observations and Comments
Performed visual inspection during placement of concrete in the tollowing locations: Pour back strips A to D between 2
and 8. Columns block out C at 7, C at 6, B at 6, B at 7 and C at 4. Concrete was placed by pump truck and hand
screeded consolidated with vibratory methods. Cast one (1) set of four (4) (4x8) concrete test cylinders. Contractor
was asked to notify our office when additional services are needed. To .the best of our knowledge, the work inspected
above was in accordance with the building department approved design drawings, specifications and applicable
workmanship provisions of the International Building Code.
Tvne of Material 'Set #1
Supplier Knife River
Mix # 2440N15200
Slump 4"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardage Placed
Inspector: Pete Furlong, ICC #00083536
CCB #176269
42.
64.
7:55 AM
4,000
4
73.75
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~d&
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconstcom
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@roberts.onsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.iane.edu
City of Springtield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT QNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
Professional Service Industries, Inc. . 1040-A Shelley Street. Springfield, OR 97477 . Phone 541/746~9649 . Fax 541n46-7163
l"~;1 Information
fI~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
November 25, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-133
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
Cascade iron Works
Welding
P.O. No.:
B.P. No.:
Shop/Field:
Weather:
P0271-255-0809
COM 2008-00438
Shop
Inside
Field Observations and Comments
Performed periodic visual inspection of the following: channel iron piece marked, five (5) 365B, seven (7) 365A, six (6)
364B, six (6) 364A, and one (1) 362B, 363A, 363B, for the project named above. Contractor was asked to notify our
office when additional services are needed. To the best of our knowledge, the work inspected above was in accordance
with the building department approved design drawings, specifications and applicable workmanship provisions of the
International Building, Codes.
Inspector: Greg Boehland, ICBO# 0884258-85
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
{<... ~"~ ctf
R~~liperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahium - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yoianda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
Professional Service Industries, Inc.. 1 04Q-A Shelley Streel . Springfield, OR 97477. Phone 541/746-9649 . Fax 541/746-7163
l...~., Information
f'I"'.lTo Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
November 18, 2008
Springfieid School District
525 Mill Street
Springfield, OR 97477
Report Number:
Client:
Project Name:
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
HSB and Welding
P.O. No.:
Weather:
722-80174-125
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Clear
Field Observations and Comments
Met on-site wilh erector's representative to establish minimum kip values on a sample of 7/8" x 1 3/4 A-325 high
strength Lajune bolts. Three (3) bolts were instailed in a Skidmore Wilhelm 'Tension indicator and tightened to twist-off.
Bolts tested met and/or exceeded the minimum kip value of 39 kips for 7/8 bolts. Contractor was asked to notify our
office when additional services are needed. To the best of our knowledge, the work inspected above was In accordance
with the building department approved design drawings, specifications and applicable workmanship provisions of the
.International Building, Codes.
. Inspector: Greg Boehland
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
'~cJU~
Raymond Aiiperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield Schooi District - jsaracen@sps.iane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORTIS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional. Service Industries," Inc. . lQ40"A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 541f746-7163
l... ~;J Information
"'~.lTo Build On
Engineering. Consulting. Jesting
DAILY FIELD REPORT
Date Performed:
Client:
November 10, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-110
Project Location:
Maple Elementary School
2109 J Street
Springfield, OR
Project Name:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
Axis Crane
Welding
P.O. No:
Shop/ Field:
Weather:
P0271-255-0809
Field
Overcast
Field Observations and Comments
Inspection was made on completed weidments in the gym classroom wing at panel cord splice connection along 5 line
from E to H. Also work is in-progress welding panel cord spiice connection in the kitchen ciassroom wing from gridiines
2 to 5 and A to D.
Inspector: Greg Boehland, Certification #0884258-85
CBB #176269
if you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
K:.rX4!:ce Industries, Inc.
Raymond ~~
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates ~ doug@milstead.us
Hyland Construction - jeffdurmaj@jhc.6nst.com .
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane,edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY. BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL" SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. lQ40.A Shelley Street. Springfield, OR 97477. Phone 541/746-9649 . Fax 541/746-7163
l... ~;1 Infol11Ultion
,,~. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT'
Date Performed:
Client:
November 11, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-114
Project Name:
Maple Elementary School
2109 J Street
Springfieid, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyiand
Axis Crane
Welding
P.O. No:
Shop/ Field:
Weather:
P0271-255.-0809
Field
Overcast
Field Observations and Comments
Inspection was made on work in-progress weiding panel cord splices in the kitchen and classroom wing from gridiine 2
to 5 at A to D and weldment being placed on corner clip connection and panel cord .spice connection in the gym
classroom winq from qridlines 5 to 8 at E to H.
Inspector: Greg Boehland, Certification #0884258.85
CBB #176269 .
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional ~ervice Industries, Inc.
r?cv.,J/ljtifO '^ .
Ray;;lr;'d AiiP=r .
Project Manager
c: Springfield School District - jsaracen@sps.iane:edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane.edu
KPFF -ugo.costa@kpff.com.
Mahium - rberndt@mahlum
City of Springfield
THIS REPORT IS PROVIDED FOR THE-INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS R~PORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTy' BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITEp
Professional Se~ice Industries, Inc.- 1 Q40-A Shelley Street .- Springfield, OR 97477 . Phone 54.1 n 46-9649 . Fax 541/746-7163
l ft~-;lIriformation
I-":~. .To Build On
COMPRESSION REPORT
8Is."".,.".f ,J .~.. "j".
Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722-80174-116
Proj. Ni\me: Maple Elementary School
Location: 2109 J Street
Springfield, OR
Placement Data: Material: Concrete
Concrete column piers - G.5 at 11, 12, 13, E at11, 12, 13. C to D at 5' 8" E. of A line and G
to H at 5' 8" E at A line
Location Sampled At:, .
Concrete column pier G.5 at 12
Date Cast: 11/11/08 Date Rec'd:
Ti~~~~~~~ [~i:4~~:15200 Weath;;;:
Ov_e.r:cast
- 'koad:
Total:
Supplier:
Knife River
Yardage
11/12/08
1
10.75
Slump (in.): ASTM C143
Max. Aggr~ Size:
A.ir Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F): .
Min Temp IF):
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 7:45 AM
Additives:
Results Reported To:
Compressive Strength Data ASTM C39 ._
Dlaced 4,000
Desil'Jn Strength (Dsi): required 3,500
Cylinder No. Test Date Age (days) Field Cure Lab Cure
(days) (days)
08-3572 I 11/18/2008 7 1 6
08-3573 I 12/9/2008 28 27
.08-3574 I 12/9/2008 28 27
08-3575 I Hold H H
. Remarks:
Diameter or
Dimensions
(Inches)
Cross Sect. Area
(s.l:)
4.00
12.57
c:
KPFF - ugo.costa@kpff.com
Hyiand Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
Cylinder WT.
(Ibs.)
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)7.46-9649 - (541)746-7163 fax
November 24, 2008 CC8#176269
Date:
B.P. No.:
P.O. No.:
Cast By:
P0271-255-0809
Chris McDonald
Field Test Data
3"
3/4"
2.8%
58"
710
.4x8
Curing Conditions:, .
1 day remainder F.e , ASTM
Jeff with Hyland
~
Max load (Ibs) Compo Strength Fracture Type."
. . (psi)
8.6
72,065
Test Time
Capping Method
-'-
C617-03
C1231-03
5,730
3
12:36 PM
x
I
.1
Respectfully Submitted,
professiona~~~ndustr/es, Inc. .
Ra~AIIPertl . ~
Project Manager
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
WITf/OUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l.... r-;1 Information
,.,~. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 11, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-115
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyiand
MetaiSome
Welding
P.O. No:
Shop/ Field:
Weather:
P0271-255'0809
Shop
Inside
Field Observations and Comments
Performed periodic visual inspection of the single pass fillet welds on the following items marked: 260A (3), 261 B (3),
262A (2), 262B (1),262C (1), 263A (6), 264A (1), 265A (7), 266A (7), 267A (1),2676 (1) and 267D (1). All items
inspected were marked "PSI" in white. Fit-up of weld joints were inspected for workmanship. Weidments were
inspected for size, length, profile and locations. To the best of our knowledge, the work inspected is in conformance
with approved shop design drawings, specifications, and applicable AWS 01.1 codes. Fabricator was asked to notify
our office when additionaiservices are needed.
Inspector: Raymond Alipertj, Certification #1017075-85
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
PfJessiona s~. ice Industries, Inc.
. UC4~/
. Ray ond Aiipert. . .
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhcon'st.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yoianda.bird@sps.iane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahium
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT GNL y, THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THEWRITTENPERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional ServiCe Industries, Inc.. 1040-A ~he)Jey Street- Springfield, OR 97477. Phone 541/746-9649. Fax 541fi46-7163
l..~;Jlnformation
"'~.lTo Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
November 11, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
Client:
Project Name:
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Epoxy
P.O. No.:
Weather:
722-80174-113
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Overcast
Field Observations and Comments
Performed continuous inspection during the installation of #4 epoxied rebar dowels in the following iocation: existing
doorway footing along A line from 5 to 5.3. and into bottom of panel along 2 line from C to C.5 in the kitchen classroom
wing. Prior to installation the predrilled holes were cleaned using a nylon brush and compressed air. Verified minimum
embedment depth of 5 inches. The above iisted epoxy anchors were installed using Hilti Hit-RE SOD-SO. Contractor
stated the nuts would be tightened after the epoxy has cured. The epoxy anchors were installed in accordance with the
approved job-site plans. Contractor was asked to notify our office when additional services are needed. To the best of
our knowledge, the work inspected above was in accordance with the building. department approved design drawings,
,specifications and applicable workmanship provisions of the international Building Codes.
Inspector: Greg Boehland, ICBD# 0884258-85
CCB #176269
If you have any questions regarding this report, please feei free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~/1V ~
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead:us
Mahlum - rberndt@mahlum.com.
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield Schooi District - jsaracen@sps.iane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield .
THIS REPOR!IS PROVIDED FOR THE fNFORMA TION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIR.D
PARTY, BY ANY MEANS:EXCEPT IN FULL, WITHOUT THE WRIT!EN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED.
Professional Service Industries, Inc. . 1040-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
l ra ~;z Information
",~. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
November 10, 2008
Springfield School District
525 Mill Street
Springfield. OR 97477
Report Number:
Client:
Project Name:
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Epoxy
P.O. No.:
Weather:
722-80174-1 09
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Overcast .
I
Field Observations and Comments
Performed continuous inspection during the installation of #4 epoxied .rebar dowels in the following iocation: into bottom
of panels in the kitchen classroom wing.' Aiong gridiines 5 from A to D and algon B line from 2 to 5. Prior to installation
the predrilied .holes were cleaned using a nylon brush and compressed air. Verified minimum embedment depth of 5
inches. The above listed epoxy anchors were installed using Hilti Hit-RE 500-SD. Contractor stated the nuts would be
tightened after the epoxy has cured. The epoxy anchors were installed in accordance with the approved job-site plans.
Contractor was asked to notify our office when additional services are needed. To the best of our knowledge, the work
inspected above was in accordance with the building department approved design drawings, specifications and
applicabie workmanship provisions of the International Building Codes. ' .
Inspector: Greg Boehland, ICBO# 0884258.85
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
I(a<-/ va~
RaymondAliperti
Project Manager.
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
. Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu .
City of Springfield
I
I
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE G.UENT ONL Y. THE REPRODUCTION OF THI~ RE~ORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, .lnc. . 1 O~O-A Shelley Stree.t . Springfield, OR 97477 .. .~hone 5411746-9649' .'Fax 541/746-7163
l...~ ;ZInjonnation
",..,. .To Build On
Engineering. Consulting. . Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 11, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-111
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
P.O. No.:
Type of Structure:
Type of Inspection:
P0271-255-0809
Permit No.:
Weather:
Rain
Relhforced Concrete
Field Observations and Comments
Performed visual Inspection of reinforcing steel at the following locations: concrete column piers per detail 1/106065-12
located at G.5 at 11,12,13, Eat 11, 12, 13, G to H at 5' 8" E of A line and C to D at 5' 8" E of A line. Reinforcing steel
was checked for grade, size, lap, placement and clearances where applicable. Reinforcing steei was secured using tie
wire and supported on concrete dobie blocks. Reinforcing steel was placed in accordance with approved design
drawings and specifications. Performed visual inspection during placement of concrete in the locations listed above.
Concrete was piaced by truck chute and consolidated. Additional comments: water migrated into hole during placement
of concrete, contractor made effort to displaced water with concrete. At completion of piacement contractor consolidated
concrete with vibrator. Contractor was asked to notify our office when additional services are needed. Tci the best of
our knowledge, the work. inspected above was in accordance with the building department approved design drawings,
specifications and applicabie workmanship provisions of the International Building Codes, except as noted.
Tvo" of Materi.al Set #1
Supplier Knife River
Mix # 2440N15200
Slump 3"
Air Content 2.8%
Ambient Temperature 58'
Material Temperature 71'
Time Placed . 3:30 PM
Design Strength (psi) 4,000
Number of Samples 4
Totai Yardage Placed 10.75
Inspector: Chris McDonald, ICC #5298238-47
cCB# 176269
If you have any questions regarding this report, please feei free to contact us at 541-746-9649:
Respectfully Submitted,
R;~S~\tf~dust~ies, Inc.
Raymond Alipertl
Project Manager
c:. KPFF - ugo.costa@kpff.com
. Hyland Construction - jeffdurmaj@jhconst.com
.Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com .
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfieid
THiS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT QNL Y. THE REPRODUCTION OF THIS REPORT, BYANY METHOD, AND ITS TRANSMITTAL TO A THIRD-
p15rbre~Si~ ~~cEffl'ltlnSrri{it.Yhb wm-jPUA rHE W, RIUfr"N PjERMISSIOfN UF PROFt:;::;;::;/UNAL ;;'~KV'lA: IIVUU;:, I rw::.:>. I;:) rr<;un//;JI J cu.
, .. 4U-, ::inelley::ilree . ::ipnng Isld. OR 9747?. Phone 541n46-9649. Fax 541/746-7163
l..~ _lInformation
,.,~. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 11, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-112
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
P0271-255-0809
Light Rain
Field Observations and Comments
As requested, a representative of PSi was on-site to observe boring for augered piers. WE observed augering of six (6)
piers on the west side of the structure for the covered play area. The following iocations were augered with a minimum
2 feet embedment into the well-graded bar run gravels. Depth of each hole is indicated in parentheses E at 13 (7' ), E at
12 (9 W), Eat 11 (7'), G.5 at 13 (8 W), G.5 at 12 (8') and G.5 at 11 (8'). The holes were drilled using a 2' auger. Far
(4) additional 12" wide piers were drilled for staircases on the northeast and southeast sides of the structure, 2 on each,
side. From north to south depths drilled to are as follows: 8 W, 8', 12' and 12'. All holes had standing water by end of
drilling. To the best of our knowledge, the work inspected above was in accordance with the building department
approved design drawings, specifications, geotechnical report and applicable workmanship provisions of the
International Buildinq Codes.
Inspector: Anthony Deluca
cce #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
KatJtI ~
Raymond Aliperti
Project Manager
c:
KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield Schooi District - jsaracen@sps.iane.edu
Yolanda Bird - yoiimda.bird@sps.lane.edu
City of Springfield
tl
D
THIS REPORT is PROVIDED FOR THE INFORMATION OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PM6reSSi~1 ~~fv"(te1XtlEP,T lNFULL, wlIHOUT [HE Wi'?lT I!;;;N Pt'.RM/::;:::;IUN UI- ,....>-<;Ur-C;;,;;,IUIV..,L "crWI\.-c lr"lJU"J r'"eJ, '" ,- '''-'' ,,'-', -,-~:'.
n us nes, Inc.. .040.A t:ihelley Street. Springfield, OR 9747~. Phone 5411746-9649. Fax 541f7~6-7163
L "'~;l Infonnation
,.,.,. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 14, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-123
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
Axis Crane
Welding
P.O. No:
Shop/ Field:
Weather:
P0271-255-0809
Field
Overcast
Field Observations and Comments
Inspection was made on weldments placed at panel cord splice connection in the gym classroom wing all cord splice
were completed from gridlines 5 to 8 from Eto H. Also weldments on beam clips to beam connection were completed in
the kitchen wing from gridiine 5 to 8 from A to D. Second floor work is in-progress welding beam clips and cord splices
in qvm classroom winq from qridlines 2 to 5 from E to H:
Inspector: Greg Boehland, Certification #0884258-85
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
K::;I,~nVJIervice Industries, Inc.
RaymOn~
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead:us
Hyiand Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yoianda Bird - yolanda.bird@sps.iane.edu
KPFF - ugo.costa@kpff.com
Mahium : rberndt@mahlum
City of Springfieid
. ~
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL ~ THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANy' MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries; Inc.. 1 040-A Shelley Street ~ Springfield, OR 97477. Phone 541/746-9649 .'Fax 541/746-7163
l..~;l Information
,.,~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 13, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
. Project Name:
Project Location:
Contractor:
Fabricator:
. Type of Inspection:
John Hyland
MetalSome
Welding
P.O. No:
Shop/ Field:
Weather:
722-80174-119
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Shop
Overcast
Field Observations and Comments
Inspection was made on weldments placed at panel corner clip connection in kitchen classroom wing from grid line 2 to 5
from A to D. Weldments in the gym ciassroom wing cord splice connection have been completed connection have been
completed between gridline 5 to 8 from E to H and from 1 to 5 from E to 'H work is in-progress welding panel cord splice
connection in the same area mention above.
Inspector: Greg Boehland, Certification #0884258-85
CBB #176269 .
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
~~ice Industries, /nc,
Raymond Alipertl
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com .
Yolanda Bird - yolanda,bird@sps.lane.edu '
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT~ BY ANY METHOD, AND ITS TRANSMITTAL TO A'THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIOf'~AL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley'Street- Springfield, OR 97477. Phone 541f746-9649,. Fax 541f746-7163
l...~;l Information
,.,~. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
November 14, 2008
Report Number:
722-80174-122
Client:
Springfield School District
525 Mill Street
Springfield, OR 97477
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
ProjecfLocation:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
MetaiSome
Welding
P.O. No:
Shop/ Field:
Weather: .
P0271-255-0809
Shop
Clear
Field Observations and Comments
Performed periodic visual inspection of the foliowing items: beam piece mark 301 C, D, E and F, and 307A one each.
Weldments were inspected for size, length, profile and locations. To the best of our knowledge, the work inspected is in
conformance with the approved drawinqs, specifications and applicable D1.1 codes.
Inspector: David F. Smith, Certification #0877340-85 .
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
t~~~JCiQVlce Industries, Inc.
Raymond AIiPe~r
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com .
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com .
Yolanda Bird - yolanda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum
. City of Springfield
THIS REPORT /s PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT,.BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
Professional Service Industries, ln~. . 1040-A Shelley Street. Springfield; OR 97477 . Phone 541/746-9649 . Fax 5411746-7163
L "~;l lriformation
",~. .To Build On
Engineering .. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 12, 2008
Springfield Schooi District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-118
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
Axis Crane
Welding
P.O. No:
Shop/ Field:
Weather:
P0271-255-0809
Field
Cloudy
Field Observations and Comments
Performed continuous visual inspection of the following items: flare bevel weldments for typical chord tie at panel
connections for the following locations: B to D from 2 to 5 and E to H from 5 to 8 for east, west, and south walls at 2nd
floor and roof elevations and on north wall at 2nd floor elevation. Fit-up of weid joints were inspected for workmanship.
In-progress welding was monitored to the erector's FCAW welding procedure specifications. Weidments were
inspected for size, iength, profile and locations. To the besi of our knowledge, the work inspected is in conformance
with approved drawings, specifications and applicable AWS D1.1 codes. Contractor was asked to notify our office when
additional services are needed.
Inspector: Chris McDonald, Certification #5298238-52
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~~!nY~
Project Manager
c: Springfield School District - jsaracen@sps.lime.edu
. Milstead & Associates - doug@milstead.us
Hyiand Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yoianda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT QNL Y. tHE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Ine;. 1040-A Shelley Street- Springfield, OR 97477. Phone 541f746-9649. Fax 541f746-7163
l...~ .ZInjonnation
",.... .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 13, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-120
Project Location:
Maple Elementary School
2109 J Street
Springfieid, OR
Project Name:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforcing Steel
P.O. No.:
Weather:
P0271-255-0809
Overcast
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: around perimeter of the kitchen classroom
wing from gridline 2 to 8 from A to D. Reinforcing steel was checked for grade, size, lap, piacement and clearances
where applicable. Reinforcing steel was secured using tie wire and supported on piastic chairs. Reinforcing steel was
piaced in accordance with approved design drawings and specifications. Contractor was asked to notify our office when
additional services are needed. To the best of our knowledge, the work inspected above was in accordance with the
building department approved design drawings, specifications and applicable workmanship provisions of the
International Building Code.
Inspector: Greg Boehland
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~v.a1f
Raymond Aliperti
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.blrd@sps.lane.edu
KPFF -ugo.costa@kpff.com
Mahlum - rberndt@mahlum.com
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT aNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Se~ice Industries,.lnc.. 1040-A ~helley Stre~t. Springfield, OR 97477. Phone 541fi46-9649. FCix 541/746-7163
l;:;sjlfo1ifj;;:;:~n
"""," ,I., il",,,, . ~. ~
Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722-80174-116
Proj. Name: Maple Elementary School
Location: 2109 J Street
Springfield, OR
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 10, 2008 CCB#176269
COMPRESSION REPORT
Date:
B.P. No.:
P.O. No.:
Cast By:
P0271-255-0809
Chris McDonald
Yardage
Slump (in.): ASTM C143
'Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Terne IF):
Specimen Size:
Unit Weight (pct): ASTM C138
rime Cast: 7:45 AM
Additives:
Results Reported To:
Field Test Data
3"
3/4"
2.8%
58"
71"
'Placement Data: Materia": -C'oncrete
Concrete column piers - G.5 at 11, 12, 13, E at 11. 12, 13, C to D at 5' 8" E. of A line and G
to H.at 5' 8" E at Aline
~
'Location'Sam pled -At:
Concrete column pier G.5 at 12
Date Cast: 11/11/08 Date Rec'd: 11/12/08
Tick~t No.: IMiX No.: . Weather:
_3224912 2440N15200 Overcast
jLoad:
ITotal: 10.75
ISUPPlier:
Knife River
4x8
Curing Conditions:
1 day remainder F.e., ASTM
Jeff with Hyland
Desi!1n Stren':jth (psi):
required 3,500
Compressive Strength Data ASTM C39
placed 4,000
Field Cure Lab Cure Diameter or
Cylinder No. Test Date Age (days) (days) (days) . Dimensions
(inches)
08'3572 11/18/2008 7 6 4.00
08-3573 12/9/2008 28 27 4.00
08-3574 12/9/2008 28 27 4.00
08-3575 Hold H H
Remarks:
Cross Sect_ Area Cylinder WT. Max. Load (Ibs;) Compo Strength Fracture Type .. Test Time Capping Method
(s.t.) (Ibs.) (psi)
C617-03 C1231-03
12.57 8.6 72,065 5,730 3 12:36 PM X
12.57 8.6 92,325 7,340 3 '11:57 AM X
12.57 8.6 94,315 7,500 3 12:02 PM X
c:
KPFF - ugo.costa@kpfLcom
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps./ane.edu
City of Springfield
Respectfully Submitted,
~;v(R}.rVices Industries. Inc.
Raymond AiiP~
Project Manager
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l ft~~ ., Irifo171Ultion
I'!!!.,~. .To Build On
.1t!nfI1n..,ring . c-.uHIng . Rltsttng
Client:
Address:
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 18, 2008 CCB#176269
Springfield School District
525 Mill Street
Springfield, OR 97477
Date:
.B.P. No.:
P.O. No.:
Cast By:
Project No.: 722-80174-151
Proj. Name: Maple EI~r:nentary School
. ,
Location: 2109.J Street
Springfield, OR
P0271-255-0809
Chris McDonald
koad:
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
IMaterial Temp. (F): ASTM C1064
,Max Temp (F):
"Min Temp (F):
.Specimen Size:
:Unit Weight (pet): ASTM C138
:TimeCast: 1 :58 PM
. IAdditives: Hot water
'Results Reported To:
Field Test Data
6"
3/4"
1.6%
44"
700
fifac-emerit Data: "Mate"rial: Concrete
Roof slab on deck for west side of area 1 and 2nd f160r slab of area 1
Location Sampled' At:
NE Ouadrant of 2nd floor
Date Cast: 12/10/08
'Ticket No.: IMiXNO.:
3160540 2440N15200
Design Strength (psi!:
_.
Cylinder No. Test Date
08-3872 12/17/2008
08-3873 1/7/2008.
08-3874 "1/7/2008
08-3875 H
Remarks: Set #2
Yardage
11
11
4x8
Date Rec'd:
Weather:
12/11/08
Total:
Supplier:
Knife River
Contractor
Curing Conditions:
1 day Remainder F.C. ASTM
Cloudv
required 4,000
Compressive Strength Data .ASTM C39
placed 4,000
Field Cure Lab Cure Diamet~r or
Age (days) (days) (days) Dimensions
. (Inches)
7 6 4.00
28 27
28 27
H 1 H
Cross Sect. Area Cylinder WT. Max. Load (Ibs.) Compo Strength Fracture Type .. Test Time Capping Method
(s.i.) (Ibs.) (pSi)
C617.03 C1231-03
12.57 8.5 45,960 3,660 3 9:48 I!oM X
Respectfully Submitted,
f;:;;'Vc/p:rVices /ndustnes. Inc
Raymond AIIPe~
Project Manager
KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
c:
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS
PROHIBITED WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
l... ~;J Information
~~'!lToBuild On
ll!!Itg' " ,
.j I.'.J . ecn.uHIng . 'Rt8fIng
Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 18, 2008 CCB#176269
Project No.: 722-80174-150
Proj. Name: Maple Elementary School
Location: 2109 J Street
Springfield, OR
Date:
B.P. No.:
P.O. No.:
Cast By:
P0271-255-0809
Chris McDonald
Placement Dahl: Material: Concrete
Roof slab on deck for west side of area 1 and 2nd floor slab on area 1
Field Test Data
Location Sampled At: .
SE quadrant of 2nd fioor slab
Date Cast: 12/10/08 Date Rec'd: 12/11/08
Ticket No.: I Mix No.: Weather:
3160534 2440N15200 Cloudy
Design Stren!Jth (psi): required 4.000
Cylinder No. , Test Date Age (days) Field Cure lab Cure
(days) (days)
08-3868 12/17/2008 7 1 6
08-3869 1/7/2008 28 27
08-3870 1/7/2008 28 27
08-3871 H H H
Remarks: Set #1
]Load:
Total:
Supplier:
Knife River
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
'Min Temp (F):
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 11 :10 AM
Additives: Hot water
Results Reported To:
Contractor
6"
3/4"
1.6%
46"
66'
Yardage '
6
10
4x8
Curing Conditions:
1 day Remainder F.e. ASTM
Compressive Strength Data ASTM C39
placed 4,000
Diameter or
DImensions
(inches)
Cross Sect. Area Cylinder WT.
(5.1.) (Ibs.)
Ma'. Load (lb5.) Comp. Strength F t T " T t T.
" (psi) rac ure ype es Ime
Capping Method.
C617-03
C1231-03
4.00
n57
8.6
53,975
4.290
3
9:40AM
x
Respectfuily Submitted,
7Tfessiona!-!Jrvices Industries, Inc.
. t\.(A..J V, LlIL.i"\
Raymond AIiPe,';i ~
Project Manager
I,PFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconsLcom
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu .
City of Springfield
c:
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS
PROHIBITED WITNOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
1~$f1fo~;::z:~n
I2ngtneenng . ~ . JMttng
COMPRESSION REPORT
Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722"80174-140
Proj. Name: Maple Elementary School
Location: 2'.109.J'Street'
Springfield, OR
-Placement Data: Maieria.'!: Concrete
Pour back strips grid line J to L at 3 to 5, J to K at 5 to 6, grade beams E at 11 to 13 and G.5
at 11 to 13 and roof at gridline B to D at 2 to 5
Location Sampled-At:
Pour backs J to K at 3 to 5 and K to L at 3
Oate Cast: 12102/08 Date Rec'd: 12/03/08
Ticket No.: IMiX No.: Weather:
3225353. 40N.15200 Cloudy
Yardage
2
103/4/611/2
Load:
Total:
Supplier:
Knife River
Desi\jn Stren\jth (osil:
re9uired 4,000
Cylinder No.
Field Cure Lab Cure Diameter or
Age (days) (days) (days) Dimensions
(inches)
7 6 4.01
.--
28 27
28 1 27
H H
12.63
Test Dale
08-3795
12/9/2008
08-3796 .12/30/2008
08-3797 12/30/2008
08-3798 H
Remarks:
c: KPFF - ugo.costa@kpff.com
Hyiand Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 16, 2008 CCB#176269
Date:
B.P, No,:
P.O. No,:
Cast By:
P0271-255-0809
Glenn Meeks Jr
Field Test Data
33/4"
3/4"
500
75"
4x8
Curing Conditions:
ASTM
Capping Method
C_617'OJ
Cf231-0J
Compressive Strength Data ASTM C39
olaced 4.000
Cross Sect. Area Cylinder WT. Comp Strength I
Max. Load (Ibs.) . Fracture Type *- Test Time'
(5.1.) <Ibs.) (psi)
'Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
.Specimen Size:
'Unit Weight (pet): ASTM C138
Time Cast: 8:30 AM
Additives: Hotwater, AEA
Results Reported To: Contractor
8.6
45,685
3,620
3
10:53 AM
x
Respectfully Submitted.
R;~7(r&~S Industries, Inc.
Raymond Aliperti
Project Manager
T/-ilS REPORT IS P,r:WVIOED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY A"!Y METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL.
IS PROHIBITED WITHOUT ruE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l r: lJl!!!to.r Information.
1'!!:_-:~lTo Build On
IJ!nglneoring . c-.uHIng . 'nttIttng
SPRINGFIELD OFFICE
1 040 ~ A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
November 24, 2008 CCB#176269
COMPRESSION REPORT
Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722-80174-117
Proj. Name: Maple Elementary School
Location: (--21 09-J Street,
- Spriiigfield~OR' ,
Compressive Strength Data ASTM C39
Desi!ln Stren!lth (psi): required 4,000 placed 4,000
....,;,.,.
Field Cure Lab Cure. Diameter or Cross Sect. Area Cylinder WT. Compo Strength
Cylinder No. Test Date Age (days) Dimensions Max. Load (Ibs_l Fracture Type H Test Time
(days) (days) (inches) (s.1.) (lbs.) (psi)
08-3635 "11/21/2008 7 6 4.01 12.63 86 40,570 3,210 2 2:01 PM
08-3636 12/12/2008 28 27 4.00 12.57 8.6 70,935 5.640 3 11:05 AM
08-3637 12/12/2008 28 27 4.00 12.57 8.6 70,350 5,600 3 11:15AM
08-3638 Hold H H
Placement Data:
Pour back strips.
4.
Material: Concrete
A to D between 2 and 8, columns block outs at: C7, C6, B6, B7 and C at
Location Sampled At:
D at 5
Date Cast:
Ticket No.:
3224972
Fog
koad:
Total:
Supplier:
Knife River
Yardage
1
10.75
11/14/08
1~:4~~15200
Date Rec'd:
Weather:
11/15/08
Remarks:
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconsLcom
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
Date:
B,P. No,:
P,O. No,:
Cast By:
P0271-255-0809
Pete Furlong
Slump (in.): A$TM Cf43
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:-
Unit Weight (pcf): ASTM C138
Time Cast: 7:55 AM
Additives:
Results Reported To:
Field Test Data
6"
42"
64"
68"
3SO
4x8
Curing Conditions:
ASTM
Contractor
C"'pp\ng Method
C611-03
C1231-03
x
X
X
Respectfully Submitted,
PrJeSSio~a\lrr;o~ustlles, Inc
~ AIIPertry""
Project Manager
THIS REPORT IS PROVIDED FOR THE INFOR"'/A TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS
PROHIBITED WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
l..~ ;ZInforrnation
,.,~. .TO Build On
Engineering. Consulting. Testing
DAILY ~!ELD REPORT
Date Performed:
Client:
December 2, 2008
Springfieid School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-141
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforced Concrete
P.O. No.:
Weather:
P0271-255-0809
Cloudy
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: pour back strips gridline J to L at 3 to 5 and J
to K at 5 to 6 grade beams E at 11 to 13 and G.5 at 11 to 13 and roof at B to D at 2 to 5 prior to placement of concrete.
The WWF at roof B to D at 2 to 5 elevated to center of concrete during placement. Reinforcing steel was checked for
grade, size, lap, piacement and clearances where appiicable. Reinforcing steei was secured using tie wire and
supported on concrete dobie blocks. Reinforcing steel was placed in accordance with latest revisions dated 5/01/08.
Performed visual inspection during piacement of concrete in the locations listed above. Concrete was placed by boom
pump and mechanically consolidated. Cast one (1) set of four (4) (4x8) concrete test cylinders. Contractor was asked
to notify our office when additional services are needed.
Tvoe of Material
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardaqe Placed
'Inspector: Glenn Meeks Jr, icc #5071538-49
CCB #176269
Set #1
Knife River
40N15200
33/4"
500
750
8:30 AM
4,000
4
61 1/2
If you have any questions regarding this report, please feei free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~poU,aQ'P
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpffcom
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects" dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolandabird@sps.iane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT, BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD
PA""tdflWSitfrtaM5~tif1ce>ftlaB.striEfS,J4tJc~lVfll2<<J;rPr8fl~1'eIM~!$f5flrqffie:lBf'8~t:iQM'15411~'~f3T4i:B1163
l~~;J lnfonnation
fI~.lTo Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
December 12, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-149
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
P.O. No:
Shop/ Field:
Weather:
P0271-255-0809
Shop
Inside
Welding
Field Observations and Comments
Performed final visual inspection on Nelson Studs and Seam welds for 2nd floor decking from gridiines E to H between
5 and 8. WeJdments were inspected for size, iength, profile, and locations. To the best of our knowledge, the work
inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Buildinq Code and applicable AWS 01.1 and AWS 01.3 codes.
Inspector: Raymond Aliperti, ICC# 1017075-85
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
prK:;~ ~ Industries, Inc.
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us .
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yoianda Bird - yolanda.bird@sps.iane.edu
City of Springfield.
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
P4RTY, BY ANY MEANS, EXCEPT IN FULL WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED
. Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 5411746-7163
l...~;lInfonnation
,.,~. .To Build On
Engineering . Consulting . Testing
DAILY FiELD REPORT
Date Performed:
December 10, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-148
Client:
Project Name:
Maple Elementary School
21 09 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforcing Steel
P.O. No.:
Weather:
P0271-255-0809
Overcast
(
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: stair #3 landing at gridline B to B.5 at 5.6 to 6.
Reinforcing steel was checked for grade, size, lap, placement and clearances where appiicable. Reinforcing steel was
secured using tie wire. Reinforcing steel was placed in accordance with latest revisions dated 5/01/08 1/S503.
Contractor was asked to notify our office when additional services are needed. To the best of our knowledge, the work
inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Building Code.
Inspector: Glenn Meeks Jr, ICC #5071538-49
CCB #176269
if you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Profess/onal Service Industries, Inc.
~iv,4
Raymond Aliperti
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurniaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum.com
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT aNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED,
Professional Service Industries, Inc. -1040-A Shelley Street. Springfield, OR 97477. Phone 5411746-9649. Fax 5411746-7163
l~~;lInformation
I"~. .To Build On
Engineering' Consulting. Testing
DAILY FiELD REPORT
Date Performed:
Report Number:
December 10, 2008
Springfield Schooi District
525 Mill Street
Springfield, OR 97477
Project Location:
Client:
Project Name:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforced Concrete
P.O. No.:
Weather:
722-80174-147
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Clear/Cold
Field Observations and Comments
Reinforcing steel was previously inspected on 12/9/08. Performed visual inspection during placement of concrete in thE
following locations: roof slab on deck for west side of area 1 and 2nd floor slab on deck for area 1. Concrete was piaced
by pump truck and manually consolidated/puddied. Cast two (2) sets of four (4) (4x8) concrete test cyiinders.
Contractor was asked to notify our office when additional. services are needed. To the best of our knowledge, the work
Inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Building Code.
Tvoe of Material Set #1 Set #2
Supplier Knife River Knife River
Mix # 2440N15200 2440N15200
Slump 6" 6"
Air Content 1.6% 1.5%
Ambient Temperature 460 440
Material Temperature 660 700
Time Placed 11:10 AM 1 :56 PM
Design Strength (psi) 4,000 4,000
Number of Samples A 4
Total Yardaqe Placed 60 110
Inspector: Dale Russell, ICC #01140789 & Chris McDonald, ICC #5298238-47
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
RJva~
Raymond Aliperti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconstcom
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagnl@robertsonsherwood.com
Springfield School District - jsaracen@sps.iane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service. Industries, Inc.. 1040-A Shelley Street. Springfield, OR ~7477. Phone 5411746.9649. Fax 541/746-7163
l ~~;lInfonnation
,.,~. .To Build On
Engineering. Consulting. Testing
DAJL Y FIELD REPORT
Date Performed:
December 9, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-146
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Reinforcing Steel
P.O. No.:
Weather:
P0271-255-0809
Cleared off
Field Observations and Comments
Performed visuai inspection of reinforcing steel and nelson studs at the following locations: 2nd floor reinforcing at
gridlines A to D at 5 to 8 and roof reinforcing at gridlines C to D at 5 to 6. Both areas require the excess trash to be
removed and the welded wire fabric/#3 reinforcing to be elevated to the required 3/4" clearance during placement 01
concrete. Reinforcing steel was checked for grade, size, lap, placement and clearances where applicable. Reinforcing
steel was secured using tie wire. Reinforcing steel was placed in accordance with latest revisions dated 5/01/08.
Contractor was asked to notify our office when additional services are needed. To the best of our knowledge, the work
inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International BuildinQ Code.
Inspector: Glenn Meeks Jr, ICC #5071538.49
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~\J~
Raymond Aliperti
Project Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - doug@milstead.us
Hyland Construction - jeffdurmaj@jhconst.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yoianda.bird@sps.lane.edu
KPFF - ugo.costa@kpff.com
Mahlum - rberndt@mahlum.com
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES,IS PROHIBITED
Professiomll Service.lndustries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541/746-7163
l...~;lIriformation
fI~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
December 9, 2008
Springfield School District
525 Mill Street
Spnngiield, OR 97477
Report Number:
722-80174-145
Client:
Project Name:
Maple Elementary School
2109 J Street
Springiield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Epoxy
P.O. No.:
Weather:
P0271-255-0809
Clear
Field Observations and Comments
Performed continuous inspection during the installation of #5 epoxied rebar dowels in the following location: (38) #5x77"
dowels at gridlines FA to G at 5.5 to 6. Verified hoies to be 3/4" in diameter by 9" in depth. Prior to installation the
predrilled holes were cleaned using a nyion brush and compressed air. Verified minimum embedment depth of 9
inches. The above listed epoxy anchors were installed using Hilti Hit-RE 500-SD epoxy with ICC# 241382. The epoxy
anchors were installed in accordance with the latest revisions dated RFI #30.
Inspector: Glenn Meeks Jr. ICC# 5071538-49
CCB #176269
If you have any questions regarding this report, please feei free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
&:~"~fl
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfieid
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CUENTONL Y. THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSI9NAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. -1040-A Shelley Street. Springfield, OR 974i,-.Phone 541/746-9649. Fax 541/746-7163
l..~;lInformation
,,~. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
December 8, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-144
Client:
Project Name:
Maple Elementarl' Schooi
2109 J Street
Springfield, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyiand
Axis Crane
Welding
P.O. No:
Shop/ Field:
Weather:
P0271-255-0809
Fieid
Cloudy
Field Observations and Comments
Performed periodic visual inspection of the following items: roof welds from gridline A to D between 5 and 8. Weldments
were inspected for size, length, profile and locations. To the best of our knowledge, the work inspected is in
.conformance with approved drawin~s, specifications and applicable AWS D1.1 and AWS D1 .3 codes. .
Inspector: David F. Smith, Certification# 0877340-85
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
~~oClc~Q~ce Industr/es, Inc.
Raymond Alipertj
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfieid School District - jsaracen@sps.lane.edu
Yoianda Bird - yolanda.bird@sps.iane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY, THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSlpNAL SERVICE INDUSTRIES, 1$ PROHIBITED.
Professional Service Industries, Inc.. 1 04Q-A Shelley Street. Springfield, OR 97477 . Phone 541f746.9649 . Fax 541f746-7163
l"'~;l Information
",..,. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed:
December 2, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-142
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
Axis Crane
Welding
P.O. No:
Shopl Field:
Weather:
P0271-255-0809
Field
Cioudy
Field Observations and Comments
Preliminary periodic visual inspection of steel decking for in-progress welding of nelson studs and seam welds at second
fioor elevation, gridlines A to D from 5 to 8. Weldments were inspected for size, length, profile and locations. To the
best of our knowledge, the work inspected is in conformance with approved drawings, specifications and applicabie
D1.1 codes. Contractor was asked to notify our office when additional services are needed.
Inspector: David F. Smith, Certification# 0877340-85
CBB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649. .
Respectfully Submitted,
Professional Service Industries, Inc.
WJ'~
Raymond A~:lti
Project Manager
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconsLcom
Milstead & Associate.s - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfieid School District - jsaracen@spsJane.edu
Yolanda Bird - yolanda.bird@sps.iane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT aNt Y. THE REPRODUCTION OF THIS REPORr BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 104Q-A Shelley Street. Springfield, OR 97477. Phone 541rT46-9649. Fax 541rT46-7163