COMPRESSION REPORT
(<t-J1-'
~n 01'1""/' 'e-
~
Client:
Address:
North Star Construction Service
718 7th Ave SW
Ozark, MI 66721-0326
Project No.: 722-80217-10
Proj. Name: Abby'slSonic
Location: Springfield, Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Dale Russell
Placement Data:
Curb at North West Drive way.
West end of building.
Material: Concrete
Island 15' off North West corner of building. Side walk-on
Location Sampled At:
Sidewalk west of building
Date Cast: 10/08/08
Ticket No.: IMiX No.:
58005371 313065
IIII
Sunny
koad:
Total:
Supplier:
Eugene Sand & Gravel
Dote Ree'd: 10109/08
Weather:
Yardage
1
5
SPRINGFIELD OFFICE
1040 - A Shelley Street"
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
October 21, 2008 CCB#176269
Stump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C10B4
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pel): ASTM C138
Time Cast: 12:25PM
A.dditives: w/air/Fiber
Results Reported'To:
Field Test Data
4
314"
48.6
63.8
4x8"
Curing Conditions:
1 day field cure, remainder ASTM
Contractor
Desirm Strenflth (psil:
3000 reauired 3.000
Compressive Strength Data ASTM C39
olaced
Cylinder No.
Field Cure
(days)
Diameter or
Dimensions
(Inches)
Cross Sect.
Area (s.l.)
Test Date
Age (days)
Lab Cure (days)
08-3059
1011512008
7
6
4.01
12.63
08-3060 111/1512008 28 27
08-3061 I 1111512008 28 27
08-3062 I H
... 1 - Cone (both ends) 2 - ConeNertical Cracks (one end) 3. Columnar 4 - Diagonal wino craking at end-=
Remarks: Truck was late
c:
North Star Construction - Services, LLC
City of Springfield
2CS Engineering, Inc.
Cylinder WT.
. (lb..)
Compo Strength 'Fracture Type
Max. Load (Ibs.) (psi)
Test Time
Capping Method'
C617-03
, C1231-03
10:11 AM I
I
I
x
8.5 32,460
2,570
5
5 - SIde fractures (at lop of boltL;n)
6 - Top frac.ures (same as #5 but end of cylinder is poinled)
]e ~fr~:~UIlY Submitted,
Pr A:v~ ~7!l:lndustries, Inc.
even E. ~~r
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORIo.1A TlON OF THE CLIENT ONL y, THE REPRODUCTfON OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL.
IS PROHIBITED WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
,
l' ....~.,Inform.ation
,.,.... To Build On
1I!ntg1ne" '''., . ~ . "-t6-.1
Client:
Address:
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street.
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
October 30, 2008 CCB#176269
North Star Construction Service
718 7th Ave SW
Ozark, MI 66721-0326
Project No.: 722-80217-15
Proj. Name: Abby'slSonic
Location: Springfield, Oregon
Date:
B.P. No.:
P.O. No.:
Cast By:
Glenn Meeker, Jr.
Yardage
1
16
Slump (in.): A$TM C143
Max. Aggr. Size:
A.lr Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Mln Temo (F\:
Specimen Size:
Unit Weight (pel): ASTM C138
Time Cast: 3:20 PM
Additives: Fiber
Results Reported To:
Field Test Data
3114"
314"
5.2%
67"
70"
690
.560
4x8"
Placement Data: Material: Concrete
Abby's pizza foolings A @ 2, B @ 2, C @ 2, 0 @ 2 and A to B @ 3
location Sampled At:
Footing A, B, C & 0 at 2 and A to B @ 3
Dale Casl: 10/15108 Date Ree'd: 10116108
Ticket No.: IMiX No.: Weather:
60008850 313065 Overcast
Load:
Total:
Supplier:
Euoene Sand & Gravel
,
Contractor
Curing Conditions:
1 day field cure, remainder ASTM
Desi!:)n Stren!lth (psi):
3000 reauired 3.000
Compressive Strength Data ASTM C39
Dlaced
Diameter or Cross Sect. Cylinder WT. Compo Strength Fracture Type Capping Method
Dimensions Ma,,:. Load '(Ibs.) Test Time-
(inches) Area (sol.) (Ibs.) (ps;) ..
C617.03 C1231-03
3.99 12.51 8.4 31,380 2,510 2 3:27PM X
3.99 12.51 8.4 49,875 3,990 3 9:18AM X
3.99 12.51 8.4 . 46,430 3,710 3 9:53 AM X
Cylinder No.
08~3155
08-3156
08-3157
08-3158
Test Date
Field Cure
(days)
Lab Cure (days)
Age (days)
1012212008
11/1212008
11/12/2008
7
28
28
H
6
27
27
u 1 - Cone (both ends) 2. Con~Nertical Cracks (one end) 3 - Colun:mar 4 - Diagonal wIno craking at ends 5. Side fractures (at top of bottom)
Remarks: Truck was late
c:
North Star Construction - Services, LLC
City of Springfield
2CS Engineering, Inc.
6 - Top frac ures (same as #5 but end of cylinder is pair led)
Res~;:~~IIY sU~1~~:~~( .
pr;;A;:i'~dustries, Inc
Sle/en E. Wilder
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD: AND ITS TRANSMlrTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
. PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
l....~.lInformation
I-!""!?!'- To Build On
I/!ngIne , I , .. . C' J -16.. . 'ftI.....
Client:
Address:
COMPRESSION REPORT
North Star Construction Service
718 7th Ave SW
Ozark, MI 66721-0326
Project No.: 722-80217-15
Proj. Name: Abby'slSonic
Location' .
. Springfield, Oregon.
'Placement Data: Material: Concrete
Abby's pizza footings A @ 2, B @ 2, C @ 2, 0 @ 2 and A to B @ 3
Yardage
1
16
Slump (In.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM Cl064
Max Temp (F):
Min Temo (F~:
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 3:20 PM
Additives: Fiber
Results Reported To:
location Sampled At:
Footing A, B. C & 0 at2 and A to B @ 3
Oate Cast: 10115/08 Date Ree'd: 10116/08
Ticket No.: !MiX No.: '-" Weather:
60008850 :11 :1065 Overcast
. ...
Load:
Total:
Supplier:
Eugene Sand & Gravel
DesiQn Strenath (osi\:
I "
3000 re9uired ~OOO
Compressive Strength Data ASTM C39
olacp.d
. 11..1
Cylinder No.
08-3155
08-3156
08-3157
08-3158
Diameter or Cross Sect. Cylinder WT. Compo Strength Fracture Type
Dimensions Area (5.1.) (Ibs.) Max. load (Ibs.) (psi) .. Test Time
(Inches)
3.99 12.51 8.4 31,380 2,510 2 3:27PM
Test Date
Field Cure
(days)
Lab Cure (days)
Age (days)
10/22/2008
1111212008
11/12/2008
7
28
6
27
27
28
H
H 1 - Cone (both ends) 2 - ConeNertical Cra(..~s (one end) 3. Columnar 4 - Diagonal wIno craking at ends
Remarks: Truck was late
c:
5. Side fractur~s (at top of bottom)
North Star Construction - Services, LLC
City o( Springfield
2CS Engineering, Inc.
,
SPRINGFIELD OFFICE
1040. A Shelley Street"
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
October 30, 2008 CCB#176269
Date:
. B.P. No.:
P.O. No.:
Cast By:
Glenn Meeker, Jr.
Field .Test Data
3114"
314"
5.2%
61'
70'
69'
56'
4x8"
Curing Conditions:
1 day field cure, remainder ASTM
Contractor
Capping Method
C617-03
C1231-0J
x
6 - Top fractures (same as #5 but end of cylinder is pain ed)
R~~ectfully Submitted,
F[ rSSic;a:/rrVices.'ndustries, Inc.
4~~ 'Peil;;--
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLlENTONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN.
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
"~;ZIriformation
l~~. ToBuildOn
/l!ngIna__"_ . ~ . n.tIng
Client:
Address:
North Star Construction Service
718 7th Ave SW
Ozark, M166721-0326
.Placement Data:
West driveway slab
COMPRESSION REPORT
Project No.: 722-80217-18
Proj. Name: Abby's/Sonic
Location: Spri~gfield, Oregon
Material: Concrete
Yardage
4
10
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM Cl064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pef): ASTM C138
Time Cast: 7:45 AM
Additives: Fiber
Results Reported To:
Location Sampled At:
Middle of west driveway
Date Cast: 10123/08 Date Rec'd: 10/24108
Ticket No.: IMiX No.: Weather:
58005696 313065 Fog
.~
Desi!ln Stren!lth (psi): 3500 reauired 3 500
,
Cylinder No. Test Date Age (days) Field Cure Lab Cure (days)
(days)
08-3302 10/30/2008 7 6
08-3303 11/20/2008 28 27
08-3304 11/20/2008 28 27
08-3305
H
h 1 - Cone "(both ends) 2 - ConeNertical Cracks (one end) 3 _ Columnar
Remarks:
c:
North Star Construction - Services, LLC
City of Springfield
2CS Engineerin9, Inc.
!=llameler or Cross Sect. Cylinder WT. Compo Strength Fracture Type
Dimensions Max. Load (Ibs.) Test Time
(inches) Area (5.1.) (Ibs.) (psi)
3.98 12.44 8.5 43,490 3,500 3 3:30PM
Load:
Total:
Supplier:
Eugene Sand & Gravel
Compressive Strength Data ASTM C39
olaced
4 -_Diagonal wIno craki.ng at ends
,
5 - Side fractu,es (at top o~ bottom)
SPRINGFIELD OFFICE
1040 - A Shelley Streel
. Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
November 3, 2008 CCB#176269
Date:
B.P. No.:
P.O. No.:
Cast By:
Pete Furlong
Field Test Data
4"
314"
3.5%
37'
73"
4x8"
Curing Conditions:
1 day field cure, remainder ASTM
roy wlNorthstar
Capping Method
C617-03
C1231-03
x
6 - Top fractures (same as #? but end of cy~nder is poir"ed)
'R~S ~fUIlYSUb~:~~,
Pr ional :;J; ~dustries, Inc.
S v E. ~der
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONt Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.