HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-5-15 .\ \ " ( K & A Engineering, Inc. 3327 Roanoke Ave., Eugene, OR 97408 (541) 684-9399 Voice (541) 684-9358 FAX -a l'nginel'ring May 15, 2007 <::;. Project: 151.06 Hayden Enterprises, inc, 2464 SW Glacier Drive #110 Redmond, OR 97756 Subject: Jasper Meadows subdivision--Lot 214 Springfield, OR Foundation Soils PURPOSE AND SCOPE At your request, K & A Engineering, Inc. has completed a geotechnical investigation of the existing soils on the subjectpLope[!y Our understRnding is that a wood-framed single-family residence supported bya cast-in- place concretespreadJootingfoundatiDnispropos~Qfor goQ?t[ugJi.qn, on this site.. The purpose of our investigation was to determine the suitability of the soils for construction of the proposed structure, and provide recommendations for construction of the foundation. The scope of our services is limited to general suitability with respect to bearing capacity and expansive soils. FOUNDATION PAD PREPARATION The project site is located on a residential lot in the new "Jasper Meadows" subdivision. The lot is mostly level and there are no apparent slope movement hazards. Foundation preparation involved constructing a level foundation pad on native. undisturbed soils. This required excavating and removing approximately 18 to 24-inch of loose organic silt from the foundation pad area. After the excavation and removal of these soils, approximately 12-inches of 3;4-inch minus dense graded crushed aggregate was placed and compacted over 3.0 to 4.0-feet of 8-inch minus "pit run" fill. This served to provide a uniform surface for footing construction. The fill materials were placed in maximum lifts of 12-inches and compacted using a Vibratory steel drum roller. We tested the in-place density of the crushed aggr~gate fill and have determined that the average dry density exceeds 95% of maximum as deten;lined by ASTM 0698. The field test results are attached to this report. K & A Engineering, Inc. SUMMARY AND RECOMMENDATIONS The project site, as prepared, is suitable to support the proposed foundations, We recommend a design allowable bearing capacity of 2,500-pounds per square fool. The soils present a moderate.shrink/swell hazard, Foundation loads should bear on undisturbed native silts a minimum depth of 36-inches below final grade around the perimeter foundation. The prepared foundation pad meets these recommendations, . Final grading around the foundation pad should raise the grade above the foundation using native or imported silts and should slope away from the foundation. ' . . We recommend approval of the foundation pad, as constructed, by the building official. Thank you for the opportunity to be of service. Please call us if you have questions or need further assistance. Respectfully, Steve Schultz, E.I.T. K & A Engineering, Inc, EXPIRES 'IDEe '30 200e .' . Revised on 11/19/07 due to the platted lot numbers being different than the .design lot numbers. Client: Hayden Enterprises Jasper Meadows-Lot 214, Springfield, OR Project: 151.06 Page 2 of 2 May 15, 2007 Density of Soil and Soil-Aggregates In-Place ASTM 02922 and 03017 Proiect: 151.06 Site Address: Jasper Meadows--Lot 214 Permit No: Date: 15/9/2007 Density TeslType1: DT-6 Dperator: SS Material Type:~ 3/4" (-) from Springfield Quarry Maximum Dry Denstiy, pcf 128,0 Standardization and Reference Check A Density (Standard Deviations) (S.D.) 1.71 IA Moisture, I (S.D:) Moist Dry Density, Density, Water Compaction, Test No. pcl pcl Content, % % Remarks 1 137.7 129,5 I 6.3 101.2% 2 126.7 119.9 I 5.7 93.6% 3 132.1 124.7 5.9 97,5% I Average: Std. Dev.: I 97.4% 3.78% . 1.53 I . I I I I I I I I 1 Direct Transmission (DT) (specify depth, in.) or Air Gap Backscatter (AGB) (specifiy(T)ouchable or (U)ntouchable mode Test performed using Seaman Nuclear Corp model C-300, SN 21113 Client: Hayden Enterprises. Inc. projW: 151.06 K & A Engineering, Inc. 11/19/2007 B - Backfill Checklist Backfill Backfill Backfill' Backfill Backfill Backfill Backfill Backfill Backfill \ \ 'e.1 of 1 ,,-~ 202 . ':20tj 206 "208 ~~ 210 . ':g12 214 216 218 Quqlity Insp>ection Template Proper Drainage .has been achieved . --,.'. ..,-'-....... -'-' "."" ..' ~ . ;\G~r~ge;has proper compaction Property Pins are staked >/F6L~HatiOn v'erits are clean Foundation has been inspected for damage {',+2&n;qitp~~~have.been compacted Concrete prep is complete ..... '. ". '- " ,::''';''~~'''' "'-";';1 :;"... , " "iDllstG6ntrol in place ............;."...-e",.,,,...,. FRAMER PACK COMPLETE plans, options... P\J\\ b~h~i fov~...h.cr"\~rol"'\ bcic.k o~ fhrcr\y lire. . , Printed: 11/9/2007 Project Man~ger . ,.," ,.. ''',-'',''',' 'Project Mar;ager Project Manager . - '" -',"'... . ""'. - . 'ProjectMaj1ager,' . ProjectM~na~er ~ .. ''Pr.6jectM.ar'i~g~r :;; Project Manager , . ~" ....1 .,n': '\.~._..'''' 'project Man8'g(;i/ . ',. ". -, ". ,~ .'''." Project Manager " 11/20/2006 .QualitylnspectionReport.rpt Report Layout an:d Design Copyright 2006 CPS (916) 635-3487 A - Pre Start List Pre Start Pr~St;:lI-t Pre start , P~e;Stild . Pre Start p\-eStiirt Pre Start pre'~t~r,t.. Pre start ''''.:''-''''",_, Pre.$tarr Pre Start Page 1 of 1 ,. ,- ~.'., ;. '. ~ ~-{-,,- 102 19.4 ~. .~' 106 ':,1q8:' 110 ;'1.12 " 114 118 124 Printed: 11/9/2007 Quality Inspection Template Lot signage in place . : ,j~mppower Pre Release Check List ',:Stake Lot Scheduled Project Manager .;;~~f6;~riM~rigg~r' ....~~ Project Manager :,-".'., "~',~ -..:\ -.",.,- , ," :'~-;' ':", ". 'ilf?r9ject:M~l!iager" . "..-. ........'...., "".', " Checks Submitted for Permits/Utilities '" . .p~~j~~t M~n~.ger . .. .. , - '.. . ." ", '.. ..'" '-'. ,'.. :. ....... >., .. ~,,-,,; >, .... ,,.' -..,,", ,',W'.' ",,'" .'. ',.'f?I<3,ns ,have been submitted to City (with c6rrecr6Rti9n:;.ei,2j~St:rv1~"ri!lg~r.. '. Push-out has been scheduled Project Manager ;.;Q;t'~i11 Engineering ::::~":~;i/riBt9j~S!M~K.~g~};' Property Pins have been properly staked Project Manager ...-..',;-::~: "- _ _.: .":r';'-ic-:,,,-.",.~;i:'H"'~''''_~':-<r,i':,~,., ~ . , . . i;P~r,mits / Address have been posted .t'c':gr,\?j,~~~',Man,<fu~r..';::' Dust Control in place Project Manager './. " 11/20/2006 QualitylnspectionReport:rpt: Report Layout and Design Copyright 2006 CPS (916) 635-3487