Loading...
HomeMy WebLinkAboutComments SUB 6/12/2006 (2) ~ ~1m ~ SPRINGFIELD UTILITY BOARD WinER SERVICE CENTElt 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.subutil.com June 12, 2006 Andy Limbird City of Springfield 225 N. 5th Street Springfield, OR 97477 D Dear Alldy: SUBJECT: PARTITION TENTATIVE #SUB2006-00033 KNIGHTS 18-02-06A2 TL 2600,3600 Garden Ave Listed below are our comments for the above referenced development proposal: I. The proposed development is currently outside of an established water service area. If public water supply is desired prior to annexation, the SUB Water Division will assist the City and the developer with a city water service extraterritorial extension application. Approval from the Lane County Boundary Commission is needed in order to serve the area with city water. The City ~\~~I).i,~g Dmi~.rtl1)~~.t-",ilLp~ t~e,leadagencyin the appli.ca,tj!,,!).p~oces~... ',. i;: C','/' 2. All new, water system facilities and modifications to water, system facilities both. inside and -'. , .'" "'. ~ . . "- . <, . ',' . ~ - .. adjacent to, the RH)posed development shall be placed in streetright-of-waY',at alocatjon and depth of bury that meets the standards of the SU)3 Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. ,All workmanship shall be performed to meet or exceed SUB Water Division construction standards. 5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB Water Division and the long-range needs of the City. These needs include, but are not limited to, meter location and access, sizes of water distribution and transmission lines, pumping facilities, and communication lines. 6. Please ask the developer to contact the SUB Water Division for detailed information on the materials a'.1d construction standards, detailed costs for installing SUB water facilities, and a schedule of:co,ns!ruction. Construction expenses may be reduced with good planning of required water.fa~iliti~s, good timing of facilities installation, and joint tr~nch opportumti~s. : " 7. All w~ter met~rs)Yill be placed in public right-of-way at a location identified by the developer. Each lator parcel must have i't~ 0"0 water service. -" . '" ~ ~ Partition Tentative #SUB2006-00033 3600 Garden Avenue June 9, 2006 Page 2 Of2 '8. Water service facilities will De installed upon collection of development charges. Development policies and charges identified in this .Iettei are subject to change. Actual charges will be those in effect at the time water service is requested. 9. Springfield has several wellhead protection areas. One hundred percent of Springfield's drinking water comes from wells. In every instance, care shall be taken to prevent groundwater contamination. Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals; petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. Sincerely, :Z>Mf 1'. ,ft!~/..J..- Bart E, McKee P.E. Senior Civil Engineer - Water Division BEM:mkm cc: Duane Knights, 2258 33'd Street, Springfield, OR 97478 Marvin Krush, Krush & Associates, 607 Hwy 99 N, Eugene, OR 97402 S:\SITEPLANI3600 Garden Ave panition tentative 6-9-06.doc