DAILY FIELD REPORT
Date Performed:
Client:
November 24, 2008
North Star Construction Service
303 N 10th St., #1
Ozark. MI 65271-0326
Report Number:
722-80217-22
, Project Name:
Abby's / Sonic
Project Location:
~,J vryrllplc
Springfield, Oregon
PO No.:
Type of Inspection:
Epoxy
Weather:
Clear
Field Observations and Comments
Performed continuous inspection during the installation of 1/2" all thread epoxied anchor bolts in the following locations:
Simpson Strong ties HTT16 placed at door frames at Line 3 between Band C; Line 2 between A and B and also C and
D as per approved plans dated 03-1 9-08 (a 2.1) detail for Foundation. Prior to installation the predrilled holes were
cleaned using a nylon brush and compressed air. Verified minimum embedment depth of 8 inches. The above listed
epoxy anchors were installed using Simpson Set pack EZ epoxy with ICC# 1722. The epoxy anchors were installed in
accordance with approved job-site plans and manufacturer's directions. Contractor was asked to notify our office when
additional services are needed. To the best of our knowledge, the work inspected above was in accordance with the
building department approved design drawings, specifications and applicable workmanship provisions of the
. International Buildinq Codes.
Inspector: Dale Russell
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitt~d,
Professional Servic ) Industries, Inc.
D~:" J-,.tt
David Smith
Project Manager
cc: North Star Construction
City of Springfield
2CS Engneering, Inc.
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT. BY ANY METHOD. AND ITS TRANSMITTAL TO A TJ-;IRD
PAPfGf~'tl.'.s-M:tIce>rISCTBStMeS/,JtncVllllfi@aoW~e1IelfBfte€f.i1~ekI,f@afW4;T(}~~51f1I1V146~ ~1WMln'WJt'163
lP~fj 1{:I;;;;~n
1In,." .. ,i '.,1 . ConauICfng . 1IMUng
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
Client: North Star Construction Service
Address: 303 N 10th St., #1
Ozark, Mi 65721-0326
Project No.: 722-80217-12
Project: Abby's I Sonic
.Project 2005 Olympic
Location: Springfield, Oregon
Equipment: Troxler: 3430 SN: 61175
1040 ~ A Shelley Street
Springfield, Oregon 97477
(541)746,9649. (541)746-7163 fax
CCB #176269
Date Performed:
P.O. No.:
B.P. No.:
Technician:
October 14, 2008
Mike Wright.
Laboratory Soil / Aggregate Data.
Moisture Density Relationship of 135 Ibs./cu.ft.. at 7% moisture, is from ourreport number 722-80217-3, dated 11,21-0Tfrom Coburg Quarry for 3/4"-0 (T,180)
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 724 DS 2880)
Test No.
Approximate Test Probe
EJev. Depth
Approximate Test.Locatiori
At Gridline 0_1 FG 10"
2 At Gridline B-1 FG 10"
3 AI Gridline A-2 FG 10"
4 IAI Gridline B-3 FG 10"
5 At Gridline 0-3 FG 10"
6 At Gridline C-l FG 10"
7 At Gridline B-2 FG 10"
Tests performed at below finished grade of base rock under footing at listed locations above.
Tests were reported to Ray.
cc:
North Star Construction
City of Springfield
2CS Engneering, Inc.
Wet Density Dry Density Percent Percent Required Comments
lBSICU.FT. lBSICU.FT. Moisture Compaction Compaction
138.2 132.2 4.5 97.9 95%
142.3 136.2 4.4 100.9 95%
137.7 131.2 4.9 97.2 95%
136.1 130.1 4.6 .96.4 95%
142.3 134.8 5.6 99.8 95%
146.3 138.3 5.8 102.4 95%
145.6 138.2 5.4 102.3 95%
Respectfully Submitted
Professional Serv, Oe-olndustries, Inc.
~(~j
David Smith
Department Manager
THIS REPORT is PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TOA THJRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, .
Slump (in.): ASTM Ct43
Max. Aggr. Size:
A.ir Content: ASTM C231
A.ir Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp IF):
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 11 :30 AM Curing Conditions:
Additives: AEA - Hot water - Fiber yellow
Results Reported To: Contractor
JJ ft~.'Information
I,""~. To Build On
1Ji!nfI- ,I I. ~ . C_ 71 -..... . 'RIetIng
COMPRESSION REPORT
Client:
Address:
North Star Construction Service
718 7th Ave SW
Ozark, MI66721-0326
Project No.: 722-80217-21
Proj. Name: Abby's/Sonic
Location: S . f' Id 0
pring Ie , regon
. Placement Data:
Southside driveway for drive-up window
Material: Concrete
Location Sampled At:
West end of Driveway
Dale Cast: 11/07/08
T~~k;~:;~:1 !MiX 3Nlo~~65
Yardage
1
10
11/08/08
Load:
Total:
Supplier:
Eugene Sand & Gravel
Date Rec'd:
Weather:
Overcast
Desi!'ln Slren!'lth (psil:
Compressive Strength Data ASTM C39
placed
3500 reauired 3.500
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 8, 2008 CCB#176269
Dale:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Field Test Data
51/4"
3/4"
4.0%
620
730
I
4x8"
1 day field cure, remainder ASTM
J
Cylinder No. Test Date
08-3527 11i14/2008 I
08-3528 12/5/2008 I
08-3529 12/5/2008 I
08-3530 H I
Diameter or Cross Sect Cylinder WT. Compo Strength Fracture Type Capping Method
Dimensions Max. Load (Ibs.) Test Time
(inches) Area (5.1.) (lb..) (psi)
C617-0J C1231-03
3.99 12.51 8.2 42,760 3,420 3 10:14AM X
4.00 12.57 8.4 58,510 4,650 3 11:00AM X
3.99 12.51 8.3 58,395 4,670 3 11:06AM X
Field Cure
(days)
Age (days)
Lab Cure (days)
7
28
28
6
27
27
H H
u 1 - Cone (both ends) 2 ~ ConeNertical Cracks (one end) 3 _ Columnar
Remarks:
4 - Diagonal wIno craking at ends 5 - Side fractures (at top of bollom)
c:
North Star Construction - Services, LLC
Cily of Springfield
2CS Engineering, Inc.
I
6 - Topfraclures (same as #5 but end of cylinder is pointed)
Re1fUIIY Submi ted, .
Pn r sional Sert es Induslries, Inc.
,t{I/JI
sfe~en E. Wilder
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT aNt Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. ~
l"'~;' Information
"'~.lTo Build On
Engineering. Consulting. Testi"bAIL Y FIELD REPORT
Date Performed: October 15, 2008 Report Number: 722-80217-13
Client: North Star Construction SVC Project Name: Abby's/Sonic
303 N 10th SI., #1
Ozark, MO 65721,0326 Project Location: 2005 Olympic Street
Springfield, Oregon
P.O. No.: Permit No.:
Type of Structure: Weather: Overcast
Type of Inspection: Reinforcing Steel and
Reinforced Concrete
Field Observations and Comments
. Performed visual inspection of reinforcing steel at the following locations: Inspected reinforcing at the following footings'
at gridlines A at 2, B at 2, C at 2, and D at 2 and A to D at 3 prior to placement of concrete. Anchor bolts installed per
plan. Reinforcing steel was checked for grade, size, lap, placement and clearances where applicable. Reinforcing steel
was secured using tie wire and supported on concrete dobie blocks. Reinforcing steel was placed in accordance with
latest revisions dated 03-19-08. Performed visual inspection during placement of concrete in the locations listed above.
Concrete was placed by mixer chute and mechanically consolidated. Cast one (1) set of four (4) (4" x 8") concrete test
cyliners. To the best of our knowledge, the work inspected above was in accordance with the building department
approved design drawings, specifications and applicable workmanship provisions of the International Building Code.
The Contractor was asked to notify our office when additional services are needed.
Tv"" of Materi"J Concr"tett1.
Supplier Eugene S&G
Mix# 313065
Slump 3 1/4".
Air Content 5.2%
Ambient Temperature 67"
Material Temperature 70"
Time Placed 3:20 PM
Design Strength (psi) 3000
Number of Samples 4
Total Yardage Placed 16
Inspector: Glenn Meeks, Jr.
CCB# 176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully SUbfd'
l rofession se~vi:~ /ndlITs, Inc
David Smith .:
Project Manager
cc: North Star Construction
City of Springfield
2CS Engneering, Inc.
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541/746.9649. Fax 541/746-7163
'n6.'InfornuJlion
1~~!l7bBuild On
I!ng.. ,.,1, . COfISlIIfIng . 1MUns
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746,9649, (541)746,7163 fax
CCB #176269
Client: North Star Construction Service
Address: 303 N 10th St, #1
Ozark, MI 65721-0326
Laboratory Soil / Aggregate Data:
Moisture Density Relationship of 135 Ibs.lcu.ft., at 7% moisture, is from our report number 722-80217-3, dated 11-21-07 from Coburg Quarry for 3/4"-0 (T-180)
Project No.: 722_80217-11
Project: Abby's ( Sonic
Project 2005 Olympic
L9cation: .Springfield, Oregon
Equipment: Troxler: 3430 SN: 61175
Date Performed:
P.O. No.:
B.P. No.:
Technician:
October 13, 2008
Mike Wright
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 684 OS 2675)
Test No:
Approximate Test Location
Approximate Test
Elev.
Northeast corner of building pad
2 Northwest corner of building pad
'3 South side of building pad I
Tests performed at finished grade of base rock at listed locations above.
Tests were reported to Contractor with Beckley.
FRG
FRG
FRG
Probe Wet Density Dry Density Percent Percent Required Comments
Depth LBS/CU.FT. LBS/CU.FT. Moisture Compaction Compaction
10" 144.0 137.0 5.1 98.5 95%
10" 148.2 140.8 5.3 104.3 95%
-
10" 145.3 137.8 5.4 102.1 95%
cc:
North Star Construction
City of Springfield
2CS Engneering, Inc.
Respectfully Submitted
i;;;/I;7'"'
David Smith
Department Manager
THIS REPORT is PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPTlN FUL~ IS PROHIBITED
WlmOUT T~IE WRF!TEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. .
Slump (in.): ASTM Cf43
Max. Aggr. Size:
,Air Content: ASTM C231
Air Temperature (F):
"Material Temp. (F): ASTM CI064
Max Temp IF}:
,Min Temp iF):
Specimen Size:
Unit Weight (pcf): ASTM C138
Time Cast: 11 :30 AM Curing 'Conditions:
Additives: 'AEA - Hot water - Fiber yellow
Results Reported To: Contractor
C617-0J . C1231-03
8.2 42,760 3,420 3 I 10:14AM X
1 I
J I I
I 1 1
l"tfI:!!i!'-lIn/onnation
~~. 7bBuild On
Eng-" " . lns . c:--IIUng . T... . "J. ."
, COMPRESSION REPORT
Client:
Address:
North Star Construction Service
718 7th Ave SW
Ozark, MI 66721-0326
Project No.: 722-80217-21
Proj. Name: Abby's/Sonic
Location: S . f' Id '0
pring Ie , regon
'''~'acement.Data:
Southside driveway.for drive-'up window
Materiar: Concrete
Location Sampled At:
West end of Driveway
Dale Cast: 11/07/08
Ticket No.: IMiX No.:
58006041 31356S
~
Yardage
1
10
Date Rec'd:
Weather:
11/08/08
load:
Total:
Supplier:
Eugene Sand & Gravel
Overcast
Desiqn Strength (psi): 3500 reauired 3,500
"
Cylinder No. Test Date Age (days) Field Cure lab Cure (days)
(days)
08-3527 11/1412008-" 7 -I 1 6
08,3528 12/5/2008 1 28 1 '1 I 27
- I I I
08-3529 12/5/2008 28 27
08-3530 H H I 1 H
Compressive Strength Data ASTM C39
olaced
,
Dlameter or
Dimensions
(inches)
Cross Sect.
Area (s.i.)
Cylinder WT.
(Ibs.)
Max. load (lbs.J
3.99 12.51
*"1 - Cone (both ends) 2 - ConeNerticalCracks (one end) 3 ~ Columnar
Remarks:
4 - Diagonal wino craking a-t ends
5 - Side fractures (at top of bottom)
c: North Star Construction - Services, LLC
City of Springfield
2CS Engineering, Inc.
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649. (541)746-7163 fax
November 25, 2008 CCB#176269
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Field Test Data
51/4"
3/4"
4.0%
62'
73' '
4x8"
1 day. tield cure, remainder ASTM
Compo Strength Fracture Type
(psi)
Tesf Time
Capping Method
6 - Top fractures (same- as #5 but end of cylinder is pain ed)
Resp,ctfully ~dl';;~ted,.
pr~€AoiICS Industries, Inc.
sdJen E. Wilder
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT GNL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRJES
n="::.,Information
II:!!.: ::-, To Build On
1/f!Itg, ""'IS. eor.utung . ~
Client:
Address:
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649. (541)746-7163 fax'
November 21, 2008 CCB#176269
North Star Construction Service
718 7th Ave SW
Ozark, MI 66721-0326
Placement Data:
Westdriveway slab
Project No.: 722-80217-18
Proj. Name: Abby's/Sonic
Location: Springfield, Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong.
Material: Concrete
Field Test Data
4"
3/4"
3.5%
37"
730
,~
'Slump (in.): ASTM Cf43
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
.Max Temp (F):
Min Temp IF):
--
Specimen Size:
Unit Weight (pcf): ASTM Cf38
Time Cast: 7:45 AM
Additives: . Fiber
Results Reported To:
Location Sampled At:
Middle of west driveway
Date Cast: 10/23/OR
Ticket No.: /MiX No.: -
58005696 31306S
,~
DesiRn StrenRth (psi):
Cylinder No.
08-3302
08-3303
08-3304
08-3305
Test Date
10/30/2008
11/20/2008
11/20/2008
natf! Rec'd:
Weather:
Yardage
4
10
1 day fleld cure, remainder ASTM
4x8"
Load:
Total:
Supplier:
Eugene Sand & Gravel
1 0/24/08
Curing Conditions:
Fog
roy w/Nbrthstar
3500 reQuired 3,500
Compressive Str,!ngth Data ASTM C39
placed.
~
Diameter or Cross Sect. Cylinder WT. Compo Strength Fracture Type Capping Method
Dimensions Max. Load (Ibs.) Test Time
(inches) Area (s.i.) (Ibs.) (psi)
C617-03 C1231-0J
3.98 12.44 8.5 43,490 3,500 3 3:30PM X
3.99 12.51 8.5 59,785 4,780 2 1:25 PM X
3.99 12.51 .8.5 62,070 4,960 2 1:30 PM X
Age (days)
Field Cure
(days)
Lab Cure (days)
7
28
28
H
6
27
27
~"1 - Cone (both ends) 2 -ConeNertical Cracks (one end) 3 - Columnar 4 - Diagonal wIno craking at ends 5"- Side fractures (al top of bottom)
Remarks:
c:
6 ~ Top fractures (same"as #5 but end of cylinder is painted)
Resq ~tfully Sub ted,
Pro P 'Jlonal Ser es Industries, Inc.
Ii Iv
Steven E. Wilder.
Laboratory Supervisor
North Star Construclion - Services, LLC
City of Springfield
2CS Engineering, Inc.
THIS REPORT /s PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL y: THE REPRODUCTION OF THIS REPORr BY ANY METHOD, AND ITS TRANSMITTAL ro A THIRD PARTY BY ANY MEANS EXCEPT IN'FULL. is
PROHiBITED WITHOUT THE WRITTEN
. PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES