FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
Client: Ms. Lauretta Davies
Address: Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Project No.: 722-80276-3
Project: Jerry's-McKenzie Field Improvments
Project 2525 Olympic St;;;j".
Location: Springfi'eld-'-'Oregon- J
Equipment: Troxler: 3430 SN: 61109
,C,q--
Date Performed:
P.O. No.:
B.P. No.:
Technician:
Laboratory Soil / Aggregate Data:
Moisture Density Relationship of 135Ibs./cu.ft., at 8% moisture was supplied by supplier for Egge Sand and GraveI3/4"-Q modified.
Test No.
Approximate Test Location
Slab on grade
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 663 OS 3182)
_()1):
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746,7163 fax
November 19, 2008
Z4175LD
Dale Russell
Approximate Test Probe Wet Density Dry Density Percent Percent Required
Elev. Depth LBS/CU.FT. LBS/CU.FT. Moisture Compaction Compaction
1 20' south of gridline D -1'bfrg 8"
2 intersection of gridlines F and G ~ 1'bfrg 8"
3 .intersection of gridnnes 0 and G I -1'bfrg I 8"
Tests performed at l' below finished grade of base rock(bfrg) at listed locations above,
Tests were reported to Jason with Egge Sand and Gravel and Jon with Chambers Construction.
144.3
142.7
143.5
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
135.0
133.6
134.2
Comments
6.9
6.8
6.9
100.0 95%
99.0 95%
99.4 95%
Respectfully Submitted
Professional 'Service Industries. Inc.
K:#1760~
Ray~ V. Aliperti
Project Manager
THIS REPORT IS PROVlOED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL' TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS
PROHIBITED WITHOUT TffE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
, "~;lInfol71U1tion
"",~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 25, 2008
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Report Number:
722-80276-5
Project Name:
Jerry's-McKenzie Field
Improvements
2525 Olympic Street
Springfield, Oregon
Project Location:
P.O. No.:
Type of Inspection:
Z4175LD
Soils Observation
. Weather:
Cloudy
Field Observations and Comments
Met on site with Chambers Construction and Egge Sand and Gravel representatives at 8:30am, 11 :30am, and 3:30pm
to observe exposed subgrade soils in the following pad footing excavations: A at 2(11 1/2'), A at 5(7'), A at 7(8'), A at
8(8'), A at 9(8'), B at 9(8'). Ali excavations were performed using a 200LC excavator with a toothed bucket. Exposed
subgrade soUsat the base of the footings appeared to be native well graded gravels. All footing excavations were clean
and relatively free of loose soil. The number in parenthesis above is the depth of the excavation measured from finished
rock grade elevation. All excavations were .filled with imported controlled density fill (CDF) from Knife River with a mix
1.0. number of 24COL3WOHO. To the best of our knowledge, the work inspected was in accordance with the building
department approved design drawings, specifications and applicable workmanship provisions of the International
Building Code. Aiso observed continuous footing excavations along gridline 9 from A to J: Depths measured were 9' at
. '"
H.5, 7 1/2' at G.5, 8 1/2' at F.5, and 8' at D.5. i
\
Inspector: Raymond Aliperti
CCB #176269
"
(
If you have any questions regarding this report, pi ease feel free to contact us at 541-746-9649.
Respectfully Submitted, . .
~,rT"'"'
David Smith
Branch Manager
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649 . Fax 541n4~-7163
l...~ ;ZInfonnation
",..,. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
November 26, 2008
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Report Number:
722-80276-6
Client:
Project Name:
Jerry's-McKenzie Field
Improvements
2525 Olympic Street
Springfield, Oregon
Project Location:
P.D. No.: Z4175LD
Type of Inspection: . Soils Observation
Weather:
. Cloudy
Field Observations and Comments
Met on site with Chambers Construction and Egge Sand and Gravel representatives at 8:30am, 11 :30am. and 1 :30pm.1
Footing excavations were performed along gridline J from 1 to 9. Depth to native gravels were measured as follows: J
at 8(9'), 1 at H.5(11 '), 1 at G.5(11 1/2'), 1 at F.5(8'), 1 at E.5(T), 1 at D.5(13'), 1 at C.5(1 0 1/2'), 1 at B.5(8'), 1 at A.5(8
1/2'),9 at B.5(7 1/2'), and 1 at A.5(8'). All measurements are from finished rock grade. All excavations were performed
'using a 200LC excavator with a toothed bucket. All footing excavations were clean and relatively free of loose soil. All
excavations were filled with imported controlled density fill (CDF) from Knife River with a mix I.D. number 01
24COL3WOHO. To the best of our knowledge, the work inspected was in accordance with the building department
approved design drawings, specifications and applicable workmanship provisions of the International Building Code.
Inspector: Raymond Aliperti
cce #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
M~r;rK"".
David Smith
'Branch Manager
c: City of Springfield _
Chambers Construction - David Bakke .
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRC?DUCTlON OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDU~TRIES. IS PROHIBITED.
Professional Service Industries, Inc. . lQ4Q-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649. Fax' 541/746-7163
, '
l... ro.Z Information
"..,. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
December 1, 2008
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Report Number:
722-80276-7
Project Name:
Jerry's-McKenzie Field
Improvements
2525 Olympic Street
Springfield, Oregon
Project Location:
P.O. No.:
Type of Inspection:
Z4175LD
Soils Observation
Weather:
Clear
Field Observations and Comments
Met on site. with Chambers Construction and Egge Sand and Gravel representatives at 8:30am. 11 :OOam. and 1 :30pm
to observe pad footing excavations at the following locations: Hat 6(8'), G at 4(8'), Fat 6(10'), Fat 4(10'), Eat 6(9'), E
at 4(12'), D at 6(71/2'), D at 4(11'), and continuous footing excavations along gridline A at 6.5(81/2'), 7.5( 7 1/2'), and
8.5(7 1/2'). All measurements are from finished rock grade. The excavations were performed using a 200LC excavator
with a toothed bucket. The excavations were filled with imported controlled density fill (CDF) from Knife River with a
mix I.D. number of 24COL3WOHO. To the best of our knowledge, the work inspected was in accordance with the
building department approved design drawings, specifications and applicable workmanship provisions of the
International Building Code.
Inspector: Raymond Aliperti
CCB #176269
If you have any questions regarding this report, please feel free to contaCt us at 541-746-9649.
Respectfully SUb+~:\
ii7:~ Llt~"OC
David Smith
Branch Manager'
c: . City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. . 104Q-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649. Fax 5411746-7163 .
L "~;lInfonnation
,.,~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
November 24, 2008
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Report Number:
722-80276-4
Project Name:
Jerry's-McKenzie' Field
Improvements
2525 Olympic Street
Springfield, Oregon
Project Location:
P.O. No.:
Type of Inspection:
Z4175LD
Soils Observation
Weather:
Clear
Field Observations and Comments
Met on site with Chambers Construction and Egge Sand and Gravel representatives at 8:30am, 11 :OOam. and 3:00pm
to observe exposed subgrade soils in the following pad footing excavations: A at 1 (7'), B. at 1 (7'), C at 1 (8 1/2'), D at
1 (11 1/2'), Eat 1 (9 1/2'), Fat 1 (7'), G at 1 (9'), Hat 1(10'), J at 1 (10'), J at 2(10'), J at 3(9 1/2'), J at 5(9'), J at 6(10'), J at
8(10'), J at 9(81/2'), H at 9(9'), G at 9(81/2'), Fat 9(10'), Eat ((71/2'), D at 9(8'), and Cat 9(7'). All excavations were
performed using a 200LC excavator with a toothed bucket. Exposed subgrade soils at the base of the footings
appeared to be native well graded gravels. All footing excavations were clean and relatively free of loose soil. The
number in parenthesis above is the depth of the excavation measured from finished rock grade elevation. All
excavations were filled with imported controlled density fill (CDF) from Knife River with a mix 1.0. number of
24COL3WOHO. To the best of our knowledge, the work inspected was in accordance,with the building department
approved design drawings, specifications and applicable workmanship provisions of the International Building Code.
Inspector: Raymond Aliperti
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649..
Respectfully Su itted, ..
Professional S rvice Inc jtries. Inc.
~~ .
David Smith
Branch Manager
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects.- Scott Stolarczyk
Metzler Engineering - Scott MetzlE3r .
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD.
PARTY, BY ANY MEANS. EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
.Professional Service Industries, Inc. . 1 040-A Shelley Street. Springfield, OR"97477. Phone 541/746-9649 . Fax 541/746-7163
l ft~'.IInfonnation
~~II To Build On
""".1,.. 11'.1 .~.'nNdJng
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
Client: Ms. Lauretta Davies
Address: Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Project No.: 722-80276-3
Project: Jerry's-McKenzie Field Improvments
Project 2525 Olympic Street
Location: Springfield, Oregon
Equipment: Troxler: 3430 SN: 61109
Date Performed:
P.O. No.:
B.P. No.:
Technician:
Laboratory Soil / Aggregate Data:
Moisture qensity Relationship of 135Ibs./cu.ft., at 8% moisture was supplied by supplier for Egge Sand and Gravel 3/4"-0 modified.
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 663 OS 3182)
Test No.
Approximate Test location
Slab on grade
Probe
Depth
Wet Density Dry Density
LBS/CU.FT. LBS/CU.FT.
Approximate Test
Elev.
20' south of gridline 0 -1 'bfrg 8"
2 intersection of grid lines F and G -1'bfrg 8"
3 intersection of grid lines 0 and G -1'bfrg 8"
Tests performed at l' below finished grade of base rock(bfrgl at listed locations above.
Tests were reported to Jason with Egge Sand and Gravel and Jon with Chambers Construction.
144.3
142.7
143.5
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
.135.0
133.6
134.2
Percent
Moisture
1040 ~A Shelley Street
Springfield, Oregon 97477
(541)746,9649 - (541)746-7163 fax
November 1 g, 2008
Z4175LD
Dale Russell
Percent
Compaction
Required
Compaction
Comments
6.9
6.8
6,9
100.0 95%
99.0
95%
I
I 99.4 95%
Respectfully Submitted
Professional Service Indusilies. Inc.
7}B #176~691
Nu.yC V~
Raymond V. Aiiperti
Project Manager
THIS REPORTfS PROVfOED FOR THE INFORMATIONOF THE CUENTONL Y. THE REPRODUCTJON OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAC TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES_
l'ftifi:!!. ;ZInformation
I':"!.:.,;::- To Build On
Jfng.." ... ,'ng. eo..uItIng. 11MJting
COMPRESSION REPORT
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Project No.: 722.80276"8
Proj. Name: Jerry's-McKenzie Fie.ld Improvments
Location: 2525 Olympic Street, Springfield,
Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Glenn Meek Jr.
Placement Data: M-ater'-al: Concrete
Utility line relocation in the parking area pour back at the north side of existing Wilco
Building
Location Sampled At:
See Placement Data
Date Cast: 10/29/08 IDate Rec'd: 10/30108
Ticket No.: IMiX No.: IWeather:
58005871 314065 Overcast
'-
Desi~n Stren~th (psi): 4,000 req u ired
Cylinder No. Test Date Age (days) Field Cure
(days)
08-3400 '11/5/2008 7
08.3401 11/26/2008 28
08,3402 11/26/2008 28
08-3403 H H 1
Yardage.
Load:
1
ITatal: 12
Supplier:
Eugene Sand and Gravel
. Slump (in.): ASTMC143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
,Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 8: 15 AM
Additives:
Results Reported To:
Compressive.Strength Data ASTM C39
4,000 placed
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 5, 2008 CCB#176269
Field Test Data
3 1/2"
3/4"
2.7%
48"
75"
4x8
146.15
Curing Conditions:
ASTM
Contractor
Lab Cure Diameter or Cross Sect~ Area Cylinder WT. Compo Strength Fracture Type Capping Method
Dimensions Max. load (Ibs.i Test Time
(days) (inches) (5.1.) (Ibs.) (psi)
C617-0J C1231-0J
6 3.99 12.51 8.2 51,920 J 4,150 3 10:56 AM X
27 3.99 12.51 8.3 ,69,015 5,520 3 2:45 PM X
27 3.99 12.51 8.3 70,995 .5,680 3 2:49 PM X
h 1 - Cone (both -ends) 2 - ConeNertical Cracks (one end)
Remarks:
c:
3 - Columnar
4 -- Diagonal wIno craking at ends' 5. Side fractures (at top of bottom)
City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
6. Top fractures (same as #5 but end at' cylincfer-'fspointedj
Respectfully Submitted,
)Ofes~V Ser Ices Industries, Inc.
R~nd V. Aliperl'
Project Manager