K & A Engineering, Inc.
3327 Roanoke Ave., Eugene, OR 97408
(541) 684-9399 Voice
(541) 684-9358 FAX
engineering
February 6, 2008
Project: 151.06
Hayden Enterprises, Inc.
2464 SW Glacier Drive #110
Redmond, OR 97756
Subject: Jasper Meadows subdivision--Lot 224
Springfield, OR
Foundation Soils
PURPOSE AND SCOPE
At your request, K & A Engineering, Inc. has completed a geotechnical investigation of the existing soils on the
sUbject property. Our understanding is that a wood-framed single-family residence supported by a cast-in-
place concrete spread fooling foundation is proposed for construction on this site.
.,~
,
The purpose of our investigation was to determine the suitability of the soils for construction of the proposed
structure, and provide recommendations for construction of the foundation. The scope of our services, is limited
to general suitability with respect to bearing capacity and expansive soils.
~
FOUNDATION PAD PREPARATION
The project site is located on a residential 101 on the east side of 58"' Street in the new "Jasper Meadows'
subdivision. The stte is mostly level and there are no apparent slope movement hazards. There is a drainage
ditch just east of fhe subject site.
Foundation preparation involved constructing a level foundation pad on native undisturbed soils, This required
excavating and removing approximately 1 to 2-feet of dark brown/black, wet, loose, organic si~, down to tan,
moist, moderately stiff, weathered sandstone, After the excavation and removal of the unsuitable subgrade
soils, approximately 10 to l8-inches of 'I.-inch minus dense graded cruShed aggregate was placed and
compacted in the foundation pad area. This served to provide a uniform surface for footing construction. The
fill materials were placed, graded, and then compacted using a vibratory steel drum roller.
We tested the in-place density of the crushed aggregate fill and have determined that the average dry density
exceeds 95% of maximum as determined by ASTM 0698. The field test results are attached to this report~
- ~---:.,
-~
. .
---,~
.F eb. 7 2008 8: 55AM
No, 2355 . P. 6/16
K & A'Englneering, Inc.
SUMMARY AND RECOMMENDATIONS
The project site', as prepared, is suitable to support the proposed foundations. We recommend a design
allowable bearing capacity of 1 ,500-pounds per square foot.
The soils present a moderate shrink/swell hazard. Foundation loads should bear on undisturbed native sills a
minimum depth of 24-inches below final grade around the perimeter foundation~ The prepared foundation pad
meets these recommendations.
Final grading around the foundation pad should raise the grade above the foundation using native or imported
silts and should slope away from the foundation.
We recommend approval oflhe foundation pad, as constructed, by the building official.
LIMITATIONS OFTHIS REPORT
, ,
ThiS report has been prepared for the exclusive use of Hayden Enterprises, Inc. and its design consullants for
the subject proposed structure.
This geotechnical investigation, analysis, and recommendations meet the standards of care of competent
geotechnical engineers providing similar services at the time these services we're provided. We do not warrant
or guarantee these recommendations, site sUrface,.or subsurface conditions. The scope of our services does
not include construction safety precautions, techniques, sequences, or procedures, except as specifically
recommended in 1his report, Our services should not be interpreted as an environmental assessment of site
conditions,
ThanK you for the opportunity to be of service. Please call us if you have questions or need further assistance~
. .. ,
-..'"
Steve Schultz, E.1.1
K & A Engineering, Inc,
'Client: Hayden Enterprises Jasper MeadOWS-lot,224, Springfield, OR
Project: 151.06
Page 2 of 2
February 6, 2008
'Feb. 7, 2008 8:55AM'
No. 2355' P. 7/16
.Denslty 01 Soil and Soli-Aggregates In-Place
ASTM,D2922 and 0.3017
,
I Proiect: 151.06
I Sile Address: Jasper Meadows--Lot 224
I Permit No:
I Dale: 2/5/2008
I DensityTeSlTv~e':IDT-6
I Operalor:!SS
I Malerial TYlle:13/4.inch minus dense graded crushed aggregate
I MaXimum Dry Denslly, pcl 128.0
I Standardization and Reierence Check'" Density ,:,1 I'" Moisture, I
(Standard Oeviations) (S.D.) '0:61 (S.D:) 1.02
Moisf Dry
Density, Density, Watel Compaction,
Test No, pel pcl Contenl. % % Remarlls '
1 142.4 I 125.7 133 98.2%
2 133.7 I 119.3 12,1 93.2%
3 134.9 1196 12.8 93.4%
I I
I I
.
) I
I
I
I
I
I
I I I
I I I
I I I
I I
,I I I 'lit
,
I I' . I
I I,
I I
I I
Average: 95%
Std. Dev.: 2.62%
, Direct Transmission (DT) (specify depth, in.)or Air Gap Backscatter (AGB) (specifly(T)ouchable or (U)ntouchable
mode
Test performed USing Seaman Nuclear Corp model C.300, SN 21'13
Client: Hayden Enterprlses,lnc.
Project: 151.06
K & A Engineering, Inc.
2/6/2008